Federal contract award

SP060007C8254

TAS::21 2020::TAS UTILITY PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM AT FORT A.P. HILL, VIRGINIA. SERVICES INCLUDE OPERATIONS & MAINTENANCE, RENEWALS & REPLACEMENTS, AND PERFORMANCE OF INITIAL CAPITAL UPGRADES TO THE WATER AND WASTEWATER SYSTEMS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDLA ENERGY
NAICS221310 — Water Supply and Irrigation Systems
PSCS114 — Water Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$85.5M
Current contract value$243.9M
Potential contract value / ceiling$243.9M
Start dateSep 14, 2007
Current end dateDec 21, 2057
Potential end dateDec 21, 2057
Latest award activityMay 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 202 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 4, 2026P00201$425.3KWATER AND WASTEWATER UTILITY SERVICES.
Mar 19, 2026P00200$425.3KWATER AND WASTEWATER UTILITY SERVICES.
Mar 6, 2026P00199$27.0KWATER AND WASTEWATER UTILITY SERVICES.
Feb 19, 2026P00198$0WATER AND WASTEWATER UTILITY SERVICES.
Feb 6, 2026P00197$424.3KWATER AND WASTEWATER UTILITY SERVICES.
Dec 29, 2025P00196$0WATER AND WASTEWATER UTILITY SERVICES.
Dec 4, 2025P00195$1.3MWATER AND WASTEWATER UTILITY SERVICES.
Nov 21, 2025P00194$825.3KWATER AND WASTEWATER UTILITY SERVICES.
Nov 5, 2025P00193$0WATER AND WASTEWATER UTILITY SERVICES.
Sep 30, 2025P00191$718.6KWATER AND WASTEWATER UTILITY SERVICES.
Sep 30, 2025P00192$0WATER AND WASTEWATER UTILITY SERVICES.
Sep 17, 2025P00190$412.7KWATER AND WASTEWATER UTILITY SERVICES.
Sep 9, 2025P00189$412.7KWATER AND WASTEWATER UTILITY SERVICES.
Aug 15, 2025P00188$3.0KWATER AND WASTEWATER UTILITY SERVICES.
Jun 26, 2025P00187$0WATER AND WASTEWATER UTILITY SERVICES.
Jun 20, 2025P00186$412.7KWATER AND WASTEWATER UTILITY SERVICES.
Jun 9, 2025P00185$10.4KWATER AND WASTEWATER UTILITY SERVICES.
May 28, 2025P00184$0WATER AND WASTEWATER UTILITY SERVICES.
Apr 17, 2025P00183$0WATER AND WASTEWATER UTILITY SERVICES.
Mar 24, 2025P00182$1.2MWATER AND WASTEWATER UTILITY SERVICES.
Mar 14, 2025P00181$412.7KWATER AND WASTEWATER UTILITY SERVICES.
Feb 10, 2025P00180$968.9KWATER AND WASTEWATER UTILITY SERVICES.
Jan 21, 2025P00179$412.7KWATER AND WASTEWATER UTILITY SERVICES.
Dec 19, 2024P00178$0WATER AND WASTEWATER UTILITY SERVICES.
Oct 16, 2024P00177$783.1KWATER AND WASTEWATER UTILITY SERVICES.
Oct 11, 2024P00176$0WATER AND WASTEWATER UTILITY SERVICES.
Sep 27, 2024P00175$414.9KWATER AND WASTEWATER UTILITY SERVICES.
Sep 19, 2024P00174$391.5KWATER AND WASTEWATER UTILITY SERVICES.
Aug 20, 2024P00173$43.6KWATER AND WASTEWATER UTILITY SERVICES.
Jul 24, 2024P00172$783.1KWATER AND WASTEWATER UTILITY SERVICES.
Jul 11, 2024P00171$125.8KWATER AND WASTEWATER UTILITY SERVICES.
Jun 13, 2024P00170$0WATER AND WASTEWATER UTILITY SERVICES.
May 3, 2024P00169$1.2MWATER AND WASTEWATER UTILITY SERVICES.
Apr 12, 2024P00168$23.3KWATER AND WASTEWATER UTILITY SERVICES.
Feb 13, 2024P00167$0WATER AND WASTEWATER UTILITY SERVICES.
Jan 23, 2024P00166$1.2MWATER AND WASTEWATER UTILITY SERVICES.
Dec 21, 2023P00165$0WATER AND WASTEWATER UTILITY SERVICES.
Nov 21, 2023P00164$361.8KWATER AND WASTEWATER UTILITY SERVICES.
Nov 7, 2023P00163$723.5KWATER AND WASTEWATER UTILITY SERVICES.
Nov 6, 2023P00162$-18.5KWATER AND WASTEWATER UTILITY SERVICES.
Sep 27, 2023P00161$3.1KWATER AND WASTEWATER UTILITY SERVICES.
Sep 21, 2023P00160$822.9KWATER AND WASTEWATER UTILITY SERVICES.
Aug 25, 2023P00159$0WATER AND WASTEWATER UTILITY SERVICES.
Jun 30, 2023P00157$0WATER AND WASTEWATER UTILITY SERVICES.
Jun 30, 2023P00158$0WATER AND WASTEWATER UTILITY SERVICES.
Mar 21, 2023P00156$2.9MWATER AND WASTEWATER UTILITY SERVICES.
Mar 8, 2023P00155$0WATER AND WASTEWATER UTILITY SERVICES.
Feb 15, 2023P00154$361.8KWATER AND WASTEWATER UTILITY SERVICES.
Feb 1, 2023P00153$37.8KWATER AND WASTEWATER UTILITY SERVICES.
Dec 30, 2022P00152$361.8KWATER AND WASTEWATER UTILITY SERVICES.
Dec 5, 2022P00151$-4.4KWATER AND WASTEWATER UTILITY SERVICES.
