Federal contract award

NNK17MA01T

IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3,DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. SPACEX CCTCAP POST CERTIFICATION MISSIONS 3-6(PCM-3-6) TASK ORDER AGAINST NNK14MA74C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSCV126 — Space Transportation and Launch Services
Parent award / vehicleNNK14MA74C
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$3.0B
Current contract value$3.1B
Potential contract value / ceiling$3.1B
Start dateDec 30, 2016
Current end dateDec 31, 2030
Potential end dateDec 31, 2030
Latest award activityMay 7, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 72 of 72 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 7, 202671$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Jan 29, 202670$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Dec 22, 202569$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Oct 8, 202568$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Aug 29, 202567$400.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Jun 26, 202566$69.5MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
May 20, 202565$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Mar 12, 202564$102.1MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Mar 11, 202563$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Mar 3, 202562$104.3MCOMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Dec 23, 202461$800.0KCOMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Oct 30, 202460$-3.0MCOMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Oct 10, 202459$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO UPDATE LAUNCH WINDOWS.
Oct 2, 202458$0COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Sep 10, 202457$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR CTS CONFIGURATION CHANGES.
Aug 29, 202455$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR CTS CONFIGURATION CHANGES.
Aug 29, 202456$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS MODIFICATION ADDS CHANGE REQUEST 35 FOR CTS CONFIGURATION.
Aug 21, 202454$43.3MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING.
Aug 12, 202453$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO ADD THE CAPABILITY FOR ADDITIONAL CONFIGURATIONS.
Aug 9, 202452$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION (PCM)-13.
Aug 6, 202451$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE BUNDLED CHANGES INCLUDING ADDITIONAL PORT RELOCATION REQUIREMENTS.
Aug 1, 202450$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REQUIREMENTS FOR CTS CONFIGURATION AND UPDATES TO LAUNCH WINDOW.
Jul 23, 202449$310.4MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS MODIFICATION INCREMENTALLY FUNDS THE TASK ORDER.
Jul 15, 202448$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS MODIFICATION EXECUTES EMERGENCY CONTINGENCY READINESS IMPLEMENTATION.
Apr 5, 202447$120.6MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS MODIFICATION INCREASES THE AMOUNT OBLIGATED UNDER THIS TASK ORDER.
Feb 29, 202445$40.3MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS MODIFICATION INCREASES THE AMOUNT OBLIGATED UNDER THIS TASK ORDER.
Feb 29, 202446$47.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS MODIFICATION INCREASES THE AMOUNT OBLIGATED UNDER THIS TASK ORDER.
Feb 21, 202444$43.6MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS).
Jan 31, 202443$25.5MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 43: THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE OBLIGATED AMOUNT ON CONTRACT LINE ITEM (CLIN) 002 UNDER THIS TASK ORDER.
Jan 19, 202442$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 42: THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ERROR IN THE TOTAL TASK ORDER VALUE.
Jan 2, 202441$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO IMPLEMENT REQUIREMENTS TO PROVIDE A SAFE HAVEN AND EMERGENCY RETURN CAPABILITY FROM THE INTERNATIONAL SPACE STATION (ISS) TO THE CREW 7-9 DRAGONS.
Dec 19, 202340$70.2MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 40: MODIFICATION TO INCREASE OBLIGATED AMOUNT. FUNDS PRESENTLY ALLOTTED WILL COVER WORK TO BE PERFORMED THROUGH 3/31/2024.
Nov 16, 202339$67.9MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 39: MODIFICATION TO INCREASE OBLIGATED AMOUNT. FUNDS PRESENTLY ALLOTTED WILL COVER WORK TO BE PERFORMED THROUGH 2/3/2024.
Sep 28, 202338$30.5MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 38: MODIFICATION TO INCREASE OBLIGATED AMOUNT. FUNDS PRESENTLY ALLOTTED WILL COVER WORK TO BE PERFORMED.
Sep 18, 202337$59.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 37: MODIFICATION TO INCREASE OBLIGATED AMOUNT. FUNDS PRESENTLY ALLOTTED WILL COVER WORK TO BE PERFORMED.
Sep 8, 202336$42.8MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 36: BILATERAL MODIFICATION TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION (PCM)-11 AND OBLIGATE INCREMENTAL FUNDING.
Aug 11, 202335$107.2MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 35: BILATERAL MODIFICATION TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION (PCM)-10 AND OBLIGATE ADDITIONAL FUNDS.
