Federal contract award
W15QKN15C0049
IGF::CL,CT::IGF SYSTEM INTEGRATOR FOR INCREMENT II OF INTEGRATED PERSONNEL AND PAY SYSTEM -- ARMY (IPPS-A)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-PICA |
| NAICS | 541511 — Custom Computer Programming Services |
| PSC | D307 — Automated Information System Design and Integration Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $733.7M |
| Current contract value | $800.8M |
| Potential contract value / ceiling | $800.8M |
| Start date | May 18, 2015 |
| Current end date | Jun 2, 2025 |
| Potential end date | Jun 2, 2025 |
| Latest award activity | Jun 2, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 170 of 170 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 2, 2025 | P00162 | $-801.2K | MOD TO DE-OB AND RE-ALIGN FUNDING. |
| Jun 2, 2025 | P00162 | $-801.2K | MOD TO DE-OB AND RE-ALIGN FUNDING. |
| Apr 30, 2025 | P00161 | $0 | THE PURPOSE OF MODIFICATION P00161 IS TO TRANSFER GFP. |
| Apr 30, 2025 | P00161 | $0 | THE PURPOSE OF MODIFICATION P00161 IS TO TRANSFER GFP. |
| Dec 3, 2024 | P00160 | $279.4K | ADD INCREMENTAL FUNDING AND UPDATE SETTLEMENT LANGUAGE. |
| Dec 3, 2024 | P00160 | $279.4K | ADD INCREMENTAL FUNDING AND UPDATE SETTLEMENT LANGUAGE. |
| Nov 5, 2024 | P00159 | $8.9M | SETTLEMENT, INCREMNTAL FUNDING, AND PWS CHANGE. |
| Nov 5, 2024 | P00159 | $8.9M | SETTLEMENT, INCREMNTAL FUNDING, AND PWS CHANGE. |
| Sep 16, 2024 | P00158 | $5.4M | THE PURPOSE OF MODIFICATION P00158 IS TO REALIGN FUNDS FROM SLINSS 810104, 811509, 812301, AND 8126 TO SLINS 820102, 821504, 822302, 822602, AND 822603. IN ADDITION, THIS MODIFICATION PROVIDES INCREMENTAL FUNDING. |
| Aug 15, 2024 | P00157 | $1.9M | TO PROVIDE INCREMENTAL FUNDING. |
| Jun 24, 2024 | P00156 | $11.8M | EXERCISE OF 52.217-8 OPTION |
| Jun 20, 2024 | P00065 | $-699.4K | THE PURPOSE OF MODIFICATION P00065 IS DEOB $699,357.31 AND REALIGN $143,344.76 FROM CLINS/SLINS 011BK AND 1011AM TO FUND CLINS/SLINS 202301 AND 202302. |
| May 21, 2024 | P00155 | $0 | ADD 52.217-8 LANGUAGE |
| Apr 30, 2024 | P00154 | $6.3M | INCREMENTAL FUNDING TO CLIN 8101 AND 8115. BOTH CLINS ARE NOW FULLY FUNDED. |
| Apr 16, 2024 | ARZ995 | $0 | NA |
| Apr 15, 2024 | P00153 | $3.0M | INCREMENTAL FUNDING MOD FOR CLIN 8115. |
| Apr 3, 2024 | P00152 | $4.8M | THE PURPOSE OF THIS MODIFICATION P00152 IS TO PROVIDE INCREMENTAL FUNDING TO CLINS 8027, 8101, 8115, AND 8126. IN ADDITION, THIS MOD REALIGNS FUNDS FROM CLIN 8003 TO CLIN 8027. TOTAL NEW FUNDS: $4,786,402.47. REALIGNMENT: 785,897.44. |
| Mar 13, 2024 | P00151 | $0 | MODIFICATION P00151 IS TO CORRECT THE CEILING VALUE LISTED ON P00150. |
| Mar 12, 2024 | P00150 | $3.0M | THE PURPOSE OF MODIFICATION P00150 IS TO PROVIDE INCREMENTAL FUNDING TO CLIN 8115, SUSTAINMENT OP1, IN THE AMOUNT OF $3,000,000.00 |
