NNG16VC39D
JUNIPER SWITCH AND OPTICS INCLUDING: EX 4550 32PORT 100M/1G/10G BASET CONVERGED SWITCH 650W (1 EACH) 650W AC POWER SUPPLY FOR EX455 AND QFX3500 PSU SIDE AIRFLOW INTAKE (1 EACH); PATCH CABLE C14 PDU (2 EACH); EX4550 8-PORT 10G SFP+ EXPANSION MODULE (1 EACH); 3YR J-CARE PREPAID NEXTDAY SUP FOR EX4550 (1 EACH); SMALL M FACTOR PLUGGABLE 10GB ENET SR OPTICS (2 EACH); AND SMALL M FACTOR PLUGGABLE 10GB ENET LR OPTICS (4 EACH).
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | GODDARD SPACE FLIGHT CENTER |
| NAICS | 334111 — Electronic Computer Manufacturing |
| PSC | 7035 — Information Technology Support Equipment |
| Parent award / vehicle | NNG15SD48B |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $26.8K |
| Current contract value | $26.8K |
| Potential contract value / ceiling | $26.8K |
| Start date | Dec 11, 2015 |
| Current end date | Jan 11, 2019 |
| Potential end date | Jan 11, 2019 |
| Latest award activity | Dec 11, 2015 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 11, 2015 | 0 | $26.8K | JUNIPER SWITCH AND OPTICS INCLUDING: EX 4550 32PORT 100M/1G/10G BASET CONVERGED SWITCH 650W (1 EACH) 650W AC POWER SUPPLY FOR EX455 AND QFX3500 PSU SIDE AIRFLOW INTAKE (1 EACH); PATCH CABLE C14 PDU (2 EACH); EX4550 8-PORT 10G SFP+ EXPANSION MODULE (1 EACH); 3YR J-CARE PREPAID NEXTDAY SUP FOR EX4550 (1 EACH); SMALL M FACTOR PLUGGABLE 10GB ENET SR OPTICS (2 EACH); AND SMALL M FACTOR PLUGGABLE 10GB ENET LR OPTICS (4 EACH). |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.