Aug 1, 202334$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 34: BILATERAL MODIFICATION TO ADD AN ADDENDUM TO JOHNSON SPACE CENTER 22538 REVF FLIGHT CREW HEALTH STABILIZATION PROGRAM (HSP) FOR POST CERTIFICATION MISSIONS 7 THROUGH 14.
Jul 11, 202333$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 33: BILATERAL MODIFICATION TO ADD EMERGENCY RETURN CAPABILITY REQUIREMENTS FOR POST CERTIFICATION MISSIONS (PCM) 6 THROUGH 8.
Apr 19, 202332$92.1MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 32: BILATERAL MODIFICATION TO INCREASE OBLIGATED AMOUNT. FUNDS PRESENTLY ALLOTTED WILL COVER WORK TO BE PERFORMED.
Feb 8, 202330$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO IMPLEMENT REQUIREMENTS TO PROVIDE A SAFE HAVEN AND EMERGENCY RETURN CAPABILITY FROM THE INTERNATIONAL SPACE STATION (ISS) TO THE CREW-5 DRAGON.
Feb 8, 202331$128.9MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION 9 AND TO OBLIGATE ADDITIONAL FUNDS.
Oct 31, 202229$122.6MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER. AS A RESULT, TASK ORDER PAGE 102 IS REPLACED.
Aug 31, 202228$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD FIVE ADDITIONAL POST CERTIFICATION MISSIONS (PCMS) TO CONTRACT LINE ITEM NUMBER (CLIN) 002.
Aug 26, 202227$163.7MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER. REPLACEMENT PAGE IS ATTACHED.
May 9, 202226$125.7MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 25: THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED TO CONTRACT LINE ITEM NUMBER (CLIN)-002 UNDER THIS TASK ORDER. THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER. THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS SEPTEMBER 30, 2022.
Apr 4, 202225$56.7MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 25: THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED TO CONTRACT LINE ITEM NUMBER (CLIN)-002 UNDER THIS TASK ORDER.
Mar 22, 202224$47.2MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED UNDER THIS TASK ORDER BY $47,211,216. THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM APRIL 12, 2022 TO APRIL 30, 2022. AS A RESULT, TASK ORDER PAGE 53 IS REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Feb 28, 202223$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD THREE ADDITIONAL POST CERTIFICATION MISSIONS (PCMS).
Dec 16, 202121$94.0MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE AMOUNT OBLIGATED $94,000,000. AS A RESULT, TASK ORDER PAGE 30 IS REPLACED.
Dec 16, 202122$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 22: REVISE THE MISSION SUCCESS CRITERIA FOR POST CERTIFICATION MISSIONS 3 THROUGH 6.
Sep 27, 202120$33.9KTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD CHANGE REQUEST 22 (CR22) CR22 BACKUP MEDEVAC HELICOPTER POST CERTIFICATION MISSION (PCM) 3. MODIFICATION INCREASES THE AMOUNT OBLIGATED $33,902. AS A RESULT, TASK ORDER PAGE 30 IS REPLACED.
Aug 25, 202119$119.2MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD CHANGE REQUEST 22 (CR22) CR22 BACKUP MEDEVAC HELICOPTER POST CERTIFICATION MISSION (PCM) 3. MODIFICATION INCREASES THE AMOUNT OBLIGATED $119,194,235. AS A RESULT, TASK ORDER PAGE 30 IS REPLACED.
Aug 4, 202118$577.3KTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD CHANGE REQUEST 22 (CR22) CR22 BACKUP MEDEVAC HELICOPTER POST CERTIFICATION MISSION (PCM) 3.
Jul 12, 202117$31.9MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MODIFICATION INCREASES OBLIGATED AMOUNT. AS A RESULT, TASK ORDER PAGE 30 IS REPLACED.
May 18, 202116$34.7MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). MOD 16: PROVIDE AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION (PCM)-6 AND OBLIGATES ADDITIONAL FUNDS.
May 5, 202115$21.2MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD FUNDING TO TASK ORDER NNK17MA01T. AS A RESULT, TASK ORDER PAGE 30 IS REPLACED.
Mar 15, 202114$119.6MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR PCM-5 AND TO OBLIGATE ADDITIONAL FUNDS.
