Federal contract award

SP060007C8259

WATER DISTRIBUTION AND WASTEWATER COLLECTION SERVICES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDLA ENERGY
NAICS221310 — Water Supply and Irrigation Systems
PSCS114 — Water Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$169.7M
Current contract value$475.7M
Potential contract value / ceiling$475.7M
Start dateSep 28, 2007
Current end dateFeb 28, 2058
Potential end dateFeb 28, 2058
Latest award activityJun 1, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 156 of 156 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026P00155$1.0MTHIS MODIFICATION FUNDS PERFORMANCE PERIOD OF MAY 1, 2026 - MAY 31, 2026.
Jun 1, 2026P00154$0THIS MODIFICATION ADMINISTRATIVELY CORRECTS A TYPOGRAPHICAL ERROR MADE IN SECTION G.4 ACCOUNTING AND APPROPRIATION DATA FROM MODIFICATION P00153.
May 28, 2026P00153$764.5KTHIS MODIFICATION FUNDS THE USC PERFORMANCE PERIOD OF APRIL 1, 2026 - APRIL 30, 2026.
May 27, 2026P00152$143.0KTHIS MODIFICATION ESTABLISHES AND FUNDS CLIN0091, INSTALL POTABLE WATER STUB-OUT AT COCO FUEL POINT FOR $142,975.10.
Mar 25, 2026P00151$2.3MTHIS MODIFICATION APPLIES THE CONTRACT YEAR 19 ECONOMIC PRICE ADJUSTMENT, AND OBLIGATES ADDITIONAL FY26 FUNDS FOR THE USC (FEB 1, 2026-MAR 31, 2026) AND CYBER COE PROJECTS A,B,C,D1A,D1B,D1A,D2B,AND E (FEB 1, 2026-APR 30, 2026).
Mar 18, 2026P00150$12.2KTHIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0090 NPW PURPLE HYDRANT AT 25TH STREET AND LANE AVENUE FOR $12,202.28.
Mar 5, 2026P00149$0THIS MODIFICATION REVISES ATTACHMENT J05, WAGE DETERMINATIONS, TO INCORPORATE UPDATED APPLICABLE WAGE DETERMINATIONS.
Mar 4, 2026P00148$0THIS MODIFICATION REVISES THE SCOPE AND ESTABLISHES A FFP FOR CLIN 0087 ESTABLISHED AS A NTE ITEM IN MODIFICATION P00115.
Dec 10, 2025P00147$4.0MTHIS MODIFICATION FUNDS THE PERFORMANCE PERIOD OF OCTOBER 1, 2025 - JANUARY 31, 2026.
Nov 13, 2025P00146$0THIS MODIFICATION REPLACES SECTION G.1 AND G.2 OF DFARS 252.201-7000 AND REVISES SECTION G.3 OF DFSARS 252.201-7006.
Sep 30, 2025P00145$7.1MTHIS MODIFICATION ESTABLISHES AND FUNDS CLIN 0088 RANGE ROAD TO AVENUE OF THE STATES WATER MAIN LOOP AND CLIN 0089 CYBER COE CAMPUS SANITARY SEWER EXTENSION PHASE 2 NORTH TRUNK.
Sep 16, 2025P00144$0THIS MODIFICATION ADMINISTRATIVELY CORRECTS TYPOGRAPHICAL ERRORS MADE IN B.3, SCHEDULE, AND SECTION G.4, ACCOUNTING AND APPROPRIATION DATA, FROM MODIFICATION P00143.
Sep 15, 2025P00143$1.9MTHIS MODIFICATION OBLIGATES TWO MONTHS OF FY25 FUNDING (AUGUST-SEPTEMBER 2025) FOR THE USC AND TWO MONTHS OF FY25 FUNDING (AUGUST-SEPTEMBER 2025) FOR CYBER COE PROJECTS A, B, C, E,
Aug 14, 2025P00142$309.5KTHIS MODIFICATION OBLIGATES ONE MONTH OF FY25 FUNDING (JULY 2025) FOR PROJECTS A, B, C, E, AND THREE MONTHS OF FY25 FUNDING (JULY-SEPTEMBER 2025) FOR PROJECTS D1A, D1B, D2A, AND D2B.
Aug 6, 2025P00141$0THIS MODIFICATION REMOVES FAR CLAUSES 52.222-21 AND 52.222-26, AND REPLACES FAR 52.222-9 AND 52.244-6, IN ACCORDANCE WITH EXECUTIVE ORDERS 14173 AND 14168.
Jul 22, 2025P00140$0THIS MODIFICATION INCORPORATES THE REDESIGNATION OF FORT EISENHOWER. ALL RELATED PLACE OF PERFORMANCE REFERENCES ON THIS CONTRACT SHALL BE REFERRED TO AS FORT GORDON.
Jul 17, 2025P00139$748.7KTHIS MODIFICATION FUNDS THE USC PERFORMANCE PERIOD OF JULY 1, 2025 - JULY 31, 2025.
May 28, 2025P00138$1.5MTHIS MODIFICATION FUNDS THE PERFORMANCE PERIOD OF MAY 1, 2025 - JUN 30, 2025.
Apr 24, 2025P00137$738.4KTHIS MODIFICATION OBLIGATES ADDITIONAL FY25 FUNDING FOR CYBER COE PROJECTS A,B,C,D1A,D1B,D2A,D2B, AND E FOR APRIL 1, 2025 TO JUNE 30, 2025.
