Federal contract award
VA26117C0173
IGF::OT::IGF DESIGN MAJOR UTILITIES AND PARKING FOR FUTURE BUILDINGS FOR VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Veterans Affairs |
| Office | 261-NETWORK CONTRACT OFFICE 21 (36C261) |
| NAICS | 541330 — Engineering Services |
| PSC | C1PC — ARCHITECT AND ENGINEERING- CONSTRUCTION: UNIMPROVED REAL PROPERTY (LAND) |
| Parent award / vehicle | Not reported |
| Set-aside | SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $760.2K |
| Current contract value | $760.2K |
| Potential contract value / ceiling | $760.2K |
| Start date | Sep 29, 2017 |
| Current end date | Feb 3, 2027 |
| Potential end date | Feb 3, 2027 |
| Latest award activity | Aug 28, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 28, 2026 | P00007 | $0 | IMPLEMENTING EO 14398 |
| Mar 5, 2026 | P00006 | $23.6K | THE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS. |
| Sep 10, 2025 | P00005 | $0 | THE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS. |
| May 21, 2025 | P00004 | $43.6K | THE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS. |
| Feb 13, 2025 | P00003 | $40.7K | THE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS. |
| Jul 30, 2024 | P00002 | $39.8K | THE CONTRACTOR SHALL DESIGN A PARKING LOT WATER, SANITARY AND STORM, POWER, COMMUNICATION REQUIREMENTS AND SUPPORT FACILITIES. THE A-E SHALL PROVIDE ALL THE NECESSARY PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES REQUIRED TO INCLUDE THE FOLLOWING: INVESTIGATIVE AND FEASIBILITY DESIGN SERVICES SCHEMATIC DESIGN DEVELOPMENT DRAWINGS, CONSTRUCTION DOCUMENTS, SPECIFICATIONS, CALCULATIONS, COST ESTIMATES AND NARRATIVES TOOLS, EQUIPMENT, MATERIALS, LABOR, TRAVEL, PER DIEM, AND INCIDENTALS EXPERTISE, SUPERVISION, TESTING, ANALYSES AND SPECIALTY SERVICES TO ACCOMPLISH ALL ITEMS AND REQUIREMENTS OUTLINED IN THE STATEMENT OF WORK AND CONTRACT DOCUMENTS. |
| Dec 1, 2021 | P00001 | $0 | EO14042 - COVID VACCINE MANDATE MODIFICATION |
| Sep 29, 2017 | 0 | $612.4K | IGF::OT::IGF DESIGN MAJOR UTILITIES AND PARKING FOR FUTURE BUILDINGS FOR VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM. |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-02-03 (94 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 8 recorded award transactions
- +10 points
- Latest award action: 2026-08-28
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.