Oct 27, 2022P00150$687.5KWATER AND WASTEWATER UTILITY SERVICES
Sep 23, 2022P00149$-5.1KWATER AND WASTEWATER UTILITY SERVICES
Sep 7, 2022P00148$624.4KWATER AND WASTEWATER UTILITY SERVICES
Aug 26, 2022P00147$173.3KWATER AND WASTEWATER UTILITY SERVICES
Aug 10, 2022P00146$84.7KWATER AND WASTEWATER UTILITY SERVICES
Jun 15, 2022P00145$1.6MWATER AND WASTEWATER UTILITY SERVICES
Mar 30, 2022P00144$326.4KWATER AND WASTEWATER UTILITY SERVICES
Mar 21, 2022P00143$652.8KWATER AND WASTEWATER UTILITY SERVICES
Mar 11, 2022P00142$0WATER AND WASTEWATER UTILITY SERVICES
Feb 17, 2022P00141$326.4KWATER AND WASTEWATER UTILITY SERVICES
Jan 26, 2022P00140$326.4KWATER AND WASTEWATER UTILITY SERVICES
Dec 15, 2021P00139$326.4KWATER AND WASTEWATER UTILITY SERVICES
Nov 22, 2021P00138$326.4KWATER AND WASTEWATER UTILITY SERVICES
Nov 15, 2021P00137$0WATER AND WASTEWATER UTILITY SERVICES. EO14042
Sep 23, 2021P00136$63.9KWATER AND WASTEWATER UTILITY SERVICES
Sep 16, 2021P00135$113.0KWATER AND WASTEWATER UTILITY SERVICES
Aug 13, 2021P00134$-25.8KWATER AND WASTEWATER UTILITY SERVICES
Jul 19, 2021P00133$342.4KWATER AND WASTEWATER UTILITY SERVICES
May 11, 2021P00132$0WATER AND WASTEWATER UTILITY SERVICES
May 4, 2021P00131$0WATER AND WASTEWATER UTILITY SERVICES
Apr 27, 2021P00130$0WATER AND WASTEWATER UTILITY SERVICES
Mar 17, 2021P00129$2.0MWATER AND WASTEWATER UTILITY SERVICES
Jan 11, 2021P00126$326.4KWATER AND WASTEWATER UTILITY SERVICES
Oct 15, 2020P00125$652.8KWATER AND WASTEWATER UTILITY SERVICES
Oct 15, 2020P00127$0WATER AND WASTEWATER UTILITY SERVICES
Sep 24, 2020P00124$0WATER AND WASTEWATER UTILITY SERVICES
Sep 16, 2020P00123$-30.7KWATER AND WASTEWATER UTILITY SERVICES
Sep 11, 2020P00122$24.5KWATER AND WASTEWATER UTILITY SERVICES
Sep 2, 2020P00121$0WATER AND WASTEWATER UTILITY SERVICES
Mar 24, 2020P00120$2.6MWATER AND WASTEWATER UTILITY SERVICES
Feb 2, 2020P00128$979.2KWATER AND WASTEWATER UTILITY SERVICES
Jan 31, 2020P00119$0WATER AND WASTEWATER UTILITY SERVICES
Dec 19, 2019P00118$652.8KTHIS MODIFICATION REVISES CLIN 0013, TO ESTABLISH AND FUND CLIN 0013AA THE FIRST TWO MONTHS OF CONTRACT YEAR 13, UTILITY SERVICES CHARGE, AND ESTABLISHES BUT NOT FUND THE REMAINING 10 MONTHS.
Nov 13, 2019P00117$652.8KTHIS MODIFICATION ACKNOWLEDGES THE CHANGE OF ADDRESS IN SYSTEM FOR AWARD MANAGEMENT AS SHOWN IN BLOCK 10A, REVISES CLIN 0012 TO FUND SUBCLIN 0012AB AND ESTABLISHES ACRN DV FOR 2 MONTHS OF CONTRACT YEAR 12, AND DOCUMENTS TWO NO-COST PERIOD OF PERFORMANCE EXTENSIONS FOR PREVIOUSLY AWARDED PROJECTS.
Sep 23, 2019P00116$418.3KPRICE REDETERMINATION #4. OBLIGATE FYS 16,17, 18, AND 19 FUNDING.
Jun 12, 2019P00115$63.1KREVISE CLIN 0124 TO PROVIDE ADDITIONAL $63,109.76 FOR FIRE SUPPRESSION AND OTHER CAPABILITIES TO THE ECS TEMF AND WAREHOUSE PROJECT AWARDED IN MODIFICATION P00106.
Mar 14, 2019P00114$1.8MTHIS MODIFICATION REVISES SECTIONS B.3 SCHEDULE AND G.4 ACCOUNTING AND APPROPRIATION DATA TO OBLIGATE SIX (6) MONTHS OF ADDITIONAL FUNDING FOR CONTRACT YEAR 12-UTILITY SERVICE CHARGES UNDER SUBCLIN 0012AA
Feb 25, 2019P00113$-3.1KTHIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0126 AND ACRN DQ IN THE AMOUNT OF $9,356.51 TO AUTHORIZE AW TO COMPLETE PROJECT FAPH-70 MARSOC, AND DEOBLIGATES $12,461.05, IN EXCESS FY14 FUNDS NOT ASSIGNED TO A CLIN ON ACRN CG. IN ADDITION THIS MODIFICATION APPOINTS A NEW COR.
Jan 23, 2019P00112$1.2MTHIS MODIFICATION REVISES CLIN 0012 TO ESTABLISH AND FUND SUBCLIN 0012AA FOR 4 MONTHS OF CONTRACT YEAR 12 UTILITY SERVICE CHARGE WITH FY19 FUNDING, AND ESTABLISHES BUT DOES NOT FUND THE REMAINING 8 MONTHS OF CONTRACT YEAR 12.
Dec 18, 2018P00111$292.5KTHIS MODIFICATION REVISES CLIN 0011 TO ESTABLISH AND FUND SUBCLIN 0011AC FOR 1 MONTH OF CONTRACT YEAR 11 UTILITY SERVICE CHARGE WITH FY19 FUNDING.