| Feb 28, 2024 | P00149 | $1.8M | MODIFICATION P00149 IS TO PROVIDE INCREMENTAL FUNDING TO CLIN 8027 IN THE AMOUNT OF $1,830,000.00 AND TO RECTIFY THE CEILING AMOUNT. |
| Feb 16, 2024 | P00147 | $0 | MODIFICATION P00147 IS A WITHIN SCOPE ADDITIONAL LEVEL OF EFFORT MOD TO INCREASE THE CEILING ON CLIN 8115 AND FAR 52.217-8 EXTENSION BY $3,896,303.00, RESPECTIVELY. |
| Feb 9, 2024 | P00148 | $4.1M | INCREMENTAL FUNDING AND FUNDS REALIGNMENT. |
| Jan 24, 2024 | P00146 | $2.0M | THE PURPOSE OF MODIFICATION P00146 IS TO PROVIDE INCREMENTAL FUNDING TO CLIN 8115. |
| Dec 28, 2023 | P00144 | $5.8M | THE PURPOSE OF MOD P00144 IS TO INCORPORATE AND EXERCISE TDS OPTION PERIOD 1 AND TO INCORPORATE FAR 52.217-8. |
| Dec 28, 2023 | P00145 | $1.8M | MODIFICATION P00145 IS A WITHIN SCOPE EXTENSION TO RDT&E CLIN 8027 EXTENDING THE POP FROM 31 DECEMBER 2023 TO 30 JUNE 2024. |
| Dec 19, 2023 | P00143 | $685.0K | THE PURPOSE OF MODIFICATION P00143 IS TO INCREMENTALLY FUND CLIN 8015 |
| Nov 30, 2023 | P00142 | $153.0K | THE PURPOSE OF MODIFICATION P00142 IS TO INCREMENTALLY FUND CLIN 8001. |
| Oct 18, 2023 | P00141 | $230.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING ON CLIN 8026 AND INCORPORATE AND FUND SLIN 802622. |
| Sep 26, 2023 | P00140 | $1.0M | INCREMENTAL FUNDING MODIFICATION FUNDING TDS CLIN 8015. |
| Sep 12, 2023 | P00139 | $8.0M | INCREMENTAL FUNDING MOD FUNDING TDS CLINS 8001 AND 8015 FOR THE IPPS-A CONTRACT. |
| Aug 17, 2023 | PZ0138 | $7.0M | DEFINITIZATION OF TRAINING, DEPLOYMENT, AND SUSTAINMENT (TDS) EXTENSION UCA (P00127). |
| Jun 16, 2023 | P00137 | $14.4M | RESUMPTION OF R3 CORE EXTENSION PERFORMANCE WORK STATEMENT (PWS), RESEARCH, DEVELOPMENT, TEST AND EVALUATION (RDT&E). |
| May 23, 2023 | P00136 | $9.5M | MODIFICATION ADDS INCREMENTAL FUNDING FOR THE TRAINING, DEPLOYMENT, SUSTAINMENT (TDS) EXTENSION UNDEFINITIZED CONTRACT ACTION (UCA) (P00127) AND UPDATES THE DEFINITIZATION SCHEDULE. |
| May 3, 2023 | P00135 | $3.8M | PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS TO THE TDS EXTENSION UCA (P00127). |
| Apr 12, 2023 | P00134 | $0 | RE-ALLOCATION OF FUNDS MODIFICATION. |
| Apr 4, 2023 | P00133 | $9.3M | THE PURPOSE OF THIS MODIFICATION (P00133) IS TO EXTEND THE DEFINITIZATION SCHEDULE AND ADD FUNDS TO THE TDS EXTENSION UCA (P00127). |
| Mar 15, 2023 | P00132 | $0 | MODIFICATION P00132 REQUIRED TO CORRECT MODIFICATION P00131 IN RE-ALLOCATING OPA AND OMA FUNDS. |
| Mar 13, 2023 | P00131 | $3.2M | ADDING AND RE-ALLOCATING FUNDS IN REGARDS TO THE TDS EXTENSION UCA (P00127) |
| Feb 3, 2023 | P00130 | $6.0M | INCREMENTAL FUNDING MOD FOR THE TDS EXTENSION UCA (P00127). |
| Jan 13, 2023 | P00129 | $6.9M | TO ADD FUNDS TO THE TDS EXTENSION UCA. |
