Federal contract award
NNJ15JM10T
IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA JOHNSON SPACE CENTER |
| NAICS | 541330 — Engineering Services |
| PSC | Z1NB — MAINTENANCE OF HEATING AND COOLING PLANTS |
| Parent award / vehicle | DEAM3609GO29030 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $44.8M |
| Current contract value | $139.1M |
| Potential contract value / ceiling | $139.1M |
| Start date | Aug 5, 2015 |
| Current end date | Jun 9, 2039 |
| Potential end date | Jun 9, 2039 |
| Latest award activity | Aug 20, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 131 of 131 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 20, 2026 | P00131 | $0 | COMBINED HEAT AND POWER PROJECT |
| Aug 6, 2026 | P00130 | $739.5K | COMBINED HEAT AND POWER PLANT |
| Mar 4, 2026 | P00128 | $11.1K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 23, 2026 | P00127 | $3.3M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 22, 2026 | P00126 | $710.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 31, 2025 | P00125 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 19, 2025 | P00124 | $1.4M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 2, 2025 | P00123 | $470.5K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 30, 2025 | P00122 | $1.8M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 19, 2025 | P00121 | $201.5K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 13, 2025 | P00120 | $202.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Apr 9, 2025 | P00119 | $185.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 13, 2025 | P00118 | $505.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 15, 2025 | P00117 | $721.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 20, 2024 | P00115 | $97.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 20, 2024 | P00116 | $360.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 11, 2024 | P00114 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 22, 2024 | P00113 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 18, 2024 | P00112 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 13, 2024 | P00111 | $405.3K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 24, 2024 | P00110 | $655.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 9, 2024 | P00109 | $245.4K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 21, 2024 | P000108 | $-44.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 21, 2024 | P00107 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 11, 2024 | P00106 | $955.8K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 29, 2024 | P00105 | $195.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 26, 2024 | P00104 | $863.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 13, 2024 | P00103 | $117 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 23, 2024 | P00102 | $573.5K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 14, 2023 | P00101 | $827.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 16, 2023 | P00100 | $433.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 13, 2023 | 99 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 12, 2023 | 98 | $558.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 19, 2023 | 97 | $300.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 29, 2023 | 96 | $262 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 2, 2023 | 95 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 7, 2023 | 94 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 14, 2023 | 93 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 31, 2023 | 90 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 31, 2023 | 91 | $558.4K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 31, 2023 | 92 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 20, 2023 | 89 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 17, 2023 | 88 | $27.3K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 13, 2023 | 87 | $188 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 7, 2023 | 86 | $2.0M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 18, 2023 | 85 | $610.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 15, 2022 | 84 | $218.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 13, 2022 | 83 | $240.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 12, 2022 | 82 | $1.0M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 24, 2022 | 81 | $18.4K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 18, 2022 | 80 | $-48.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 20, 2022 | 79 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 18, 2022 | 78 | $200.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 21, 2022 | 77 | $136 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 16, 2022 | 76 | $786.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 27, 2022 | 75 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Apr 18, 2022 | 74 | $348.8K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 31, 2022 | 73 | $538.8K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 14, 2022 | 72 | $283 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 23, 2022 | 71 | $142.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 18, 2022 | 70 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 4, 2022 | 69 | $400.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 15, 2021 | 68 | $777.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 2, 2021 | 67 | $83.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 3, 2021 | 65 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 2, 2021 | 66 | $471.0K | EO14042 ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 5, 2021 | 64 | $0 | EO14042 ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 28, 2021 | 63 | $353.2K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 19, 2021 | 62 | $152.1K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 9, 2021 | 61 | $376.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 28, 2021 | 60 | $623.3K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 2, 2021 | 59 | $673.8K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 26, 2021 | 58 | $605.2K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Apr 21, 2021 | 57 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 5, 2021 | 55 | $1.1M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 5, 2021 | 56 | $69.8K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 9, 2021 | 54 | $745.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 25, 2021 | 53 | $2.2K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 20, 2021 | 52 | $374.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 13, 2021 | 51 | $22.7K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 16, 2020 | 50 | $100 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 8, 2020 | 49 | $374.3K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 7, 2020 | 48 | $-374.3K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 30, 2020 | 47 | $374.3K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 14, 2020 | 46 | $746.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 22, 2020 | 44 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 18, 2020 | 45 | $225.1K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 31, 2020 | 43 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 23, 2020 | 42 | $112.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 18, 2020 | 40 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 17, 2020 | 41 | $60.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 9, 2020 | 39 | $364.8K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 26, 2020 | 38 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 11, 2020 | 37 | $1.5M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 4, 2020 | 36 | $706.6K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 17, 2020 | 35 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 2, 2020 | 34 | $70.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 11, 2019 | 33 | $130.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 2, 2019 | 32 | $220.0K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 20, 2019 | 31 | $106.1K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 9, 2019 | 30 | $572.6K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 8, 2019 | 29 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 1, 2019 | 28 | $0 | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 18, 2019 | 27 | $47.1K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 17, 2019 | 26 | $336.9K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 19, 2019 | 25 | $2.0M | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Apr 26, 2019 | 24 | $17.4K | ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 25, 2019 | 23 | $636.0K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Mar 15, 2019 | 22 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 14, 2019 | 21 | $91.2K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Feb 11, 2019 | 20 | $173.7K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 31, 2019 | 19 | $168.5K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 26, 2018 | 18 | $75.9K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Dec 18, 2018 | 17 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Nov 29, 2018 | 16 | $126.0K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 25, 2018 | 15 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Oct 22, 2018 | 14 | $398.9K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 26, 2018 | 13 | $165.8K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 27, 2018 | 12 | $803.1K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 11, 2018 | 11 | $1.3M | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| May 10, 2018 | 10 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 14, 2017 | 9 | $-207.8K | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 21, 2017 | 8 | $2.2M | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 20, 2017 | 7 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jul 10, 2017 | 6 | $-2.2M | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jun 26, 2017 | 5 | $2.2M | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 26, 2016 | 4 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Jan 6, 2016 | 3 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 11, 2015 | 2 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Sep 1, 2015 | 1 | $0 | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
| Aug 5, 2015 | 0 | $1.0M | IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT (ESPC) TASK ORDER NASA JSC COMBINED HEAT AND POWER (CHP) PROJECT |
Estimated positioning window
Jun 9, 2038 – Dec 9, 2038
30/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 30/100. Available recorded signals: 25 points.
- Contract end 2039-06-09 (4610 days from calculation)
- +5 points
- 1 historical awards in this buyer and category group
- +0 points
- 131 recorded award transactions
- +10 points
- Latest award action: 2026-08-20
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.