Oct 19, 2018P00110$292.5KTHIS MODIFICATION REVISES CLIN 0011 TO ESTABLISH AND FUND SUBCLIN 0011AB FOR 1 MONTH OF CONTRACT YEAR 11 UTILITY SERVICE CHARGE WITH FY19 FUNDING, AND ESTABLISH BUT NOT FUND THE REMAINING MONTH OF CONTRACT YEAR 11.
Sep 26, 2018P00109$-27.4KDEOBLIGATES EXCESS FUNDS FROM ACRN CF UNDER DIRECT CITE MIPR 10719864-BASIC IN THE AMOUNT OF $27,354.41.
Sep 5, 2018P00107$0THIS ADMINISTRATIVE MODIFICATION ACKNOWLEDGES THE CHANGE IN THE NAME OF THE CONTRACTOR FROM AN INC. TO LLC, AS AWARDED IN A SEPARATE CONTRACT.
Sep 5, 2018P00108$137.3KTO AUTHORIZE THE SYSTEM OWNER TO COMPLETED THE SERVICE CONNECTION IDENTIFIED AS FAPH-74, CHAMPS RV UPGRADES, AND ESTABLISH AND FUND CLIN 0125.
Jul 17, 2018P00106$2.5MTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CLIN 0124 FOR THE ECS TEMF AND WAREHOUSE PROJECT LOCATED ON FORT AP HILL.
Jan 24, 2018P00105$2.9MTHIS MODIFICATION ESTABLISHES SUBCLIN 0011AA TO FUND 10 MONTHS OF CONTRACT YEAR 11.
Nov 30, 2017P00104$585.1KTHIS MODIFICATION; ESTABLISHES SUBCLIN 0010AC TO FUND 2 MONTHS OF CONTRACT YEAR 10 AND CHANGES THE CONTRACTING OFFICER.
Sep 22, 2017P00103$42.1KTHE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE SYSTEM OWNER TO PERFORM A SERVICE CONNECTION FOR THE BACKLFOW PREVENTER TESTING PROJECT.
Aug 23, 2017P00101$2.1KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CLIN 0122 FOR THE CVWF-OPERATIONS PROJECT.
Aug 23, 2017P00102$2.2KTHE PURPOSE OF THIS MODIFICATION IS TO FUND A SCOPE OF WORK CHANGE TO THE NORTHGATE ACP PROJECT INITIALLY FUNDED ON P00091.
Apr 27, 2017P00100$0THE PURPOSE OF P00100 IS TO EXTEND THE PERIOD OF PERFORMANCE OF THE NORTH GATE ACP PROJECT FROM APRIL 28, 2017 TO JUNE 30, 2017.
Mar 17, 2017P00099$1.8MTHE PURPOSE OF THIS MODIFICATION IS TO FUND CLIN 0010AB FOR THE FIXED MONTHLY CHARGE FOR PERIOD APRIL TO OCT 2017 IN THE AMOUNT OF $1,755,204.00.
Feb 27, 2017P00097$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DFARS 252.204-7009 IAW DFARS 204.7304(B) AND DFARS 252.204.7012 IAW 204.7304(C). UPDATE DFARS 252.204-7000.
Feb 27, 2017P00098$1.2MTHE PURPOSE OF MODIFICATION P00098 IS TO ESTABLISH AND FUND CONTRACT LINE ITEM NUMBER (CLIN) 0010AA FOR THE FMC FUNDING FOR 4 MONTHS.
Jan 20, 2017P00095$775.1KTHE PURPOSE OF BILATERAL MODIFICATION P00095 IS TO INCORPORATE THE PRICE REDETERMINATION#3 FOR THE CONTRACT PERFORMANCE PERIOD DECEMBER 21, 2015 THROUGH DECEMBER 20, 2018.
Jan 20, 2017P00096$0THE PURPOSE OF MODIFICATION P00096 IS TO EXTEND THE PERFORMANCE PERIOD TO NOVEMBER 15, 2017.
Nov 8, 2016P00094$19.8KTHE PURPOSE OF MODIFICATION P00094 IS TO ESTABLISH AND FUND CLIN 0121 FOR THE ECS TEMF HYDRAULIC WATER MODEL.
Oct 21, 2016P00093$455.9KTHE PURPOSE OF THIS MODIFICATION IS TO FUND MONTHS 107&108 OF YEAR 9 FIXED MONTHLY CHARGE.
Oct 17, 2016P00092$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE AUTHORITY CITED ON MODIFICATION P00091 DATED SEPTEMBER 29, 2016 FROM SECTION C.3.1 UTILITY SERVICE REQUIREMENT OF THE CONTRACT TO C.11.2.5 CAPITAL UPGRADES/CONNECTION CHARGES.
Sep 29, 2016P00091$132.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CLIN 0120 FOR THE NORTH GATE PROJECT. THIS PROJECT WILL PROVIDE AND INSTALL DOMESTIC WATER SERVICE, FIRE PROTECTION, AND SANITARY SEWER SERVICE TO SERVE THE PROPOSED VISITOR CENTER AT THE NORTH GATE ENTRANCE TO FORT A.P. HILL
Jun 28, 2016P00090$683.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBCLIN 0008AJ FOR THE FIXED MONTHLY CHARGE FOR A PERIOD OF THREE (3) MONTHS.
Jun 27, 2016P00089$4.1KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CLIN 0119 FOR THE CENTRAL VEHICLE WASH FACILITY (CVWF). THE PROJECT WILL CONTROL THE PUMPS AND VALVES ASSOCIATED WITH THE CONTROL PANEL TO OPERATE THE WASH FACILITY DURING THE TRAINING EXERCISES.
May 20, 2016P00088$683.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBCLIN 0008AH FOR THE FIXED MONTHLY CHARGE FOR MONTHS 101 - 103 OF YEAR 8, TOTALING $683,828.91.