| Jan 6, 2023 | P00128 | $0 | ADMIN MOD DUE TO SYSTEM ERROR. |
| Dec 29, 2022 | P00127 | $4.4M | PURPOSE OF THE MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE TDS SUPPORT SERVICES VIA A UCA. |
| Dec 27, 2022 | P00126 | $1.6M | INCREMENTAL FUNDING MODIFICATION |
| Dec 14, 2022 | P00125 | $500.0K | INCREMENTAL FUNDING MOD FOR TDS CLIN AND TRAVEL CLIN. |
| Nov 22, 2022 | PZ0124 | $4.6M | DEFINITIZATION MODIFICATION FOR UCA P00120, WHICH EXTENDED R3 MVS. |
| Nov 4, 2022 | P00123 | $14.9M | ADDITIONAL FUNDING MODIFICATION ADDING FUNDS TO THE R3 MVS UCA, AS WELL AS TDS CLINS. |
| Sep 28, 2022 | P00122 | $625.0K | MODIFICATION ADDING FUNDS TO CLIN 8003 IN REGARDS TO THE UCA MOD R3 EXTENSION (P00120). |
| Sep 22, 2022 | P00121 | $500.0K | FUNDING MODIFICATION ADDING FUNDS TO CLIN 8003 IN REGARDS TO THE UCA MOD R3 EXTENSION (P00120). |
| Sep 21, 2022 | P00120 | $1.1M | UCA MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR R3 MVS FROM 23 SEPTEMBER 2022 THROUGH 31 DECEMBER 2022. |
| Sep 15, 2022 | P00119 | $1.2M | TO INCREASE THE SCOPE OF THE TRAINING, DEPLOYMENT, AND SUSTAINMENT (TDS) PORTION OF W15QKN-15-C-0049. |
| Aug 17, 2022 | P00118 | $93.5K | ADDING FUNDING TO CLIN 0023 |
| Jul 6, 2022 | P00117 | $3.3M | INCREMENTAL FUNDING MODIFICATION FOR TDS CLINS 8001 AND 8015. |
| Jun 30, 2022 | PZ0116 | $9.6M | DEFINITIZATION OF R3 MVS MODIFICATION P00109. |
| Jun 1, 2022 | P00114 | $4.6M | ADDITIONAL FUNDING AND SCHEDULE UPDATE TO R3 MVS UCA MODIFICATION |
| Apr 27, 2022 | P00113 | $8.1M | ADDITIONAL FUNDING FOR R3 MVS UCA |
| Apr 13, 2022 | PZ0112 | $7.6M | DEFINITIZATION OF TDS MODIFICATION PZ0105 |
| Apr 7, 2022 | P00111 | $0 | ADMINISTRATIVE MODIFICATION TO UPDATE FUNDING CHART WITHIN MODIFICATION. |
| Feb 4, 2022 | P00110 | $15.8M | ADMINISTRATIVE MOD TO DE-OBLIGATE, RE-ALLOCATE, AND ADD FUNDING TO UCAS FOR TDS AND R3 MVS |
| Dec 22, 2021 | P00109 | $11.0M | UCA MODIFICATION FOR R3 MVS EXTENSION |
| Dec 17, 2021 | PZ0108 | $2.2M | DEFINITIZATION FOR GAT SUPPORT CLIN 7003 (P00106) |
| Nov 30, 2021 | P00107 | $5.0M | FUNDING ACTION AND UCA SCHEDULE REVISION |
| Nov 23, 2021 | P00106 | $6.7M | UCA MODIFICATION FOR INCREASED LOE FOR GAT SUPPORT ON BEHALF OF IPPS-A INCREMENT II RELEASE 3 |
| Oct 29, 2021 | PZ0105 | $3.7M | UCA FOR TDS R3 POP EXTENSION |
| Oct 21, 2021 | P00104 | $4.5M | ECP EXTENSION MODIFICATION AND INCREMENTAL FUNDING |
| Sep 27, 2021 | P00103 | $2.3M | DE-OBLIGATION MODIFICATION |
| Aug 19, 2021 | P00102 | $0 | ADMINISTRATIVE MOD FOR UPDATES IN VERBIAGE AND ADDED SOFA LANGUAGE |
| Aug 3, 2021 | P00101 | $0 | MODIFICATION ON INC II R3 CONTRACT TO INCORPORATE SOFA VERBIAGE |
| Jul 30, 2021 | P00100 | $1.4M | BUNDLE 20 ECPS FOR IPPS-A R3, ECP POP EXTENSIONS, AND ADDITIONAL FUNDING |
