Federal contract award
NNG13FB20C
IGF::OT::IGF THE AFT OPTICS SYSTEM(AOS) SOURCE PLATE ASSEMBLY (ASPA); TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING; AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR S SHALL PROVIDE THE SYSTEMS ENGINEERING; EXPERT PERSONNEL; TRAVEL; REPORTS AND DOCUMENTATION; SOFTWARE OR SOFTWARE CHANGES; GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541330 — Engineering Services |
| PSC | AR23 — SPACE SCIENCE AND APPLICATIONS - ADVANCED DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $66.3M |
| Current contract value | $66.4M |
| Potential contract value / ceiling | $66.4M |
| Start date | Sep 4, 2013 |
| Current end date | Jun 30, 2023 |
| Potential end date | Jun 30, 2023 |
| Latest award activity | Jul 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 27, 2026 | 87 | $0 | THE AFT OPTICS SYSTEM (AOS) SOURCE PLATE ASSEMBLY (ASPA) TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR'S SHALL PROVIDE THE SYSTEMS ENGINEERING EXPERT PERSONNEL TRAVEL REPORTS AND DOCUMENTATION SOFTWARE OR SOFTWARE CHANGES GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED. |
| Jun 30, 2026 | 86 | $50.8K | THE AFT OPTICS SYSTEM (AOS) SOURCE PLATE ASSEMBLY (ASPA) TINSLEY CLOSEOUT, OPTICAL INTEGRATION AND TESTING AND SPECIAL STUDIES, FOR THE JAMES WEBB SPACE TELESCOPE. THE CONTRACTOR SHALL DESIGN, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, AND TEST THE HARDWARE DESCRIBED IN THE STATEMENT OF WORK (SOW). THE HARDWARE, IF USED INSIDE A VACUUM CHAMBER OR IS ATTACHED TO, OR CONTROLS FLIGHT HARDWARE, MUST COMPLY WITH THE REQUIREMENTS IN THE SOW. FOR NON-HARDWARE SUPPORT ASPECTS OF THIS EFFORT, THE CONTRACTOR'S SHALL PROVIDE THE SYSTEMS ENGINEERING EXPERT PERSONNEL TRAVEL REPORTS AND DOCUMENTATION SOFTWARE OR SOFTWARE CHANGES GROUND SUPPORT EQUIPMENT INTEGRATION, OPERATIONS AND MODIFICATION DEFINITION, NECESSARY TO ACCOMPLISH THE EFFORT. THE CONTRACTOR SHALL MANAGE ALL ASPECTS OF THIS CONTRACT EFFORT TO ENSURE THAT THE CONTRACT REQUIREMENTS ARE MET OR EXCEEDED. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.