Apr 1, 2016P00087$464.0KTHE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO: 1) ACCEPT AMERICAN WATER'S ANNUAL COST TO OPERATE OPERATION AND MAINTENANCE (ACTO O&M) PROPOSAL DATED JULY 15, 2015, AND INCORPORATE THE ACTO O&M METHODOLOGY INTO THIS CONTRACT. THE ACTO O&M METHODOLOGY WILL APPLY ONLY FOR INFRASTRUCTURE INCORPORATED INTO THIS CONTRACT FOLLOWING THE EFFECTIVE DATE OF THIS MODIFICATION. THE ORIGINAL O&M METHODOLOGY ACCEPTED BY THE GOVERNMENT AT TIME OF CONTRACT AWARD REMAINS IN PLACE FOR ANY INFRASTRUCTURE INCORPORATED INTO THIS CONTRACT PRIOR TO THE EFFECTIVE DATE OF THIS MODIFICATION. 2) ISSUE RETROACTIVE PAYMENTS TO AMERICAN WATER FOR THE 16 FUTURE CAPITAL UPGRADE PROJECTS.
Feb 23, 2016P00086$0THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE RANGE 39 DRY VAULT LATRINE PROJECT AT NO ADDITIONAL COST TO THE GOVERNMENT.
Feb 9, 2016P00085$911.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBCLINS 0008AF AND 0008AG FOR THE FIXED MONTHLY CHARGE FOR MONTHS 97 - 100 OF YEAR 8, TOTALING $911,771.88
Dec 9, 2015P00084$455.9KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBCLIN 0008AE FOR THE FIXED MONTHLY CHARGE FOR MONTHS 95 AND 96 OF YEAR 8, TOTALING $455,885.94
Oct 27, 2015P00083$0THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO CORRECT THE CLIN STRUCTURE NOTED IN SECTION G- CONTRACT ADMINISTRATION DATA OF P00081 TO ADD SUBCLINS FOR PROJECT FAPH-F62 DPTMS AND RANGE 37 CONNECT TO SEWER.
Sep 28, 2015P00082$41.3KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CONTRACT LINE ITEMS (CLINS) 0113 AND 0114 FOR THE REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR THE UNPLANNED COSTS, BOTH INCURRED AND TO BE INCURRED, FOR ADDITIONAL WATER SYSTEM SAMPLING REQUIRED BY THE VIRGINIA DEPARTMENT OF HEALTH (VDH). ADDITIONALLY, SECTION G.4 ACCOUNTING AND APPROPRIATION DATA ESTABLISHES ACCOUNTING CLASSIFICATION REFERENCE NUMBERS (ACRNS) CN AND CP TO FUND CLINS 0113 AND 0114.
Sep 25, 2015P00080$73.8KTHE PURPOSE OF MODIFICATION P00080-DRY VAULT LATRINE RANGE 39 IS TO ESTABLISH AND FUND CLIN 0110. THE CONTRACTOR WILL INSTALL A DRY VAULT LATRINE AT RANGE 39 (BREACHER FACILITY).
Sep 25, 2015P00081$944.4KTHE PURPOSE OF MODIFICATION P00081 IS TO ESTABLISH AND FUND SUBCLIN 0112-DPTMS&RANGE 37 SEWER CONNECT PROJECT. THE CONTRACTOR WILL INSTALL A LIFT STATION AT DPTMS TO ELIMINATE TWO SEPTIC TANKS AND A SINGLE DRAIN FIELD. THIS PROJECT WILL PROVIDE WASTEWATER SERVICES TO THE DPTMS FACILITY, RANGE 37, AND BUILDING 1273, AND WILL ELIMINATE THE SEPTIC SYSTEMS AND WASTEWATER HOLDING TANK AT THOSE LOCATIONS.
Sep 22, 2015P00078$245.5KTHE PURPOSE OF MODIFICATION P00078 IS TO ESTABLISH AND FUND CLIN 0109 FOR A WATER QUALITY STUDY IDENTIFIED AS PROJECT FAPH-F63. THIS PROJECT WILL EVALUATE WATER QUALITY ISSUES AND DEVELOP RECOMMENDATIONS AND STRATEGIES TO MITIGATE ISSUES AND OPTIMIZE OPERATIONS OF THE SYSTEM.
Sep 22, 2015P00079$12.8KTHE PURPOSE OF MODIFICATION P00079 IS TO ESTABLISH AND FUND CLIN 0110-FIRE STATION #7 PROJECT. THE CONTRACTOR WILL INSTALL 4-INCH FIRE SERVICE LINES, 2-INCH DOMESTIC WATER SERVICE, AND 6-INCH SANITARY SEWER LATERAL LINES TO THE NEW MODULAR BUILDING ADJACENT TO THE FIRE STATION.
Aug 31, 2015P00077$482.0KTHE PURPOSE OF THIS MODIFICATION IS TO NOTE THE AGREEMENT REACHED BETWEEN THE CONTRACTOR AND THE GOVERNMENT FOR PRICE REDETERMINATION #2, AND APPLY THE 2013 AND 2014 CREDIT ADJUSTMENT FOR THE PEUMANSEND CREEK REGIONAL JAIL (PCRJ).
Apr 23, 2015P00076$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND SUBCLIN 0008AC FOR THE FIXED MONTHLY CHARGE FOR MONTHS 88 THROUGH 94 OF YEAR 8.
Mar 18, 2015P00074$155.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CONTRACT LINE ITEM (CLIN) 0108 FOR THE RIGHT-OF-WAY CLEARING PROJECT.
Mar 18, 2015P00075$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE AN ADMINISTRATIVE CORRECTION TO CLIN 0106 ESTABLISHED ON MODIFICATION P00065 DATED MAY 6, 2014.
Jan 28, 2015P00073$427.5KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND SUBCLIN 0008AB FOR THE FIXED MONTHLY CHARGE FOR MONTHS 86 AND 87 OF YEAR 8.