Apr 7, 2025P00136$748.7KTHIS MODIFICATION OBLIGATES ADDITIONAL FY 25 FUNDING FOR THE UTILITIES SERVICES CHARGE FOR APRIL 1, 2025 TO APRIL 30, 2025.
Mar 31, 2025P00135$19.7KTHIS MODIFICATION APPLIES THE CONTRACT YEAR 18 ECONOMIC PRICE ADJUSTMENT, AND OBLIGATES ADDITIONAL FY25 FUNDS FOR THE USC (MARCH 1, 2025 - MARCH 31, 2025).
Mar 4, 2025P00133$0THIS MODIFICATION UPDATES SECTION I.2 TO INCORPORATE ADDITIONAL REQUIRES FAR CLAUSES.
Mar 4, 2025P00134$0THIS MODIFICATION REVISES ATTACHMENT J05, WAGE DETERMINATIONS, TO INCORPORATE UPDATED APPLICABLE WAGE DETERMINATIONS.
Feb 12, 2025P00132$729.0KTHIS MODIFICATION PROVIDES FY25 FUNDS FOR THE USC MARCH 1, 2025 TO MARCH 31, 2025.
Jan 6, 2025P00131$2.2MTHIS MODIFICATION PROVIDES FY25 FUNDS FOR THE USC (JANUARY 1-FEBRUARY 28, 2025) AND CYBER COE CHARGES A, B, C, D1A, D1B, D2A, D2B, AND E (JANUARY 1, 2025 - MARCH 31, 2025).
Nov 21, 2024P00130$2.0MTHIS MODIFICATION PROVIDES FY25 FUNDS FOR THE USC (NOVEMBER 1-DECEMBER 31, 2024) AND CYBER COE CHARGES A, B, C, D1A, D1B, D2A, D2B, AND E (NOVEMBER 1, 2024 - DECEMBER 31, 2024).
Oct 31, 2024P00129$246.1KTHIS MODIFICATION PROVIDES FY25 FUNDS FOR THE CYBER COE CHARGES A, B, C, D1A, D1B, D2A, D2B, AND E (OCTOBER 1, 2024 - OCTOBER 31, 2024) UNDER SUBCLINS 0077AF, 0078AF, 0079AF, 0080AF, 0080AG, 0081AG, 0081AH, AND 0084AC.
Oct 23, 2024P00128$729.0KTHIS MODIFICATION PROVIDES FY25 FUNDS FOR THE USC (OCTOBER 1, 2024 - OCTOBER 31, 2024) UNDER SUBCLINS 0017AC AND 0017AD.
Oct 9, 2024P00127$0THIS MODIFICATION UPDATES DFARS 252.204-7012 AND DFARS 252.204-7020.
Aug 6, 2024P00126$1.5MTHIS MODIFICATION OBLIGATES FY24 FUNDS FOR THE USC (AUG 1, 2024 - SEP 30, 2024).
Jul 24, 2024P00125$729.0KTHIS MODIFICATION OBLIGATES FY24 FUNDS FOR THE USC (JUL 1, 2024 - JUL 31, 2024).
Apr 10, 2024P00124$3.7MTHIS MODIFICATION OBLIGATES FY24 FUNDS FOR THE USC (APR 1, 2024 - JUNE 30, 2024) AND CYBER COE PROJECTS A, B, C, D1A, D1B, D2A, D2B, AND E (APRIL 1, 2024 - SEPTEMBER 30, 2024).
Apr 2, 2024P00123$246.1KTHIS MODIFICATION OBLIGATES FY24 FUNDS FOR CYBER COE PROJECTS A, B, C, D1A, D1B, D2A, D2B, AND E (MARCH 1, 2024 - MARCH 31, 2024).
Mar 18, 2024P00122$729.0KTHIS MODIFICATION APPLIES THE CONTRACT YEAR 17 ECONOMIC PRICE ADJUSTMENT, AND OBLIGATES FY24 FUNDS FOR THE USC (MARCH 1, 2024 - MARCH 31, 2024).
Mar 6, 2024P00121$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE AND UPDATE ATTACHMENT J05 WAGE DETERMINATION TO INCORPORATE THE NEW LABOR WAGE RATES.
Feb 2, 2024P00120$1.9MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE TWO MONTHS OF FY24 FUNDS (JAN-FEB 2024) FOR THE UTILITY SERVICES CHARGE, AND PROJECTS A, B, C, D1, D1B, D2A, D2B, AND E.
Dec 7, 2023P00119$947.8KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ONE MONTH OF FY24 FUNDS (DEC 2023) FOR THE UTILITY SERVICES CHARGE, AND PROJECTS A, B, C, D1, D1B, D2A, D2B, AND E.
Nov 6, 2023P00118$947.8KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ONE MONTH OF FY24 FUNDS (NOV 2023) FOR THE UTILITY SERVICES CHARGE, AND PROJECTS A, B, C, D1, D1B, D2A, D2B, AND E.
Oct 30, 2023P00117$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE REDESIGNATION OF FORT GORDON TO FORT EISENHOWER. ALL RELATED PLACE OF PERFORMANCE REFERENCES ON THIS CONTRACT SHALL BE REFERRED TO AS FORT EISENHOWER.
