Federal contract award
NNG14FC03C
TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 611310 — Colleges, Universities, and Professional Schools |
| PSC | 1810 — Space Vehicles |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $110.1M |
| Current contract value | $110.1M |
| Potential contract value / ceiling | $110.1M |
| Start date | May 22, 2013 |
| Current end date | Dec 1, 2026 |
| Potential end date | Dec 1, 2026 |
| Latest award activity | Jul 27, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 69 of 69 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 27, 2026 | 68 | $1.4M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Jul 13, 2026 | 67 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Jun 30, 2026 | 66 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| May 29, 2026 | 64 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| May 29, 2026 | 65 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Mar 30, 2026 | 63 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Feb 11, 2026 | 62 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Sep 16, 2025 | 61 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Jun 16, 2025 | 60 | $3.7M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASES B-F OF THE TESS MISSION. THE CONTRACTOR SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE CONTRACTOR ALSO SHALL PROVIDE SCIENCE SUPPORT FOR THE TESS GUEST INVESTIGATOR PROGRAM AND RESPONSIBLE FOR THE DEVELOPMENT AND TEST OF HARDWARE AND SOFTWARE ASSOCIATED WITH THE SCIENCE OPERATIONS CENTER (SOC). |
| Apr 29, 2025 | 59 | $0 | REMOVAL OF CLAUSES IAW EO 14168, EO 14173, EO 14148, & EO 14208. |
| Mar 12, 2025 | 58 | $800.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jan 23, 2025 | 57 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jan 13, 2025 | 56 | $1.6M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Oct 24, 2024 | 55 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Aug 26, 2024 | 54 | $875.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Feb 7, 2024 | 53 | $3.3M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 25, 2023 | 51 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 25, 2023 | 52 | $4.8M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 29, 2023 | 50 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 15, 2023 | 49 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Feb 22, 2023 | 48 | $1.2M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Dec 15, 2022 | 47 | $920.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Nov 30, 2022 | 46 | $273.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 26, 2022 | 45 | $3.5M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Mar 17, 2022 | 44 | $1.8M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Nov 10, 2021 | 43 | $1.7M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 21-03) WITHIN SECTION I. TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Oct 18, 2021 | 42 | $0 | EO14042 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 21-03) WITHIN SECTION I. TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 24, 2021 | 41 | $340.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Mar 17, 2021 | 40 | $4.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Feb 16, 2021 | 39 | $1.7M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Dec 29, 2020 | 38 | $2.2M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Aug 27, 2020 | 37 | $163.9K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Apr 30, 2020 | 36 | $2.3M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Dec 20, 2019 | 35 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 11, 2019 | 34 | $100.1K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 23, 2019 | 33 | $3.3M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 19, 2019 | 32 | $215.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| May 8, 2019 | 31 | $260.6K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Apr 17, 2019 | 30 | $-260.6K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 28, 2018 | 29 | $1.8M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 27, 2018 | 28 | $80.3K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 5, 2018 | 27 | $6.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 2, 2018 | 26 | $4.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 18, 2018 | 25 | $312.3K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 15, 2018 | 24 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| May 8, 2018 | 23 | $144.4K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Apr 9, 2018 | 22 | $162.8K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 27, 2017 | 21 | $1.3M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 7, 2017 | 20 | $3.3M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 12, 2017 | 19 | $3.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Mar 29, 2017 | 18 | $3.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Feb 27, 2017 | 17 | $450.0K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Oct 18, 2016 | 16 | $4.5M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 9, 2016 | 15 | $1.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Aug 22, 2016 | 14 | $2.3M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Aug 15, 2016 | 13 | $1.2M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 28, 2016 | 12 | $3.5M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| May 24, 2016 | 11 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Mar 9, 2016 | 10 | $3.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Sep 1, 2015 | 9 | $4.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Aug 5, 2015 | 8 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 16, 2015 | 7 | $11.0M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Aug 26, 2014 | 6 | $2.4M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jul 17, 2014 | 5 | $8.9M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Jun 30, 2014 | 4 | $627.4K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| May 20, 2014 | 3 | $839.3K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Mar 31, 2014 | 2 | $0 | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Mar 27, 2014 | 1 | $-863.4K | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES; DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW; PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE; PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT; PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE); MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE; ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
| Nov 18, 2013 | 0 | $3.9M | TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2026-12-01 (37 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 69 recorded award transactions
- +10 points
- Latest award action: 2026-07-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.