Jan 8, 2015P00072$213.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND SUBCLIN 0008AA FOR THE FIXED MONTHLY CHARGE FOR MONTH 85 OF YEAR 8.
Dec 5, 2014P00071$0THE PURPOSE OF P00071 IS TO ADD THE WIDE AREA WORK FLOW (WAWF) REQUIREMENT TO CONTRACT SP060007C8254.
Nov 3, 2014P00070$427.5KESTABLISH AND FUND SUBCLIN 0007AE FOR THE FIXED MONTHLY CHARGE (FMC) FOR MONTHS 83-84
Jul 9, 2014P00069$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CORRECTIONS TO THE QUANTITY AND UNIT PRICE FOR CLIN 0007AC AS ESTABLISHED ON MODIFICATION P00067 AND TO ESTABLISH SUBCLIN 0007AD FOR THE FIXED MONTHLY CHARGE FOR MONTHS 79-82 OF YEAR 7, TOTALING $1,051,057.96. IN ADDITION, THIS MODIFICATION PROVIDES A NO-COST EXTENSION TO THE PERIOD OF PERFORMANCE FOR THE AWG FIRE FLOW PROJECT.
Jun 5, 2014P00068$79.7KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CONTRACT LINE ITEM (CLIN) 0107 FOR THE REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR THE RELIEF OF ADDITIONAL EXPENSES INCURRED FOR THE OPERATIONAL SUPPORT OF THE BOY SCOUTS OF AMERICA NATIONAL JAMBOREE.
May 29, 2014P00067$1.1MTO ESTABLISH AND FUND SUBCLIN 0007AC FOR THE FIXED MONTHLY CHARGE FOR MONTHS 78-82 OF YEAR 7.
May 12, 2014P00066$0EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0100-PENDER CAMP LIFT STATION FROM APRIL 15, 2014 TO MAY 6, 2014.
May 6, 2014P00065$1.0MTO ESTABLISH ACRN BX AND FUND CLIN 0106 FOR THE LATRINES UPGRADE PROJECT.
Apr 14, 2014P00064$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0100-PENDER CAMP LIFT STATION FROM 02/28/2014 TO 04/15/2014.
Feb 21, 2014P00062$16.3KTO ESTABLISH ACRN BW AND FUND CLIN 0105 FOR COST ASSOCIATED WITH THE DELAY OF CONSTRUCTION CLAIM FOR THE ADMINISTRATION BUILDING LOCATED ON FORT AP HILL.
Feb 21, 2014P00063$0INCORPORATE REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT FOR VIRGINIA, REV -17.
Feb 7, 2014P00061$855.1KTO ESTABLISH AND FUND SUBCLIN 0007AB FOR THE FMC FOR MONTHS 74-77 OF YEAR 7 UNDER ACRN BV.
Jan 9, 2014P00060$28.7KTO ESTABLISH ACRN BU AND FUND CLIN 0104 FOR THE AUTOMATIC FLUSHING.
Dec 11, 2013P00059$0EXTEND THE PERIOD OF PERFORMANCE FROM 12/30/13 TO 02/28/14 FOR CLIN 0100-PENDER CAMP LIFT STATION.
Dec 9, 2013P00058$427.5KTO ESTABLISH AND FUND SUBCLIN 0006H FOR THE FMC FOR MONTHS 72-73 OF YEAR 6 UNDER ACRN BT
Nov 22, 2013P00057$213.8KTO ESTABLISH AND FUND SUBCLIN 0006AG FOR THE FMC FOR MONTH 71 OF YEAR 6 UNDER ACRN BS.
Nov 4, 2013P00056$0TO EXTEND THE PERIOD OF PERFORMANCE FROM OCT 30, 2013 TO JAN 31, 2014. CHANGE THE CONTRACT LINE ITEM NUMBER (CLIN) FROM 0102 TO SUBCLINS 0102AA AND 0102AB FOR PAYMENT OF INVOICE PURPOSES.
Oct 24, 2013P00055$213.8KTO ESTABLISH AND FUND SUBCLINS 0006AE AND 0006AF FOR THE FMC FOR MONTH 70 OF YEAR 6 UNDER ACRNS BQ AND BR.
Sep 27, 2013P00054$767.4KTO ESTABLISH ACRN BP AND FUND CLIN 103 FOR THE AWG FIRE FLOW.
Sep 20, 2013P00052$-17.0KTO DE-OBLIGATE EXCESS FUNDS ON CLINS 0069 AND 0070 TOTALING $17,019.67
Sep 20, 2013P00053$11.2KTO ESTABLISH ACRN BN AND ESTABLISH AND FUND CLIN 0102 FOR THE HAZMAT BUILDING.
Jun 28, 2013P00051$280.5KESTABLISH AND FUND CLIN 0100 AND CLIN 0101
Jun 4, 2013P00050$0EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0099-CENTRAL VEHICLE WASH FACILITY (CVWF)
May 6, 2013P00049$855.1KTO ESTABLISH AND FUND SUBCLIN 0006AD FOR THE FMC FOR MONTHS 66-69 OF YEAR 6 UNDER ACRN BL.
Apr 19, 2013P00048$213.8KTO ESTABLISH AND FUND SUBCLIN 00106AC FOR THE FMC FOR MONTH 65 OF YEAR 6 UNDER ACRN BK. IN ADDITION, TO CORRECT CLIN 0006 FORMAT IN B.3 SCHEDULE.
Feb 15, 2013P00047$641.3KTO FUND SUBCLIN 0006AB FOR THE FIXED MONTHLY CHARGE FOR MONTHS 62,63, AND 64 OF YEAR 6. ESTABLISHES ACRN BJ.
Feb 1, 2013P00046$213.8KTO FUND SUBCLIN 0006AA, FIXED MONTHLY CHARGE FOR MONTH 61 OF YEAR 6 UNDER THE FORT AP HILL WATER AND WASTEWATER UTILITY SERVICES CONTRACT
Jan 3, 2013P00045$0TO EXTEND THE PERIOD OF PERFORMANCE FOR SUBCLINS 0094AF AND 0094AG.
Sep 27, 2012P00042$0TO EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0094AD AND 0095
Sep 27, 2012P00043$40.5KTO ESTABLISH ACRN BG AND ESTABLISH AND FUND CONTRACT LINE ITEM NUMBER (CLIN) 0099 FOR THE CENTRAL VEHICLE WAS FACILITY PROJECT.
Sep 27, 2012P00044$0TO REPLACE THE STATEMENT OF WORK (SOW) FOR CONTRACT LINE ITEM NUMBER (CLIN) 0097.
Jun 22, 2012P00040$0PERIOD OF PERFORMANCE EXTENSION FOR PROJECTS FAPH-38, FROM MAY 31, 2012 TO JUNE 30, 2012 AND FAPH-F36, FROM MAY 31, 2012 TO JULY 15, 2012.
Jun 22, 2012P00041$1.3MTO FUND REMAINING YEAR 5 AND REDUCE FIXED MONTHLY CHARGE FOR MONTH 55 BY $10,294.77.
Mar 14, 2012P00039$28.5KP00039 WAS TO ESTABLISH AND FUND CLIN 0098- AWG INSPECTION SERVICES
Dec 30, 2011P00038$13.1KTHE PURPOSE OF P00038 WAS TO ESTABLISHED AND FUND CLIN 0097- TSC FIRE HYDRANT RELOCATION.
Dec 9, 2011P00037$0MODIFICATION P00037 EXTENDS THE PERIOD OF PERFORMANCE FOR CONTRACT LINE ITEM (CLIN 91) FROM 12/7/2011 TO 6/7/2012.
Nov 17, 2011P00036$0MODIFICATION P00036 EXTENDS THE PERIOD OF PERFORMANCE FOR CONTRACT LINE ITEM NUMBER (CLIN) 0090.
Sep 30, 2011P00035$-775.8KTHIS MODIFICATION INCREASES THE FIXED MONTHLY CHARGE FOR CLINS 6 THROUGH 60 FOR FORT JACKSON.
Sep 29, 2011P00033$1.2MTHE PURPOSE OF THIS BILATERAL MODIFICATION, P00033, IS TO INCORPORATE THE PRICE REDETERMINATION FOR THE CONTRACT S MONTHS 25-600 OF THE CONTRACT, AS PRESCRIBED BY FAR 52.216-5 PRICE REDETERMINATION PROSPECTIVE.
Sep 29, 2011P00034$1.1MTHE PURPOSE OF THE MODIFICATION IS TO REVISE SECTION B.3, SCHEDULE, TO ESTABLISH THE FOLLOWING SUB/CLINS IN ACCORDANCE WITH SECTIONS C.4.1, TEMPORARY CONNECTIONS, AND C.11.2.5, CAPITAL UPGRADES/CONNECTION CHARGES, OF THE CONTRACT
Sep 12, 2011P00032$4.2MMODIFICATION P00032 ESTABLISHES AND FUNDS TWO CONTRACT LINE ITEM NUMBERS (CLINS) TO AUTHORIZE THE CONTRACTOR TO EXECUTE TWO PROJECTS THAT ARE WITHIN THE SCOPE OF THE CONTRACT. THIS MODIFICATION ALSO REVISES THE PERIODS OF PERFORMANCE OF FOUR OTHER CLINS ON CONTRACT.
Jul 20, 2011P00031$0ADMINISTRATIVE MODIFICATION TO CHANGE THE CONTRACTING OFFICER'S REPRESENTATIVE.
Jun 20, 2011P00030$1.2MIS MODIFIED TO FUND SUBCLINS 0004AC AND 0004AD FOR THE FIXED MONTHLY CHARGE FOR PART OF MONTH 42 THROUGH MONTHS 48 OF YEAR 4. THIS MODIFICATION ALSO ESTABLISHES ACRN AY UNDER SECTION G.4, ACCOUNTING AND APPROPRIATION DATA, TO FUND SUBCLINS 0004AC AND 0004AD.
May 9, 2011P00029$0THE PURPOSE OF MODIFICATION P00029 IS TO EXTEND THE PERIOD OF PERFORMANCE OF THE TRAINING SUPPORT CENTER (TSC) PROJECT, CLIN 0081, BY TWO MONTHS DUE TO DELAYS BEYOND THE CONTRACTOR'S CONTROL.
Feb 17, 2011P00028$37.2KTO ESTABLISH AND FUND CLIN 0089 FOR THE COMPLETION OF THE PENDER CAMP SHOWERS ADD ON SERVICE CONNECTION IN ACCORDANCE WITH C.11.2.5 CAPITAL UPGRADES/CONNECTION CHARGES OF THE CONTRACT. AS A RESULT, ACRN AX IS ESTABLISHED UNDER G.4, ACCOUNTING AND APPROPRIATION DATA.
Feb 7, 2011P00027$21.2KTHIS MODIFICATION INCREASES THE FIXED MONTHLY CHARGE AS A RESULT OF THIRD PARTY INFRASTRUCTURE CONVEYED TO AMERICAN WATER OPERATIONS AND MAINTENANCE, INC. IN ADDITION, THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FOR SERVICE CONNECTION FOR THE TRAINING SUPPORT CENTER (TSC) LASTLY, THIS ESTABLISHES FUNDING FOR THE INVENTORY ADJUSTMENT.
Nov 16, 2010P00026$0CONTRACT SP0600-07-C-8254 FOR THE UTILITY PRIVATIZATION OF THE FORT A.P. HILL, VA WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS IS MODIFIED TO CORRECT P00020 AS THERE WAS A MATHEMATHICAL ERROR ON CLIN 0078. AS A RESULT, THIS MODIFICATION REDUCES THE QUANTITY ON SUBCLIN 0077AA FROM 7 TO 6 AND ESTABLISHES SUBCLIN 0077AB TO OFFSET THE PREVIOUSLY AGREED UTILITY SERVICE YEAR 3 FOR MONTH 36 BY $1,959.80 AS CREDIT FOR THE MATHEMATHICAL ERROR ON CLIN 0078. IN ADDITION, THIS MODIFICATION REVISES PREVIOUSLY ESTABLISHED ACRN AB UNDER SECTION G.4, ACCOUNTING AND APPROPRIATION DATA TO RE-ALLOCATE FUNDS ON SUBCLIN 0077AA AND FUND SUBCLIN 0077AB.
Sep 29, 2010P00025$-3.0MCONTRACT SP0600-07-C-8254 FOR THE UTILITY PRIVATIZATION OF THE FORT A.P. HILL, VA WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS IS MODIFIED TO ESTABLISH CLINS 0086 AND 0087 FOR THE COMPLETION OF THE PENDER FORCE MAIN CAPITAL IMPROVEMENT PROJECT AND THE SERVICE CONNECTION OF THE LATRINE LOCATED AT RANGE 37, RESPECTIVELY, IN ACCORDANCE WITH C.11.2.5 CAPITAL UPGRADES/CONNECTION CHARGES OF THE CONTRACT. ADDITIONALLY, THIS MODIFICATION ALSO ESTABLISHES ACRN AV TO FUND CLIN 0087, REVISES PREVIOUSLY ESTABLISHED ACRN AT TO FUND CLIN 00086, AND DEOBLIGATE EXCESS FUNDS ON ACRNS AT AND AU UNDER SECTION G.4, ACCOUNTING AND APPROPRIATION DATA.
Sep 8, 2010P00023$0CONTRACT SP0600-07-C-8254 FOR THE UTILITY PRIVATIZATION OF THE FORT A.P. HILL, VA WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS IS MODIFIED TO ACKNOWLEDGE THE AMENDED BILL OF SALE, DATED JULY 7, 2010, FOR THE TRANSFER OF ADDITIONAL UTILITY ASSETS CONSTRUCTED, INSTALLED, AND/OR PUT INTO SERVICE PRIOR TO THE ORIGINAL CONVEYANCE OF ASSETS ON DECEMBER 19, 2007 TO AMERICAN WATER OPERATIONS AND MAINTENANCE (AWO&M). BILL OF SALE NUMBER DACA65-S-10-61 WITH EXHIBITS A , B , C , D , E , AND F , FOR THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS, AS AMENDED, ARE INCLUDED IN THE CONTRACT FOR REFERENCE ONLY. ADJUSTMENTS TO THE MONTHLY CHARGE, AS A RESULT OF ADDITIONAL INVENTORY, WERE INCORPORATED UNDER P00020 OF THIS CONTRACT.
Sep 8, 2010P00024$8.2MCONTRACT SP0600-07-C-8254 FOR THE UTILITY PRIVATIZATION OF THE FORT A.P. HILL, VA WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS IS MODIFIED TO ESTABLISH CLIN 0082 FOR THE COMPLETION OF A SERVICE CONNECTION PROJECT FOR THE EXPLOSIVE ORDNANCE DISPOSAL (EOD) FIELD TRAINING FACILITY, CLIN 0083 FOR THE COMPLETION OF A CAPITAL UPGRADE FOR THE INSTALLATION OF AN EMERGENCY GENERATOR, AND CLINS 0084 AND 0085 FOR WATER AND WASTEWATER SCADA FREQUENCY CHANGES, RESPECTIVELY, AND SOIL TESTING, IN ACCORDANCE WITH C.11.2.5 CAPITAL UPGRADES/CONNECTION CHARGES OF THE CONTRACT.
Aug 26, 2010P00022$129.7KCONTRACT SP0600-07-C-8254 FOR THE UTILITY PRIVATIZATION OF THE FORT A.P. HILL, VA WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS IS MODIFIED TO ESTABLISH CLIN 0081 FOR THE COMPLETION OF A SERVICE CONNECTION PROJECT FOR THE TRAINING SUPPORT CENTER (TSC), IN ACCORDANCE WITH C.11.2.5 CAPITAL UPGRADES/CONNECTION CHARGES OF THE CONTRACT. ADDITIONALLY, THIS MODIFICATION ASSIGNS APPLICABLE APPROPRIATION DATA UNDER SECTION G.4, ACCOUNTING AND APPROPRIATION DATA.
Jun 2, 2010P00021$1.2MCONTRACT SP0600-07-C-8254 FOR THE UTILITY PRIVATIZATION OF THE FORT A.P. HILL, VA WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEMS IS MODIFIED TO INCORPORATE CHANGES TO THE CONTRACT IN ACCORDANCE WITH FAR 52.243-1 ALT. I CHANGES FIXED PRICE. THIS MODIFICATION ESTABLISHES CLINS 0079 AND 0080 FOR THE COMPLETION OF SERVICE CONNECTION PROJECTS LOCATED AT PENDER CAMP AND CAMP CONNORS, RESPECTIVELY, IN ACCORDANCE WITH C.11.2.5 CAPITAL UPGRADES/CONNECTION CHARGES OF THE CONTRACT. ADDITIONALLY, THIS MODIFICATION ASSIGNS APPLICABLE APPROPRIATION DATA UNDER SECTION G.4, ACCOUNTING AND APPROPRIATION DATA.
May 28, 2010P00020$0MODIFICATION OF THE UTILITY PRIVATIZATION CONTRACT TO INCORPORATE ADJUSTMENTS TO THE MONTHLY CHARGE IN ACCORDANCE WITH FAR 52.243-1 ALT. I CHANGES FIXED PRICE. THIS MODIFICATION REVISES SECTIONS J02, WASTEWATER AND J03, POTABLE WATER, AND CLINS 0004-0050, AND ESTABLISHES SUBCLIN 0077AA AND CLIN 0078, AS A RESULT OF THE TRANSFER OF ADDITIONAL UTILITY ASSETS CONSTRUCTED, INSTALLED, AND/OR PUT INTO SERVICE PRIOR TO THE ORIGINAL CONVEYANCE OF ASSETS ON DECEMBER 19, 2007. SECTIONS B.3, B.4, AND B.5 ARE HEREBY DELETED IN THEIR ENTIRETY AND REPLACED AS A RESULT OF THE CHANGES IN THE INVENTORY. SECTION G.4 IS REVISED TO RE-ALLOCATE FUNDS FOR ACRN AB IN ORDER TO FUND THE INCREASE IN O&M/R&R. THIS MODIFICATION IS RETROACTIVELY EFFECTIVE FROM THE BEGINNING OF YEAR 3 OF THE CONTRACT, COMMENCING ON DECEMBER 21, 2009.
