Federal contract award
NNG17FC93C
IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing |
| PSC | AR32 — SPACE FLIGHT - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $12.1M |
| Current contract value | $12.1M |
| Potential contract value / ceiling | $12.1M |
| Start date | Mar 23, 2017 |
| Current end date | Sep 30, 2026 |
| Potential end date | Sep 30, 2026 |
| Latest award activity | Jul 17, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 38 of 38 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 17, 2026 | 37 | $254.7K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THE CONTRACTOR IS RESPONSIBLE FOR THE CONDUCT OF ALL PHASES & ASPECTS OF THE IBEX MISSION INCLUDING: 1)LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, & OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) & 3) POST-OPERATIONS DATA ANALYSIS & ARCHIVING. |
| Jun 22, 2026 | 36 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Apr 8, 2026 | 35 | $310.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Mar 6, 2026 | 34 | $135.2K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Feb 18, 2026 | 33 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Sep 30, 2025 | 32 | $533.2K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Sep 15, 2025 | 31 | $13.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jun 11, 2025 | 30 | $210.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Apr 29, 2025 | 29 | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14168, EO 14173, EO 14148, & EO 14208. THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Dec 23, 2024 | 28 | $648.2K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jul 22, 2024 | 27 | $270.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jun 27, 2024 | 26 | $373.3K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| May 9, 2023 | 25 | $874.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Sep 23, 2022 | 24 | $289.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Apr 12, 2022 | 23 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Feb 25, 2022 | 22 | $1.8M | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Dec 22, 2021 | 21 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Nov 10, 2021 | 20 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Oct 6, 2021 | 19 | $0 | EO14042 THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Aug 25, 2021 | 18 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jul 8, 2021 | 17 | $209.0K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Mar 11, 2021 | 16 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Sep 28, 2020 | 15 | $193.8K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jul 28, 2020 | 14 | $424.3K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jan 16, 2020 | 13 | $0 | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Sep 11, 2019 | 12 | $1.1M | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Aug 27, 2019 | 11 | $447.7K | THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Mar 27, 2019 | 10 | $500.0K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Aug 10, 2018 | 9 | $952.2K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Apr 10, 2018 | 8 | $0 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Feb 6, 2018 | 7 | $300.0K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Nov 30, 2017 | 6 | $200.0K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Nov 8, 2017 | 5 | $17.1K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Aug 22, 2017 | 4 | $0 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Aug 4, 2017 | 3 | $-19.3K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jun 14, 2017 | 2 | $892.3K | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Jun 12, 2017 | 1 | $0 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS); AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS; AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS; H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT; I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
| Mar 23, 2017 | 0 | $1.1M | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.