Federal contract award

NNG17FB00C

THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1675 — Space Vehicle Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$139.8M
Current contract value$154.2M
Potential contract value / ceiling$154.2M
Start dateDec 5, 2016
Current end dateFeb 28, 2027
Potential end dateFeb 28, 2027
Latest award activityAug 7, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 70 of 70 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 7, 202669$712.2KFUNDING ACTION ONLY TO INCREMENTALLY FUND TASK ORDER 2.
Jun 16, 202567$31.4KFUNDING ACTION ONLY TO FULLY FUND TO3.
Jun 16, 202568$0INCORPORATE INTO THE CONTRACT FAR CLAUSE 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION APR 2026)
May 27, 202566$0REMOVAL OF CLAUSES/DRDS IAW E.O. 14173 AND E.O. 14168
Apr 24, 202565$24.8KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Apr 1, 202564$500.0KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 13, 202563$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Feb 19, 202562$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jan 28, 202561$607.1KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Dec 16, 202460$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Oct 2, 202459$806.4KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Aug 22, 202458$4.9MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jul 26, 202457$1.0MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jul 19, 202456$206.0KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jul 10, 202455$206.0KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 13, 202454$3.5MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 16, 202452$68.8KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 16, 202453$956.6KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 7, 202451$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Apr 25, 202450$5.5MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Apr 3, 202449$5.5MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 27, 202448$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 13, 202446$61.4KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 13, 202447$1.2MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Feb 6, 202445$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jan 3, 202444$1.4MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Nov 20, 202343$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Sep 19, 202342$4.0MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 30, 202341$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 14, 202340$119.7KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 19, 202339$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Feb 7, 202338$190.6KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Sep 15, 202237$5.0MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Nov 24, 202136$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Oct 15, 202135$0EO14042 THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Oct 4, 202134$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 8, 202133$3.4MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Apr 16, 202132$40.3KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 10, 202131$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jan 26, 202130$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Dec 15, 202029$2.2MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Dec 2, 202027$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Dec 2, 202028$0COVID-19 INCORPORATE ADVANCE AGREEMENT MOD THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Aug 20, 202026$-4.2MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 10, 202025$4.6MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Feb 25, 202024$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Sep 10, 201923$15.0MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Aug 26, 201922$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Aug 16, 201921$20.0MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 25, 201919$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 25, 201920$1.2MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Apr 29, 201918$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Apr 23, 201917$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Nov 28, 201816$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Nov 8, 201815$18.8MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Aug 21, 201814$8.5MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jun 14, 201813$823.0KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 29, 201812$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 14, 201811$50.0KTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 15, 201810$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Feb 6, 20189$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Dec 29, 20178$2.5MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Nov 28, 20177$9.4MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Oct 2, 20176$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Aug 1, 20175$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Jul 17, 20174$9.2MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
May 23, 20173$3.0MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Mar 10, 20172$5.2MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Feb 6, 20171$0THE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.
Dec 5, 20160$3.5MTHE CONTRACTOR FURNISHES ALL THE NECESSARY PERSONNEL, FACILITIES, SERVICES, EQUIPMENT, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, AND DELIVER THE SPACECRAFT BUS, AND PROVIDE SERVICES SUCH AS INTEGRATION AND TEST OF THE RSV AT GSFC AND PERFORMANCE OF ON-ORBIT ACTIVITIES FOR THE INITIAL RESTORE-L REFUELING CAMPAIGN IN MID-2020. SINCE THE CONTRACTOR IS PROVIDING THE SPACECRAFT BUS, NASA INVOLVEMENT WILL BE TAILORED TO BALANCE THE LEVELS OF OVERSIGHT VS. INSIGHT NEEDED TO ASCERTAIN THE APPROPRIATE LEVEL OF RISK TO THE OVERALL MISSION.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-02-28 (126 days from calculation)
+35 points
8 historical awards in this buyer and category group
+15 points
70 recorded award transactions
+10 points
Latest award action: 2026-08-07
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.