Federal contract award

W15QKN17C0011

M777A2 INDIA FMS CASE IN-B-UAK 145 HOWITZERS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RI-PICATINNY
NAICS332994 — Small Arms, Ordnance, and Ordnance Accessories Manufacturing
PSC1025 — Guns, over 150 mm through 200 mm Includes Firing Platforms; Mounts; Gun Shields.
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$564.3M
Current contract value$564.3M
Potential contract value / ceiling$564.3M
Start dateJan 12, 2017
Current end dateOct 30, 2028
Potential end dateOct 30, 2028
Latest award activityApr 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 132 of 132 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 29, 2026P00130$0UPDATE SPARES LIST AS ATTACHMENT -UPDATE SECTION C LANGUAGE
Feb 26, 2026P00129$0UPDATE APPENDIX C & D
Dec 11, 2025P00126$18.1KLIPS 10 TO 15
Dec 4, 2025P00128$0UPDATE PBB SCHEDULE
Nov 21, 2025P00127$0CHANGE OF IOR ADDRESS
Nov 20, 2025A00002$0M777A2 INDIA FMS CASE IN-B-UAK 145 HOWITZERS
Sep 24, 2025P00125$2.8MMAJOR STRUCTURES ADDITION TO SPARES LOT 3
Sep 3, 2025P00124$0MOD TO UPDATE SPARES LOT 3 ADDRESS ON 1012AA AND 1012AB ADD PBP ATTACHMENT
Jul 31, 2025P00113$143.8KUPDATE INDIA SPARES LOT 3
Jul 18, 2025P00123$0UPDATE DELIVERY DATE ON 1081AA AND UPDATE DFARS CLAUSES
Apr 14, 2025P00122$67.1KSOW MODIFICATION OF INDIA HOWITZERS TO INCLUDE GUN REPAIR AND VISIT
Aug 22, 2024P00121$0INCLUDE BAE ANNISTON TO ESTABLISH IMPORTER OF RECORD
Jan 26, 2024P00120$0THE PURPOSE OF THIS MOD IS TO THAT 2 EA BALANCER ASSEMBLIES WILL BE PROVIDED FREE OF CHARGE BY BAE AS CONSIDERATION FOR RFV L23A8118.
Nov 21, 2023P00114$2.0MSHAKTI SOFTWARE INTEGRATION FOR THE M777A2 INDIA 155MM ULTRA LIGHTWEIGHT HOWITZER.
Nov 9, 2023P00118$0PBP SCHEDULE UPDATE
Sep 5, 2023P00116$0MODIFICATION TO INCORPORATE REQUESTS FOR VARIANCE (RFVS).
Aug 18, 2023P00117$0MODIFICATION TO INCORPORATE REQUEST FOR VARIANCE (RFV) FOR CRADLE TUBE MATERIAL.
Mar 21, 2023P00115$0MOD TO DFARS 252.225-7047
Feb 1, 2023P00108$0P00108 RFV/ECP INCORPORATION
Jan 31, 2023P00109$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ENGINEERING CHANGE PROPOSALS (ECPS) AND REQUESTS FOR VARIANCE (RFVS).
Jan 26, 2023P00110$0MODIFICATION TO INCORPORATE ENGINEERING CHANGE PROPOSALS (ECPS) AND REQUESTS FOR VARIANCE (RFVS).
Jan 26, 2023P00112$0MODIFICATION TO INCORPORATE ENGINEERING CHANGE PROPOSALS (ECPS) AND REQUESTS FOR VARIANCE (RFVS).
Apr 19, 2022P00111$500.0KADD CLIN 1036AF FOR INDIRECT TAX EXPOSURE
Jan 14, 2022P00088$0P00088 REA
Dec 14, 2021A00001$0M777A2 INDIA FMS CASE IN-B-UAK 145 HOWITZERS
May 27, 2021P00106$0RFV/ECP INCORPORATION
Feb 4, 2021P00102$0INCORPORATION OF RFV.
Feb 1, 2021P00104$0PBP SCHEDULE UPDATE
Jan 29, 2021P00105$0RFV & ECP INCORPORATIONS
Jan 11, 2021P00096$0INCORPORATION OF ECP.
Jan 6, 2021P00095$0INCORPORATION OF RFVS.
Jan 6, 2021P00097$0INCORPORATION OF RFVS.
Jan 6, 2021P00103$0INCORPORATION OF ECP AND RFVS.
Dec 15, 2020P00036$0INCORPORATION OF SUBCONTRACTING PLAN.
