Federal contract award
NNM17AA04C
IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MARSHALL SPACE FLIGHT CENTER |
| NAICS | 541330 — Engineering Services |
| PSC | C211 — Architect - Engineer Services (including landscaping, interior layout, and designing) |
| Parent award / vehicle | Not reported |
| Set-aside | 8A COMPETED |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $51.0M |
| Current contract value | $60.2M |
| Potential contract value / ceiling | $60.2M |
| Start date | Apr 1, 2017 |
| Current end date | Mar 31, 2025 |
| Potential end date | Mar 31, 2025 |
| Latest award activity | Aug 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 112 of 112 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 27, 2026 | 111 | $-0 | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Feb 19, 2025 | 110 | $445.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jan 22, 2025 | 109 | $486.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 20, 2024 | 108 | $521.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 18, 2024 | 107 | $248.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 7, 2024 | 106 | $104.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Oct 23, 2024 | 105 | $846.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Sep 24, 2024 | 104 | $420.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Aug 15, 2024 | 103 | $371.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jul 25, 2024 | 102 | $-45.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jul 16, 2024 | 101 | $576.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jun 7, 2024 | 100 | $265.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Apr 30, 2024 | 99 | $933.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Mar 14, 2024 | 98 | $586.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jan 31, 2024 | 97 | $334.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 8, 2023 | 96 | $791.7K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 29, 2023 | 95 | $26.6K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 3, 2023 | 94 | $211.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Sep 28, 2023 | 93 | $1.2M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jul 28, 2023 | 92 | $821.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| May 16, 2023 | 91 | $1.7M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Mar 30, 2023 | 90 | $987.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jan 24, 2023 | 88 | $81.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jan 24, 2023 | 89 | $368.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jan 11, 2023 | 87 | $379.6K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 22, 2022 | 86 | $46.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 19, 2022 | 85 | $613.4K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 12, 2022 | 84 | $172.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 30, 2022 | 83 | $94.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Oct 11, 2022 | 81 | $11.7K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Oct 11, 2022 | 82 | $378.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Sep 28, 2022 | 80 | $551.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Aug 23, 2022 | 79 | $202.3K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jul 22, 2022 | 78 | $112.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jun 14, 2022 | 76 | $351.2K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Jun 14, 2022 | 77 | $625.5K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Apr 25, 2022 | 75 | $735.4K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Apr 4, 2022 | 74 | $49.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Mar 18, 2022 | 73 | $94.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Mar 14, 2022 | 72 | $28.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Mar 10, 2022 | 71 | $613.5K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Feb 23, 2022 | 70 | $254.4K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Feb 7, 2022 | 69 | $0 | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 16, 2021 | 67 | $590.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 16, 2021 | 68 | $208.7K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Dec 7, 2021 | 66 | $837.3K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 29, 2021 | 65 | $69.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 17, 2021 | 64 | $270.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Nov 2, 2021 | 63 | $129.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING... |
| Oct 12, 2021 | 62 | $0 | EO14042 FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 22, 2021 | 61 | $127.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 14, 2021 | 60 | $958.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Aug 11, 2021 | 59 | $502.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jul 19, 2021 | 58 | $1.0M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| May 25, 2021 | 57 | $376.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| May 6, 2021 | 56 | $34.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 28, 2021 | 55 | $569.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 16, 2021 | 54 | $22.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 6, 2021 | 53 | $570.2K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 5, 2021 | 52 | $0 | COVID-19 FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 31, 2021 | 51 | $17.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 22, 2021 | 50 | $800.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Feb 25, 2021 | 49 | $2.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Feb 24, 2021 | 48 | $630.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Feb 3, 2021 | 47 | $170.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jan 29, 2021 | 46 | $115.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jan 14, 2021 | 45 | $385.3K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Dec 14, 2020 | 44 | $12.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Nov 10, 2020 | 43 | $0 | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Oct 5, 2020 | 42 | $0 | COVID-19 FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 23, 2020 | 41 | $558.7K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 22, 2020 | 40 | $71.6K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 3, 2020 | 39 | $233.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Aug 19, 2020 | 38 | $43.2K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jul 14, 2020 | 37 | $400.5K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jun 17, 2020 | 36 | $1.3M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 27, 2020 | 35 | $577.5K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 9, 2020 | 34 | $0 | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 26, 2020 | 33 | $2.0M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 19, 2020 | 32 | $752.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jan 28, 2020 | 31 | $1.0M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Dec 2, 2019 | 30 | $894.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Oct 25, 2019 | 29 | $501.3K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Oct 15, 2019 | 28 | $0 | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 24, 2019 | 27 | $538.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 5, 2019 | 26 | $162.8K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Aug 21, 2019 | 25 | $-35.0K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Aug 12, 2019 | 24 | $269.2K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jul 19, 2019 | 23 | $137.6K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jun 4, 2019 | 22 | $45.6K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| May 23, 2019 | 21 | $107.5K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Apr 26, 2019 | 20 | $469.2K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 25, 2019 | 19 | $2.0M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Feb 14, 2019 | 18 | $493.5K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Feb 1, 2019 | 17 | $532.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Dec 18, 2018 | 16 | $484.9K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 26, 2018 | 15 | $146.7K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 12, 2018 | 14 | $245.1K | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jun 11, 2018 | 13 | $3.1M | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| May 8, 2018 | 12 | $624.3K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 30, 2018 | 11 | $534.5K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 21, 2018 | 10 | $0 | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Feb 16, 2018 | 9 | $660.5K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jan 19, 2018 | 8 | $548.8K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Nov 13, 2017 | 7 | $1.0M | FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 26, 2017 | 6 | $82.4K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Sep 5, 2017 | 5 | $1.4M | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jul 17, 2017 | 4 | $981.2K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jun 14, 2017 | 3 | $595.4K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Jun 2, 2017 | 2 | $210.3K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| May 3, 2017 | 1 | $636.6K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
| Mar 29, 2017 | 0 | $591.0K | IGF::OT::IGF FEDIS IS A COST PLUS FIXED FEE WITH PERFORMANCE DEDUCTIONS CONTRACT. THE EFFORT WILL BE PERFORMED AS A MISSION SERVICES ARRANGEMENT, WITH FIXED FEE. FEDIS IS AN EFFORT FOR ON-SITE ARCHITECTURAL AND ENGINEERING DESIGN SERVICES, MASTER PLANNING SERVICES, CONSTRUCTION INSPECTION, PLANT OPERATIONS AND MAINTENANCE INSPECTION AND TOTAL BUILDING COMMISSIONING AT MARSHALL SPACE FLIGHT CENTER (MSFC). THIS EFFORT APPLIES TO THE BASIC EFFORT (BASE YEAR) AND ALL OPTIONS IF EXERCISED. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.