Dec 2, 202012$54.5MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS. THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION (PCM)-4 AND TO OBLIGATE ADDITIONAL FUNDS.
Dec 2, 202013$29.5MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDS, FUNDED THROUGH DATE IS CHANGED TO 3/17/21.
Nov 25, 202011$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS. THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD CHANGE REQUEST 18 (CR18) ORTHOSTATIC INTOLERANCE PROTECTION GARMENT (OIG).
May 18, 202010$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). . .MOD 10: THE PURPOSE OF THIS MODIFICATION IS TO ADD CHANGES TO THE MILESTONE DATES RESULTING FROM QUARTERLY PROGRAM REVIEW (QPR) HELD IN FEBRUARY 2020 IN EXCHANGE FOR PERFORMING PAD RESCUE TRAINING FOR ALL PCMS AND PROVIDING AMMONIA EMERGENCY RESPONSE (AER) SUPPORT FOR THE DEMO-2 TEST FLIGHT.
May 18, 20209$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). . . THE PURPOSE OF THIS MODIFICATION IS TO ADD CHANGE REQUEST (CR) 14 REQUIREMENTS FOR MISSION CAPABILITY ENHANCEMENTS.
Mar 12, 20208$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS). . . THE PURPOSE OF THIS MODIFICATION IS TO ADD CHANGE REQUEST (CR) 13 REQUIREMENTS FOR BACKUP CREW TRAINING.
Oct 1, 20197$0COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT
Jul 18, 20196$52.9MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. MOD 6: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR PCM-3. THIS MODIFICATION CHANGES THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS TASK ORDER BY $52,918,120, FROM $52,918,120 TO $105,836,240. THE DATE THAT IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED IS CHANGED FROM JUNE 30, 2019 TO NOVEMBER 30, 2019.
Apr 25, 20195$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. MOD 5: 1. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE POST CERTIFICATION MISSIONS 3-6 (PCMS 3-6) MILESTONE VALUES WHICH OCCUR AS A RESULT OF CHANGE REQUEST (CR) 9, DOCUMENT CHANGES TO SPACE SHUTTLE PROGRAM (SSP) 50808 REVISION F DOCUMENT CHANGE NOTICE (DCN) 193A. NOTE: THE CR9 SSP 50808 DCN 193A REQUIREMENT CHANGES ALSO AFFECTS CLIN 001 AND PCM TASK ORDERS. SEE NNK14MA74C MOD 064, NNK16MA03T PCM-1 MOD 015 AND NNK16MA58T PCM 2 MOD 013. 2. THE FOLLOWING CONTRACT SECTIONS ARE REVISED: PCM-3 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, THE TOTAL MILESTONE VALUE CHANGED FROM $211,785,053 TO $211,830,426, AN INCREASE OF $45,373. PCM-4 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, THE TOTAL MILESTONE VALUE IS CHANGED FROM $218,137,403 TO $218,184,136, AN INCREASE OF $46,733. PCM-5 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, THE TOTAL MILESTONE VALUE IS CHANGED FROM $224,646,056 TO $224,694,190, AN INCREASE OF $48,134. PCM-6 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, THE TOTAL MILESTONE VALUE IS CHANGED FROM $231,383,708 TO $231,431,842, AN INCREASE OF $48,134. NOTE: PCMS 4-6 HAVE NOT BEEN GRANTED AUTHORITY TO PROCEED (ATP). 3. AS A RESULT, TASK ORDER PAGES 6, 14, 22, AND 30 ARE REPLACED.
Feb 4, 20194$16.2MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. MOD 4: THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING IN THE AMOUNT OF $16,167,248. THIS MODIFICATION CHANGES THE AMOUNT OBLIGATED UNDER THIS CONTRACT FROM $36,750,872 TO $52,918,120, AN INCREASE OF $16,167,248. CLAUSE H.4 NFS 1852.232-77 LIMITATION OF FUNDS (FIXEDPRICE CONTRACT). (MAR 1989): PARAGRAPH (A), THE SUM PRESENTLY AVAILABLE FOR PAYMENTS AND ALLOTTED TO THIS CONTRACT IS CHANGED FROM $36,750,872 TO $52,918,120.
Nov 2, 20183$36.8MTHE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. MOD 3: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AUTHORITY TO PROCEED (ATP) FOR POST CERTIFICATION MISSION (PCM) 3 AND PROVIDE INCREMENTAL FUNDING.
