Federal contract award
SP060021C8348
NATURAL GAS DISTRIBUTION SYSTEM SERVICES AT FORT LEONARD WOOD, MISSOURI
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DLA ENERGY |
| NAICS | 221210 — Natural Gas Distribution |
| PSC | S111 — Gas Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $46.5M |
| Current contract value | $89.4M |
| Potential contract value / ceiling | $89.4M |
| Start date | Feb 1, 2016 |
| Current end date | Jul 31, 2026 |
| Potential end date | Jul 31, 2026 |
| Latest award activity | May 11, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 90 of 90 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 11, 2026 | P00089 | $1.0M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND CONTRACT YEAR 10, DEOBLIGATES FUNDS FROM THE NATURAL GAS SUPPLY FOR MARCH, AND DEOBLIGATES THE PROPANE SUPPLY. |
| Apr 27, 2026 | P00088 | $1.4M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND CONTRACT YEAR 10. |
| Mar 18, 2026 | P00087 | $1.3M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND CONTRACT YEAR 10 AND RECONCILE THE NATURAL GAS SUPPLY FOR A MONTH AND ADD FUNDS FOR PROPANE. |
| Feb 26, 2026 | P00086 | $1.0M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND CONTRACT YEAR 10 AND RECONCILE THE NATURAL GAS SUPPLY FOR A FEW MONTHS. |
| Jan 29, 2026 | P00085 | $40.0K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE PROPANE SUPPLY FOR CONTRACT YEAR 10. |
| Jan 27, 2026 | P00084 | $-184.2K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2026 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Dec 30, 2025 | P00083 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION TO EXTEND SERVICES. |
| Dec 19, 2025 | P00082 | $1.9M | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE REMAINING USC FOR CONTRACT YEAR 10. |
| Nov 24, 2025 | P00081 | $1.6M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE USC FOR CONTRACT YEAR 10. |
| Sep 30, 2025 | P00080 | $657.5K | THE PURPOSE OF THIS MODIFICATION IS TO FUND CLIN 0015. |
| Sep 19, 2025 | P00079 | $-31.7K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2025 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Sep 15, 2025 | P00078 | $-63.7K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2025 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Aug 20, 2025 | P00077 | $648.1K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE USC FOR CONTRACT YEAR 10. |
| Aug 14, 2025 | P00076 | $626.4K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE USC FOR CONTRACT YEAR 10 |
| Aug 6, 2025 | P00075 | $34.1K | THE PURPOSE OF THIS MODIFICATION IS TO FUND CLIN0014. |
| Jul 24, 2025 | P00074 | $-112.9K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2025 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Jul 10, 2025 | P00073 | $649.0K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE USC FOR CONTRACT YEAR 10. |
| Jun 18, 2025 | P00072 | $662.0K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE USC FOR CONTRACT YEAR 10. |
| Jun 10, 2025 | P00071 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REMOVE AND UPDATE FAR CLAUSES. |
| May 22, 2025 | P00069 | $-98.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2025 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| May 22, 2025 | P00070 | $677.4K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 10. |
| May 1, 2025 | P00068 | $696.5K | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE UTILITY SERVICE CHARGE FOR CONTRACT YEAR 10. |
| Apr 29, 2025 | P00067 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT UTILITY SERVICE CHARGE. |
| Apr 2, 2025 | P00066 | $0 | THIS MODIFICATION INCORPORATES THE MOST RECENT PUBLICATIONS FOR SCA AND DBA AS OF THE BEGINNING OF CY10, PERIOD OF PERFORMANCE FROM APRIL 1, 2025, THROUGH JANUARY 31, 2026. |
| Mar 26, 2025 | P00065 | $857.8K | THE PURPOSE OF THIS MODIFICATION IS TO FUND THE REMAINING UTILITY SERVICE CHARGE FOR CONTRACT YEAR 9. |
| Mar 20, 2025 | P00064 | $-131.0K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2025 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Feb 26, 2025 | P00063 | $85.0K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND PROPANE SUPPLY FOR CONTRACT YEAR 9. |
| Feb 6, 2025 | P00062 | $950.4K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2025. |
| Jan 22, 2025 | P00061 | $1.9M | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2025. |
| Nov 22, 2024 | P00060 | $-116.2K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2025 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Nov 6, 2024 | P00059 | $-61.4K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Nov 1, 2024 | P00058 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DFARS CLAUSE 252.232-7006. |
| Oct 25, 2024 | P00057 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A CLERICAL ERROR IN A PREVIOUS MOD. |
| Oct 24, 2024 | P00056 | $879.5K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2025. |
| Oct 23, 2024 | P00054 | $726.3K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY FUND THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2025. |
| Oct 23, 2024 | P00055 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DFARS 252.204-7012 AND 252.204-7020. |
| Sep 25, 2024 | P00053 | $67.2K | THE PURPOSE OF THIS MODIFICATION IS TO FUND CLIN 0013. |
| Sep 17, 2024 | P00052 | $-92.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Sep 10, 2024 | P00051 | $-77.2K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Aug 26, 2024 | P00050 | $535.8K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISAL YEAR FUNDS UNDER THE CONTINUED CONTRACT AND TO COVER THE REMAINING UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| Jul 18, 2024 | P00049 | $504.5K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISAL YEAR FUNDS UNDER THE CONTINUED CONTRACT AND TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024 AND UPDATE DFARS CLAUSE. |
| Jun 20, 2024 | P00048 | $238.7K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISAL YEAR FUNDS UNDER THE CONTINUED CONTRACT AND TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| May 23, 2024 | P00047 | $655.0K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| May 7, 2024 | P00046 | $667.1K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| Apr 29, 2024 | P00045 | $749.5K | THE PURPOSE OF THIS MODIFICATION IS TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT UTILITY SERVICE CHARGE, PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AND UPDATE THE WAGE DETERMINATION FOR CONTRACT YEAR 9. |
| Apr 3, 2024 | P00044 | $323.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT AND TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| Feb 13, 2024 | P00043 | $2.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| Jan 25, 2024 | P00042 | $125.0K | THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY COVER THE PROPANE SUPPLY FOR FY2024. |
| Dec 21, 2023 | P00041 | $651.4K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2024 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT AND PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| Dec 20, 2023 | P00040 | $-34.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE 2023 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Nov 29, 2023 | P00039 | $872.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024. |
| Oct 11, 2023 | P00038 | $692.0K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2024 AND CORRECT A CLERICAL ERROR IN P00037. |
| Sep 29, 2023 | P00037 | $934.1K | THE PURPOSE OF THIS MODIFICATION IS TO FUND CLINS 0011 AND 0012. |
| Sep 21, 2023 | P00036 | $-31.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATES 2023 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Aug 18, 2023 | P00035 | $-431.0K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATES 2023 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Aug 4, 2023 | P00034 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2023 AND INCORPORATES FAR CLAUSE 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUNE 2023) INTO THE CONTRACT. |
| Jul 19, 2023 | P00033 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2023 AND INCORPORATES THE REQUIREMENT FOR THE SYSTEM OWNER TO SUBMIT AN ANNUAL ASSESSMENT OF THE SYSTEM. |
| Apr 28, 2023 | P00032 | $-460.2K | THIS MODIFICATION DEOBLIGATES 2023 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Apr 13, 2023 | P00031 | $700.2K | THIS PROVIDES FUNDING FOR THE UTILITY SERVICE CHARGE FOR 2023 FISCAL YEAR. |
| Apr 3, 2023 | P00030 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A CLERICAL ERROR ON MODIFICATION P00029. |
| Mar 27, 2023 | P00029 | $801.1K | THE PURPOSE OF THIS MODIFICATION IS TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MONTHLY UTILITY SERVICE CHARGE AND PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, INCORPORATE THE MSPR REQUIREMENT, AND UPDATE THE WAGE DETERMINATION. |
| Mar 10, 2023 | P00028 | $-300.0K | THIS MODIFICATION DEOBLIGATES 2023 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Feb 16, 2023 | P00027 | $1.0M | THIS PROVIDES FUNDING FOR THE UTILITY SERVICE CHARGE FOR 2023 FISCAL YEAR. |
| Feb 1, 2023 | P00026 | $25.0K | THIS PROVIDES FUNDING TO PARTIALLY COVER THE PROPANE SUPPLY FOR FY2023. |
| Jan 25, 2023 | P00025 | $2.7M | THIS PROVIDES FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE 2023 FISCAL YEAR. |
| Jan 10, 2023 | P00024 | $601.7K | THIS PROVIDES FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE 2023 FISCAL YEAR. |
| Oct 21, 2022 | P00023 | $1.2M | THIS PROVIDES FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE 2023 FISCAL YEAR. |
| Oct 17, 2022 | P00022 | $849.5K | THIS MODIFICATION DEOBLIGATES 2022 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT AND PROVIDES FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE 2023 FISCAL YEAR. |
| Sep 14, 2022 | P00021 | $-80.0K | THIS MODIFICATION DEOBLIGATES 2022 FISCAL YEAR FUNDS UNDER THE CONTINUED CONTRACT. |
| Sep 6, 2022 | P00020 | $614.9K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022. |
| Aug 15, 2022 | P00019 | $-354.4K | THIS MODIFICATION DEOBLIGATES 2022 FISCAL YEAR FUNDS UNDER THE CONTINUED AND ADDRESSES THE DEOBLIGATED FUNDS ON THE PREDECESSOR CONTRACT. |
| Jul 26, 2022 | P00018 | $871.3K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022 |
| Jun 28, 2022 | P00017 | $796.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022 |
| May 27, 2022 | P00016 | $748.3K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022 |
| May 2, 2022 | P00015 | $0 | THIS MODIFICATION UPDATES THE NATURAL GAS PIPELINE RESERVATION CHARGE TO FORT LEONARD WOOD. |
| Apr 21, 2022 | P00014 | $709.9K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022. |
| Apr 15, 2022 | P00013 | $730.0K | THE PURPOSE OF THIS MODIFICATION IS TO APPLY AN ECONOMIC PRICE ADJUSTMENT TO THE CURRENT MONTHLY UTILITY SERVICE CHARGE (MUSC) AND PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022. |
| Mar 9, 2022 | P00012 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022. THIS MODIFICATION ALSO ADDS FAR CLAUSE 52.249-2 AND UPDATES DFARS 252.232-7006. |
| Feb 23, 2022 | P00011 | $-762.9K | THIS MODIFICATION DEOBLIGATES 2022 FISCAL YEARS FUNDS. |
| Feb 2, 2022 | P00010 | $0 | THIS MODIFICATION REDUCES THE NATURAL GAS PIPELINE RESERVATION CHARGE TO FORT LEONARD WOOD. |
| Jan 20, 2022 | P00009 | $0 | THIS MODIFICATION UPDATES CLAUSE 252.204-7012, ADD CLAUSE 252.204-7020, ADD 52.204-21, AND UPDATED REGISTER OF WAGE DETERMINATION UNDER THE SERVICE CONTRACT ACT AND GENERAL DECISION FOR CONSTRUCTION WAGE RATES UNDER THE DAVIS-BACON ACT. |
| Jan 12, 2022 | P00008 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT A CLERICAL ERROR ON MODIFICATION P00007, SUBCLIN CORRECTION. |
| Jan 11, 2022 | P00007 | $1.3M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022. |
| Dec 17, 2021 | P00006 | $2.8M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR THE FISCAL YEAR 2022. |
| Nov 16, 2021 | P00005 | $0 | EO14042:THIS MODIFICATION INCORPORATES DFARS CLAUSE 252.223-799, ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 2021-O0009) (OCT 2021) INTO THE CONTRACT IN ACCORDANCE WITH EXECUTIVE ORDER 14042. |
| Nov 1, 2021 | P00004 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE NATURAL AND PROPANE GAS, AS WELL AS THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2022. |
| Oct 25, 2021 | P00003 | $-50.8K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS TO COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2021. |
| Oct 8, 2021 | P00002 | $766.5K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2022. |
| Sep 9, 2021 | P00001 | $665.6K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO PARTIALLY COVER THE UTILITY SERVICE CHARGE FOR FISCAL YEAR 2021. |
| Sep 3, 2021 | 0 | $0 | NATURAL GAS DISTRIBUTION SYSTEM SERVICES AT FORT LEONARD WOOD, MISSOURI |