Federal contract award

NNK15MA50T

IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSCV126 — Space Transportation and Launch Services
Parent award / vehicleNNK14MA75C
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$360.6M
Current contract value$360.6M
Potential contract value / ceiling$360.6M
Start dateMay 22, 2015
Current end dateJun 30, 2026
Potential end dateJun 30, 2026
Latest award activityNov 21, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 27 of 27 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 21, 202526$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS.
Sep 25, 202325$4.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. MOD 25: THIS MODIFICATION INCORPORATES BUNDLED CHANGES INCLUDING THE ADDITION OF LAUNCH VEHICLE INTEGRATED REVIEW REQUIREMENTS AND UPDATES TO THE MILESTONE AND LAUNCH DATES.
Mar 24, 202224$83.3KTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. MOD 24: BILATERAL MODIFICATION INCORPORATES BUNDLE CHANGES WHICH INCREASES AND OBLIGATES TASK ORDER VALUE.
Aug 23, 202123$8.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. MOD 23: HE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CHANGE THE OBLIGATED AMOUNT UNDER THIS TASK ORDER FROM $348,548,963 TO $356,524,556, AN INCREASE OF $7,975,593. THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM MAY 21, 2022 TO OCTOBER 31, 2022. TASK ORDER PAGE 7 IS REPLACED.
Feb 4, 202122$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. THE PURPOSE OF THIS MODIFICATION IS TO ADD THE CHANGE REQUEST 19: PAD RESCUE TRAINING TO THIS TASK ORDER.
Sep 28, 202020$14.5MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 20: INCREASES OBLIGATIONS TO CONTRACT LINE ITEM 002 OF THIS TASK ORDER. FUNDS ARE SUFFICIENT TO COVER WORK 5/16/22.
Sep 28, 202021$1.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 21: INCREASES OBLIGATIONS TO CONTRACT LINE ITEM 002 OF THIS TASK ORDER. FUNDS ARE SUFFICIENT TO COVER WORK 5/21/22.
Jan 17, 202019$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 19: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE TASK ORDER VALUE AND DATES AS A RESULT OF CHANGE REQUEST 14 FOR BACKUP CREW TRAINING (REFERENCE CONTRACT MOD 101) AND CHANGE REQUEST 15 (REFERENCE CONTRACT MOD 102).
Jun 20, 201918$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 18: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CHANGE THE PCM-1 LAUNCH AND RETURN DATES AND ADJUST THE MILESTONE DATES ACCORDINGLY, AS AGREED TO IN THE TELEMETRY BUNDLE NEGOTIATIONS (REFERENCE CLIN 001 MOD 090). THE AMOUNT OBLIGATED UNDER THIS TASK ORDER IS UNCHANGED; HOWEVER, THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM APRIL 12, 2020 TO OCTOBER 12, 2020 DUE TO THE NEW MILESTONE DATES. AS A RESULT, PAGES 3, 6, AND 7 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Jan 22, 201917$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 17: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE TASK ORDER VALUE BY $26,663 FROM $351,081,226 TO $351,107,889 AS A RESULT OF CR7 PART 1 (REFERENCE NNK14MA75C MOD 078). AS A RESULT, THE FOLLOWING CHANGES ARE MADE TO THE TASK ORDER: 1. THE AMOUNT OBLIGATED UNDER THIS TASK ORDER IS UNCHANGED; HOWEVER, THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM APRIL 13, 2020 TO APRIL 12, 2020 DUE TO THE ADDED CR7 PART 1 WORK. 2. TASK ORDER PAGES 6 AND 7 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Dec 5, 201816$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 16: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE TASK ORDER VALUE BY $351,110 FROM $350,730,116 TO $351,081,226 AS A RESULT OF CR10 PART 1 (REFERENCE NNK14MA75C MOD 076). AS A RESULT, THE FOLLOWING CHANGES ARE MADE TO THE TASK ORDER: 1. THE AMOUNT OBLIGATED UNDER THIS TASK ORDER IS UNCHANGED; HOWEVER, THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM SEPTEMBER 14, 2019 TO SEPTEMBER 13, 2019 DUE TO THE ADDED CR10 PART 1 WORK, AND FURTHER CHANGED TO APRIL 13, 2020 DUE TO BOEING'S TARGET COMPLETION DATES. 2. TASK ORDER PAGES 6 AND 7 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Sep 4, 201815$107.8MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 15: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CHANGE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER FROM $225,300,000 TO $333,055,541, AN INCREASE OF $107,755,541. THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM DECEMBER 8, 2018 TO SEPTEMBER 14, 2019. CONTRACT PAGE 7 IS REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Aug 9, 201814$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 14: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE TASK ORDER VALUE BY $86,581 FROM $350,643,535 TO $350,730,116 AS A RESULT OF CR9 (REFERENCE NNK14MA75C MOD 064). AS A RESULT, THE FOLLOWING CHANGES ARE MADE TO THE TASK ORDER: 1. THE AMOUNT OBLIGATED UNDER THIS TASK ORDER IS UNCHANGED; HOWEVER, THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM DECEMBER 9, 2018 TO DECEMBER 8, 2018 DUE TO THE ADDED CR9 WORK. 2. TASK ORDER PAGES 6 AND 7 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Jun 15, 201813$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. . . MOD 13: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO SPLIT THE MIR MILESTONE AND CHANGE THE SARR MILESTONE CRITERIA. AS A RESULT OF THESE CHANGES MANY TASK ORDER PAGES ARE AFFECTED AND ADDED, THEREFORE THE ENTIRE TASK ORDER IS REPLACED (PAGES 3-15). CONSIDERATION FOR THESE CHANGES IS INCLUDED WITH MOD 062 OF THE BASE CONTRACT.
