Federal contract award
NNG17FB00C
THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 336414 — Guided Missile and Space Vehicle Manufacturing |
| PSC | 1675 — Space Vehicle Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $139.8M |
| Current contract value | $154.2M |
| Potential contract value / ceiling | $154.2M |
| Start date | Dec 5, 2016 |
| Current end date | Feb 28, 2027 |
| Potential end date | Feb 28, 2027 |
| Latest award activity | Aug 7, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 70 of 70 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 7, 2026 | 69 | $712.2K | FUNDING ACTION ONLY TO INCREMENTALLY FUND TASK ORDER 2. |
| Jun 16, 2025 | 67 | $31.4K | FUNDING ACTION ONLY TO FULLY FUND TO3. |
| Jun 16, 2025 | 68 | $0 | INCORPORATE INTO THE CONTRACT FAR CLAUSE 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION APR 2026) |
| May 27, 2025 | 66 | $0 | REMOVAL OF CLAUSES/DRDS IAW E.O. 14173 AND E.O. 14168 |
| Apr 24, 2025 | 65 | $24.8K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Apr 1, 2025 | 64 | $500.0K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 13, 2025 | 63 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Feb 19, 2025 | 62 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jan 28, 2025 | 61 | $607.1K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Dec 16, 2024 | 60 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Oct 2, 2024 | 59 | $806.4K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Aug 22, 2024 | 58 | $4.9M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jul 26, 2024 | 57 | $1.0M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jul 19, 2024 | 56 | $206.0K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jul 10, 2024 | 55 | $206.0K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 13, 2024 | 54 | $3.5M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 16, 2024 | 52 | $68.8K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 16, 2024 | 53 | $956.6K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 7, 2024 | 51 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Apr 25, 2024 | 50 | $5.5M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Apr 3, 2024 | 49 | $5.5M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 27, 2024 | 48 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 13, 2024 | 46 | $61.4K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 13, 2024 | 47 | $1.2M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Feb 6, 2024 | 45 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jan 3, 2024 | 44 | $1.4M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Nov 20, 2023 | 43 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Sep 19, 2023 | 42 | $4.0M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 30, 2023 | 41 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 14, 2023 | 40 | $119.7K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 19, 2023 | 39 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Feb 7, 2023 | 38 | $190.6K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Sep 15, 2022 | 37 | $5.0M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Nov 24, 2021 | 36 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Oct 15, 2021 | 35 | $0 | EO14042 THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Oct 4, 2021 | 34 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 8, 2021 | 33 | $3.4M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Apr 16, 2021 | 32 | $40.3K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 10, 2021 | 31 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jan 26, 2021 | 30 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Dec 15, 2020 | 29 | $2.2M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Dec 2, 2020 | 27 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Dec 2, 2020 | 28 | $0 | COVID-19 INCORPORATE ADVANCE AGREEMENT MOD THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Aug 20, 2020 | 26 | $-4.2M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 10, 2020 | 25 | $4.6M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Feb 25, 2020 | 24 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Sep 10, 2019 | 23 | $15.0M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Aug 26, 2019 | 22 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Aug 16, 2019 | 21 | $20.0M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 25, 2019 | 19 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 25, 2019 | 20 | $1.2M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Apr 29, 2019 | 18 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Apr 23, 2019 | 17 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Nov 28, 2018 | 16 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Nov 8, 2018 | 15 | $18.8M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Aug 21, 2018 | 14 | $8.5M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jun 14, 2018 | 13 | $823.0K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 29, 2018 | 12 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 14, 2018 | 11 | $50.0K | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 15, 2018 | 10 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Feb 6, 2018 | 9 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Dec 29, 2017 | 8 | $2.5M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Nov 28, 2017 | 7 | $9.4M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Oct 2, 2017 | 6 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Aug 1, 2017 | 5 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Jul 17, 2017 | 4 | $9.2M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| May 23, 2017 | 3 | $3.0M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Mar 10, 2017 | 2 | $5.2M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Feb 6, 2017 | 1 | $0 | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
| Dec 5, 2016 | 0 | $3.5M | THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-02-28 (126 days from calculation)
- +35 points
- 8 historical awards in this buyer and category group
- +15 points
- 70 recorded award transactions
- +10 points
- Latest award action: 2026-08-07
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.