Dec 14, 2020P00093$0INCORPORATION OF RFVS.
Dec 14, 2020P00094$0INCORPORATION OF RFVS.
Dec 14, 2020P00098$0INCORPORATION OF ECP AND RFVS.
Dec 14, 2020P00099$0INCORPORATION OF RFVS.
Dec 14, 2020P00100$0INCORPORATION OF RFVS.
Dec 14, 2020P00101$0INCORPORATION OF RFVS.
Dec 8, 2020P00064$246.7KINDIA BORESCOPE TESTING AND REPORTING.
Dec 3, 2020P00091$0INCORPORATION OF SECTION 889.
Sep 18, 2020P00058$0INCORPORATE RFVS/ECPS
Sep 17, 2020P00060$0INCORPORATE RFVS AT NO COST.
Sep 17, 2020P00087$0INCORPORATION OF RFVS.
Sep 17, 2020P00090$0INCORPORATION RFV.
Sep 17, 2020P00092$0INCORPORATION OF RFVS.
Sep 3, 2020P00089$0INCORPORATION OF RFV.
Aug 25, 2020P00083$0INCORPORATION OF RFVS.
Aug 25, 2020P00084$0IMPLEMENTATION OF RFV.
Aug 25, 2020P00085$0INCORPORATION OF RFVS.
Aug 25, 2020P00086$0IMPLEMENTATION OF RFVS.
Aug 12, 2020P00076$0INSPECT / ACCEPT AT BOTH ORIGIN AND DESTINATION.
Jul 29, 2020P00080$0UPDATE OF APPENDIX D FOR ADDITIONAL NO-COST SPARES.
Jul 23, 2020P00082$0INCORPORATION OF RFVS.
Jul 21, 2020P00072$0INCORPORATION OF ECP.
Jul 21, 2020P00079$0INCORPORATION OF RFVS.
Jul 21, 2020P00081$0INCORPORATION OF RFV.
Jul 7, 2020P00065$0INCORPORATION OF RFV.
Jul 1, 2020P00078$0INCORPORATION OF RFVS.
Jun 23, 2020P00075$0IMPLEMENTATION OF RFVS AND ECPS.
Jun 23, 2020P00077$0INCORPORATION OF RFVS.
Jun 16, 2020P00046$0THE PURPOSE OF THIS NO COST MODIFICATION IS TO INCORPORATE APPENDIX E TOOL LIST AS AN ATTACHMENT IN SECTION J.
Jun 16, 2020P00070$0IMPLEMENTATION OF RFVS AND ECPS.
Jun 11, 2020P00033$-408.4KUPDATE OF APPENDIX D SPARES LISTING FOR SPARES LOT 1 AND 2
Jun 11, 2020P00054$0INCORPORATION OF RFV AND CAVEATS.
Jun 11, 2020P00066$0IMPLEMENTATION OF RFVS.
Jun 11, 2020P00073$0IMPLEMENTATION OF RFVS.
Jun 8, 2020P00074$0CROSSOVER PART #2
May 11, 2020P00071$0INCORPORATION OF UPDATED PBP SCHEDULE.
Apr 29, 2020P00069$0INCORPORATION OF ECP AND RFVS.
Apr 17, 2020P00068$0INCORPORATION OF RFVS AND ECPS.
Apr 15, 2020P00067$0INCORPORATION OF RFVS AND ECPS.
Apr 14, 2020P00059$47.1KREA.
Mar 17, 2020P00063$0INCORPORATION OF RFVS.
Mar 5, 2020P00062$0INCORPORATION OF ECP.
Mar 3, 2020P00061$0THE PURPOSE OF THIS NO COST MODIFICATION IS TO INCORPORATE RFV L20A8006 REDUCTION IN THICKNESS TO TRAIL BLOCK TO ALLOW VARIATION IN CASTINGS AND TOLERANCE STACK.
Feb 3, 2020P00057$0INCORPORATION OF RFVS.
Jan 28, 2020P00053$0INCORPORATION OF RFVS.
Jan 28, 2020P00055$0INCORPORATION OF RFVS
Jan 28, 2020P00056$0INCORPORATION
Jan 16, 2020P00051$0IMPLEMENTATION OF RFVS AND ECPS
Dec 19, 2019P00052$0TO INCLUDE CLAUSES FAR 52.216-7 AND FAR 52.216-11 TO CHANGE CLINS 1036AA, 1036AB, 1036AC 1036AD AND 1036AE FROM FIRM FIXED PRICE TO COST TYPE AS WELL THE ACCEPTANCE LOCATIONS FROM DESTINATION OR ORIGIN.
Dec 10, 2019P00047$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE 9 RFVS.
Dec 5, 2019P00050$0UPDATE OF PBP SCHEDULE AND CHANGE TO INSPECTION / ACCEPTANCE LOCATIONS.
Dec 4, 2019P00045$0IMPLEMENTATION OF RFV.
Dec 4, 2019P00049$0IMPLEMENTATION OF RFVS AND ECPS