| Jul 1, 2021 | P00099 | $802.7K | BUNDLE 19 FOR IPPS-A R3 |
| Jun 24, 2021 | P00098 | $100.5K | INCORPORATE ECP 2656 |
| Jun 1, 2021 | P00097 | $0 | ECP 727 POP EXTENSION |
| May 28, 2021 | P00096 | $6.4M | MODIFICATION TO INCORPORATE ECP BUNDLE 18. |
| May 7, 2021 | P00095 | $91.7K | MODIFICATION TO INCORPORATE ENGINEERING CHANGE PROPOSAL #1622. |
| May 5, 2021 | P00093 | $21.1M | MODIFICATION TO EXERCISE OPTION 02. |
| May 5, 2021 | P00094 | $0 | MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR ENGINEERING CHANGES AND TO REVISE SECTION H TERMS & CONDITIONS. |
| Apr 14, 2021 | P00092 | $0 | MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR ENGINEERING CHANGE PROPOSALS. |
| Mar 30, 2021 | P00091 | $0 | MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR TWO ENGINEERING CHANGE PROPOSALS. |
| Mar 8, 2021 | P00090 | $10.4M | MODIFICATION TO INCORPORATE ECP BUNDLE 17 AND INCREMENTAL FUNDING. |
| Feb 17, 2021 | P00089 | $1.3M | MODIFICATION TO INCORPORATE ECP BUNDLE 16. |
| Feb 3, 2021 | P00088 | $0 | MODIFICATION TO INCORPORATE ENGINEERING CHANGE PROPOSAL FOR RCAS. |
| Feb 1, 2021 | P00087 | $422.7K | MODIFICATION TO INCORPORATE ENGINEERING CHANGES AS PART OF BUNDLE 15 |
| Jan 26, 2021 | P00078 | $3.2M | MODIFICATION TO INCORPORATE THE CHANGES FOR THE TRAINING, DEPLOYMENT, AND SUSTAINMENT (TDS) EFFORT, REVISED TDS PERFORMANCE WORK STATEMENT, AND CONTRACT DATA REQUIREMENTS LISTS. |
| Dec 30, 2020 | P00085 | $121.2K | MODIFICATION TO INCORPORATE ECP BUNDLE 13 AND BUNDLE 12 PROPOSAL PREPARATION COSTS. |
| Dec 30, 2020 | P00086 | $236.3K | MODIFICATION TO INCORPORATE ECP BUNDLE 14 AND PROPOSAL PREPARATION COSTS. |
| Dec 2, 2020 | P00084 | $1.2M | MODIFICATION TO INCORPORATE ECP BUNDLE 12 AND FUNDING. |
| Oct 29, 2020 | P00083 | $33.4M | IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION (FAR) 52.217-9, OPTION TO EXTEND THE TERM OF THE CONTRACT, THE PURPOSE OF MODIFICATION P00083 UNDER CONTRACT W15QKN-15-C-0049 IS TO EXERCISE RELEASE 3 CORE REQUIREMENT BUILD AND TEST, OPTION 1, DEVELOPER INTEGRATION TEST (DIT) AND GOVERNMENT ACCEPTANCE TEST (GAT) PREPARATION ACTIVITIES. THE PERIOD OF PERFORMANCE FOR OPTION 1 SHALL BE FROM 01 NOVEMBER 2020 TO 30 APRIL 2021. |
| Oct 14, 2020 | P00082 | $0 | THE PURPOSE OF MODIFICATION P00082 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FOR A REALIGNMENT OF FUNDING ON CONTRACT LINE ITEM NUMBER (CLIN) 4001. |
| Oct 9, 2020 | P00081 | $5.4M | THE PURPOSE OF MODIFICATION P00081 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING FOR CONTRACT LINE ITEM NUMBERS (CLIN) 4001 AND 4015. IN ADDITION, THERE IS A REALIGNMENT OF FUNDING FROM CLIN 4015 TO CLIN 4001. |