Jun 6, 201812$15.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE / CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE / CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 12: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CHANGE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER FROM $210,300,000 TO $225,300,000, AN INCREASE OF $15,000,000. THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS TASK ORDER WILL COVER THE WORK TO BE PERFORMED IS DECEMBER 9, 2018. TASK ORDER PAGE 7 IS REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Mar 23, 201811$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE / CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE / CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 1: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE TASK ORDER VALUE BY $143,535 FROM $350,500,000 TO $350,643,535 AS A RESULT OF CR11 (REFERENCE NNK14MA75C MOD 056). AS A RESULT, THE FOLLOWING CHANGES ARE MADE TO THE TASK ORDER: 1. THE AMOUNT OBLIGATED UNDER THIS TASK ORDER IS UNCHANGED; HOWEVER, THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM OCTOBER 31, 2018 TO JULY 30, 2018 DUE TO THE ADDED CR11 WORK. 2. TASK ORDER PAGES 6 AND 7 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Oct 23, 201710$0IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 10: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CHANGE THE PCM-1 LAUNCH AND RETURN DATES AND ADJUST THE MILESTONE DATES ACCORDINGLY AS AGREED TO IN CHANGE REQUEST 8 (CR8) NEGOTIATIONS (REFERENCE CONTRACT MOD 049). THE AMOUNT OBLIGATED UNDER THIS TASK ORDER IS UNCHANGED; HOWEVER, THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM MAY 31, 2018 TO OCTOBER 31, 2018 DUE TO THE NEW MILESTONE DATES. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Jun 30, 20179$17.5MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 9: THE PURPOSE OF THIS BILATERAL MOD1FICAT1ON 1S TO CHANGE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER FROM $192,775,000 TO $210,300,000, AN INCREASE OF $17,525,000 THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS TASK ORDER WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM DECEMBER 31, 2017 TO MAY 31, 2018. TASK ORDER PAGE 7 IS REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
May 10, 20178$0IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. MOD 8: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCORPORATE TASK ORDER STATEMENT OF WORK LANGUAGE AS A RESULT OF CLIN 001 CHANGE REQUEST 6 (CR6) AMMONIA EMERGENCY RESPONSE (AER) RISK REDUCTION TASK (NNK14MA75C MOD 41), WHICH IMPACTED SUBJECT TASK ORDER LANGUAGE SECTION II "CREW&CARGO COMPLEMENT". REFERENCE CHANGE BAR ON ATTACHED TASK ORDER REPLACEMENT PAGE 3. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENT. THERE IS NO CHANGE TO THE PCM-1 TASK ORDER PRICE RESULTING FROM THIS MODIFICATION.
Feb 16, 20177$122.7MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001... MOD 7: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO PROVIDE $122,675,000 IN ADDITIONAL FUNDING FOR PCM-1 (POST CERTIFICATION MISSION), 02A.3-1: SPACECRAFT ASSEMBLY READINESS REVIEW (SARR). THIS MODIFICATION CHANGES (1) THE AMOUNT OBLIGATED AND (2) THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS CONTRACT, PER CLAUSE H.4 ENTITLED "NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989)", AS FOLLOWS: . CHANGED FROM: $ 70,100,000 . CHANGED BY: $122,675,000 . CHANGED TO: $192,775,000 THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED UNDER PARAGRAPH (C)(1) OF CLAUSE H.4, AS FOLLOWS: CHANGED FROM: FEBRUARY 28, 2017 CHANGED TO: DECEMBER 31, 2017 AS A RESULT OF THE ABOVE, PAGE 7, PARAGRAPH (A) AND PARAGRAPH (C)(1) HAVE BEEN CHANGED. REFERENCE THE CHANGE BARS ON ATTACHED REPLACEMENT PAGE 7.
