Federal contract award

SP060017C8328

IGF::OT::IGF THIS CONTRACT IS AWARDED FOR THE OWNERSHIP, OPERATION AND MAINTENANCE OF THE WATER AND WASTEWATER UTILITY SYSTEMS AT FORT RILEY, KANSAS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDLA ENERGY
NAICS221310 — Water Supply and Irrigation Systems
PSCS114 — Water Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT
Obligations$155.5M
Current contract value$871.3M
Potential contract value / ceiling$871.3M
Start dateSep 29, 2017
Current end dateJun 30, 2068
Potential end dateJun 30, 2068
Latest award activityMay 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 118 of 118 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 28, 2026P00117$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY2026.
Apr 30, 2026P00116$3.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY2026.
Mar 12, 2026P00115$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY2026.
Mar 10, 2026P00114$0THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CHANGE ORDER TO EXTEND THE COMPLETION DATES FOR PROJECTS FRKS-SW-24-001, FRKS-SW-25-002, AND FRKS-SW-25-003.
Jan 27, 2026P00113$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2026.
Dec 16, 2025P00112$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2026.
Dec 11, 2025P00111$0THE PURPOSE OF THIS MODIFICATION FOR A CHANGE IN WORK ORDER FOR CLIN 106
Nov 21, 2025P00110$4.9MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2026.
Nov 19, 2025P00109$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE LANGUAGE IN THE CONTRACT SURROUNDING WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS.
Sep 30, 2025P00108$571.9KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CAPITAL IMPROVEMENTS OF THE WATER AND WASTEWATER SYSTEMS.
Sep 22, 2025P00107$3.3MTHIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR AUGUST AND SEPTEMBER OF 2025.
Aug 11, 2025P00106$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE MONTHLY UTILITY SERVICE CHARGE (MUSC) DUE TO INVENTORY CHANGES AND TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MUSC AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE.
Jul 30, 2025P00105$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION I, CONTRACT CLAUSES, IN ACCORDANCE WITH EXECUTIVE ORDERS 14173 AND 14168.
Jul 7, 2025P00104$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE APPLICABLE WAGE DETERMINATIONS UNDER THE DAVIS-BACON ACT (DBA) AND SERVICE CONTRACT ACT FOR CONTRACT YEAR 8.
Jun 27, 2025P00103$1.7MTHIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR JUNE OF 2025.
May 8, 2025P00102$1.7MTHIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR MAY OF 2025.
Apr 8, 2025P00101$1.7MTHIS MODIFICATION FUNDS THE UTILITY SERVICE CHARGE FOR APRIL OF 2025 AND UPDATES ATTACHMENT JE6.
Mar 13, 2025P00100$1.7MTHIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25.
Nov 19, 2024P00098$3.4MTHIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25.
Oct 28, 2024P00097$1.7MTHIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25.
Oct 11, 2024P00096$0THIS MODIFICATION UPDATES THE CONTRACT WITH CLAUSES DFARS 252.204-7012 AND DFARS 252.204-7020.
Sep 25, 2024P00095$225.3KP00095 AUTHORIZES PROJECT FRKS-SW-24-002 .
Aug 30, 2024P00094$7.4MP00094 AUTHORIZES PROJECT FRKS-SW-24-001 AND FUNDS THE USC AND ISDC CLINS.
Aug 7, 2024P00093$39.3KTHE PURPOSE OF THIS MODIFICATION IS TO ADJUST MONTHLY UTILITY SERVICE CHARGE (MUSC) DUE TO INVENTORY CHANGES AND TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MUSC AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE.
Jul 10, 2024P00092$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE APPLICABLE WAGE DETERMINATIONS UNDER THE DAVIS-BACON ACT (DBA) AND SERVICE CONTRACT ACT FOR CONTRACT YEAR 7.
Jun 28, 2024P00091$3.3MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
May 29, 2024P00090$1.7MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Apr 15, 2024P00089$1.7MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Mar 24, 2024P00088$1.9MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Feb 21, 2024P00087$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Jan 8, 2024P00099$3.3MTHIS MODIFICATION FUNDS THE USC AND ISDC FOR FY25.