| Oct 6, 2020 | P00080 | $1.0M | THE PURPOSE OF MODIFICATION P00080 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING FOR CONTRACT LINE ITEM NUMBERS (CLIN) 4001 AND 4015. IN ADDITION, THERE IS A REALIGNMENT OF FUNDING FROM CLIN 4001 TO CLIN 4015 AND CORRECTION OF AN ADMINISTRATIVE ERROR. |
| Sep 24, 2020 | P00077 | $322.8K | MODIFICATION TO INCORPORATE TWO ENGINEERING CHANGE PROPOSALS AND COST SUMMARY DATA REPORT REQUESTED CHANGE |
| Sep 23, 2020 | P00079 | $43.7K | MODIFICATION IN ACCORDANCE WITH A DCMA A SETTLEMENT DIRECTIVE RELATING TO PENSION TERMINATION COSTS FOR ACCENTURE FEDERAL SERVICES, A SUBCONTRACTOR TO CACI. |
| Sep 2, 2020 | P00076 | $212.3K | MODIFICATION TO INCORPORATE ENGINEERING CHANGE PROPOSAL #63, PROVIDE FUNDING,AND REALIGN FUNDING |
| Aug 21, 2020 | P00074 | $107.2K | THE PURPOSE OF MODIFICATION P00074 IS TO INCORPORATE THREE WITHIN-SCOPE ENGINEERING CHANGE PROPOSALS. |
| Aug 11, 2020 | P00075 | $0 | MODIFICATION P00075 IS TO INCORPORATE TWO NO-COST ENGINEERING CHANGES. |
| Jul 24, 2020 | P00073 | $2.5M | PURPOSE OF MODIFICATION P00073 IS TO ADD FUNDING TO CLIN 4015, MINOR CDRL DUE DATE CHANGES, AND THE ADDITION OF THE IPPS-A PMO CDRL PROCESS GUIDE. |
| Jun 11, 2020 | ARZ998 | $0 | IGF:CL,CT:IGF SYSTEM INTEGRATOR FOR INCREMENT II OF INTEGRATED PERSONNEL AND PAY SYSTEM -- ARMY (IPPS-A) |
| Jun 5, 2020 | P00072 | $1.0M | THE PURPOSE OF MODIFICATION P00072 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING FOR CONTRACT LINE ITEM NUMBER 4001 FOR CONTINUATION OF SYSTEM INTEGRATOR SERVICES FOR THE INTEGRATED PERSONNEL AND PAY SYSTEM - ARMY INCREMENT II PROGRAM. IN ADDITION, THERE IS A REALIGNMENT OF FUNDING TO CONTRACT LINE ITEM NUMBER 4026. |
| Jun 1, 2020 | P00071 | $0 | THE PURPOSE OF MODIFICATION P00071 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FOR A REALIGNMENT OF CEILING DOLLAR AMOUNTS FROM CONTRACT LINE ITEM NUMBER 0011 TO CLIN 4001 AND FROM CLIN 4015 TO CLIN 4001. |
| Apr 7, 2020 | P00070 | $-677.9K | THE PURPOSE OF MODIFICATION P00070 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING TO CONTRACT LINE ITEM NUMBER (CLIN) 4001. IN ADDITION, DE-OBLIGATIONS DUE TO EXPIRING FUNDING HAVE BEEN MADE. |
| Mar 26, 2020 | P00069 | $4.7M | THE PURPOSE OF MODIFICATION P00069 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING TO CONTRACT LINE ITEM NUMBERS 0023, 4026, AND 5000. IN ADDITION, REVISIONS TO A CONTRACT DATA REQUIREMENTS LIST ITEM HAVE BEEN MADE |
| Feb 27, 2020 | P00068 | $17.4M | THE PURPOSE OF MODIFICATION P00068 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING TO CONTRACT LINE ITEM NUMBERS 4001, 4015, AND 4026. IN ADDITION, REVISIONS TO THE CACI TECHNICAL APPROACH AND SEVERAL CONTRACT DATA REQUIREMENTS LIST ITEMS HAVE BEEN MADE. |
