Federal contract award
NNM16AA02C
IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MARSHALL SPACE FLIGHT CENTER |
| NAICS | 541712 |
| PSC | 1675 — Space Vehicle Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $3.4B |
| Current contract value | $3.9B |
| Potential contract value / ceiling | $3.9B |
| Start date | Nov 1, 2015 |
| Current end date | Sep 30, 2029 |
| Potential end date | Sep 30, 2029 |
| Latest award activity | Jul 31, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 172 of 172 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 31, 2026 | 171 | $63.2M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Jun 30, 2026 | 170 | $37.8M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Jun 4, 2026 | 169 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| May 21, 2026 | 168 | $32.8M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Apr 29, 2026 | 167 | $29.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Apr 21, 2026 | 166 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Mar 30, 2026 | 165 | $26.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Mar 19, 2026 | 164 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Mar 9, 2026 | 163 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Feb 20, 2026 | 162 | $30.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Feb 10, 2026 | 161 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Feb 9, 2026 | 160 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Jan 20, 2026 | 159 | $17.5M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Dec 19, 2025 | 158 | $30.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Nov 25, 2025 | 157 | $50.5M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Nov 13, 2025 | 154 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Nov 13, 2025 | 155 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Nov 13, 2025 | 156 | $4.8M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Oct 30, 2025 | 153 | $2.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENT UNDER THE SPACE LAUNCH SYSTEM |
| Sep 30, 2025 | 151 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Sep 30, 2025 | 152 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Sep 23, 2025 | 150 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Sep 12, 2025 | 149 | $4.3M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Aug 29, 2025 | 148 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Aug 15, 2025 | 146 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Aug 15, 2025 | 147 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Aug 12, 2025 | 145 | $36.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Jul 29, 2025 | 144 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Jul 23, 2025 | 143 | $17.0K | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Jul 21, 2025 | 142 | $44.6M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Jul 14, 2025 | 141 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Jun 6, 2025 | 140 | $21.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| May 29, 2025 | 139 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| May 1, 2025 | 137 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, |
| May 1, 2025 | 138 | $27.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM. |
| Mar 10, 2025 | 136 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Mar 6, 2025 | 135 | $41.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jan 31, 2025 | 134 | $14.7M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jan 21, 2025 | 133 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 31, 2024 | 132 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 17, 2024 | 131 | $21.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Nov 22, 2024 | 130 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Nov 21, 2024 | 129 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Oct 11, 2024 | 128 | $89.5M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Sep 26, 2024 | 127 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Sep 13, 2024 | 126 | $23.2M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Sep 11, 2024 | 125 | $1.4M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Aug 15, 2024 | 124 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Aug 14, 2024 | 123 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jul 31, 2024 | 122 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jul 3, 2024 | 120 | $52.8M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jul 3, 2024 | 121 | $50.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| May 23, 2024 | 118 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| May 23, 2024 | 119 | $0 | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Apr 26, 2024 | 117 | $119.0M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Mar 7, 2024 | 116 | $18.7M | RS25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Feb 16, 2024 | 115 | $45.8M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jan 25, 2024 | 114 | $24.4M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jan 16, 2024 | 113 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 20, 2023 | 112 | $30.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 7, 2023 | 111 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Nov 13, 2023 | 110 | $3.8M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Sep 29, 2023 | 109 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Aug 28, 2023 | 108 | $3.5M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Aug 3, 2023 | 107 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jun 5, 2023 | 106 | $157.5M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Apr 3, 2023 | 105 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Feb 25, 2023 | 104 | $115.3M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Feb 1, 2023 | 103 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jan 13, 2023 | 102 | $28.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 20, 2022 | 101 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Oct 27, 2022 | 100 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Oct 18, 2022 | 99 | $41.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Sep 22, 2022 | 98 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Sep 7, 2022 | 97 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Aug 17, 2022 | 96 | $4.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jun 29, 2022 | 95 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Jun 8, 2022 | 94 | $49.3M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| May 11, 2022 | 93 | $84.3M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Apr 28, 2022 | 92 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Apr 18, 2022 | 91 | $63.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Mar 17, 2022 | 89 | $23.2M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Mar 17, 2022 | 90 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Feb 25, 2022 | 87 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Feb 25, 2022 | 88 | $13.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 13, 2021 | 85 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Dec 13, 2021 | 86 | $39.9M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Nov 5, 2021 | 84 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION. |
