Federal contract award
SP060009C8257
UTILITY SERVICE CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DLA ENERGY |
| NAICS | 221310 — Water Supply and Irrigation Systems |
| PSC | S114 — Water Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $206.8M |
| Current contract value | $462.0M |
| Potential contract value / ceiling | $462.0M |
| Start date | Sep 30, 2009 |
| Current end date | Mar 5, 2060 |
| Potential end date | Mar 5, 2060 |
| Latest award activity | May 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 236 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 4, 2026 | P00235 | $2.5M | THIS MODIFICATION OBLIGATES FOUR MONTHS OF USC FUNDING FOR THE PERFORMANCE PERIOD MARCH 6, 2026 TO JULY 5, 2026. |
| Feb 25, 2026 | P00234 | $1.3M | THIS MODIFICATION OBLIGATES TWO MONTHS OF USC FUNDING FOR THE PERFORMANCE PERIOD JANUARY 6, 2026 TO MARCH 5, 2026. |
| Feb 20, 2026 | P00233 | $0 | THIS MODIFICATION REVISES AND EXTENDS THE POP FOR PROJECT MODIFY LIFT STATIONS 339,685,1035 AND 1234 AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Dec 1, 2025 | P00232 | $1.9M | THIS MODIFICATION OBLIGATES THREE MONTHS OF USC FUNDING FOR THE PERFORMANCE PERIOD OCTOBER 6, 2025 TO JANUARY 5, 2026. |
| Nov 12, 2025 | P00231 | $0 | THIS MODIFICATION REVISES SECTION G.3 AND SECTION G.7 OF THE CONTRACT. |
| Sep 24, 2025 | P00230 | $0 | THIS MODIFICATION REVISES THE TECHNICAL APPROACH TO CLIN 1410 AND UPDATES THE PERIOD OF PERFORMANCE AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Sep 17, 2025 | P00229 | $631.8K | THIS MODIFICATION OBLIGATES USC FUNDING FOR THE MONTH OF SEPTEMBER 2025. |
| Aug 26, 2025 | P00228 | $789.5K | THIS MODIFICATION SERVES TO FUND THE PROJECT RELATED TO INSTALLING WATER, SEWER, AND FIRE SERVICES TO THE NEW 911TH VEHICLE MAINTENANCE FACILITY (VEMF) BUILDING. |
| Aug 20, 2025 | P00227 | $1.3M | THIS MODIFICATION OBLIGATES USC FUNDING FOR TWO MONTHS, JULY AND AUGUST 2025. |
| Aug 13, 2025 | P00226 | $0 | HIS MODIFICATION UPDATES FAR CLAUSES WITHIN SECTION I OF THE CONTRACT IN ACCORDANCE WITH EXECUTIVE ORDERS 14173 AND 14168. |
| Jun 24, 2025 | P00225 | $631.8K | THIS MODIFICATION OBLIGATES USC FUNDING FOR THE MONTH OF JUNE 2025. |
| May 13, 2025 | P00224 | $1.3M | THIS MODIFICATION ACCEPTS AW'S ECONOMIC PRICE ADJUSTMENT PROPOSAL FOR CONTRACT YEAR 16. |
| Mar 7, 2025 | P00223 | $0 | THIS MODIFICATION UPDATES AND REPLACES ATTACHMENT J5, WAGE DETERMINATIONS FOR CONTRACT YEAR 16. |
| Feb 27, 2025 | P00222 | $0 | THIS MODIFICATION CORRECTS AN ADMINISTRATIVE ERROR IN B.3 SCHEDULE AND SECTION G.5, ACCOUNTING AND APPROPRIATION DATA OF THE PREVIOUSLY EXECUTED MODIFICATION P00220. |
| Feb 6, 2025 | P00221 | $94.5K | THIS MODIFICATION SERVES TO FUND THE PROJECT RELATED TO THE ABANDON WATER SEWERS FOR BUILDINGS 507-509. |
| Feb 4, 2025 | P00220 | $1.2M | PROVIDES USC FUNDING FOR FEBRUARY AND MARCH 2025. |
| Jan 10, 2025 | P00219 | $612.9K | PROVIDES USC FUNDING FOR JANUARY 2025. |
| Jan 7, 2025 | P00218 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FOR CONTRACT LINE-ITEM NUMBER 1411. |
| Dec 4, 2024 | P00217 | $612.9K | PROVIDES USC FUNDING FOR DECEMBER 2024. |
| Dec 3, 2024 | P00216 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FOR CONTRACT LINE-ITEM NUMBER 1408. |
| Nov 26, 2024 | P00215 | $0 | CORRECT ADMINISTRATION TYPO DISCOVERED IN PREVIOUS MODIFICATION. |
| Nov 13, 2024 | P00214 | $612.9K | PROVIDES USC FUNDING FOR NOVEMBER 2024. |
| Oct 14, 2024 | P00213 | $0 | PROVIDE UPDATES TO DFARS CLAUSES. |
| Oct 13, 2024 | P00212 | $612.9K | FUNDS ONE MONTH OF THE UTILITY SERVICE CHARGE FOR FY25. |
| Aug 5, 2024 | P00211 | $1.2M | THIS MODIFICATION REVISES CLINS 1501 AND 1502 TO OBLIGATE FY24 FUNDS FOR THE USC. |
| Jun 28, 2024 | P00210 | $0 | THIS MODIFICATION CORRECTS AN ADMINISTRATIVE ERROR DISCOVERED. |
| Jun 25, 2024 | P00209 | $612.9K | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE MONTH OF JULY 2024. |
| Jun 3, 2024 | P00208 | $612.9K | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE MONTH OF JUNE 2024. |
| May 30, 2024 | P00207 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FOR CLINS 1307AB AND 1410, AT NO COST TO THE GOVERNMENT. |
| May 16, 2024 | P00206 | $612.9K | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE MONTH OF MAY 2024. |
| Apr 16, 2024 | P00205 | $1.2M | THIS MODIFICATION ACCEPTS AW'S ECONOMIC PRICE ADJUSTMENT PROPOSAL FOR CONTRACT YEAR 15. |
| Apr 5, 2024 | P00204 | $17.1K | THIS MODIFICATION AWARDS AMERICAN WATER WITH THE WATER RELOCATION PROJECT FOR BUILDING 3138. |
| Mar 6, 2024 | P00203 | $0 | THIS MODIFICATION UPDATES AND REPLACES ATTACHMENT J5, WAGE DETERMINATION FOR CONTRACT YEAR 15. |
| Mar 5, 2024 | P00202 | $-1.1M | THIS MODIFICATION FINALIZES THE PRICE STRUCTURE FOR CLIN 1405. |
| Feb 5, 2024 | P00201 | $585.6K | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE MONTH OF FEBRUARY 2024. |
| Dec 20, 2023 | P00200 | $585.6K | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE MONTH OF JANUARY 2024. |
| Dec 14, 2023 | P00198 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE FOR CLIN 1307, AT NO COST TO THE GOVERNMENT. |
| Dec 14, 2023 | P00199 | $585.6K | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE MONTH OF DECEMBER 2023. |
| Nov 22, 2023 | P00197 | $585.6K | OBLIGATES ONE MONTH OF USC FUNDING FOR THE POP OF NOVEMBER 6, 2023 - DECEMBER 5, 2023. |
| Nov 1, 2023 | P00196 | $0 | PROVIDES A NO-COST EXTENSION (NCE) FOR STREAM RESTORATION PROJECTS (SITES 3,12,13). |
| Oct 16, 2023 | P00195 | $585.6K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 28, 2023 | P00194 | $4.3M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 12, 2023 | P00193 | $2.9M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Aug 2, 2023 | P00192 | $-629.0K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jul 13, 2023 | P00191 | $585.6K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jul 3, 2023 | P00189 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jul 3, 2023 | P00190 | $1.2M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jun 22, 2023 | P00188 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 16, 2023 | P00187 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 1, 2023 | P00186 | $1.2M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Apr 10, 2023 | P00185 | $1.2M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Apr 3, 2023 | P00184 | $109.2K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 16, 2023 | P00183 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 1, 2023 | P00182 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jan 30, 2023 | P00181 | $551.7K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jan 6, 2023 | P00180 | $551.7K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Dec 19, 2022 | P00179 | $551.7K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Oct 14, 2022 | P00178 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 23, 2022 | P00177 | $3.7M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Aug 31, 2022 | P00176 | $1.3M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Aug 5, 2022 | P00175 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Aug 2, 2022 | P00174 | $551.7K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jun 8, 2022 | P00173 | $81.3K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 20, 2022 | P00172 | $33.2K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 18, 2022 | P00171 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 6, 2022 | P00169 | $394.6K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 6, 2022 | P00170 | $87.8K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 2, 2022 | P00168 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Apr 28, 2022 | P00167 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 10, 2022 | P00166 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Feb 2, 2022 | P00165 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jan 7, 2022 | P00164 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Dec 22, 2021 | P00163 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Nov 16, 2021 | P00162 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. EO14042 |
| Oct 27, 2021 | P00161 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Oct 14, 2021 | P00160 | $527.3K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 23, 2021 | P00159 | $187.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 13, 2021 | P00158 | $135.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Aug 5, 2021 | P00157 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jul 7, 2021 | P00156 | $527.3K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jun 4, 2021 | P00155 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 28, 2021 | P00154 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 25, 2021 | P00153 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Apr 29, 2021 | P00152 | $1.1M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 30, 2021 | P00150 | $76.9K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 30, 2021 | P00151 | $46.2K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 10, 2021 | P00149 | $70.1K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Feb 23, 2021 | P00148 | $33.9K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Feb 5, 2021 | P00147 | $1.5M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Dec 22, 2020 | P00146 | $505.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Nov 17, 2020 | P00145 | $505.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 23, 2020 | P00144 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 15, 2020 | P00143 | $18.3K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jul 24, 2020 | P00142 | $69.9K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jun 30, 2020 | P00141 | $-2 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 28, 2020 | P00140 | $-96.8K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| May 1, 2020 | P00139 | $1.0M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Apr 1, 2020 | P00138 | $1.5M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 12, 2020 | P00137 | $0 | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Mar 9, 2020 | P00136 | $185.2K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Feb 26, 2020 | P00135 | $1.5M | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Feb 18, 2020 | P00134 | $151.7K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jan 23, 2020 | P00133 | $505.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEMS INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jan 8, 2020 | P00132 | $505.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Dec 19, 2019 | P00131 | $505.4K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Nov 27, 2019 | P00130 | $-21.9K | UTILITY SERVICE CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 30, 2019 | P00128 | $350.0K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Sep 27, 2019 | P00127 | $49.9K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Sep 26, 2019 | P00126 | $404.4K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Aug 26, 2019 | P00124 | $-116.2K | RE-SCOPE CONTRACT LINE ITEMS (CLIN) 0552, 0553, AND TO CONNECT GRAVITY SEWER FROM AREA 1400 TO LIFT STATION 1234. REVISED SECTION A SOLICITATION/CONTRACT FORM, BLOCK 15F. REVISED B.3 SCHEDULE TO RE-SCOPE AND EXTEND THE PROJECT COMPLETION DATES FROM CLINS 0552, 0553, 0554. |
| Aug 26, 2019 | P00125 | $235.8K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Aug 22, 2019 | P00123 | $1.3M | THIS MODIFICATION ACCEPT AMERICAN WATER'S PROPOSALS TO DESIGN, PERMIT, AND INSTALL A REDUNDANT WATER MAIN FROM GUNSTON ROAD TO BUILDING 2310 AND CONNECT BUILDING 2321, AND TO INSTALL A FIRE SERVICE MAIN TO BUILDING 1188. |
| Jun 13, 2019 | P00122 | $0 | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| May 23, 2019 | P00121 | $0 | CHANGE THE CONTRACTOR ADDRESS, AND INCORPORATE THE CURRENT WAGE DETERMINATION |
| Apr 11, 2019 | P00120 | $115.0K | THIS MODIFICATION ACCEPT AMERICAN WATER'S PROPOSAL TO REPAIR SANITARY SEWER SERVICE LINE AT BUILDING 1471 |
| Feb 5, 2019 | P00118 | $28.6K | THIS MODIFICATION ACCEPT AMERICAN WATER'S PROPOSAL TO CONSTRUCT A 15 LINEAR-FOOT SECTION OF 6-INCH WATER MAIN UNDERNEATH A PROPOSED STORM SEWER ASSOCIATED WITH BUILDING 707 RENOVATION ACTIVITIES. |
| Feb 5, 2019 | P00119 | $52.8K | THIS MODIFICATION ACCEPT AMERICAN WATER'S PROPOSAL TO INSTALL A FIRE SERVICE MAIN TO BUILDING 317. |
| Jan 18, 2019 | P00117 | $2.5M | THIS MODIFICATION PROVIDES FIVE MONTHS OF FUNDING FOR THE PRIVATIZED UTILITY SERVICES WATER DISTRIBUTION AND WASTEWATER CONTRACT, CORRECT THE PERIOD OF PERFORMANCE FOR SUBCLINS 1001AA AND 1002AA, CORRECT THE TOTAL PRICE STATED FOR SUBCLIN 1001AB, AND REVISE SUBCLINS 1001AB AND 1002AB. |
| Jan 9, 2019 | P00116 | $1.5M | THIS MODIFICATION PROVIDES ONE MONTH OF FUNDING FOR THE PRIVATIZED UTILITY SERVICES WATER DISTRIBUTION AND WASTEWATER CONTRACT AT FORT BELVOIR, VA. |
| Dec 7, 2018 | P00115 | $-92.6K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Nov 7, 2018 | P00114 | $0 | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Oct 30, 2018 | P00113 | $2.0M | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Sep 28, 2018 | P00111 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE, AND CORRECT CONTRACT ADMINISTRATION DATA. |
| Sep 28, 2018 | P00112 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO RECOGNIZE THE CHANGE-OF-NAME AGREEMENT BETWEEN THE GOVERNMENT AND THE CONTRACTOR DATED JANUARY 8, 2018 IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION 42.1205. |
| Sep 6, 2018 | P00110 | $-1.6K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Aug 17, 2018 | P00109 | $68.4K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Jun 6, 2018 | P00108 | $114.8K | THIS MODIFICATION WAS EXECUTED TO ACCEPT AWOM'S PRICE REDETERMINATION PROPOSAL NUMBER 3 FOR THE PRIVATIZED UTILITY SERVICES WATER DISTRIBUTION AND WASTEWATER CONTRACT AT FORT BELVOIR, VA. |
| May 3, 2018 | P00107 | $3.4M | THIS MODIFICATION PROVIDES SEVEN (7) MONTHS OF FUNDING FOR THE PRIVATIZED UTILITY SERVICES WATER DISTRIBUTION AND WASTEWATER CONTRACT AT FORT BELVOIR, VA. |
| Mar 23, 2018 | P00106 | $489.0K | THIS MODIFICATION PROVIDES ONE (1) MONTH OF FUNDING FOR THE PRIVATIZED UTILITY SERVICES WATER DISTRIBUTION AND WASTEWATER CONTRACT AT FORT BELVOIR, VA. |
| Mar 5, 2018 | P00105 | $0 | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. |
| Jan 19, 2018 | P00104 | $-24.0K | UTILITY SERVICES FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VA. THIS ACTION IS FOR THE DE-OBLIGATION OF FUNDS FOR A PREVIOUSLY ACCEPTED PROJECT. |
| Jan 10, 2018 | P00103 | $977.9K | UTILITY SERVICES CONTRACT FOR PRIVATIZATION OF THE WATER DISTRIBUTION AND WASTEWATER COLLECTION SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Dec 28, 2017 | P00102 | $489.0K | PROVIDE ONE MONTH OF FUNDING FOR THE FIXED MONTHLY CHARGE IN THE AMOUNT OF $488,970.48 FOR THE UTILITY SERVICES CONTRACT AT FORT BELVOIR, VIRGINIA. |
| Dec 4, 2017 | P00101 | $489.0K | UTILITY SERVICE CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Sep 22, 2017 | P00100 | $23.0K | THIS MODIFICATION WILL ACCEPT AMERICAN WATER'S PROPOSAL TO CONSTRUCT A 6-INCH FIRE SERVICE LINE AS A PART OF THE RENOVATION OF BUILDING 315 IN ORDER TO INCLUDE THE ADDITION OF FIRE PROTECTION. |
| Jun 19, 2017 | P00099 | $0 | UTILITY SERVICE CONTRACT FOR PRIVATIZATION OF THE WATER AND WASTEWATER UTILITY SYSTEM INFRASTRUCTURE AT FORT BELVOIR, VIRGINIA. |
| Jun 6, 2017 | P00098 | $0 | THIS MODIFICATION WILL REPLACE CANCELED FY10 FUNDS ESTABLISHED AS ACRN AC IN P00007 WITH CURRENT YEAR FUNDS ESTABLISHED AS ACRN CD. |
| Mar 28, 2017 | P00096 | $0 | THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT MODIFICATION P00096 THAT REVISES CLIN 0568 STREAM RESTORATION PROJECT-SITE RESTORATION TO REMOVE THE REQUIREMENT FOR POST-CONSTRUCTION MONITORING AND REPORTING, AND ESTABLISHES CLIN 0569 STREAM RESTORATION PROJECT-POST CONSTRUCTION MONITORING AND REPORTING. THE ORIGINAL PRICE FOR CLIN 0568 WAS $55,119.00, WHICH WILL NOW BE REVISED TO $33,119.00. THE REMAINING $22,000.00 WILL BE ALLOCATED TO NEWLY CREATED CLIN 0569. THE PERIOD OF PERFORMANCE FOR CLIN 0568 NOT TO EXCEED JUNE 30, 2017 WILL REMAIN UNCHANGED. THE PERIOD OF PERFORMANCE FOR CLIN 0569 WILL BE THE ONE-YEAR PERIOD FOLLOWING COMPLETION OF THE REVISED CLIN 0568. AWS ORIGINAL PROPOSAL OF SEPTEMBER 14, 2014, REVISION 2 SUPPORTS THIS PRICING BREAKOUT. |
| Mar 28, 2017 | P00097 | $14.7K | THIS MODIFICATION WILL ACCEPT AMERICAN WATER'S PROPOSAL FOR THE PURCHASE OF HYDROGEN SULFIDE MONITORS TO ENABLE AW TO MONITOR THE CONCENTRATION OF HYDROGEN SULFIDE IN THE AIR AT WASTEWATER DISCHARGE POINTS PRIOR TO ENTERING FAIRFAX COUNTY SEWER SYSTEM. |
| Mar 2, 2017 | P00095 | $14.5K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AMERICAN WATER OPERATIONS AND MAINTENANCE, INC. (AWO&M) PROPOSAL TO REMOVE TREES FROM THE ALIGNMENT OF THE 12-INCH WATER MAIN THROUGH PHASE 1 OF THE NMUSA PROJECT. THIS WILL ALLOW FOR AN OPEN CUT INSTALLATION OF THE WATER MAIN. AWO&M WILL FURNISH ALL EQUIPMENT, LABOR, AND MATERIAL FOR THE REMOVAL OF ELEVEN (11) MATURE TREES; THE SCOPE WILL CONSIST OF LIMBING, CUTTING, EXCAVATION OF STUMPS, AND HAUL OFF ALL DEBRIS. |
| Jan 9, 2017 | P00094 | $4.4M | THIS PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE MONTHLY SERVICE CHARGE TO COVER THE PERIOD OF PERFORMANCE OF JANUARY 6, 2017 - OCTOBER 5, 2017 (9 MONTHS). |
| Nov 22, 2016 | P00093 | $977.9K | THE PURPOSE OF THIS MODIFICATION IS TO REVISE SUBCLINS 0701AC, 0701AD, 0702AC AND 0702AD AND TO PROVIDE 2 MONTHS OF FUNDING FOR THE UTILITY SERVICE CHARGE IN THE AMOUNT OF $977,940.96 FOR CONTRACT YEAR SEVEN. |
| Oct 24, 2016 | P00092 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN MODIFICATION P00091. |
| Oct 21, 2016 | P00091 | $489.0K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBCLINS 0701AC, 0701AD, 0702AC AND 0702AD AND TO FUND THE FIXED MONTHLY CHARGE FROM 6 OCT 2016 THRU 5 NOV 2016. |
| Sep 30, 2016 | P00088 | $1.1M | THIS MODIFICATION WAS EXECUTED TO ACCEPT AND INCORPORATE PRICE REDETERMINATION NUMBER 2 FOR THE OPERATIONS AND MAINTENANCE AND THE RENEWAL AND REPLACEMENTS FOR CONTRACT SP0600-09-C-8257 FORT BELVOIR, VIRGINIA. PRICE REDETERMINATION NUMBER 2 PERIOD OF PERFORMANCE (POP) IS MARCH 6, 2015 TO MARCH 5, 2018. |
| Sep 30, 2016 | P00089 | $4.3M | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AWO&M PROPOSAL TO INSTALL WATER AND WASTEWATER INFRASTRUCTURE THAT WILL PROVIDE UTILITIES SERVICES TO THE PROPOSED NATIONAL MUSEUM OF THE U.S. ARMY ON FORT BELVOIR. |
| Sep 30, 2016 | P00090 | $146.8K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AMERICAN WATER OPERATIONS AND MAINTENANCE, INC. PROPOSAL TO INSTALL A NEW FIRE SERVICE LINE AT BUILDING 1822 ON FORT BELVOIR, VIRGINIA. |
| Sep 20, 2016 | P00087 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN MODIFICATION P00086. |
| Sep 6, 2016 | P00086 | $-1.4K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS ON ACRN AK. |
| Jul 18, 2016 | P00084 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DELETE AND REPLACE THE B.3 SCHEDULE IN ITS ENTIRETY. DLA ENERGY PERFORMED A CONTRACT AUDIT AND VARIOUS ADMINISTRATIVE ERRORS WERE DISCOVERED REQUIRING CORRECTION. |
| Jul 7, 2016 | P00085 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN MODIFICATION P00064 RELATING TO THE LOA AND MIPR NUMBER. |
| Jun 1, 2016 | P00083 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND EXTEND THE PERIOD OF PERFORMANCE (POP) FOR CLINS/SUBCLINS 0416, 0418, 0519, 0523, 0524, 0525, 0564, 0565, 0566, 0567, 0568, 0621, AND 0622 |
| May 23, 2016 | P00082 | $0 | REPLACE CONTRACT ATTACHMENT J5 WITH THE CURRENT VIRGINIA WAGE DETERMINATION NO. 2015-4281 WITH THE ATTACHMENT J5 - WAGE DETERMINATION NO. 2015-4281 REVISION 3. |
| Feb 29, 2016 | P00081 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND EXTEND THE PERIOD OF PERFORMANCE (POP) FOR CLINS/SUBCLINS 0325, 0332, 0513, 0530, 0531, 0532, 0533, 0550, 0552, 0553, 0554, 0555, 0560, 0561, 0562, 0563. |
| Feb 12, 2016 | P00080 | $3.5M | THE PURPOSE OF THIS MODIFICATION IS TO REVISE SUBCLINS 0601AC, 0602AC, 0601AD AND 0602AD TO PROVIDE ONE MONTH OF FUNDING FOR THE FIXED MONTHLY CHARGE FOR CONTRACT YEAR SIX IN THE AMOUNT OF $433,588.48. THIS MODIFICATION ALSO ESTABLISHES SUBCLINS 0701AA, 0702AA, 0701AB AND 0702AB TO PROVIDE SEVEN MONTHS OF FUNDING FOR THE FMC IN THE AMOUNT OF $3,035,119.36 FOR CONTRACT YEAR SEVEN ON FORT BELVOIR'S UTILITY SERVICE CONTRACT NUMBER SP0600-09-C-8257. |
| Jan 14, 2016 | P00079 | $433.6K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CONTRACT SP060009C8257 IN THE AMOUNT OF $433,588.48 FOR THE FMC FROM 6JAN THRU 5FEB 2016. THIS MOD ALSO CORRECTS AN ADMIN ERROR IN MODIFICATION P00076 RELATING TO THE ACRN CITED UNDER SECTION B.3. SCHEDULE. |
| Dec 8, 2015 | P00078 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN MODIFICATION P00051 RELATING TO THE CLINS AND DOLLAR AMOUNT CITED UNDER SECTION G.5 ACCOUNTING AND APPROPRIATION DATA. |
| Nov 24, 2015 | P00077 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REPLACE VA WAGE DETERMINATION REVISION 13 CONTRACT ATTACHMENT J5 WITH THE CURRENT VA WAGE DETERMINATION NO 2005-2103 REVISION 16. |
| Nov 9, 2015 | P00076 | $1.3M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CONTRACT SP0600-09-C-8257 IN THE AMOUNT OF $1,300,765.44 FOR THE FIXED MONTHLY CHARGES FROM 6 OCT 2015 THRU 5 JAN 2016. |
| Sep 28, 2015 | P00073 | $609.4K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0626, 0627, 0628, 0629, AND 0630 TO PERFORM NATURAL STREAM DESIGNS FOR REPAIRING, RESTORING, AND ENHANCING FOUR DIFFERENT STREAM REACHES WHILE STABILIZING THE STREAMS AT WATER AND WASTEWATER LINES FOR STREAM RESTORATION SITES 2, 3, 4 AND 6 ON FORT BELVOIR, VIRGINIA UNDER CONTRACT SP0600-09-C-8257. |
| Sep 28, 2015 | P00074 | $-65.3K | THE PURPOSE OF THIS MODIFICATION IS TO DECREASE THE PRICE OF CLINS 0101AM AND 0102AL AND TO DE-OBLIGATE EXCESS FUNDS FROM ACRN AC. CLIN 0101AM AND 0102AL, PREVIOUSLY REVISED IN P00056, IS HEREBY DECREASED IN THE AMOUNT OF $65,304.00 FROM $100,000.00 TO $34,696.00. THE FINAL INVOICE (#1207) HAS BEEN SUBMITTED IN THE AMOUNT OF $34,696.00 AND HAS BEEN ACCEPTED BY THE GOVERNMENT AND PAID ON SEPT 27, 2015. |
| Sep 28, 2015 | P00075 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN MODIFICATION P00053 RELATING TO THE CLINS AND DESCRIPTION OF SERVICES CITED UNDER SECTION G.5 ACCOUNTING AND APPROPRIATION DATA. THE CLINS AND DESCRIPTION OF SERVICES WERE INCORRECTLY CITED IN THE TABLE. IN ORDER TO CORRECT THIS ERROR WE WILL CORRECTLY CITE CLINS 0546, 0547, 0548, 0549, 0550, 0551, 0552, 0553, AND 0554 WITH ITS RESPECTIVE DESCRIPTION OF SERVICES. |
| Sep 21, 2015 | P00071 | $21.2K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLIN 0625 FOR THE REPAIR OF AN EXISTING STORM CROSS DRAIN AND TO RE-ALIGN A SANITARY FORCE MAIN AT PATRICK ROAD ON FT. BELVOIR, VIRGINIA. |
| Sep 21, 2015 | P00072 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AW'S ANNUAL COST TO OPERATE OPERATIONS&MAINTENANCE (ACTO O&M) PROPOSAL DTD JULY 15, 2015, AND INCORPORATE THE ACTO O&M METHODOLOGY INTO THIS CONTRACT. |
| Sep 15, 2015 | P00069 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DFARS CLAUSE 252.204-7012, SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION, INTO THE FORT BELVOIR WATER/WASTEWATER CONTRACT SP0600-09-C-8257. |
| Sep 15, 2015 | P00070 | $78.8K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0623 AND 0624 TO INSTALL APPROX. 100 LINEAR FEET OF WATER MAIN TO PROVIDE A FIRE SERVICE LINE TO BUILDING 1099 ON FT. BELVOIR, UNDER CONTRACT SP060009C8257. |
| Aug 18, 2015 | P00068 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REPLACE FAR CLAUSE 52.22-44 WITH FAR CLAUSE 52.222-43. |
| Aug 7, 2015 | P00067 | $201.7K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0621 AND 0622 TO FUND THE INSTALLATION OF A SMALL GRINDER LIFT STATION TO SERVICE BLDG. 219 ON FORT BELVOIR, VIRGINIA UNDER CONTRACT SP060009C8257. |
| Jul 9, 2015 | P00066 | $0 | THE PROJECT COMPLETION DATE FOR CLIN 0508 PRE-1960 WATER MAIN - ABBOT ROAD, PREVIOUSLY ESTABLISHED IN MODIFICATION P00044 DATED APRIL 9, 2014 IS HEREBY REVISED FROM MAY 14, 2015 TO JULY 13, 2015. THE GOVERNMENT ACCEPTS AWO&M'S LETTER OF REQUEST DATED MAY 4, 2015 TO EXTEND THE PROJECT FOR CLIN 0508, AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Jun 26, 2015 | P00064 | $3.4M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0605 AND 0606 FOR THE CONSTRUCTION OF AW BUILDING EXTENDED DETENTION POND ALONG WITH 0607, 0608, 0609, 0610, 0611, AND 0613 FOR THE PRE-1960 WATERMAIN PIPING AT AREA 1400. |
| Jun 26, 2015 | P00065 | $675.1K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0613, 0614, 0615, 0616, 0617, 0618, 0619 AND 0620 TO REALIGN WATER LINES ON BEULAH ROAD AND FOR THE INSTALLATION OF OIL WATER SEPARATORS (OWS) AT DAAF HANGAR BUILDING 3140 AND 3145 ON FORT BELVOIR. |
| May 8, 2015 | P00063 | $119.2K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0603 AND 0604 FOR THE INSTALLATION OF A NEW LIFT STATION (LS) AND FORCE MAIN AT BLDG 318. THE NEW LS AT BUILDING 318 WILL PROVIDE SANITARY SERVICE THAT DID NOT EXIST AT THE BUILDING AND WILL BE CONSTRUCTED UNDER CONTRACT NUMBER SP0600-09-C-8257 FOR THE WASTEWATER SYSTEM LOCATED AT FORT BELVOIR, VIRGINIA. |
| Apr 14, 2015 | P00061 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND EXTEND THE PERIOD OF PERFORMANCE (POP) FOR CLINS/SUBCLINS 0101AG, 0101AM, 0102AL, 0202AD, 0202AE, 0202AF, 0309, 0310, 0322, 0325, 0327, 0332, 040801, 0410,0411, 0412, 0413, 0414, 0415, 0416, 0417, 0418, 0419, 0505, 0512, 0513, 0526, 0527, AND 0550. |
| Apr 14, 2015 | P00062 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE SCOPE OF WORK ASSOCIATED WITH THE GOVERNMENT RECOGNIZED SYSTEM DEFICIENCY #2, SEWER LATERALS COMPONENT AS REPRESENTED BY CLINS 0202AD, 0202AE, AND 0202AF. |
| Mar 30, 2015 | P00060 | $3.0M | THE PURPOSE OF THIS MODIFICATION IS TO REVISE SUBCLINS 0601AA AND 0602AA AND PROVIDE SEVEN (7) MONTHS OF FUNDING FOR SUBCLINS 0601AB AND 0602AB; AND TO ESTABLISH SUBCLINS 0601AC AND 0602AC. ALSO TO CORRECT AN ADMIN ERROR IN P00059 AFFECTING SECTION G.5. |
| Feb 25, 2015 | P00059 | $433.6K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CONTRACT NUMBER SP0600-09-C-8257 IN THE AMOUNT OF $433,588.48 FOR THE MONTH OF FEBRUARY 2015. |
| Dec 29, 2014 | P00058 | $867.2K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CONTRACT NUMBER SP0600-09-C-8257 IN THE AMOUNT OF $867,176.96 FOR DECEMBER 1, 2014 THRU JANUARY 31, 2015. |
| Nov 3, 2014 | P00057 | $867.2K | THIS MODIFICATION IS TO PROVIDE FUNDING FOR CONTRACT SP0600-09-C-8257 IN THE AMOUNT OF $867,176.96. THIS FUNDING WILL COVER THE OCTOBER AND NOVEMBER MONTHLY SERVICE CHARGE. |
| Sep 30, 2014 | P00056 | $396.1K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0564, 0565, 0566, 0567, AND 0568 TO PERFORM WORK ON STREAM RESTORATION FOR SITE NO. 1, 5, 7, AND 8. THIS MOD WILL ALSO REVISE SECTION B.3 SCHEDULE TO CLINS 0101AM W ISDC #15 REPAIR 3 STREAM CROSSINGS AND 0102AL WW ISDC #6 REPAIR 10 STREAM CROSSINGS. |
| Sep 22, 2014 | P00054 | $409.2K | THIS MODIFICATION WAS ISSUED TO INSTALL A NEW SECURITY FENCING AT LIFT STATION 97 AND 687 AND ALSO REHABILITATE THE OVERFLOW BASIN FOR LIFT STATION 97. |
| Sep 22, 2014 | P00055 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0559, 0560, 0561, 0562, AND 0563 TO CONSTRUCT AND TO MAKE OPERATIONAL A NEW WASTEWATER LIFT STATION (LS) 584 AND FORCE MAIN TO SERVE 120 FAMILY RESIDENTIAL UNITS THAT WILL COMPLY WITH VDH REGULATIONS AND AWO&M DESIGN STANDARDS AND SPECIFICATION. THIS NEW LS WILL REPLACE THE EXISTING LS 584 AND WILL BE INSTALLED IN A NEW LOCATION UNDER CONTRACT NUMBER SP0600-09-C-8257 FOR THE WATER DISTRIBUTION SYSTEM LOCATED AT FORT BELVOIR, VIRGINIA IN THE AMOUNT OF $1,156,642.00. |
| Sep 12, 2014 | P00053 | $871.5K | THE PURPOSE OF THIS MODIFICATION IS TO FUND 5 FUTURE CAPITAL UPGRADE PROJECTS: UPGRADE LS 1409 AT TULLEY GATE; INSTALL SEWAGE GRINDERS AT LS 1695, 1832; RAISE 14 MANHOLES AND REPLACE EXISTING MANHOLE LIDS WITH WATER TIGHT LIDS; AND TO CONNECT THE EXISTING GRAVITY SEWER MAIN FROM AREA 1400 TO NEW LS 1234 ON FORT BELVOIR, VA. |
| Sep 8, 2014 | P00052 | $400.4K | DESIGN AND CONSTRUCTION OF A NEW WATERMAIN AND FIRE HYDRANT AT AREA 300 ON FOR FT BELVOIR VA. PROJECT WILL INCREASE HYDRAULIC CAPACITY OF THE WATER DISTRIBUTION CENTER. |
| Aug 22, 2014 | P00051 | $278.5K | THE PURPOSE OF THIS MODIFICAITON IS TO ESTABLISH CLINS 0539, 0540, 0541,AND 0542 FOR THE INSTALLATION WATER, FIRE, AND SANITARY SEWER SERVICE LINES FOR BUILDINGS 205, 207 AND 1425 AT FORT BELVOIR, VA. |
| Aug 15, 2014 | P00050 | $33.6K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0537 AND 0538, TO INSTALL FIRE SUPPRESSION WATER LINES FOR THE NEW SPRINKLER SYSTEM LOCATED AT BLDG. 1417, TO CORRECT AN ADMINISTRATIVE ERROR IN MODIFICATION P00046, AS WELL AS EXTEND THE PERIOD OF PERFORMANCE IN MODIFICATION P00047. |
| Aug 12, 2014 | P00049 | $279.2K | THE PURPOSE OF THIS MODIFICATION P00049 IS TO ESTABLISH CLINS 0534, 0535,AND 0536 FOR RELOCATION OF LIFT STATION 1035 UNDER THE WATER/WASTEWATER SYSTEM ON FT. BELVOIR, VIRGINIA. |
| Aug 6, 2014 | P00048 | $1.4M | THE PURPOSE OF THIS MODIFICATION P00048 IS TO ESTABLISH CLINS 0528, 0529, 0530, 0531, 0532, AND 0533 TO PERFORM WORK TO RELOCATE LIFT STATION 7350 AND INSTALL APPROXIMATELY 2300 LF OF NEW 6 INCH SEWER FORCE MAIN ON THE WASTEWATER COLLECTION SYSTEM ON FT. BELVOIR, VIRGINIA. |
| Jun 18, 2014 | P00047 | $60.2K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH CLINS 0526 AND 0527 FOR DESIGN ALLOWANCES THAT WILL BE MADE TO COLLECT STORM DRAINAGE FROM AMERICAN WATER (AW) SITE AND CONVEY TO EXISTING DETENTION POND NOW OCCUPYING THE SITE SOUTHWEST OF THE AW SITE AND ADJACENT TO BUILDING 768 IN THE WATER DISTRIBUTION SYSTEM AND THE WASTEWATER COLLECTION SYSTEM ON FORT BELVOIR, VIRGINIA. |
| May 19, 2014 | P00046 | $1.7M | FUNDING FOR JUNE-SEPTEMBER 2014 MONTHLY SERVICE CHARGE FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. |
| Apr 17, 2014 | P00045 | $11.8M | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT IDENTIFIED STRUCTURAL DEFICIENCIES IN THE WATER DISTRIBUTION SYSTEM AND THE WASTEWATER COLLECTION SYSTEM SERVING THE WOODLAWN VILLAGE FAMILY RESIDENTIAL DEVELOPMENT ON FORT BELVOIR, VIRGINIA. |
| Apr 9, 2014 | P00044 | $2.1M | ESTABLISHED CLINS 0507, 0508, 0509, 5010, 0511, 0512 AND 0513 IN THE AMOUNT OF $2,138,407.00. MOD ALSO CORRECTS ESTIMATED CONTRACT VALUE ON P00017. THE CONTRACT VALUE NOW REFLECTS WHAT IS IN FPDS-NG. |
| Mar 25, 2014 | P00043 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT AN INCORRECT MIPR NUMBER ON MODIFICATION P00023 FOR FORT BELVOIR, VA. |
| Mar 11, 2014 | P00042 | $0 | WATER MAIN RELOCATION PROJECT FOR DAVISON ARMY AIRFIELD EQUITABLE ADJUSTMENT FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. FUNDING CAN FROM A PREVIOUS CREDIT. |
| Feb 25, 2014 | P00041 | $1.7M | FUNDING FOR FEB-MAY 2014 MONTHLY SERVICE CHARGE FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. |
| Feb 20, 2014 | P00040 | $0 | ADMINISTRATIVE MODIFICATION TO INCORPORATE THE DEPARTMENT OF LABOR, REGISTER OF WAGE DETERMINATION REVISIONS 9-13 FOR THE FORT BELVOIR CONTRACT. |
| Feb 18, 2014 | P00039 | $0 | PCB CONTAMINATION REMEDIATION PROJECT AND REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR DIFFERING SITE CONDITIONS AT WATER STORAGE TANKS (WST) 589 FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VIRGINIA. |
| Jan 30, 2014 | P00038 | $433.6K | FUNDING FOR JANUARY 2014 MONTHLY SERVICE CHARGE FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. |
| Dec 16, 2013 | P00037 | $867.2K | FUNDING FOR NOVEMBER&DECEMBER 2013 MONTHLY SERVICE CHARGE FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. |
| Dec 4, 2013 | P00036 | $0 | DAAF FIRE HYDRANT PROJECT FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. |
| Nov 5, 2013 | P00035 | $433.6K | FUNDING FOR OCTOBER 2013 MONTHLY SERVICE CHARGE FOR THE WATER/WASTEWATER CONTRACT FOR FORT BELVOIR, VA. |
Estimated positioning window
Mar 5, 2059 – Sep 5, 2059
40/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 40/100. Available recorded signals: 35 points.
- Contract end 2060-03-05 (12178 days from calculation)
- +5 points
- 18 historical awards in this buyer and category group
- +15 points
- 236 recorded award transactions
- +10 points
- Latest award action: 2026-05-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.