| Feb 10, 2020 | P00067 | $5.0M | IN ACCORDANCE WITH FAR 52.232-22 LIMITATION OF FUNDS AND DFARS 252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION, THE PURPOSE OF MODIFICATION P00067 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FUNDING TO CONTRACT LINE ITEM NUMBER (CLIN) 5000. |
| Jan 30, 2020 | P00066 | $0 | THE PURPOSE OF MODIFICATION P00066 UNDER CONTRACT W15QKN-15-C-0049 IS TO PROVIDE FOR FUNDING ON CONTRACT LINE ITEM NUMBER (CLIN) 5001, RELEASE 3 QUICK REACTION STUDIES. |
| Jan 15, 2020 | P00064 | $230.7K | IN ACCORDANCE WITH FAR 52.216 INCENTIVE FEE, THE PURPOSE OF MODIFICATION P00064 UNDER CONTRACT W15QKN15C0049 IS TO PROVIDE FOR PAYMENT FOR RELEASE 3 PRELIMINARY DESIGN REVIEW, RELEASE 3 CRITICAL DESIGN REVIEW, RELEASE 2 INCENTIVE FEE, RELEASE 3 INCENTIVE FEE, REVISE RELEASE 3, MILESTONE 1 AND MILESTONE 2 CRITERIA, AND INCORPORATE THE INCENTIVE FEE PLAN DATED 19 DECEMBER 2019. |
| Dec 12, 2019 | P00063 | $26.0M | THE PURPOSE OF MODIFICATION P00063 UNDER CONTRACT W15QKN-15-C-0049 IS TO ADD FUNDING TO CONTRACT LINE ITEM NUMBERS (CLIN) 4009, 4026, 5000, AND 5002. |
| Nov 22, 2019 | P00062 | $5.0M | MODIFICATION P00062 IS TO TO EXTEND THE PERIOD OF PERFORMANCE AND INCREASE THE CEILING TO DEVELOP AND TEST THE INTEGRATED PERSONNEL AND PAY SYSTEM - ARMY INCREMENT II RELEASE 3. |
| Nov 13, 2019 | P00061 | $8.9M | MODIFICATION P00061 IS A FUNDING MODIFICATION TO CONTRACT LINE ITEM NUMBER 4015 FOR CONTINUED SUPPORT OF THE INTEGRATED PERSONNEL AND PAY SYSTEM - ARMY INCREMENT II PROGRAM. |
| Oct 1, 2019 | P00060 | $0 | MODIFICATION P00060 IS FOR A WITHIN SCOPE MODIFICATION AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Sep 26, 2019 | P00059 | $0 | MODIFICATION P00059 IS FOR THE REALIGNMENT OF FUNDING. |
| Sep 3, 2019 | P00058 | $17.1M | P00058 IS TO EXTEND THE PERIOD OF PERFORMANCE OF CONTRACT W15QKN-15-C-0049 THROUGH TO 30 NOVEMBER 2019. |
| Aug 28, 2019 | P00057 | $0 | THE PURPOSE OF MODIFICATION P00057 UNDER CONTRACT W15QKN-15-C-0049 IS TO INCORPORATE SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2018-O0015) INTO THE CONTRACT. |
| Aug 1, 2019 | P00056 | $8.7M | P00056 IS TO INCREMENTALLY FUND W15QKN-15-C-0049 THROUGH THE MONTH OF AUGUST. |
| Jul 2, 2019 | P00055 | $229.2K | RELEASE 3 CONTINUATION OF PERFORMANCE UNTIL 31 JULY 2019 |
| May 31, 2019 | P00054 | $3.5M | RELEASE 3 CONTINUATION OF PERFORMANCE UNTIL 30 JUNE 2019 |
| Apr 30, 2019 | P00053 | $3.5M | MOD 53 IS TO PROVIDE INCREMENTAL FUNDING TO RELEASE 3 FROM 1 MAY 2019 THROUGH 31 MAY 2019. |
| Apr 10, 2019 | P00052 | $0 | EXTEND THE STOP WORK ORDER FOR RELEASE 4 OF INCREMENT II |
| Apr 1, 2019 | P00051 | $4.5M | MODIFICATION 51 IS TO DEFINITIZE ECP BUNDLE 8 AND TO EXTEND OPTION PERIOD 3/RELEASE 5. |
| Mar 15, 2019 | P00050 | $22.5M | MOD 50 IS TO DEFINITIZE AND INCREMENTALLY FUND THE UNDEFINITIZED CONTRACT ACTION FOR TRAINING AND DEPLOYMENT PREVIOUSLY DONE ON MODIFICATION 44. |
| Feb 7, 2019 | P00049 | $-5.6M | MODIFICATION P00049 IS TO REVISE AND EXTEND THE DEFINITIZATION SCHEDULE IN SUPPORT OF THE UCA FOR TRAINING DEPLOYMENT AND SUSTAINMENT, AND DEOBLIGATE SUSTAINMENT FUNDING FROM SLIN 401501 |
| Feb 5, 2019 | P00048 | $35.4M | MOD 48 IS IN SUPPORT OF AND TO FUND THE IPPS-A RELEASE 2 AND RELEASE 3 COST OVERRUN AS WELL AS THE RELEASE 2 3% MINIMUM INCENTIVE FEE. |
| Jan 11, 2019 | P00047 | $0 | STOP-WORK ORDER FOR RELEASE 4 OF INCREMENT II OF IPPS-A |
| Nov 19, 2018 | P00046 | $1.9M | MOD 46 IS TO INCORPORATE ECP BUNDLE 7 AND INCREMENTALLY AND FULLY FUND RELEASE 2 CLIN 0011 SYSTEM INTEGRATOR CLIN. |
| Oct 24, 2018 | P00045 | $10.9M | MOD 45 IS TO REALIGN FUNDING AND CEILING CHANGES FROM MOD 41, INCREMENTAL FUNDING FOR CLIN 4015 SUSTAINMENT AND INCORPORATION OF OCONUS CLAUSES. |
| Oct 1, 2018 | P00044 | $12.1M | MODIFICATION 44 IS IN SUPPORT OF THE UNDEFINITIZED CONTRACT ACTION FOR TRAINING, DEPLOYMENT AND SUSTAINMENT IN SUPPORT OF PM IPPS-A |
| Sep 26, 2018 | P00043 | $7.2M | IPPS-A RELEASE 2 CEILING ADJUSTMENT FOR COST OVERRUN |
| Aug 10, 2018 | P00042 | $10.4M | AWARD TO CONTRACTOR THE MINIMUM INCENTIVE FEE EARNED AND INCREMENTALLY FUND CONTRACT |
| Aug 1, 2018 | P00041 | $2.1M | MOD 41: THIS MOD IS TO CONVERT RELEASE 2, 3 AND 4 FFP CLINS INTO INCREMENT WIDE CPFF CLINS. |
| Jun 29, 2018 | P00040 | $514.7K | MOD 40 IS FOR AN FIRM FIXED PRICE CLIN EXTENSION FOR JULY, AND AN EXTENSION TO THE EXERCISE DATE OF OPTION 3/RELEASE 5 |
| Jun 1, 2018 | P00039 | $441.2K | EXTENSION OF FFP TASKS FROM 31 MAY 2018 TO 30 JUNE 2018 |
| May 10, 2018 | P00038 | $11.3M | MOD 38 IS FOR AN EXTENSION TO THE PERIOD OF PERFORMANCE AND INCREMENTAL FUNDING FOR RELEASE 2 CLIN 0011 |
| Apr 30, 2018 | P00037 | $484.3K | MOD 37 IS THE FFP EXTENSION FOR RELEASE 2 MAY. |
| Apr 17, 2018 | P00036 | $35.6K | MOD 36 IS FOR INCREMENTAL FUNDING OF RELEASE 2 CLIN 0009 FOR LIFE CYCLE MANAGEMENT SERVICES |
| Mar 23, 2018 | P00035 | $497.0K | MOD 35 IS FOR A ONE (1) MONTH EXTENSION TO RELEASE 2 FFP CLINS. |
| Mar 14, 2018 | P00034 | $3.6M | MOD 34 IS ESTABLISHED TO INCREASE CEILING AND FUNDING ON REL 2 AND REL TRAINING PLANNING, ESTABLISH CEILING AND FUNDING ON REL 4 TRAINING PLANNING AND INCREMENTALLY FUND TRAVEL. |
| Feb 8, 2018 | P00033 | $1.7M | MOD 33 IS FOR A UCO IN SUPPORT ECP BUNDLE 9 FOR PMO IPPS-A. |
| Feb 7, 2018 | A00003 | $0 | IGF::CL,CT::IGF SYSTEM INTEGRATOR FOR INCREMENT II OF INTEGRATED PERSONNEL AND PAY SYSTEM -- ARMY (IPPS-A) |
| Jan 8, 2018 | A00002 | $0 | IGF::CL,CT::IGF SYSTEM INTEGRATOR FOR INCREMENT II OF INTEGRATED PERSONNEL AND PAY SYSTEM -- ARMY (IPPS-A) |