| Oct 21, 2021 | 83 | $26.7M | EO14042 COVID-19 RS-25 ENGINE PRODUCTION FOR THE SPACE LAUNCH SYSTEM. |
| Oct 18, 2021 | 82 | $0 | RS-25 ENGINE PRODUCTION FOR THE SPACE LAUNCH SYSTEM. |
| Oct 5, 2021 | 81 | $0 | RS-25 ENGINE PRODUCTION FOR THE SPACE LAUNCH SYSTEM. |
| Sep 22, 2021 | 80 | $15.0M | RS-25 ENGINE PRODUCTION FOR THE SPACE LAUNCH SYSTEM. |
| Aug 25, 2021 | 79 | $2.8M | RS-25 ENGINE PRODUCTION FOR THE SPACE LAUNCH SYSTEM. |
| Aug 19, 2021 | 78 | $0 | RS-25 ENGINE PRODUCTION FOR THE SPACE LAUNCH SYSTEM. |
| Jul 27, 2021 | 77 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTU |
| Jul 19, 2021 | 76 | $145.7M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING... |
| Jun 30, 2021 | 75 | $6.4M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jun 14, 2021 | 74 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTU |
| May 3, 2021 | 73 | $1.3M | COVID-19 RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 16, 2021 | 72 | $165.5M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 11, 2021 | 71 | $1.3M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jan 15, 2021 | 70 | $57.2M | COVID-19 RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 18, 2020 | 69 | $24.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 16, 2020 | 68 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING TWENTY-FOUR RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTU |
| Dec 8, 2020 | 67 | $15.9M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 19, 2020 | 66 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 3, 2020 | 65 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Sep 24, 2020 | 64 | $67.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Sep 8, 2020 | 63 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 28, 2020 | 62 | $863.4K | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 5, 2020 | 61 | $13.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jul 20, 2020 | 60 | $46.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jun 11, 2020 | 59 | $41.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| May 1, 2020 | 58 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Mar 5, 2020 | 56 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Mar 5, 2020 | 57 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 14, 2020 | 54 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 14, 2020 | 55 | $147.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jan 21, 2020 | 53 | $26.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 16, 2019 | 52 | $20.9M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 18, 2019 | 51 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Oct 22, 2019 | 50 | $24.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Sep 26, 2019 | 49 | $43.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 14, 2019 | 48 | $5.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 7, 2019 | 47 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 2, 2019 | 46 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jun 24, 2019 | 45 | $74.6M | SPACE LAUNCH SYSTEMS (SLS) RS-25 CORE STAGE ENGINES PRODUCTION RESTART |
| Jun 21, 2019 | 44 | $1.1M | INCORPORATE ADAPTATION COMPLETION EFFORT DUE THE EXPIRATION DATE OF APRIL 30, 2019 OF CONTRACT NNM06AB13C AND INCREMENTALLY FUND THE SUBJECT CONTRACT. |
| Apr 10, 2019 | 43 | $64.2M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Apr 9, 2019 | 42 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 15, 2019 | 41 | $6.3M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 8, 2019 | 40 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 7, 2019 | 39 | $57.3M | INCORPORATE ADAPTATION COMPLETION EFFORT DUE THE EXPIRATION DATE OF APRIL 30, 2019 OF CONTRACT NNM06AB13C AND INCREMENTALLY FUND THE SUBJECT CONTRACT. |
| Dec 20, 2018 | 38 | $21.3M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 1, 2018 | 37 | $32.1M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Oct 26, 2018 | 36 | $0 | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 1, 2018 | 35 | $48.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| May 17, 2018 | 34 | $79.0M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Apr 9, 2018 | 33 | $24.0M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 23, 2018 | 32 | $20.4M | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jan 30, 2018 | 31 | $17.0M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jan 19, 2018 | 30 | $9.0M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jan 11, 2018 | 29 | $0 | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 20, 2017 | 28 | $11.0M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 4, 2017 | 27 | $0 | RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 27, 2017 | 26 | $15.0M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Oct 16, 2017 | 25 | $14.5M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Oct 11, 2017 | 24 | $0 | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Oct 2, 2017 | 23 | $0 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 31, 2017 | 22 | $66.4M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jun 30, 2017 | 21 | $39.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| May 19, 2017 | 20 | $23.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Apr 21, 2017 | 19 | $21.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 22, 2017 | 18 | $33.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 6, 2017 | 17 | $0 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 21, 2016 | 15 | $0 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 21, 2016 | 16 | $21.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 20, 2016 | 14 | $0 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 30, 2016 | 13 | $19.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Oct 20, 2016 | 12 | $13.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Sep 28, 2016 | 11 | $17.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 15, 2016 | 10 | $11.5M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Aug 9, 2016 | 9 | $20.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| May 13, 2016 | 8 | $0 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Apr 13, 2016 | 7 | $32.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 10, 2016 | 6 | $53.1M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 9, 2016 | 5 | $-53.1M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Feb 2, 2016 | 4 | $0 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Jan 25, 2016 | 3 | $30.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 23, 2015 | 2 | $10.0M | IGF::OT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Dec 1, 2015 | 1 | $10.0M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
| Nov 19, 2015 | 0 | $3.1M | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
Estimated positioning window
Sep 30, 2028 – Mar 30, 2029
45/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 45/100. Available recorded signals: 40 points.
- Contract end 2029-09-30 (1071 days from calculation)
- +15 points
- 1 historical awards in this buyer and category group
- +0 points
- 172 recorded award transactions
- +10 points
- Latest award action: 2026-07-31
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.