Dec 22, 2023P00086$3.3MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Nov 29, 2023P00085$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Oct 18, 2023P00084$1.6MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2024.
Sep 20, 2023P00083$1.2MTHE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND CAPITAL IMPROVEMENT PROJECTS.
Jul 26, 2023P00082$257.5KTHIS MODIFICATION APPLIES AN ECONOMIC PRICE ADJUSTMENT TO THE MONTHLY UTILITY SERVICES CHARGE AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE AND PROVIDES FUNDING TO COVER THREE MONTHS OF THE USC AT THE ADJUSTED RATE FOR FISCAL YEAR 2023.
Jul 10, 2023P00081$0THIS MODIFICATION INCORPORATES THE UPDATED REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT WAGE DETERMINATION AND THE GENERAL DECISION FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT FOR CONTRACT YEAR 6 OF 50.
Jul 3, 2023P00080$4.6MTHIS MODIFICATION INCORPORATES FAR CLAUSE 52.204-27 AND FUNDS THE UTILITY SERVICE CHARGE FOR W/WW AND ISDCWW 5.
Jun 8, 2023P00079$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REQUIREMENT FOR THE SYSTEM OWNER TO SUBMIT AN ANNUAL UTILITY SYSTEM CONDITION ASSESSMENT AND ACCOMPANYING SELF-ATTESTATION.
May 18, 2023P00078$3.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Mar 21, 2023P00077$2.8KTHE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE FRUS TO PERFORM PFOS AND PFOA SAMPLING/TESTING AT SEVERAL LOCATIONS AT FORT RILEY, KS.
Mar 20, 2023P00076$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ARMY MONTHLY SYSTEM PERFORMANCE REPORT (MSPR) REQUIREMENT.
Feb 23, 2023P00075$3.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Feb 14, 2023P00074$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Feb 1, 2023P00073$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Jan 31, 2023P00071$0THE MODIFICATION UPDATES THE REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT AND THE GENERAL DECISIONS FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT.
Jan 31, 2023P00072$40.5KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR A SERVICE CONNECTION USING FY21 FUNDS.
Dec 13, 2022P00070$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Nov 18, 2022P00069$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A TYPOGRAPHICAL ERROR IN P00068.
Nov 11, 2022P00068$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Nov 9, 2022P00067$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE AND REPLACE EXHIBIT JE6, SUBCONTRACTING PLAN, TO INCORPORATE THE APPROVED 2023 COMMERCIAL SMALL BUSINESS SUBCONTRACTING PLAN OF AMERICAN STATES UTILITY SERVICES, INC.
Oct 25, 2022P00066$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A TYPOGRAPHICAL ERROR IN P00065.
Oct 14, 2022P00065$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTION FOR FISCAL YEAR 2023.
Sep 21, 2022P00064$29.0KTHE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND A NEW SERVICE CONNECTION.
Aug 5, 2022P00063$236.8KTHIS MODIFICATION APPLIES AN ECONOMIC PRICE ADJUSTMENT TO THE MONTHLY UTILITY SERVICE CHARGE AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE AND PROVIDES FUNDING TO PARTIALLY COVER THE FIXED MONTHLY CHARGE. THIS MODIFICATION ALSO UPDATES THE REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT AND THE GENERAL DECISIONS FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT.
Jul 26, 2022P00062$469.6KTHE PURPOSE OF THIS MODIFICATION IS TO AWARD AND FUND NEW SERVICE CONNECTIONS.
Jun 30, 2022P00061$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A TYPOGRAPHICAL ERROR IN P00060.
Jun 29, 2022P00060$271.6KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR NEW SERVICE CONNECTIONS.
May 12, 2022P00059$0THE PURPOSE OF THIS MODIFICATION IS TO ADD FAR 52.251-1 AND DFARS 252.251-7000 TO THE CONTRACT.
Mar 31, 2022P00058$8.9MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2022 AND TO PROVIDE FUNDING FOR NEW SERVICE CONNECTIONS.
Mar 8, 2022P00057$0THE PURPOSE OF THIS MODIFICATION IS TO TRANSITION FROM THE DUNS NUMBER TO THE SAM UEI AND TO CORRECT A TYPOGRAPHICAL ERROR IN P00056.
Mar 2, 2022P00056$1.4MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE & INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2022 AND TO UPDATE DFARS CLAUSE 252.232-7006.
Jan 13, 2022P00055$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR COMPLETION OF THE FRKS-SW-21-008: LIFT STATIONS SP 6918N, SP 845, AND SP 888 - GENERATOR CONNECTION PROJECT.
Jan 11, 2022P00054$1.4MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2022.
Dec 20, 2021P00053$69.3KTHE PURPOSE OF THIS MODIFICATION IS PROVIDE FOR AN EXTENSION OF COVID 19 SURVEILLANCE SAMPLING/TESTING AT SEVERAL LOCATIONS WITHIN FORT RILEY, KS.
Dec 8, 2021P00052$2.8MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2022.
Nov 16, 2021P00050$1.4MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2022.
Nov 16, 2021P00051$0THE PURPOSE OF THIS MODIFICATION IS TO ADD FAR CLAUSE 52.204-21 TO THE CONTRACT.
Oct 8, 2021P00049$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE, INITIAL SYSTEM DEFICIENCY CORRECTIONS, AND A TEMPORARY SERVICE CONNECTION FOR FISCAL YEAR 2022.
Oct 1, 2021P00048$0THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE A TEMPORARY SERVICE CONNECTION.
Sep 20, 2021P00047$799.9KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR NEW SERVICE CONNECTIONS.
Sep 3, 2021P00046$6.0KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR A NEW SERVICE CONNECTION.
Jun 24, 2021P00045$0THIS MODIFICATION UPDATES REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT AND GENERAL DECISIONS FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT.
Jun 10, 2021P00044$4.1MTHIS MODIFICATION APPLIES AN ECONOMIC PRICE ADJUSTMENT TO THE MONTHLY UTILITY SERVICE CHARGE AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE AND PROVIDES FUNDING TO PARTIALLY COVER INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FY 2021.
May 21, 2021P00043$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DFARS CLAUSE 252.204-7012 AND ADD CLAUSE 252.204-7020 TO THE CONTRACT.
Apr 13, 2021P00042$2.6MTHIS PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2021.
Mar 24, 2021P00041$1.3MTHIS PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2021.
Mar 19, 2021P00040$102.2KTHIS MODIFICATION IS TO ALLOW FRUS TO PERFORM COVID 19 SURVEILLANCE SAMPLING/TESTING AT SEVERAL LOCATIONS AT FORT RILEY, KS.
Feb 25, 2021P00039$2.6KTHIS MODIFICATION IS TO ALLOW FRUS TO PERFORM PFOS AND PFOA SAMPLING/TESTING AT SEVERAL LOCATIONS AT FORT RILEY, KS.
Feb 3, 2021P00038$1.3MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2021
Jan 19, 2021P00036$1.3MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2021.
Jan 19, 2021P00037$214.0KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR A NEW SERVICE CONNECTION.
Jan 12, 2021P00035$1.3MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND FOR INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2021.
Dec 29, 2020P00034$1.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE AND FOR INITIAL SYSTEM DEFICIENCY CORRECTIONS FOR FISCAL YEAR 2021.
Nov 6, 2020P00033$211.6KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR INITIAL SYSTEM DEFICIENCY CORRECTIONS.
Oct 13, 2020P00032$2.3MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2021.
Sep 30, 2020P00031$-402.8KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE FIRM FIXED-PRICE AND COMPLETION DATE OF THE FOLLOWING CAPITAL UPGRADE: "ACURRP PROJECT #17, ADDITIONAL ISOLATION VALVES BASE-WIDE".
Sep 25, 2020P00030$4.9KTHE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE FRUS TO COMPLETE THIRD-PARTY INSPECTIONS.
Aug 21, 2020P00029$25.6KTHE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE FRUS TO COMPLETE A NEW CONNECTION AT BUILDING 7604 AND 7606.
Aug 5, 2020P00028$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2020.
Jul 23, 2020P00027$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2020.
Jun 26, 2020P00026$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MONTHLY UTILITY SERVICE CHARGE (MUSC) AND THE THIRD PARTY CONSTRUCTION HOURLY INSPECTION CHARGE RATE.
May 28, 2020P00025$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2020.
Mar 27, 2020P00024$474.9KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR INITIAL SYSTEM DEFICIENCY CORRECTIONS.
Mar 23, 2020P00023$2.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2020.
Mar 20, 2020P00022$0UPDATES REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT AND GENERAL DECISIONS FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT.
Mar 5, 2020P00021$11.9KPERMANENT CONNECTION: FR-20-002 - BUILDING 7608 DOMESTIC WATER SERVICE LINE
Jan 30, 2020P00020$2.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICES CHARGE FOR FISCAL YEAR 2020.
Jan 9, 2020P00019$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICES CHARGE FOR FISCAL YEAR 2020.
Dec 6, 2019P00018$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICES CHARGE FOR FISCAL YEAR 2020.
Nov 19, 2019P00017$35.0KPERMANENT CONNECTION: FR-20-007 - BUILDING 207 FIRE LINE AND BACKFLOW PREVENTER
Oct 16, 2019P00016$2.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICES CHARGE FOR FISCAL YEAR 2020.
Sep 30, 2019P00015$980.0KCAPITAL UPGRADE: PROJECT #17, ADDITIONAL ISOLATION VALVES BASEWIDE.
Sep 27, 2019P00014$46.3KTHIS MODIFICATION AUTHORIZES FRUS TO COMPLETE THE FR 19-001 - 7981SCB AND 7003SCB BACKFLOW PREVENTER AND METER/SHUT-OFF VALVE RELOCATION PROJECT. THIS ESTABLISHED THE FIRM FIXED PRICE CLIN 0068 FOR $46,285.00 WITH A POP OF SEP 27, 2019 - OCT 25, 2019.
Jul 12, 2019P00013$57.9KTHIS MODIFICATION APPLIES AN ECONOMIC PRICE ADJUSTMENT (EPA) TO THE CURRENT MONTHLY UTILITY SERVICE CHARGE (MUSC,)INCREASING THE MUSC BY 1.77%, EFFECTIVE AT THE START OF CONTRACT YEAR 2 OF 50 IN ACCORDANCE WITH CLAUSE I-0002 B.19.40 ECONOMIC PRICE ADJUSTMENT-PRICE INDEX UTILITY SERVICES.
May 30, 2019P00012$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE NOVATION AGREEMENT BETWEEN THE UNITED STATES, AMERICAN STATES UTILITY SERVICES, INC. AND FORT RILEY UTILITY SERVICES, INC. ASUS'S SUCCESSOR IN INTEREST.
May 3, 2019P00011$3.3MMODIFICATION PROVIDES THREE MONTHS OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0002AA AND SUBCLIN 0002AC, FOR CONTRACT YEAR 2, MONTHS 13-15 (JULY 1, 2019 THROUGH SEPTEMBER 30, 2019) FOR THE WATER AND WASTEWATER UTILITY SYSTEMS.
Apr 11, 2019P00010$2.2MMODIFICATION P00010 PROVIDES TWO MONTH OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0001AJ AND SUBCLIN 0001AK, FOR CONTRACT YEAR 1, MONTHS 11-12 (MAY 1, 2019 THROUGH JUNE 30, 2019 FOR THE WATER AND WASTEWATER UTILITY SYSTEM).
Mar 29, 2019P00009$2.3MMODIFICATION P00009 PROVIDES ONE MONTH OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE. THIS MODIFICATION ALSO FUNDS ISDC CLINS 0055, 0059, 0061, AND 0062AA(3 MONTHS 7/1/2019 THRU 9/30/2019) AND ADJUST FORWARD THE POP END DATES FOR ISDC CLINS 0055, 0059,&0061.
Jan 29, 2019P00008$3.6MMODIFICATION P00008 PROVIDES TWO MONTHS OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE. THIS MODIFICATION ALSO EXTENDS THE PERIOD OF PERFORMANCE OF TWO INITIAL SYSTEM DEFICIENCY CORRECTIONS (ISDCS) BY ONE MONTH FROM DECEMBER 31, 2018 TO JANUARY 31, 2019.
Dec 17, 2018P00007$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ONE MONTH OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0001AJ AND SUBCLIN 0001AK, FOR CONTRACT YEAR 1, MONTH 7 (NOVEMBER 1, 2018 THROUGH JANUARY 31, 2019) FOR THE WATER AND WASTEWATER UTILITY SYSTEMS.
Nov 2, 2018P00006$2.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE TWO MONTHS OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0001AJ AND SUBCLIN 0001AK, FOR CONTRACT YEAR 1, MONTH 5-6 (NOVEMBER 1, 2018 THROUGH DECEMBER 31, 2018) FOR THE WATER AND WASTEWATER UTILITY SYSTEMS.
Oct 30, 2018P00005$1.1MTHIS MODIFICATION IS TO PROVIDE ONE MONTH OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0001AB AND SUBCLIN 0001AD,FOR CONTRACT YEAR 1,MONTH 4(OCTOBER 1, 2018 THROUGH OCTOBER 31, 2018)FOR THE WATER AND WASTEWATER UTILITY SYSTEMS
Sep 28, 2018P00004$411.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AMERICAN STATES UTILITY SERVICES, INC. (ASUS) DUE DILIGENCE ADJUSTMENT PROPOSAL TO THE CONTRACT. ASUS' DUE DILIGENCE PROPOSAL, DATED SEPTEMBER 27, 2018, REFLECTS CHANGES TO THE WATER AND WASTEWATER SYSTEMS INVENTORY AS IDENTIFIED IN REFERENCE DOCUMENT JR1, BILL OF SALE NO. DACA41-6-18-055 AND ADDRESSES THE REDUCTION TO THE U.S. FEDERAL CORPORATE INCOME TAX RATE FROM 35 PERCENT TO 21 PERCENT, AS IMPLEMENTED BY THE TAX CUTS AND JOBS ACT, EFFECTIVE JANUARY 1, 2018.
Jul 27, 2018P00003$1.9MTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE TWO MONTHS OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0001AE AND SUBCLIN 0001AF, FOR CONTRACT YEAR 1, MONTHS 2 AND 3 (AUGUST 1, 2018 THROUGH SEPTEMBER 30, 2018) FOR THE WATER AND WASTEWATER UTILITY SYSTEMS.
Jul 13, 2018P00002$936.4KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ONE MONTH OF FUNDING FOR THE FIXED MONTHLY UTILITY SERVICES CHARGE UNDER SUBCLIN 0001AA AND SUBCLIN 0001AC, FOR CONTRACT YEAR 1, MONTH 1 (JULY 1-31, 2018) FOR THE WATER AND WASTEWATER UTILITY SYSTEMS.
Jun 8, 2018P00001$0THE PURPOSE OF THIS MODIFICATION IS TO ACKNOWLEDGE THE BILL OF SALE NO. DACA41-6-18-055, DATED JUNE 27, 2018, FOR THE CONVEYANCE OF THE WATER AND WASTEWATER UTILITY SYSTEMS AT FORT RILEY, KS TO AMERICAN STATES UTILITY SERVICES, INC.
Sep 29, 20170$2.7MIGF::OT::IGF THIS CONTRACT IS AWARDED FOR THE OWNERSHIP, OPERATION AND MAINTENANCE OF THE WATER AND WASTEWATER UTILITY SYSTEMS AT FORT RILEY, KANSAS.

Estimated positioning window

Jun 30, 2067 – Dec 30, 2067

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2068-06-30 (15224 days from calculation)
+5 points
18 historical awards in this buyer and category group
+15 points
118 recorded award transactions
+10 points
Latest award action: 2026-05-28
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.