Federal contract award

NNG13FB20C

IGF::OT::IGF THE AFT OPTICS SYSTEM(AOS) SOURCE PLATE ASSEMBLY (ASPA); TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING; AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR S SHALL PROVIDE THE SYSTEMS ENGINEERING; EXPERT PERSONNEL; TRAVEL; REPORTS AND DOCUMENTATION; SOFTWARE OR SOFTWARE CHANGES; GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541330 — Engineering Services
PSCAR23 — SPACE SCIENCE AND APPLICATIONS - ADVANCED DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$66.3M
Current contract value$66.4M
Potential contract value / ceiling$66.4M
Start dateSep 4, 2013
Current end dateJun 30, 2023
Potential end dateJun 30, 2023
Latest award activityJul 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 27, 202687$0THE AFT OPTICS SYSTEM (AOS) SOURCE PLATE ASSEMBLY (ASPA) TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR'S SHALL PROVIDE THE SYSTEMS ENGINEERING EXPERT PERSONNEL TRAVEL REPORTS AND DOCUMENTATION SOFTWARE OR SOFTWARE CHANGES GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED.
Jun 30, 202686$50.8KTHE AFT OPTICS SYSTEM (AOS) SOURCE PLATE ASSEMBLY (ASPA) TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR'S SHALL PROVIDE THE SYSTEMS ENGINEERING EXPERT PERSONNEL TRAVEL REPORTS AND DOCUMENTATION SOFTWARE OR SOFTWARE CHANGES GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED.