Federal contract award
SP060016C8314
IGF::OT::IGF UTILITY SERVICE CONTRACT FOR PRIVATIZATION OF THE ELECTRIC DISTRIBUTION SYSTEM AT EGLIN AFB, FL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DLA ENERGY |
| NAICS | 221122 — Electric Power Distribution |
| PSC | S112 — Electric Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $127.3M |
| Current contract value | $642.5M |
| Potential contract value / ceiling | $642.5M |
| Start date | Aug 1, 2017 |
| Current end date | Jul 31, 2067 |
| Potential end date | Jul 31, 2067 |
| Latest award activity | May 18, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 89 of 89 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 18, 2026 | P00088 | $0 | THIS MODIFICATION INCORPORATES FAR CLAUSE 52.208-90 (DEVIATION NOV 2025) AND DFARS CLAUSE 252-208-7999 (DEVIATION 2026-O0049) INTO THE CONTRACT. |
| Feb 11, 2026 | P00087 | $-681.1K | THIS MODIFICATION CANCELS THE ELECTRIC VEHICLE INFRASTRUCTURE (MAKE-READY WORK) PROJECT FOR THE DOWNTOWN DISTRICT SITES PER FAR 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT. |
| Feb 9, 2026 | P00086 | $39.6K | THIS MODIFICATION ACCEPTS CHELCO'S FIRM-FIXED-PRICE PROPOSAL FOR THE EAFB-E-25-006 SERVICE CONNECTION TO TARGET STRUCTURE NEXT TO BUILDING 463. |
| Nov 18, 2025 | P00085 | $12.6M | THIS MODIFICATION FUNDS THE UTILITY SERVICES CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2025 TO SEPTEMBER 30, 2026. |
| Nov 10, 2025 | P00084 | $0 | THIS MODIFICATION UPDATES CONTRACT SECTIONS G.2 & G.3. |
| Sep 30, 2025 | P00083 | $218.8K | THIS MODIFICATION AWARDS THE EAFB-E-25-003 25KV SWITCHING STATION ATS SCHEME PROJECT TO CHELCO. |
| Sep 16, 2025 | P00082 | $70.9K | THIS MODIFICATION AWARDS THE EAFB-E-25-005 SOOKOO RANGE N15 SOUTH PROJECT TO CHELCO. |
| Aug 22, 2025 | P00081 | $61.0K | THIS MODIFICATION APPLIES THE ECONOMIC PRICE ADJUSTMENT TO THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 9. |
| Aug 20, 2025 | P00080 | $3.7M | THIS MODIFICATION ACCEPTS CHELCO'S FIRM-FIXED-PRICE PROPOSAL EAFB-E-25-004 ADVANCED METERING INFRASTRUCTURE PROJECT. |
| Aug 7, 2025 | P00078 | $0 | THIS MODIFICATION INCORPORATES UPDATED WAGE DETERMINATIONS FOR CONTRACT YEAR 9. |
| Aug 7, 2025 | P00079 | $0 | THIS MODIFICATION UPDATES SECTION I, CONTRACT CLAUSES IN ACCORDANCE WITH EXECUTIVE ORDER 14173 AND 14168. |
| Apr 16, 2025 | P00077 | $106.4K | THIS MODIFICATION AWARDS THE EAFB-E-25-002 BUILDING 1333 PAD-MOUNT TRANSFORMER REPLACEMENT PROJECT TO CHELCO. |
| Feb 11, 2025 | P00076 | $241.6K | THIS MODIFICATION AWARDS THE EAFB-E-25-001 UNDERBRUSH COMPOUND CHARLIE SITE PROJECT. |
| Oct 9, 2024 | P00075 | $12.2M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2024 TO SEPTEMBER 30, 2025. |
| Oct 8, 2024 | P00074 | $0 | THIS MODIFICATION UPDATES DFARS 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING AND DFARS 252.204-7020, NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS. |
| Sep 27, 2024 | P00072 | $23.0K | THIS MODIFICATION AWARDS THE FOSTER STADIUM LIGHTS PROJECT TO CHELCO. |
| Sep 27, 2024 | P00073 | $1.0M | THIS MODIFICATION AWARDS MAKE READY WORK FOR EV CHARGING STATIONS IN THE DOWNTOWN AND NAVY EOD DISTRICTS. |
| Aug 19, 2024 | P00071 | $145.6K | THIS MODIFICATION APPLIES THE ECONOMIC PRICE ADJUSTMENT TO THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 8. |
| Aug 1, 2024 | P00070 | $0 | THIS MODIFICATION INCORPORATES UPDATED WAGE DETERMINATIONS FOR CONTRACT YEAR 8. |
| Jun 11, 2024 | P00069 | $0 | THIS MODIFICATION REVISES DFAS PAYMENT OFFICE DODAAC FROM F67100 TO F87700 TO ALLOW FOR THE TRANSITION FROM IAPS TO DEAMS. |
| Jan 29, 2024 | P00068 | $24.9K | THIS MODIFICATION ACCEPTS CHELCO'S PROPOSAL TO RE-ESTABLISH POWER TO BUILDING 1413. |
| Dec 7, 2023 | P00067 | $132.3K | THIS MODIFICATION OBLIGATES ADDITIONAL FUNDING TO CLIN 0085 DUE TO PROJECT SCOPE CHANGE. |
| Dec 1, 2023 | P00066 | $0 | THIS MODIFICATION CORRECTS AN ADMINISTRATIVE ERROR IN SECTION G.6 ACCOUNTING AND APPROPRIATION DATA OF THE PREVIOUSLY EXECUTED MODIFICATION P00065. |
| Oct 19, 2023 | P00065 | $11.2M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2023 TO SEPTEMBER 30, 2024. |
| Sep 15, 2023 | P00064 | $0 | THIS MODIFICATION REVISES CLIN 0089 AND EXTENDS THE PERIOD OF PERFORMANCE FOR SUBCLIN 0088AB. |
| Aug 29, 2023 | P00063 | $158.7K | THIS MODIFICATION APPLIES THE ECONOMIC PRICE ADJUSTMENT TO THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 7. |
| Aug 4, 2023 | P00062 | $0 | THIS MODIFICATION UPDATES THE WAGE DETERMINATION FOR CONTRACT YEAR 7. |
| Jun 23, 2023 | P00061 | $0 | THIS MODIFICATION INCORPORATES FAR CLAUSE 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023) INTO THE CONTRACT. |
| Jun 5, 2023 | P00060 | $389.6K | THIS MODIFICATION ACCEPTS CHELCO'S PROPOSAL FOR PROJECT EAFB-23-001 DUKE EV CHARGING STATION & EAFB-23-002 CABLE UPGRADE VALP DUKE CIRCUIT PROJECT. |
| Dec 1, 2022 | P00059 | $0 | THIS MODIFICATION REVISES EAFB-E-22-001 UNDERBRUSH PROJECT PREVIOUSLY AWARDED IN MODIFICATION P00054, AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Oct 26, 2022 | P00058 | $10.1M | THIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2022 TO SEPTEMBER 30, 2023. |
| Sep 8, 2022 | P00057 | $7.1K | THIS MODIFICATION FUNDS AN ADJUSTMENT TO CHELCO'S CONTRACT YEAR 5 RATES TO COVER THE COSTS OF EXCESS LINE LOCATES PERFORMED AT EGLIN AFB, FL FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2021 - JULY 31, 2022. |
| Sep 7, 2022 | P00056 | $136.9K | THIS MODIFICATION ACCEPTS CHOCTAWHATCHEE ELECTRIC COOPERATIVE (CHELCO) FIRM FIXED PRICE PROPOSAL EAFB-E-22-003 PRIMARY DISTRIBUTION CONSTRUCTION FOR NEW FEEDER AT DUKE FIELD SUBSTATION. |
| Aug 10, 2022 | P00055 | $112.5K | THIS MODIFICATION APPLIES THE ECONOMIC PRICE ADJUSTMENT (EPA) TO THE UTILITY SERVICE CHARGE (USC) FOR CONTRACT YEAR 6 AND UPDATES ATTACHMENT JA6 WAGE DETERMINATIONS. |
| Aug 4, 2022 | P00054 | $244.8K | ESTABLISHES AND FUNDS PROJECT EAFB-E-22-001. |
| Jan 6, 2022 | P00053 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0085 AND INCORPORATE FAR CLAUSE 52.204-21 TO THE CONTRACT IN FULL TEXT. |
| Oct 20, 2021 | P00052 | $9.5M | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE UTILITY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2021 TO SEPTEMBER 30, 2022. |
| Sep 24, 2021 | P00051 | $3.6K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH AND FUND CLIN 0087 PROVIDING AN EQUITABLE ADJUSTMENT TO CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC. (CHELCO). |
| Sep 15, 2021 | P00050 | $508.6K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT CHOCTAWHATCHEE ELECTRIC COOPERATIVE (CHELCO) FIRM FIXED PRICE PROPOSAL FOR PROJECT EAFB-E-21-005. |
| Sep 9, 2021 | P00049 | $272.8K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT CHOCTAWHATCHEE ELECTRIC COOPERATIVE (CHELCO) FIRM FIXED PRICE PROPOSAL FOR THE EAFB-E-21-004 RANGE C-64 PROJECT. |
| Sep 1, 2021 | P00048 | $296.9K | THE PURPOSE OF THIS MODIFICATION IS TO ACCELERATE THE PERFORMANCE PERIOD AND OBLIGATE FUNDING FOR CLIN 0069AE AND REVISE PRICING FOR CLIN 0005AB. |
| Aug 30, 2021 | P00047 | $9.7K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT CHELCO'S FIRM FIXED PRICE PROPOSAL FOR THE DUKE FIELD CONEX SERVICE CONNECTION. |
| Aug 10, 2021 | P00046 | $90.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 5 TO INCORPORATE THE ANNUAL ECONOMIC PRICE ADJUSTMENT AND INVENTORY ADJUSTMENTS. |
| May 21, 2021 | P00045 | $0 | THIS MODIFICATION UPDATES DFARS CLAUSE 252.204-7012, SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING, AND ADDS DFARS CLAUSE 252.204-7020, NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS. |
| May 20, 2021 | P00044 | $-21.2K | THIS MODIFICATION INCORPORATES CHANGES TO ISDC PROJECTS 15 AND 20, AND MAKES ADJUSTMENTS TO CLINS 0069AC, 0074AA, AND 0074AC. |
| Apr 29, 2021 | P00043 | $8.2K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AND FUND PROJECT EAFB-E-21-002. |
| Apr 28, 2021 | P00042 | $417.9K | THE PURPOSE OF THIS MODIFICATION IS TO FUND CLLNS 0069AD, 0070AD, 0072AF AND 0072AK. |
| Mar 18, 2021 | P00041 | $126.7K | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT CHOCTAWHATCHEE ELECTRIC COOPERATIVE'S FIRM FIXED PRICE PROPOSAL FOR THE EAFB 20-005 UNDERBRUSH RANGE EXPANSION PROJECT. |
| Dec 3, 2020 | P00040 | $-140.8K | THE PURPOSE OF THIS MODIFICATION IS TO APPLY CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC. (CHELCO) 2018, 2019, AND 2020 CAPITAL CREDITS TOWARDS DESIGNATED ISDC PROJECTS. |
| Oct 28, 2020 | P00039 | $8.9M | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE UTILITY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2020 TO SEPTEMBER 30, 2021. |
| Oct 19, 2020 | P00038 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0062 AND 0063 ISDC AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Sep 3, 2020 | P00037 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DELETE AND REPLACE ATTACHMENTS JA1 EGLIN AFB ELECTRIC DISTRIBUTION SYSTEM AND JA6 WAGE DETERMINATIONS IN ITS ENTIRETY WITH REVISED AND UPDATED COPIES. |
| Aug 19, 2020 | P00036 | $2.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 4 TO INCORPORATE THE ANNUAL ECONOMIC PRICE ADJUSTMENT, INVENTORY ADJUSTMENTS, AND ADJUSTMENTS TO ANNUAL LINE LOCATION REQUIREMENTS. |
| Jul 16, 2020 | P00035 | $482.0K | THE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND SERVICE CONNECTION PROJECTS EAFB-20-003 TEST AREA A-73 SITE #1, AND EAFB- 20-004 TEST AREA A-73 SITE #2. |
| Apr 23, 2020 | P00034 | $212.2K | THE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND PROJECT EAFB-20-001 NAVSCOLEOD TRAINING AREA 8 SERVICE CONNECTION. |
| Apr 17, 2020 | P00033 | $129.1K | THE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND PROJECT EAFB-20-002 NAVSCOLEOD C-87 PRACTICAL TRAINING SITE H1 SERVICE CONNECTION. |
| Jan 10, 2020 | P00032 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE LINE OF ACCOUNTING FOR ACRN AT PREVIOUSLY ESTABLISHED IN P00031. |
| Dec 11, 2019 | P00031 | $695.1K | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE FOLLOWING ISDC PROJECTS: ISDC #14 TRANSCLOSURE TRANSFORMER REPLACEMENTS-PHASE 3 (NORTH GATE) ISDC #15 GROUND MOUNTED TRANSFORMER REPLACEMENTS - PHASE 3 (EAST RANGE)ISDC #16 UNDERGROUND REPAIRS AND CODE VIOLATION CORRECTIONS - PHASE 3 (ACC/A1/VAL-P/GWEF)ISDC #18 OVERHEAD DEFICIENCY AND CODE VIOLATION CORRECTIONS - PART 2-PHASE C (NORTH GATE/VAL-P)ISDC #18 OVERHEAD DEFICIENCY AND CODE VIOLATION CORRECTIONS - PART 3 - PHASE C (EAST RANGE) AND ISDC #20 LIVE FRONT CONCRETE PAD REPLACEMENT - PHASE 3 (FOSTER/GWEF/MAIN CONTONMENT/WEST GATE/NORTH GATE). |
| Nov 19, 2019 | P00030 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0061 ISDC #10 - INSTALL SCADA, CLIN 0062 ISDC #11 - INTERCONNECT EAST AND WEST SUBSTATIONS (PHASE II), CLIN 0063 ISDC #12 - INTERCONNECT EAST AND WEST SUBSTATIONS (PHASE III) AND CLIN 0076 EAFB - 18-04 GWEF MAIN SUBSTATION CONTROL HOUSE AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Oct 21, 2019 | P00029 | $8.6M | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE UTILITY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2019 TO SEPTEMBER 30, 2020. |
| Sep 17, 2019 | P00028 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LINE OF ACCOUNTING FOR ACRN AR PREVIOUSLY ESTABLISHED IN P00026. |
| Aug 16, 2019 | P00027 | $5.5K | THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 3 TO INCORPORATE THE ANNUAL ECONOMIC PRICE ADJUSTMENT, INVENTORY ADJUSTMENTS, AND ADJUSTMENTS TO ANNUAL LINE LOCATION REQUIREMENTS. |
| Jul 24, 2019 | P00026 | $78.0K | THE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND PROJECT EAFB-19-01 TO PROVIDE AN ELECTRIC SERVICE CONNECTION FOR THE NATIONAL INTREPID CENTER OF EXCELLENCE. |
| Jun 18, 2019 | P00025 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE ATTACHMENT JA1 EGLIN AFB, FL - ELECTRIC DISTRIBUTION SYSTEM BY UPDATING PARAGRAPH 1 MONTHLY SYSTEM PERFORMANCE REPORTS (MSPR)AND REPLACE ATTACHMENT JA21 IN ITS ENTIRETY WITH THE NEWER VERSION DATED 02 APR 2019. |
| May 21, 2019 | P00024 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO WAIVE THE COST ACCOUNTING STANDARD (CAS) CLAUSES THAT WERE INADVERTENTLY INCORPORATED INTO THE CONTRACT. CAS IS HEREBY WAIVED BY THE CONTRACTING OFFICER IN ACCORDANCE WITH THE CAS WAIVER APPROVED ON AUGUST 31, 2016. |
| May 14, 2019 | P00023 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION I.1 FAR CLAUSES INCORPORATED BY REFERENCE (FEB 1998), ESTABLISH SECTION I.2 FAR CLAUSES AND TO INCORPORATED FAR 52.245-1, GOVERNMENT PROPERTY (JAN 2017) AND DFARS 252.251-7000, ORDERING FROM GOVERNMENT SUPPLY SOURCES (AUG 2012), INTO THE CONTRACT. |
| Apr 17, 2019 | P00022 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PROJECT COMPLETION DATES FOR SUBCLINS 0068AA, 0068AB, 0069AA, 0069AB, 0070AA, 0070AB, 0071AA, 0072AA, 0072AB, 0072AC, 0072AD, 0072AG, 0072AH, AND 0074AA. |
| Mar 6, 2019 | P00021 | $6.0M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND ISDC PROJECT #12 "INTERCONNECT EAST AND WEST SUBSTATION (PHASE III). |
| Jan 25, 2019 | P00020 | $13.1M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND ISDC PROJECT #1 "LOAD FLOW AND SHORT CIRCUIT ANALYSIS" AND ISDC PROJECT #11 "INTERCONNECT EAST AND WEST SUBSTATION (PHASE II). |
| Nov 14, 2018 | P00019 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS CORRECT ADMINISTRATIVE ERRORS IN THE LINE OF ACCOUNTING FOR ACRN AN PREVIOUSLY ESTABLISHED IN P00018. |
| Oct 31, 2018 | P00018 | $8.3M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND THE MONTHLY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2018 TO SEPTEMBER 30, 2019. |
| Oct 24, 2018 | P00017 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENTS AT JA6 TO INCORPORATE THE CURRENT DEPARTMENT OF LABOR WAGE DETERMINATIONS AND INCORPORATE BY REFERENCE CLAUSE FAR 52.204-23 "PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)." |
| Oct 9, 2018 | P00016 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A NEW MONTHLY SYSTEM PERFORMANCE REPORT (MSPR) REQUIREMENT THAT IS BEING ADDED TO THE SECTION JA1.6 MONTHLY SUBMITTALS. |
| Sep 27, 2018 | P00015 | $1.2M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND AND ACCELERATE THE PERIOD OF PERFORMANCE FOR EIGHT INITIAL SYSTEM DEFICIENCY CORRECTION (ISDC) PROJECTS. |
| Sep 20, 2018 | P00014 | $522.7K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT THE CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC. (CHELCO) PROPOSAL DATED AUGUST 10, 2018 TO INSTALL A NEW JOINT CONTROL HOUSE AT MAIN BASE AND GWEF SUBSTATIONS IN THE TOTAL AMOUNT OF $522,654.00. |
| Aug 29, 2018 | P00013 | $64.1K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AND FUND AN EQUITABLE ADJUSTMENT FOR EXCESS LINE LOCATES PERFORMED DURING CONTRACT YEAR 1 AND APPLY A CREDIT FOR OVERSTATED RENEWALS AND REPLACEMENTS CHARGES MADE IN ERROR DURING CONTRACT YEAR 1. |
| Aug 10, 2018 | P00012 | $68.0K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 2 TO INCORPORATE THE ANNUAL ECONOMIC PRICE ADJUSTMENT, INVENTORY ADJUSTMENTS, AND ADJUSTMENTS TO ANNUAL LINE LOCATION REQUIREMENTS. |
| Jul 17, 2018 | P00011 | $2.5M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AND FUND NINE INITIAL SYSTEM DEFICIENCY CORRECTION (ISDC) PROJECTS. ADDITIONALLY, THIS MODIFICATION OBLIGATES FUNDING TO PREVIOUSLY ESTABLISHED CLIN 0061. |
| Jun 21, 2018 | P00010 | $4.7K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT AND FUND A PROJECT TO AUTHORIZE THE REMOVAL OF A THREE PHASE POLE AND INSTALLATION OF A NEW OVERHEAD GUY POLE. |
| Apr 6, 2018 | P00009 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE O&M/R&R ADJUSTMENT RESULTANT FROM PROJECT EAFB-18-02 PREVIOUSLY AWARDED IN P00007, AND EXTEND THE PERFORMANCE PERIOD FOR ISDC#10, INSTALL SCADA. |
| Mar 19, 2018 | P00008 | $4.0M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND THE MONTHLY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF APRIL 1, 2018 TO SEPTEMBER 30, 2018. |
| Dec 20, 2017 | P00006 | $1.1M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND ISDC PROJECT # 4 "UPGRADE SYSTEM MAPS," ISDC PROJECT # 7 "DEVELOP CPR DATABASE," ISDC PROJECT # 8 "CREATE MILSOFT WINDMILL DISSPATCH," AND ISDC PROJECT # 9 "INSTALL FAULT INDICATORS." |
| Dec 12, 2017 | P00005 | $6.6K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO AWARD PROJECT EAFB-18-01, WHICH PROVIDES A TEMPORARY ELECTRIC SERVICE CONNECTION TO TEMPORARY OFFICE FACILITIES AT HANGAR 71. |
| Oct 26, 2017 | P00004 | $4.0M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FUND THE MONTHLY SERVICE CHARGE FOR THE PERFORMANCE PERIOD OF OCTOBER 1, 2017 TO MARCH 31, 2018. |
| Sep 26, 2017 | P00003 | $978.1K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CONTRACT PRICE ADJUSTMENTS AS A RESULT OF DUE DILIGENCE. THESE ADJUSTMENTS ACCOUNT FOR ADDITIONAL INVENTORY DISCOVERED FOR CONVEYANCE DURING THE TRANSITION PROCESS AS WELL AS PRICING ADJUSTMENTS TO ISDC PROJECTS. |
| Jul 31, 2017 | P00002 | $1.6M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE CHELCO TO BEGIN CONTRACT PERFORMANCE EFFECTIVE AUGUST 1, 2017; INCORPORATE THE FULLY EXECUTED UTILITY SYSTEM BILL OF SALE FOR THE ELECTRIC DISTRIBUTION SYSTEM AT EGLIN AFB, FL; AND OBLIGATE FUNDING FOR THE PERFORMANCE PERIOD OF AUGUST 1, 2017 - JULY 31, 2018. |
| Jul 17, 2017 | P00001 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REMOVE A NON-APPLICABLE CLAUSE AND UPDATES REMAINING CLAUSES TO THE LATEST PUBLISHED REVISIONS. |
| Jan 23, 2017 | P00007 | $37.5K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO AWARD PROJECT EAFB-18-02 TEMPORARY LODGING FACILITY (TLF) PERMANENT CONNECTION. |
| Sep 14, 2016 | 0 | $1.2M | IGF::OT::IGF UTILITY SERVICE CONTRACT FOR PRIVATIZATION OF THE ELECTRIC DISTRIBUTION SYSTEM AT EGLIN AFB, FL |
Estimated positioning window
Jul 31, 2066 – Jan 31, 2067
50/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 50/100. Available recorded signals: 45 points.
- Contract end 2067-07-31 (14882 days from calculation)
- +5 points
- 20 historical awards in this buyer and category group
- +15 points
- 89 recorded award transactions
- +10 points
- Latest award action: 2026-05-18
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.