Oct 19, 2023P00116$947.8KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ONE MONTH OF FY24 FUNDS (OCT 2023) FOR THE UTILITY SERVICES CHARGE, AND PROJECTS A, B, C, D1A, D1B, D2A, D2B, AND E.
Sep 5, 2023P00115$694.5KESTABLISHES AND FUNDS CLIN 0087 FOR PROJECT AUD00023-3P.
Jul 26, 2023P00114$316.3KESTABLISHES AND FUNDS CLIN 0086 FOR PROJECT FTG-WS-23-002.
Jun 26, 2023P00113$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE FAR CLAUSE 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023) INTO THE CONTRACT.
Jun 21, 2023P00112$0THE PURPOSE OF THIS MODIFICATION IS TO ESTABLLISH NEW REQUIREMENTS FOR COMPLETION OF AN ANNUAL UTILITY SYSTEM CONDITION ASSESSMENT (USCA) AND SELF ATTESTATION. ATTACHMENTS J2 AND J3 ARE MODIFIED, AND JA27 IS INCORPORATED.
Jun 8, 2023P00111$-80.8KTHE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE COMPLETION DATE OF PROJECT E TO 31 JULY 2023, AND DE-OBLIGATE TWO MONTHS OF FY23 FUNDS TO ACCOUNT FOR THE POP CHANGE TO SUBCLIN 0084AA.
May 15, 2023P00110$701.7KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE ONE MONTH OF FY23 FUNDS (SEPTEMBER 2023) FOR THE UTILITY SERVICES CHARGE, AND INCORPORATE REVISED VERSIONS OF ATTACHMENTS J24 AND J25.
May 9, 2023P00109$2.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE TWO MONTHS OF FY23 FUNDS (JULY 2023 - AUGUST 2023) FOR THE UTILITY SERVICES CHARGE, AND FOUR MONTHS OF FY23 FUNDS (JUNE 2023 - SEPTEMBER 2023) FOR PROJECTS A,B,C,D1A,D1B, D2A, D2B, AND E.
Apr 12, 2023P00108$411.5KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE TWO MONTHS OF FY23 FUNDS (APRIL 2023 - MAY 2023) FOR PROJECTS A,B,C,D1A,D1B, D2A, D2B.
Mar 29, 2023P00107$2.1MTHE PURPOSE OF THIS MODIFICATION IS TO APPLY THE ECONOMIC PRICE ADJUSTMENT TO THE UTILITY SERVICES CHARGE FOR CONTRACT YEAR 16, AND OBLIGATE FY23 FUNDS FOR MARCH 2023 TO JUNE 2023.
Mar 1, 2023P00106$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A NEW MONTHLY SYSTEM PERFORMANCE REPORT (MSPR) REQUIREMENT THAT IS BEING ADDED TO SECTION J2.5 AND J3.5.
Feb 9, 2023P00105$1.7MTHIS MODIFICATION PROVIDES FY23 FUNDS FOR THE FIXED MONTHLY CHARGE (FMC), AND PROJECTS A, B, C, D1A, D2A, D2B, AND D2B, FOR THE POP OF FEBRUARY 1, 2023 TO MARCH 31, 2023.
Jan 27, 2023P00104$0THIS MODIFICATION REVISES THE PERIOD OF PERFORMANCE (POP) FOR PROJECTS D1B AND D2B TO 27 JANUARY 2023.
Jan 10, 2023P00103$859.4KTHIS MODIFICATION OBLIGATES FY23 FUNDING FOR THE UTILITY SERVICES CHARGE AND CYBER COE PROJECTS.
Nov 23, 2022P00102$0THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FOR PROJECT E TO MAY 31, 2023, AT NO ADDITIONAL COST TO THE GOVERNMENT.
Nov 17, 2022P00101$602.9KTHIS MODIFICATION OBLIGATES 3 MONTHS OF FY23 FUNDING (OCTOBER 1, 2022 - DECEMBER 31, 2022) FOR COE PROJECTS A, B, C, D1A, AND D2A.
Oct 21, 2022P00100$2.0MTHIS MODIFICATION OBLIGATES FY23 FUNDING FOR 3 MONTHS OF THE FMC (OCTOBER 1, 2022 - DECEMBER 31, 2022) AND ESTABLISHES SUBCLINS 0015AE AND 0015AF.
Jul 21, 2022P00099$1.3MTHIS MODIFICATION OBLIGATES FY22 FUNDING FOR 1 MONTH OF THE FMC (SEPTEMBER 1, 2022 - SEPTEMBER 30, 2022) AND THREE (3) MONTHS (JULY 1, 2022 - SEPTEMBER 30, 2022) FOR SUBCLINS 0077AC, 0078AC, 0079AC, 0080AA, AND 0081AA.
Jul 13, 2022P00098$0THIS MODIFICATION CORRECTS ADMINISTRATIVE ERRORS AFFECTING THE STATED CONTRACT VALUE CALCULATIONS FOR MODIFICATIONS P00052 THROUGH P00097.
Jul 11, 2022P00097$1.3MTHIS MODIFICATION FUNDS TWO (2) MONTHS OF THE FIXED MONTHLY CHARGE FOR THE PERIOD OF JULY 1, 2022 TO AUGUST 31, 2022.
Jun 27, 2022P00096$658.4KTHIS MODIFICATION FUNDS ONE (1) MONTH OF THE FIXED MONTHLY CHARGE FOR THE PERIOD OF JUNE 1, 2022 TO JUNE 30, 2022.
May 18, 2022P00095$658.4KTHIS MODIFICATION FUNDS ONE MONTH (MAY 1, 2022 - MAY 31, 2022) OF THE FIXED MONTHLY CHARGE UNDER SUBCLINS 0015AA AND 0015AB.
May 6, 2022P00094$611.9KTHIS MODIFICATION FUNDS THREE MONTHS (APR 1, 2022 - JUNE 30, 2022) OF CYBER COE PROJECTS A,B,C, AND D1A. ADDITIONALLY, IT ALSO FUNDS FOUR MONTHS (MARCH 1, 2022 - JUNE 30, 2022) OF CYBER COE PROJECT D2A.
Apr 22, 2022P00093$1.3MTHIS MODIFICATION APPLIES THE ECONOMIC PRICE ADJUSTMENT TO THE UTILITY SERVICES CHARGE FOR CONTRACT YEAR 15 AND PROVIDES FUNDING FOR THE PERIOD OF MARCH 1, 2022 TO APRIL 30, 2022. THIS MODIFICATION ALSO UPDATES WAGE DETERMINATIONS AND REPLACES DUNS NUMBER WITH UNIQUE ENTITY IDENTIFIER IN BLOCK 8 OF STANDARD FORM 26.
Jan 13, 2022P00091$1.2MTHIS MODIFICATION OBLIGATES FUNDING FOR THE FIXED MONTHLY UTILITY SERVICE CHARGE FOR 1 JANUARY 2022 - 28 FEB 2022.
Jan 13, 2022P00092$1.1MTHIS MODIFICATION OBLIGATES FY22 FUNDING FOR THE CYBER COE PROJECTS A, B, C, AND D1A. PROJECTS A-C ARE FUNDED FOR SIX (6) MONTHS FROM OCTOBER 1, 2021 - MARCH 31, 2022. PROJECT D1A IS FUNDED FOR FOUR (4) MONTHS FROM DECEMBER 1, 2021 - MARCH 31, 2022.
Jan 11, 2022P00090$0THIS MODIFICATION INCORPORATES FAR CLAUSE 52.204-21 (NOV 2021), AND UPDATES CONTRACT SECTIONS G.1 CONTRACTING OFFICER, G.2 DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991), AND G.3 SUBMISSION OF PAYMENT OF INVOICES.
Dec 7, 2021P00089$-629.9KTHIS MODIFICATION DE-OBLIGATES UNUSED FY20 IN THE AMOUNT OF $472,392 FROM SUBCLIN 0078AA AND FY21 FUNDS IN THE AMOUNT OF $157,464. IN ADDITION, CYBER COE CLINS HAS BEEN RE-STRUCTURED TO BREAKDOWN MONTHLY PAYMENTS AND EXTEND PROJECT COMPLETION DATES.
Oct 20, 2021P00088$1.9MTHIS MODIFICATION OBLIGATES THREE MONTHS OF FY22 FUNDING FOR THE FIXED MONTHLY CHARGE, OCTOBER 01 2021 - DECEMBER 31, 2021.
Jul 28, 2021P00087$2.3MTHIS MODIFICATION OBLIGATES TWO MONTHS OF FUNDING FOR THE FIXED MONTHLY CHARGE AND SIX MONTHS OF FUNDING FOR THE CYBERCOE PROJECTS A, B AND C.
Jul 15, 2021P00086$0THIS MODIFICATION INCORPORATES ADDITIONAL CONTRACT CLAUSES AND UPDATES THE APPLICABLE WAGE DETERMINATIONS.
Jun 30, 2021P00085$620.6KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE MONTHLY UTILITY SERVICE CHARGE FUNDING FOR THE PERFORMANCE PERIOD OF JULY 1, 2021 TO JULY 31, 2021.
May 11, 2021P00084$2.5MTHE PURPOSE OF THIS MODIFICATION IS TO APPLY THE ECONOMIC PRICE ADJUSTMENT TO THE UTILITY SERVICES CHARGE FOR CONTRACT YEAR 14 AND OBLIGATE FUNDING FOR THE USC FOR THE MONTHS OF MARCH TO JUNE 2021.
Apr 26, 2021P00083$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE DFARS 252.204-7012 WITH THE UPDATED VERSION AND INCORPORATE DFARS 252.204-7020 UNDER SECTION I.4 OF THE CONTRACT.
Mar 8, 2021P00082$1.0MTHIS MODIFICATION PROVIDES 6 MONTHS OF ADDITIONAL FUNDING FOR THE CYBER COE PROJECTS.
Jan 27, 2021P00081$1.2MTHIS MODIFICATION PROVIDES TWO ADDITIONAL MONTHS OF FUNDING FOR THE FIXED MONTHLY CHARGE FOR CONTRACT YEAR 13 JANUARY TO FEBRUARY 2021 FOR THE WATER AND WASTEWATER SYSTEMS.
Nov 25, 2020P00080$-7THIS MODIFICATION DE-OBLIGATES FY16 FUNDS IN THE AMOUNT OF $7.00 FROM THE LINE OF ACCOUNTING DUE TO TYPOGRAPHICAL ERROR FOUND IN SECTION G OF MODIFICATION P00050.
Nov 19, 2020P00079$1.8MTHIS MODIFICATION PROVIDES FUNDING FOR THE FIRST QUARTER OF FY21 WATER AND WASTEWATER UTILITY SERVICES FIXED MONTHLY CHARGE.
Aug 26, 2020P00078$3.0MFUNDING
Apr 27, 2020P00077$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACTING OFFICER.
Apr 7, 2020P00076$2.5MAPPLIES AN EPA TO THE CURRENT FIXED MONTHLY CHARGE (FMC), EFFECTIVE AT THE START OF CONTRACT YEAR 13 PROVIDES FOUR (4) MONTHS OF FUNDING FOR THE FMC FOR WATER AND WASTEWATER UTILITY SERVICES AND CHANGES KO.
Feb 26, 2020P00075$1.2MFOR WATER AND WASTEWATER UTILITY SERVICES.
Jan 17, 2020P00074$605.0KFOR WATER AND WASTEWATER UTILITY SERVICES.
Dec 9, 2019P00073$605.0KPROVIDES ONE MONTH OF FUNDING (NOVEMBER 2019) FOR THE FIXED MONTHLY CHARGE ON SUBCLINS 0012AC AND 0012AD FOR WATER AND WASTEWATER UTILITY SERVICES, RESPECTIVELY.
Nov 19, 2019P00072$605.0KFUNDS ONE MONTH OF FMC FOR SEWER/WATER FOR THE MONTH OF OCTOBER.
Jul 25, 2019P00070$3.6MFUNDING FOR FY2019
Jul 25, 2019P00071$0ADMINISTRATIVE CORRECTION
May 14, 2019P00067$0CORRECT SECTION G "CONTRACT ADMINISTRATION" FROM P00061
May 14, 2019P00069$0CORRECT TYPOGRAPHICAL ERROR IN P00066 SECTION B "SUPPLIES/SERVICES FOR CLINS 0012AA AN 0012AB TO REFLECT THE CORRECT POP, AND ATTACH WAGE DETERMINATION DOCUMENTS NOT INCLUDED.
Apr 4, 2019P00066$1.2MWAGE DETERMINATION UPDATE, AND FUNDING FOR FEB 1 - MARCH 31, 2019 YR1 FMC
Mar 27, 2019P00068$0CORRECT SF30, SECTION 13 "CONTRACT CITATION," FROM P00062
Mar 26, 2019P00065$792.6KESTABLISH AND FUND CLIN 0085 WITH SIX SUBCLINS FOR REA PROPOSAL DATED MAY 31 2017. ESTABLISH AND FUND ACRNS BJ AND BK
Dec 7, 2018P00064$0ESTABLISH CLINS 0080,0081,0082, 0083, AND 0084 FOR PROJECTS D1,D2, D3, D4, AND E. ESTABLISH 10-YEAR AMORTIZATION SCHEDULE FOR CLINS 0080, 0081, 0082, 0083, AND 0084.
Dec 6, 2018P00063$0ESTABLISH CLINS 0077, 0078, AND 0079 FOR PROJECTS A,B, AND C. ESTABLISH 10-YEAR AMORTIZATION SCHEDULE FOR CLINS 0077,0078, AND 0079.
Nov 20, 2018P00062$2.4MESTABLISH FOUR MONTHS OF FUNDING TO CLINS 0011AG AND 0011AH AND ESTABLISH AND FUND ACRNS BH AND BI
Nov 7, 2018P00061$1.8MESTABLISH AND ADD FUNDING TO CLINS 0011AC AND 1100AD,ESTABLISH AND ADD FUNDING TO CLINS 0011AE AND 0011AF, AND UPDATE CONTRACT VALUE WITH REVISED NUMBERS
May 10, 2018P00060$0MOD TO ADD THE FOLLOWING CLAUSES TO THE CONTRACT: DFARS 252.204-7008 "COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016)" AND DFARS 252.204-7012 "SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016)".
Apr 4, 2018P00059$1.7MADD 3 MONTHS OF FUNDING TO CLINS 0011AA AND 0011AB YEAR 11 FMC
Feb 8, 2018P00058$0CORRECTION MOD TO REFLECT AND UPDATE THE ACCURATE CLINS ON P00057
Jan 31, 2018P00057$1.7MTO ADD 2 MONTHS OF FUNDING TO CLINS 0010AC AND 0010AD YEAR 10 FIX MONTHLY CHARGES AND 1 MONTH OF FUNDING TO CLINS 0011AA AND 0011AB YEAR 11 FIXED MONTHLY CHARGE.
Jan 1, 2018P00056$1.7MTO ADD 3 MONTHS OF FUNDING TO CLINS 0010AC AND 0010AD YEAR 10 FIX MONTHLY CHARGES
Sep 26, 2017P00055$917.7KTO FUND RFP 376: BLOCK 10 REPLACEMENT OF IRRIGATION SYSTEM FROM POTABLE TO NON-POTABLE.
Jul 11, 2017P00054$1.7MFUND 3 MONTHS OF FUNDING POF JULY 1, 2017 - SEPT 20, 2017 YEAR 10 CLINS 0010AA AND 0010AB
May 1, 2017P00053$1.7MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE THREE MONTHS OF FUNDING TO CLINS 0010AA AND 0010AB, FOR YEAR 10 MONTHS 114 - 116 OF 604 FOR THE PERFORMANCE PERIOD OF APRIL 1, 2017 - JUNE 30, 2017.
Jan 19, 2017P00052$1.7MTO FUND CLINS 0009AE AND 0009AF FOR MONTHS 110-112 OF 604 YEAR 9 AND TO ESTABLISH CLINS 0010AA AND 0010AB FOR MONTHS 113 OF 604 YEAR 10.
Dec 7, 2016P00051$1.7MFUNDING ACTION, MONTHS 108 - 110
Sep 30, 2016P00050$1.1MCONVERSION TO FIXED-PRICE WITH ECONOMIC PRICE ADJUSTMENT (FPEPA)
Jun 10, 2016P00049$1.3MFUNDING ACTION FOR YEAR 9 MONTHS 105 - 107 JULY 1,2016 TO SEPTEMBER 30, 2016, CLINS 0009AA AND 0009AB
May 5, 2016P00048$1.3MFUNDING ACTION FOR UTILITY PRIVATIZATION
Nov 15, 2015P00046$0ADMINISTRATIVE CORRECTION TO P00045 OBLIGATED TOTAL AMOUNT.
Nov 5, 2015P00045$420.9KTO ADD FUNDING FOR SUB-CLIN'S 0008AH&0008AG FOR ADDITIONAL MONTHLY CHARGE FOR YEAR 8 MONTHS 96-97 OF 600
Oct 16, 2015P00044$420.9KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH FUNDING FOR SUBCLINS 0008AG AND 0008AH, FIXED MONTHLY CHARGE FOR YEAR 8, MONTH 96.
Jul 1, 2015P00043$1.7MTO ADD FUNDING TO SUBCLINS 0008AE AND 0008AF, FIXED MONTHLY CHARGE YEAR 8.
May 6, 2015P00042$841.8KTHE PURPOSE IS TO ADD FUNDING TO SUBCLINS 0008AE AND 0008AF, FIXED MONTHLY CHARGE FOR YEAR 8.
Apr 21, 2015P00041$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION G.1 OF THE CONTRACT TO INCORPORATE A CHANGE TO THE CONTRACTING OFFICER.
Apr 3, 2015P00040$-703TO ESTABLISH THE FIRM-FIXED PRICE AND PERIOD OF PERFORMANCE FOR CLIN 0075, DARK FIBER INSTALLATION PROJECT, DEOBLIGATE EXCESS FUNDS FROM ACRN AT, AND REVISE THE APPLICABLE APPROPRIATION DATA.
Jan 23, 2015P00039$1.3MTO INCREASE THE QUANTITY AND TOTAL AMOUNTS FOR SUBCLINS 0007AC AND 0007AD, FIXED MONTHLY CHARGE FOR YEAR 7, AND ESTABLISH SUBCLINS 0008AE AND 0008AF, FIXED MONTHLY CHARGE FOR YEAR 8, AND FUND CONTRACT MONTHS 87 - 89 (JANUARY 1, 2015 - MARCH 31, 2015).
Jan 8, 2015P00047$1.7MTO ADD FUNDING FOR SUB-CLIN'S 0008AH AND 0008HG FOR ADDITIONAL MONTHLY CHARGE FOR YEAR 8 MONTHS 98-100 OF 600. TO ESTABLISH SUB-CLIN'S 0009AA AND 0009AB MONTHLY CHARGE FOR YEAR 9 MONTHS 101 OF 600.
Dec 23, 2014P00038$420.9KTO INCREASE THE QUANTITY AND TOTAL AMOUNTS FOR SUBCLINS 0007AC AND 0007AD, FIXED MONTHLY CHARGE FOR YEAR 7, AND FUND CONTRACT MONTH 86 (DECEMBER 1, 2014 DECEMBER 31, 2014) AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Oct 24, 2014P00037$841.8KTO ESTABLISH SUBCLINS 0007AC AND 0007AD, FIXED MONTHLY CHARGE FOR YEAR 7, AND FUND CONTRACT MONTHS 84 85 (OCTOBER 1, 2014 NOVEMBER 30, 2014) AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Sep 26, 2014P00036$500.0KTO ISSUE A CHANGE ORDER REQUIRING AUGUSTA UTILITIES DEPARTMENT (AUD) TO COMPLETE THE CAPITAL IMPROVEMENT PROJECT ESTABLISHED BELOW IN CLIN 0075, WHICH WAS SUBMITTED BY THE CONTRACTOR IN ITS ANNUAL CAPITAL UPGRADES AND RENEWALS AND REPLACEMENTS PLAN (ACURRP) FY 2014, AND TO ASSIGN THE APPLICABLE APPROPRIATION DATA.
May 8, 2014P00035$1.7MTO ADD ADDITIONAL FUNDING TO SUBCLINS 0007AA AND 0007AB, FIXED MONTHLY CHARGE FOR YEAR 7, AND FUND CONTRACT MONTHS 80 - 83 (JUNE 1, 2014 - SEPTEMBER 30, 2014) AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Apr 2, 2014P00034$1.3MTO ESTABLISH CLIN 0007 AND ITS ASSOCIATED SUBCLINS FOR THE FIXED MONTHLY CHARGE FOR YEAR 7, AND PROVIDE FUNDING FOR CONTRACT MONTHS 77 - 79 (MARCH 1, 2014 - MAY 31, 2014) AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Mar 26, 2014P00033$0TO MODIFY SECTION G.1 OF THE CONTRACT TO INCORPORATE A CHANGE TO THE CONTRACTING OFFICER.
Feb 26, 2014P00032$0TO INCORPORATE REVISIONS 3, 5, 9, 11, 12 AND 13 OF GEORGIA, SOUTH CAROLINA WAGE DETERMINATION NO. 2005-2135 AND REPLACE CONTRACT ATTACHMENT J5 WITH THE CURRENT WAGE DETERMINATION NO. 2005-2135 REVISION 14 AS REQUIRED BY THE SERVICE CONTRACT ACT.
Jan 22, 2014P00031$420.9KTO ADD ONE (1) PERFORMANCE MONTH AND FUNDING TO SUBCLINS 0006AC AND 0006AD FOR CONTRACT YEAR 6, MONTH 76 (FEBRUARY 1, 2014 FEBRUARY 28, 2014), AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Dec 31, 2013P00030$841.8KTO FUND SUBCLINS 0006AC AND 0006AD ON CONTRACT YEAR 6, MONTHS 74 - 75 (DECEMBER 1, 2013 - JANUARY 31, 2014.
Nov 7, 2013P00029$841.8KTO ESTABLISH SUBCLINS 0006AC AND 0006AD TO FUND CONTRACT YEAR 6, MONTHS 72 - 73 (OCTOBER 1, 2013 - NOVEMBER 30, 2013).
May 28, 2013P00028$2.1MADD ADDITIONAL FUNDING TO CLIN 0006 AND ITS ASSOCIATED SUBCLINS 0006AA AND 0006AB FOR FIXED MONTHLY CHARGES FOR YEAR 6 MONTHS 67-71 (5/1/13 - 9/30/13)
Mar 7, 2013P00027$841.8KESTABLISH CLIN 0006 AND ITS ASSOCIATED SUBCLINS FOR THE FIXED MONTHLY CHARGE FOR YEAR 6 MONTHS 65-66 (3/1/13 - 4/30/13)
Oct 24, 2012P00026$0TO INCORPORATETHE FIXED MONTHLY CHARGE OF THE PRICE REDETERMINATION AS NEGOTIATED AND MUTUALLY AGREED BY THE GOVERNMENT AND THE CONTRACTOR, AS PRESCRIBED BY FAR 52.216-5 - PRICE REDETERMINATION - PROSPECTIVE. THE FIXED MONTHLY CHARGE FOR CONTRACT YEARS 3,4&5 (MOS 29 - 64) OF THE CONTRACT WILL REMAIN UNCHANGED FROM THE PREVIOUS PRICE ADJUSTMENT AS A RESULT OF JOINT INVENTORY, AS INITIALLY ESTABLISHED IN MOD P00008 DATED 7/15/2010 AND FUNDED IN SUBSEQUENT MODIFICATIONS.
Oct 3, 2012P00025$0TO MODIFY SECTION G.1 OF THE CONTRACT TO INCORPORATE A CHANGE TO THE CONTRACTING OFFICER.
Sep 20, 2012P00024$310.7KTO ESTABLISH CLIN 0074 FOR THE WATER SYSTEM UPGRADE AT GORDON LAKES GOLF COURSE, AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Sep 5, 2012P00023$2.1MTO INCREASE FUNDING FOR SUBCLINS 0005AA AND 0005AB FOR THE FIXED MONTHLY CHARGE YR 5 IN THE B.3 SCHEDULE, PERFORMANCE MONTHS 53 - 64 (3/1/2012 - 3/30/2013) AND ASSIGN THE APPLICABLE APPROPRIATION DATA. THIS MOD ALSO CORRECTS A TYPOGRAPHICAL ERROR MADE IN THE FUNDING BREAKDOWN OF ACRN AC.
Jun 19, 2012P00022$841.8KTO INCREASE FUNDING FOR SUBCLINS 0005AA AND 0005AB FOR THE FIXED MONTHLY CHARGE YEAR 5, PERFORMANCE MONTHS 53 - 59 (3/31/2012 - 9/30/2012) AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
May 21, 2012P00021$841.8KTO FUND TWO ADDITIONAL PERFORMANCE MONTHS (MONTHS 56-57, JUNE 1, 2012 TO JULY 31, 2012) FOR SUBCLINS 0005AA AND 0005AB, FIXED MONTHLY CHARGE YEAR 5. SUBCLINS 0005AA AND 0005AB ARE REVISED TO FUND A TOTAL OF FIVE PERFORMANCE MONTHS (MONTHS 53-57) AS FOLLOWS: 0005AA - YEAR 5 WATER $184,677/ MONTH OR $923,385 FOR 5 MONTHS 0005AB - YEAR 5 WASTEWATER $236.224/ MONTH OR $2,104,505 FOR 5 MONTHS. ACRN AN IS INCREASED BY $841,802 FROM $1,262,703 TO $2,104,505.
May 1, 2012P00020$-30TO DECREASE THE TOTAL PRICES AND OBLIGATED AMOUNTS FOR SUBCLINS 0001AA AND 0001AB, AS A RESULT OF UNDERPAYMENTS ON THE CONTRACTOR'S INVOICES DUE TO PAYMENT PROCESSING ERRORS MADE BY THE GOVERNMENT, AND TO DEOBLIGATE EXPIRING FUNDS, AS AGREEED TO BY BOTH PARTIES FROM ACRNS AA AND AB IN SECTION G.
Mar 6, 2012P00019$1.3MTO ESTABLISH CLIN 0005 AND ITS ASSOCIATED SUBCLINS FOR THE FIXED MONTHLY CHARGE FOR YEAR 5, PERFORMANCE MONTHS 53 - 55 AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Feb 23, 2012P00018$0TO RESTRUCTURE CLINS 0052,0056-0059, 0063-066, 0068, 0069, 0071 AND 0073 TO ESTABLISH SUBCLINS ALLOWING THE CONTRACTOR TO INVOICE FOR COMPLETED WORK.
Aug 4, 2011P00017$0TO MODIFY PARAGRAPHS G.2 AMD G.3 TO APPOINT AN ADDITIONAL CONTRACTING OFFICER'S REPRESENTATIVE (COR).
Aug 1, 2011P00016$1.7MTO ADD FUNDING FOR 4 ADDITIONAL PERFORMANCE MONTHS AND FUNDING TO SUBCLIN 0004AA AND 0004AB FOR YEAR 4, MONTHS 41-52.
Jul 1, 2011P00015$1.7MTO ADD FOUR (4) ADDITIONAL PERFORMANCE MONTHS AND FUNDING TO SUBCLIN 0004AA AND SUBCLIN 0004AB FOR YEAR 4, PERFORMANCE MONTHS 41-48 AND TO CORRECT THE TOTAL OBLIGATED AMOUNT IN MOD P00014.
May 3, 2011P00014$841.8KTO ADD TWO (2) ADDITIONAL PERFORMANCE MONTHS AND FUNDING TO SUBCLIN 0004AA AND SUBCLIN 0004AB FOR YEAR 4, PERFORMANCE MONTHS 41-44.
May 2, 2011P00013$0TO REVISE THE SCOPES OF WORK FOR CLINS 0052, 0056, 0058, 0059, 0064, 0069, 0073, INCREASE THE PRICE OF CLIN 0052 AND DECREASE THE PRICE OF CLIN 0056 AND REVISE THE FUNDING BREAKDOWN OF ACRN AC.
Apr 5, 2011P00012$420.9KTO ADD ONE (1) ADDITIONAL PERFORMANCE MONTH AND FUNDING TO SUBCLIN 0004AA AND SUBCLIN 0004AB FOR YEAR 4, MONTHS 41-42.
Mar 18, 2011P00011$420.9KESTABLISH CLIN 0004 AND ITS ASSOCIATED SUBCLINS FOR THE FIXED MONTHLY CHARGE YEAR 4 AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Sep 28, 2010P00010$3.4MTO ADD ADDITIONAL PERFORMANCE MONTHS AND FUNDING TO SUBCLIN 0003AA AND SUBCLIN0003AB FOR YEAR 3 (MONTHS 36-40) AND ESTABLIDH CLIN 0073 FOR RAW WATER IRRIGATION SYSTEM PHASE III IN THE AMOUNT OF $1,250,000.00 (NTE).
Aug 9, 2010P00009$879.8KMODIFICATION P00009 IS TO ADD ADDITIONAL FUNDS TO SUBCLINS 0003AA & 0003AB.
Jul 15, 2010P00008$2.1MMODIFICATION P00008 IS TO ESTABLISH CLIN 0003 AND ASSOCIATED SUBCLINS FOR THE FIXED MONTHLY CHARGE YEAR 3 AND ESTABLISH CLIN 0072 FOR THE REMOVAL OF A FUEL OIL TANK.
Feb 19, 2010P00007$312.3KMODIFICATION TO ADD FUNDS TO EXISTING SUBCLINS 0002AB ($145,467.00) AND 0002AC ($166,860.00).
Jan 12, 2010P00006$624.7KMODIFICATION TO FUND YEAR 2, MONTHS 10-11
Dec 10, 2009P00005$-173.7KMODIFICATION TO DEOBLIGATE FUNDS UNDER ACRN AB.
Sep 24, 2009P00004$7.9MMODIFICATION TO UP CONTRACT TO ASSIGN APPLICABLE APPROPRIATION DATA, MODIFY SECTION G, AND TO INCORPORATE WAWF DFARS CLAUSE.
Sep 29, 2008P00003$4.3MAUTHORIZE AUGUSTA UTILITY DEPARTMENT TO COMPLETE NEW SERVICE AND TO ESTABLISH AND ASSIGN THE APPLICABLE APPROPRIATION DATA.
Jun 12, 2008P00001$112.4KNEW CONNECTION TO WATER SYSTEM AT FT. GORDON, GA.
Apr 7, 2008P00002$0INCORPORATE THE WATER AND WASTEWATER UTILITY SYSTEM EASEMENTS AS ATTACHMENT J4 TO THE CONTRACT.
Sep 28, 20070$17.5MWATER DISTRIBUTION AND WASTEWATER COLLECTION SERVICES

Estimated positioning window

Feb 28, 2057 – Aug 28, 2057

Recompete signal:
40/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 40/100. Available recorded signals: 35 points.

Contract end 2058-02-28 (11449 days from calculation)
+5 points
18 historical awards in this buyer and category group
+15 points
156 recorded award transactions
+10 points
Latest award action: 2026-06-01
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.