Nov 25, 2019P00048$0IMPLEMENTATION OF 10 RFVS.
Nov 19, 2019P00042$0INCLUSION OF PBP LANGUAGE AND UPDATE TO PBPS.
Oct 22, 2019P00044$0IMPLEMENTATION OF RFVS AND ECP.
Oct 9, 2019P00043$0INCORPORATION OF ECPS AND RFV.
Oct 2, 2019P00039$0INCORPORATION OF RFVS AND ECPS
Oct 2, 2019P00040$0INCORPORATION OF RFVS AND ECPS
Oct 2, 2019P00041$0INCORPORATION OF RFVS AND ECPS
Sep 26, 2019ARZ999$0M777A2 INDIA FMS CASE IN-B-UAK 145 HOWITZERS
Sep 16, 2019P00038$0INCORPORATION OF RFVS AND ECPS.
Aug 12, 2019P00037$0RFVS
Aug 5, 2019P00031$0IMPLEMENTATION OF RFVS AND ECPS.
Aug 5, 2019P00035$0IMPLEMENTATION OF RFVS.
Jul 26, 2019P00029$1.2MINDIA CROSSOVER
Jul 23, 2019P00034$0INCORPORATION OF RFVS/ECPS.
Jun 26, 2019P00032$0INCORPORATION OF RFV AND UPDATE TO ISO LANGUAGE
May 23, 2019P00030$0IMPLEMENTATION OF RFVS AND ECPS
May 8, 2019P00025$9.2MM777 INDIA - SEA TO AIR FREIGHT AND PRODUCTION ACCELERATION
Apr 2, 2019P00028$0IMPLEMENTATION OF RFVS.
Jan 31, 2019P00027$0INCORPORATION OF RFV L18A8212
Jan 23, 2019P00021$0INDIA TOOLS LIST DELIVERY.
Jan 15, 2019P00026$0BI-MONTHLY ECP AND RFV IMPLEMENTATION
Dec 10, 2018P00024$140.8KSURROGATE CANNON ASSEMBLIES
Nov 20, 2018P00023$7.2MFIRING TABLES INCIDENT TESTING MOD
Nov 15, 2018P00022$0IMPLEMENTATION OF ECPS AND RFVS
Nov 1, 2018P00020$-192.4KDESCOPE FOR TRAINING CHANGES&TRANSPORT OF EQUIPMENT
Jul 25, 2018P00019$191.7KFALLBACK TESTING
Jul 17, 2018P00018$0QUALITY ASSURANCE CHANGES (ISO CLAUSE TAILORING, NON-CONFORMING MATERIALS, CLAUSES) AND UPDATED PBP SCHEDULE ISSUE 10 VERSION 7
Jun 25, 2018P00017$-722.2KTRAINING DESCOPE AND ISPL
May 2, 2018P00016$0REVISE GFE SCHEDULE
Apr 10, 2018P00015$-880.9KUMBRELLA DESCOPE AND INCORPORATE RFVS
Mar 9, 2018P00014$6.4MINDIA FUNDING SWAP
Jan 31, 2018P00013$0INCORPORATION OF RFVS AND ECPS
Dec 20, 2017P00012$-6.4MTEMPORARY REPLACEMENT OF INDIA FMS CASE IN-B-UAK FUNDING NECESSARY TO CORRECT SUBLINES.
Dec 12, 2017P00011$0INCORPORATION OF RFVS L17A8081&L17A8027.
Nov 13, 2017P00010$0UPDATE PBP SCHEDULE ISSUE 10 VERSION 5
Oct 11, 2017P00009$-43.0KUPDATE OF SOW
Sep 27, 2017P00008$401.9KM777A2 INDIA TOOLS
Jul 31, 2017P00007$-2.9KCLOSING OF RATE REOPENERS
Jun 14, 2017P00006$122.3KCHANGE IN SHIPPING LOCATION FROM PICATINNY ARSENAL TO YUMA PROVING GROUNDS
May 12, 2017P00005$0INCORPORATE NO COST RFVS
Mar 16, 2017P00004$0FEDWIRE CLAUSE
Mar 15, 2017P00003$0TO UPDATE THE PERFORMANCE BASED PAYMENT SCHEDULE AND ADD DFARS 252.232-7013
Feb 27, 2017P00002$0PERFORMANCE BASED PAYMENT MODIFICATION
Feb 6, 2017P00001$0POST AWARD MODIFICATION
Jan 12, 20170$542.1MM777A2 INDIA FMS CASE IN-B-UAK 145 HOWITZERS

Estimated positioning window

Oct 30, 2027 – Apr 30, 2028

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-10-30 (729 days from calculation)
+25 points
466 historical awards in this buyer and category group
+15 points
132 recorded award transactions
+10 points
Latest award action: 2026-04-29
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.