Aug 10, 20182$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. MOD 2: 1. THE PURPOSE OF THIS MODIFICATION IS TO ADD THE REQUIREMENTS TO PROVIDE THE CAPABILITY TO MOUNT OR STOW AMMONIA EMERGENCY RESPONSE (AER) HARDWARE. NOTE: THE AER REQUIREMENT ALSO AFFECTS CLIN 001 AND PCM TASK ORDERS. SEE NNK14MA74C MOD 050, NNK16MA03T PCM -1 MOD 010 AND NNK16MA58T PCM 2 MOD 010. 2. THE REVISED CONTRACT SECTIONS ARE ATTACHED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Feb 7, 20181$0THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. MOD 1: 1. THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE POST CERTIFICATION MISSIONS 3-6 (PCMS-3-6) MILESTONE VALUES WHICH OCCUR AS A RESULT OF CR6, CHANGES TO CCT-REQ-1130 AND JSC 22538 HEALTH STABILIZATION REQUIREMENTS. NOTE: THE CR6 CCT-REQ-1130 AND JSC 22538 HEALTH STABILIZATION REQUIREMENT CHANGES ALSO AFFECT CLIN 001 AND PCM TASK ORDERS. SEE NNK14MA74C MOD 047, NNK16MA03T PCM- 1 MOD 009 AND NNK16MA58T PCM-2 MOD 008. 2. THE FOLLOWING CONTRACT SECTIONS ARE REVISED: PCM-3 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, PCM-4 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, PCM-5 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, AND PCM-6 SECTION VI. MISSION MILESTONE REVIEW PAYMENT SCHEDULE, NOTE* CLAUSE H.4 NFS1852.232-77 LIMITATION OF FUNDS (FIXED- PRICE CONTRACT). (MAR 1989) (APPLICABLE TO PCMS 3-6) (C)(1) IT IS CONTEMPLATED THAT FUNDS PRESENTLY ALLOTTED TO THIS CONTRACT WILL COVER THE WORK TO BE PERFORMED UNTIL TBD (TO BE ADDRESSED AT AUTHORITY TO PROCEED (ATP)). 3. AS A RESULT OF THE ABOVE, THE FOLLOWING PAGES ARE AFFECTED: TASK ORDER PAGES 6, 14, 22 AND 30 ARE REPLACED. IN CONSIDERATION OF THE MODIFICATION AGREED TO HEREIN AS COMPLETE EQUITABLE ADJUSTMENT FOR CHANGES DESCRIBED ABOVE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY UNDER THIS CONTRACT FOR FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO THE PROPOSED ADJUSTMENTS.
Dec 30, 20160$0IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3,DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, POST CERTIFICATION MISSION PRICES. THE PER MISSION PRICES ARE FOR A SINGLE ORDER AT THE PRICE STATED PER THE CALENDAR YEAR (CY) BASED ON THE NUMBER OF MISSIONS ORDERED. CTS FULL MISSION CAPABILITY PRICES SHALL BE BASED ON (1) FULFILLMENT OF THE DESIGN REFERENCE MISSION TO THE ISS FOUND IN CCT-DRM-1110, CREW TRANSPORTATION SYSTEM DESIGN REFERENCE MISSIONS, ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, AND OTHER TERMS AND CONDITIONS IN THE CONTRACT AND (2) ALL INHERENT CTS CAPABILITIES THAT ARE WITHIN THE PROPOSED MISSION PRICES. IN ACCORDANCE WITH ATTACHMENT J-03, CONTRACT PERFORMANCE WORK STATEMENT, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTOR SHALL PERFORM SPECIAL STUDIES, TEST AND ANALYSES, AS INITIATED BY WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. SPACEX CCTCAP POST CERTIFICATION MISSIONS 3-6(PCM-3-6) TASK ORDER AGAINST NNK14MA74C CLIN 002, AS DESCRIBED IN CLAUSE B.4 POST CERTIFICATION MISSIONS (IDIQ)(CLIN 002) AND ALL OTHER APPLICABLE TERMS AND CONDITIONS.

Estimated positioning window

Dec 31, 2029 – Jun 30, 2030

Recompete signal:
45/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 45/100. Available recorded signals: 40 points.

Contract end 2030-12-31 (1528 days from calculation)
+5 points
6 historical awards in this buyer and category group
+15 points
72 recorded award transactions
+10 points
Latest award action: 2026-05-07
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.