Federal contract award

VA26117C0173

IGF::OT::IGF DESIGN MAJOR UTILITIES AND PARKING FOR FUTURE BUILDINGS FOR VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Veterans Affairs
Office261-NETWORK CONTRACT OFFICE 21 (36C261)
NAICS541330 — Engineering Services
PSCC1PC — ARCHITECT AND ENGINEERING- CONSTRUCTION: UNIMPROVED REAL PROPERTY (LAND)
Parent award / vehicleNot reported
Set-asideSERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Pricing typeFIRM FIXED PRICE
Obligations$760.2K
Current contract value$760.2K
Potential contract value / ceiling$760.2K
Start dateSep 29, 2017
Current end dateFeb 3, 2027
Potential end dateFeb 3, 2027
Latest award activityAug 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 28, 2026P00007$0IMPLEMENTING EO 14398
Mar 5, 2026P00006$23.6KTHE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS.
Sep 10, 2025P00005$0THE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS.
May 21, 2025P00004$43.6KTHE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS.
Feb 13, 2025P00003$40.7KTHE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS.
Jul 30, 2024P00002$39.8KTHE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS.
Dec 1, 2021P00001$0EO14042 - COVID VACCINE MANDATE MODIFICATION
Sep 29, 20170$612.4KIGF::OT::IGF DESIGN MAJOR UTILITIES AND PARKING FOR FUTURE BUILDINGS FOR VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-02-03 (94 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
8 recorded award transactions
+10 points
Latest award action: 2026-08-28
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.