Federal contract award

NNM17AA04C

IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MARSHALL SPACE FLIGHT CENTER
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleNot reported
Set-aside8A COMPETED
Pricing typeCOST PLUS FIXED FEE
Obligations$51.0M
Current contract value$60.2M
Potential contract value / ceiling$60.2M
Start dateApr 1, 2017
Current end dateMar 31, 2025
Potential end dateMar 31, 2025
Latest award activityAug 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 112 of 112 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 27, 2026111$-0FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Feb 19, 2025110$445.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jan 22, 2025109$486.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 20, 2024108$521.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 18, 2024107$248.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 7, 2024106$104.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Oct 23, 2024105$846.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Sep 24, 2024104$420.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Aug 15, 2024103$371.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jul 25, 2024102$-45.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jul 16, 2024101$576.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jun 7, 2024100$265.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Apr 30, 202499$933.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Mar 14, 202498$586.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jan 31, 202497$334.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 8, 202396$791.7KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 29, 202395$26.6KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 3, 202394$211.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Sep 28, 202393$1.2MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jul 28, 202392$821.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
May 16, 202391$1.7MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Mar 30, 202390$987.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jan 24, 202388$81.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jan 24, 202389$368.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jan 11, 202387$379.6KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 22, 202286$46.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 19, 202285$613.4KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 12, 202284$172.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 30, 202283$94.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Oct 11, 202281$11.7KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Oct 11, 202282$378.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Sep 28, 202280$551.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Aug 23, 202279$202.3KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jul 22, 202278$112.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jun 14, 202276$351.2KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Jun 14, 202277$625.5KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Apr 25, 202275$735.4KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Apr 4, 202274$49.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Mar 18, 202273$94.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Mar 14, 202272$28.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Mar 10, 202271$613.5KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Feb 23, 202270$254.4KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Feb 7, 202269$0FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 16, 202167$590.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 16, 202168$208.7KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Dec 7, 202166$837.3KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 29, 202165$69.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 17, 202164$270.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Nov 2, 202163$129.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING...
Oct 12, 202162$0EO14042 FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 22, 202161$127.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 14, 202160$958.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Aug 11, 202159$502.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jul 19, 202158$1.0MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
May 25, 202157$376.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
May 6, 202156$34.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 28, 202155$569.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 16, 202154$22.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 6, 202153$570.2KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 5, 202152$0COVID-19 FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 31, 202151$17.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 22, 202150$800.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Feb 25, 202149$2.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Feb 24, 202148$630.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Feb 3, 202147$170.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jan 29, 202146$115.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jan 14, 202145$385.3KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Dec 14, 202044$12.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Nov 10, 202043$0FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Oct 5, 202042$0COVID-19 FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 23, 202041$558.7KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 22, 202040$71.6KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 3, 202039$233.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Aug 19, 202038$43.2KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jul 14, 202037$400.5KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jun 17, 202036$1.3MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 27, 202035$577.5KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 9, 202034$0FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 26, 202033$2.0MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 19, 202032$752.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jan 28, 202031$1.0MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Dec 2, 201930$894.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Oct 25, 201929$501.3KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Oct 15, 201928$0FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 24, 201927$538.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 5, 201926$162.8KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Aug 21, 201925$-35.0KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Aug 12, 201924$269.2KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jul 19, 201923$137.6KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jun 4, 201922$45.6KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
May 23, 201921$107.5KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Apr 26, 201920$469.2KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 25, 201919$2.0MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Feb 14, 201918$493.5KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Feb 1, 201917$532.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Dec 18, 201816$484.9KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 26, 201815$146.7KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 12, 201814$245.1KFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jun 11, 201813$3.1MIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
May 8, 201812$624.3KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 30, 201811$534.5KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 21, 201810$0IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Feb 16, 20189$660.5KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jan 19, 20188$548.8KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Nov 13, 20177$1.0MFEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 26, 20176$82.4KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Sep 5, 20175$1.4MIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jul 17, 20174$981.2KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jun 14, 20173$595.4KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Jun 2, 20172$210.3KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
May 3, 20171$636.6KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Mar 29, 20170$591.0KIGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.