May 4, 2010P00019$0MODIFICATION TO THE UTILITIES PRIVATIZATION CONTRACT TO ACKNOWLEDGE THE AMENDED BILL OF SALE AND THE WATER AND WASTEWATER EASEMENTS.
Apr 20, 2010P00018$93.8KCORRECT ERRORS ON P00003, ESTABLISH CLIN 0076 FOR A CAPITAL IMPROVEMENT PROJECT AT CAMP CONNORS, FT. AP HILL, AND ASSIGN APPLICABLE APPROPRIATION DATA.
Mar 24, 2010P00017$92.5KDELETE SECTIONS B.3, B.4 AND B.5 AND REPLACE THEM WITH NEW VERSIONS, ESTABLISH CLIN 0074 FOR THE CHANGES TO THE MONTHLY CHARGE FOR YR3 AND ESTABLISH CLIN 0075 FOR ADDITIONAL OPERATIONAL SUPPORT SERVICES FOR THE BOY SCOUTS OF AMERICAN NATIONAL JAMBOREE AND REVISED SECTION G.4.
Dec 4, 2009P00016$11.4KASSIGN CLIN 0073 FOR A NEW SERVICE CONNECTION AT THE GAMING LAB AT FT. AP HILL, AND ASSIGN APPLICABLE APPROPRIATION DATA.
Oct 22, 2009P00015$4.1KCONTRACT MOD TO ADD CLIN 0072 FOR SERVICE CONNECTION AND ADD APPROPRIATION DATA.
Sep 30, 2009P00014$914MODIFICATION TO THE UP CONTRACT TO ESTABLISH CLIN 0071 FOR CAPITAL IMPROVEMENT PROJECT, ASSIGN APPLICABLE APPROPRIATION DATA AND EXTEND PERIOD OF PERFORMANCE FOR CLINS 0060, 0061, 0062 AND 0064, ESTABLISHED IN P00006.
Sep 29, 2009P00013$100.4KMODIFICATION TO THE UP CONTRACT TO ADD CLIN FOR CAPITAL UPGRADE AND ADD FUNDS.
Sep 23, 2009P00011$10.7KMODIFICATION TO THE UTILITY PRIVATIZATION CONTRACT TO ADD CLIN 0068, REDUCE CLIN 0063, REVISE AND ASSIGN APPROPRIATION DATA.
Sep 23, 2009P00012$0CONTRACT MOD TO THE UP CONTRACT TO CORRECT APPROPRIATION DATA FOR ACRN AD.
Sep 18, 2009P00010$32.4KMODIFICATION TO THE UP CONTRACT TO REVISE CLIN 0065 ON P00008, ADD CLIN 0067 FOR NEW SERVICE CONNECTION CAMP COOKE BLDG. 808 AND ASSIGN APPLICABLE APPROPRIATION DATA.
Jul 8, 2009P00009$9.4KMODIFICATION IS CREATED TO ADD CLIN 0066 FOR A NEW SERVICE CONNECTION TO SUPPLY DOMESTIC WATER AND SANITARY SEWER SERVICE FOR RANGE 8/9 LATRINE BUILDING LOCATED AT FT. AP HILL.
Jun 17, 2009P00008$5.9KMODIFICATION TO THE UTILITY PRIVATIZATION CONTRACT TO ADD CAPITAL UPGRADE PROJECT AND REVISE THE SCADA LOCATIONS IDENTIFIED UNDER MOD P00006.
Feb 11, 2009P00007$0ADMINISTRATIVE MODIFICATION TO UPDATE CLAUSES AND SECTIONS IN THE UTILITY PRIVATIZATION CONTRACT.
Sep 30, 2008P00006$226.8KCAPITAL IMPROVEMENTS UNDER THE UTILITY PRIVATIZATION CONTRACT.
Feb 29, 2008P00005$0MODIFICATION TO CORRECT LINE ITEMS FOR THE TRANSITION PERIOD FROM 0053 FOR WATER SYSTEM AND 0054 FOR WASTEWATER SYSTEM TO 0051 FOR WATER SYSTEM AND 0052 FOR WASTEWATER SYSTEM UNDER SECTION B.4 UTILITY SERVICE PAYMENT BY THE GOVERNMENT.
Feb 15, 2008P00004$0EXTEND TRANSITION PERIOD
Dec 20, 2007P00003$0MODIFICATION TO INCORPORATE THE BILL OF SALE AND EASEMENT TO THE UTILITY PRIVATIZATION CONTRACT.
Dec 17, 2007P00002$0MODIFICATION TO THE UTILITY PRIVATIZATION CONTRACT AT FT. AP HILL TO EXTEND THE TRANSITION PERIOD INDEFINETELY PENDING EXECUTION OF BILL OF SALE. THE CONTRACTOR WILL BE PAID $2,288 PER DAY BEGINNING 18 DEC 2007 FOR TRANSITION COSTS UNTIL THE TRANSITION PERIOD IS TERMINATED. NO FUNDS WERE ADDED TO THIS MOD.

Estimated positioning window

Dec 21, 2056 – Jun 21, 2057

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2057-12-21 (11380 days from calculation)
+5 points
18 historical awards in this buyer and category group
+15 points
202 recorded award transactions
+10 points
Latest award action: 2026-05-04
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.