| Jan 8, 2018 | P00032 | $181.8K | MOD 32 IS IN SUPPORT OF A UCO FOR ECP BUNDLE 8, IN SUPPORT PMO IPPS-A. |
| Dec 5, 2017 | P00031 | $0 | MOD 31 IS TO DEFINITIZE ECP BUNDLE 5. ECP BUNDLE 5 WAS OBLIGATED ONTO CONTRACT, AS AN UNDEFINITIZED CONTRACT ACTION ON MOD 22. |
| Nov 29, 2017 | P00030 | $1.6M | MOD 30- TO INCORPORATE CLIN 1026 FOR RELEASE 3 TRAINING. |
| Oct 27, 2017 | P00029 | $46.9M | INCREMENTAL FUNDING FOR RELEASE 1,2,3, AND 4 |
| Oct 17, 2017 | P00028 | $2.8M | INCREMENTAL FUNDING FOR CLIN 0026 |
| Sep 20, 2017 | P00027 | $0 | IGF::CL,CT::IGF |
| Sep 15, 2017 | P00026 | $2.2M | IGF::CL,CT::IGF |
| Sep 1, 2017 | P00025 | $0 | IGF::CL,CT::IGF |
| Aug 23, 2017 | P00024 | $750.0K | IGF::CL,CT::IGF |
| Aug 15, 2017 | P00023 | $5.7M | IGF::CL,CT::IGF |
| Jul 31, 2017 | P00022 | $2.5M | IGF::CL,CT::IGF |
| Jul 13, 2017 | P00021 | $4.0M | IGF::CL,CT::IGF |
| Jul 10, 2017 | P00020 | $0 | IGF::CL,CT::IGF |
| May 18, 2017 | P00019 | $323.6K | IGF::CL,CT::IGF |
| Apr 27, 2017 | P00018 | $-404.6K | IGF::CL,CT::IGF |
| Mar 22, 2017 | P00017 | $15.6M | IGF::CL,CT::IGF |
| Mar 16, 2017 | P00016 | $23.1K | IGF::CL,CT::IGF |
| Feb 23, 2017 | P00015 | $10.8M | IGF::CL,CT::IGF ISSUANCE OF AWARD FEE AND INCREMENTAL FUNDING |
| Feb 7, 2017 | P00014 | $2.6M | IGF::CL,CT::IGF EXERCISE OPTION PERIOD ONE/RELEASE 3 TO INCREMENT II, IPPS-A |
| Jan 27, 2017 | P00013 | $8.0M | IGF::CL,CT::IGF INCREMENTAL FUNDING, ENGINEERING CHANGES AND INCENTIVE FEE PROGRESS PAYMENTS FOR FDR |
| Dec 14, 2016 | P00012 | $4.0M | IGF::CL,CT::IGF INCREMENTAL FUNDING |
| Dec 7, 2016 | P00011 | $822.4K | IGF::CL,CT::IGF AWARD FEE FOR INTEGRATED BASELINE REVIEW FOR IPPS-A INCREMENT II |
| Nov 18, 2016 | P00010 | $13.8M | IGF::CL,CT::IGF REALIGNMENT OF TASK 14 TRAINING&INCREMENTAL FUNDING |
| Oct 20, 2016 | P00009 | $0 | IGF::CL,CT::IGF |
| Sep 19, 2016 | P00008 | $12.7M | IGF::CL,CT::IGF INCREMENTAL FUNDING |
| Jun 27, 2016 | P00007 | $0 | IGF::CL,CT::IGF INCORPORATE REVISED DD254 |
| Mar 29, 2016 | P00006 | $8.9M | IGF::CL,CT::IGF WITH-IN SCOPE PWS REVISIONS. |
| Mar 11, 2016 | P00005 | $7.3M | IGF::CL,CT::IGF REVISE PWS SECTION 4.12 "TECHNICAL REVIEWS" |
| Feb 2, 2016 | P00004 | $0 | IGF::CL,CT::IGF INCLUDE REVISED AWARD AND INCENTIVE FEE PLAN |
| Nov 16, 2015 | P00003 | $11.8M | IGF::CL,CT::IGF INCREMENTAL FUNDING AND CHANGE COR |
| Sep 23, 2015 | P00002 | $1.7M | IGF::CL,CT::IGF INCREMENTAL FUNDING FOR IPPS-A INCREMENT II |
| Sep 11, 2015 | P00001 | $4.6M | IGF::CL,CT::IGF INCREMENTALLY FUND CONTRACT AND REVISE PWS, QASP&CDRL'S. |
| May 15, 2015 | 0 | $10.8M | IGF::CL,CT::IGF SYSTEM INTEGRATOR FOR INCREMENT II OF INTEGRATED PERSONNEL AND PAY SYSTEM -- ARMY (IPPS-A) |