Jun 22, 20166$7.0MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION ... MOD 6: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO PROVIDE $7,010,000 IN ADDITIONAL FUNDING FOR PCM-1 (POST CERTIFICATION MISSION), 02A.2: MISSION INTEGRATION REVIEW (MIR). THIS MODIFICATION CHANGES (1) THE AMOUNT OBLIGATED AND (2) THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS CONTRACT, PER CLAUSE H.4 ENTITLED "NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989)", AS FOLLOWS: . CHANGED FROM: $63,090,000 . CHANGED BY: $ 7,010,000 . CHANGED TO: $70,100,000 THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED UNDER PARAGRAPH (C)(1) OF CLAUSE H.4, AS FOLLOWS: CHANGED FROM: SEPTEMBER 30, 2016 CHANGED TO: FEBRUARY 28, 2017 AS A RESULT OF THE ABOVE, PAGE 7, PARAGRAPH (A) AND PARAGRAPH (C)(1) HAVE BEEN CHANGED. REFERENCE THE CHANGE BARS ON ATTACHED REPLACEMENT PAGE
Apr 8, 20165$0IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING...:: MOD 5: THE PURPOSE OF THIS MOD IS TO MAKE THE FOLLOWING CHANGES. 1. SECTION II, CREW&CARGO COMPLEMENT, FIGURE 1: CHANGE INHERENT CAPABILITY ABOVE NASA REQUIREMENT FROM 'A MINIMUM OF 108.9 KG (240 LBM)' TO 'A TARGET OF 108.9 KG (240 LBM)'. 2. SECTION III, INITIAL MISSION SUCCESS CRITERIA, IS REVISED TO REFLECT THE UPDATED CRITERIA AGREED TO BY NASA AND BOEING AND TO IDENTIFY THE PERCENTAGES OF THE FINAL PAYMENT EARNED FOR MISSION PERFORMANCE. AS A RESULT OF THE ABOVE, THE FOLLOWING PAGES ARE AFFECTED: PAGES 3-5 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENT. THERE IS NO CHANGE TO THE TASK ORDER PRICE RESULTING FROM THIS MODIFICATION.
Mar 17, 20164$7.0MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASAS REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 4: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE FUNDING IN THE AMOUNT OF $7,010,000. THIS MODIFICATION CHANGES THE AMOUNT OBLIGATED UNDER THIS CONTRACT FROM $56,080,000 TO $63,090,000, AN INCREASE OF $7,010,000. CLAUSE H.4 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED- PRICE CONTRACT),(MAR 1989): PARAGRAPH (A), THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS CONTRACT IS CHANGED FROM $56,080,000 TO $63,090,000. PARAGRAPH (C)(1), THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM MARCH 31, 2016 TO SEPTEMBER 30, 2016.
Mar 9, 20163$0IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS... MOD 3: THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE PCM-1 LAUNCH AND RETURN DATES AND ADJUST THE MILESTONE DATES WHICH WERE AFFECTED BY CHANGE REQUEST 2 TO CLIN 001(NNK14MA75C MODIFICATION 23). AS A RESULT OF THE ABOVE, PAGES 3 AND 6 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENT. THERE IS NO CHANGE TO THE TASK ORDER PRICE RESULTING FROM THIS MODIFICATION.
Oct 30, 20152$7.0MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 2: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE FUNDING IN THE AMOUNT OF $7,010,000. THIS MODIFICATION CHANGES THE AMOUNT OBLIGATED UNDER THIS CONTRACT FROM $42,060,000 TO $49,070,000, AN INCREASE OF $7,010,000. CLAUSE H.4 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED- PRICE CONTRACT),(MAR 1989): PARAGRAPH (A), THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS CONTRACT IS CHANGED FROM $42,060,000 TO $49,070,000. PARAGRAPH (C)(1), THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM JUNE 30, 2015 TO OCTOBER 31,2015. AS A RESULT OF THE ABOVE, CONTRACT PAGE 7 IS REPLACED.
Jun 16, 20151$7.0MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS. MOD 1: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE FUNDING IN THE AMOUNT OF $7,010,000. THIS MODIFICATION CHANGES THE AMOUNT OBLIGATED UNDER THIS CONTRACT FROM $42,060,000 TO $49,070,000, AN INCREASE OF $7,010,000. CLAUSE H.4 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED- PRICE CONTRACT),(MAR 1989): PARAGRAPH (A), THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS CONTRACT IS CHANGED FROM $42,060,000 TO $49,070,000. PARAGRAPH (C)(1), THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM JUNE 30, 2015 TO OCTOBER 31,2015. AS A RESULT OF THE ABOVE, CONTRACT PAGE 7 IS REPLACED.
May 22, 20150$42.1MIGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3, DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROMTHE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. BOEING CCTCAP POST CERTIFICATION MISSION 1 (PCM-1) TASK ORDER AGAINST NNK14MA75C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS.