Federal contract award
VA101CFMP0043
AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Veterans Affairs |
| Office | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) |
| NAICS | 541310 — Architectural Services |
| PSC | C114 — Hospital Buildings |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $58.4M |
| Current contract value | $59.6M |
| Potential contract value / ceiling | $62.1M |
| Start date | Jul 31, 2009 |
| Current end date | Mar 31, 2026 |
| Potential end date | Mar 31, 2026 |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 96 of 96 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 4, 2026 | A00060 | $0 | EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052, A00055, A00056. |
| Sep 4, 2026 | A00061 | $0 | EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052, A00055, A00056. |
| Sep 4, 2026 | A00062 | $209.5K | EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052, A00055, A00056. |
| Sep 4, 2026 | A00063 | $0 | EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC POP: A00043, A00045, A00047, A00048, A00049, A00051, A00052, A00055, A00056. |
| Mar 9, 2026 | P00031 | $31.5K | EXTENSION OF CONSTRUCTION PHASE SERVICES CPS CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTATIVE - NTE AMOUNT FOR A00044. |
| Mar 5, 2026 | A00059 | $377.1K | EXTENSION OF CONSTRUCTION PHASE SERVICES FOR PARKING STRUCTURE. POP FOR CPS FOR PARKING STRUCTURE EXTENDED UNTIL JUNE 12, 2026 |
| Feb 12, 2026 | A00046 | $140.1K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A00046 $140,143.00 TO EXTEND CX SERVICES |
| Feb 3, 2026 | A00053 | $40.9K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA EXTENSION OF CPS SERVICES. |
| Feb 3, 2026 | A00054 | $54.0K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA - DEFINITIZE MOD A00053 |
| Feb 3, 2026 | A00057 | $43.6K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA - REA ADJUSTMENT |
| Feb 3, 2026 | A00058 | $24.9K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA - THE TOTAL NEGOTIATED AGREED UPON AMOUNT IS $24,863 AS PER HOK'S REQUEST FOR EQUITABLE ADJUSTMENT FOR MODS A00008 AND A00046 |
| Jul 1, 2025 | A00056 | $0 | EXTENSION OF PERIOD OF PERFORMANCE FROM 30 JUN 2025 TO 30 SEP 2025. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Apr 14, 2025 | A00055 | $0 | EXTENSION OF PERIOD OF PERFORMANCE TO 30 JUN 2025. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Mar 25, 2025 | A00052 | $0 | EXTENSION OF PERIOD OF PERFORMANCE TO 28 FEB 2025 - AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 20, 2024 | A00051 | $0 | EXTENSION OF PERIOD OF PERFORMANCE TO 30 NOV 2024. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Apr 23, 2024 | A00050 | $30.6K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Mar 14, 2024 | A00049 | $0 | EXTENSION OF PERIOD OF PERFORMANCE TO 31 JUL 2024. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Feb 2, 2024 | A00048 | $0 | EXTENSION OF PERIOD OF PERFORMANCE TO 31 MAR 2024. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Nov 16, 2023 | A00047 | $0 | EXTENSION OF PERIOD OF PERFORMANCE FOR CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTATIVE. AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Nov 1, 2023 | A00045 | $0 | EXTENSION OF PERIOD OF PERFORMANCE FOR CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTATIVE. A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Aug 31, 2023 | A00044 | $31.5K | NOT TO EXCEED - EXTENSION OF PERIOD OF PERFORMANCE FOR CLC OBSERVATIONAL AND GEOTECHNICAL SITE VISITS ONSITE REPRESENTATIVE. |
| May 5, 2023 | A00043 | $0 | POP EXTENSION FOR GEOTECH SITE VISITS - AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Dec 9, 2022 | A00042 | $31.3M | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Oct 11, 2022 | A00036 | $150.0K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jul 19, 2022 | A00038 | $84.0K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Mar 2, 2022 | A00040 | $121.4K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jan 6, 2022 | A00039 | $122.2K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Oct 25, 2021 | A00037 | $10.6K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Aug 10, 2021 | A00034 | $21.6K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 29, 2021 | A00031 | $34.8K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 28, 2021 | A00033 | $99.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 1, 2021 | A00027 | $198.7K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| May 14, 2021 | A00026 | $51.4K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| May 4, 2021 | A00029 | $249.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Apr 27, 2021 | A00028 | $95.8K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Mar 3, 2021 | A00012 | $64.8K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Dec 3, 2020 | A00022 | $58.7K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Nov 3, 2020 | A00025 | $130.9K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Nov 3, 2020 | P00030 | $16.1K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Sep 14, 2020 | A00024 | $249.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Aug 24, 2020 | A00023 | $16.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jul 2, 2020 | A00020 | $74.4K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 30, 2020 | A00021 | $3.8K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 20, 2020 | A00019 | $81.6K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jun 18, 2020 | A00018 | $34.4K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Apr 27, 2020 | A00015 | $1.1M | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Dec 17, 2019 | A00016 | $219.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Sep 12, 2019 | A00014 | $26.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jul 19, 2019 | A00003 | $8.2K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jul 11, 2019 | A00013 | $31.4K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jun 13, 2019 | A00010 | $2.1M | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jun 13, 2019 | A00011 | $119.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| May 7, 2019 | A00009 | $319.6K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Mar 20, 2019 | A00002 | $86.2K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Mar 12, 2019 | A00005 | $70.4K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Dec 17, 2018 | P00029 | $32.3K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Nov 28, 2018 | A00008 | $970.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Oct 26, 2018 | A00007 | $3.5M | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Aug 28, 2018 | A00006 | $0 | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Jul 19, 2018 | A00004 | $0 | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Feb 7, 2018 | P00027 | $0 | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Aug 8, 2017 | P00025 | $65.7K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Aug 8, 2017 | P00026 | $35.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Jun 14, 2017 | P00024 | $45.0K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Jun 1, 2017 | P00022 | $152.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Jun 1, 2017 | P00023 | $16.4K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| May 14, 2017 | P00021 | $121.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO REVISE THE CURRENT DESIGN OF THE COMMUNITY LIVING CENTER (CLC) FROM A TWO-STORY TO A THREE-STORY SCHEME. |
| May 10, 2017 | P00020 | $7.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO REVISE THE CURRENT DESIGN OF THE COMMUNITY LIVING CENTER (CLC) FROM A TWO-STORY TO A THREE-STORY SCHEME. |
| Mar 10, 2017 | P00019 | $46.2K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO REVISE THE CURRENT DESIGN OF THE COMMUNITY LIVING CENTER (CLC) FROM A TWO-STORY TO A THREE-STORY SCHEME. |
| Oct 6, 2016 | P00016 | $60.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Oct 6, 2016 | P00017 | $67.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Oct 6, 2016 | P00018 | $98.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jul 29, 2016 | P00015 | $276.5K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jul 7, 2016 | P00014 | $12.1K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jun 23, 2016 | P00013 | $15.3K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Mar 21, 2016 | P00011 | $54.9K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Mar 21, 2016 | P00012 | $16.3K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Feb 26, 2016 | P00009 | $43.5K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Feb 19, 2016 | P00010 | $77.3K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jan 22, 2016 | P00008 | $2.2K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Dec 4, 2015 | P00007 | $27.9K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Nov 2, 2015 | P00006 | $68.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Mar 30, 2015 | P00005 | $20.0K | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, LONG BEACHMENTAL HEALTH, CLC AND CHILLER REPLACEMENT, SAN DIEGO SCI AND CLC PARKING, PLA STUDIES, VAMC LONG BEACH,AND VAMC SAN DIEGO, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Feb 19, 2015 | P00004 | $0 | AE CD CONTRACT AWARD ADDENDUM, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Dec 10, 2014 | P00003 | $126.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1, COMMISSIONING SERVICES ADDED IN. A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Jul 31, 2014 | P00001 | $7.7M | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO FOR PRE-DESIGN SERVICES, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND OTHER SERVICES FOR PROJECT 600-405, VA LONG BEACH HEALTHCARE SYSTEM COMMUNITY LIVING CENTER, SPINAL CORD INJURY BUILDING, AND PARKING STRUCTURE, LONG BEACH CA |
| Nov 14, 2011 | SA008 | $646.3K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E SHALL PROVIDE ADDITIONAL DESIGN SERVICES TO REVISE THE CURRENT DESIGN OF THE COMMUNITY LIVING CENTER (CLC) FROM A TWO-STORY TO A THREE-STORY SCHEME. |
| Feb 14, 2011 | CO01A | $95.0K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA A/E TO PROVIDE SPACE ANALYSIS REPORT TO THE CURRENT DESIGN OF THE MHIP TO EVENTUALLY INCORPORATE THE REQAURIEMENTS FOR PROGRESSIVE COLLAPSE. |
| Nov 9, 2010 | SA006 | $96.7K | NEW SITE LOCATION (WEST OF CAMPUS) FOR MENTAL HEALTH FACILITIES. AN ADDITIONAL 5 ACRES ADDED TO ORIGINAL SCOPE. |
| Nov 9, 2010 | SA007 | $14.1K | TO COMPLETE REQUIREMENT FOR BSO RECORDS. |
| Oct 4, 2010 | SA005 | $57.5K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Sep 21, 2010 | SA004 | $66.3K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Mar 26, 2010 | SA001 | $61.7K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Mar 26, 2010 | SA002 | $-12.9K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Mar 26, 2010 | SA003 | $10.4K | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |
| Jul 31, 2009 | 0 | $5.4M | AE CONTRACT, SEISMIC CORRECTIONS, MENTAL HEALTH, CLC AND CHILLER REPLACEMENT, PHASE 1 DESIGN, VAMC LONG BEACH, CA |