Federal contract award
W31P4Q10C0348
UCA AWARD FOR SENTINEL ENGINEERING SERVICES FOLLOW ON CONTRACT FY10-14
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 541330 — Engineering Services |
| PSC | 5841 — Radar Equipment, Airborne |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $81.3M |
| Current contract value | $81.3M |
| Potential contract value / ceiling | $81.3M |
| Start date | Sep 9, 2010 |
| Current end date | May 31, 2017 |
| Potential end date | May 31, 2017 |
| Latest award activity | May 18, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 157 of 157 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 18, 2026 | P00149 | $0 | ENGINEERING SERVICES |
| Feb 17, 2026 | P00148 | $-57.2K | SENTINEL ENGINEERING SERVICES |
| Jul 24, 2025 | P00147 | $-50.7K | SENTINEL ENGINEERING SERVICES |
| Aug 21, 2024 | P00144 | $-5.6K | DEOBLIGATE FUNDS IN THE AMOUNT OF $1350.29 |
| Aug 21, 2024 | P00144 | $-19.5K | DEOB MOD |
| Jul 14, 2022 | P00143 | $-217.3K | SENTINEL ENGINEERING SERVICES |
| May 14, 2020 | P00142 | $-268.4K | THE SENTINEL ENGINEERING SERVICES |
| Oct 29, 2019 | P00140 | $-3.3K | THE PURPOSED OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS. |
| Oct 29, 2019 | P00140 | $-4.3K | THE PURPOSE OF THIS ACTION IS TO DE-OBLIGATE EXCESS FUNDS. |
| Sep 11, 2019 | P00141 | $-136.7K | THE PURPOSE OF THIS ACTION IS IN SUPPORT OF THE SENTINEL RADAR SYSTEM FOR SENTINEL ENGINEERING SERVICES INCLUDING TECHNICAL AND ENGINEERING. |
| Sep 6, 2018 | P00139 | $-1.0M | THE PURPOSE OF THE ACTION IS TO DE-OBLIGATE CANCELLING FUNDS. |
| Nov 28, 2017 | P00138 | $0 | THE PURPOSE OF THIS MODIFICATION IS IN SUPPORT OF SENTINEL LIFECYCLE CONTRACTOR SUPPORT TO TRANSFER GFE TO THE CURRENT LCCS CONTRACT. |
| Sep 28, 2017 | P00137 | $-2.2K | THE PURPOSE OF THE MODIFICATION IS TO DE-OB EXCESS FUNDS. |
| Oct 19, 2016 | P00136 | $0 | TO EXTEND THE POP ON SLINS 0017CK,0018AY, AND 0019BB |
| Sep 23, 2016 | P00135 | $-152.2K | TO REALIGN FUNDS AND DE-OB CANCELLING FUNDS |
| Sep 8, 2016 | ARZ999 | $3.9M | UCA AWARD FOR SENTINEL ENGINEERING SERVICES FOLLOW ON CONTRACT FY10-14 |
| Aug 26, 2016 | P00134 | $0 | TO RE-ALIGN FUNDING FROM SLIN 0019BC TO 0017CL |
| Aug 4, 2016 | P00133 | $0 | TO UPDATE H-3 CLAUSE TO ADD SENTINEL CONTRACTS AND TO REMOVE SOME CLOSED CONTRACTS, TO REALIGN FUNDING, AND TO TRANSFER GFE LIST ATTACHMENT TO CURRENT ES CONTRACT |
| May 13, 2016 | P00132 | $0 | IGF::OT::IGF UPDATE H CLAUSE |
| Apr 20, 2016 | P00131 | $0 | RE-ALIGNMENT OF FUNDS |
| Sep 24, 2015 | P00130 | $-32.3K | DE-OBLIGATION OF FUNDS |
| Aug 28, 2015 | P00129 | $403 | EXERCISE OPTIONS AND RE-ALIGN FUNDING. |
| Aug 21, 2015 | P00128 | $825.0K | EXTEND POP AT NO ADDITIONAL COST AND TO AWARD ESMS FOR THE OPTION PERIOD |
| Jul 28, 2015 | P00127 | $462.5K | EXTENDING POP FOR OPTION PERIOD, OBLIGATE FUNDING FOR TASK. |
| Jul 23, 2015 | P00126 | $817.0K | EXERCISE OPTION FOR CY15 FOR V5.8.5 SQT/SVT |
| Jul 15, 2015 | P00125 | $-319.4K | MOD TO DE-OBLIGATE FUNDING FROM CY15 OPTION PERIOD |
| Jun 25, 2015 | P00124 | $229.7K | EXERCISE OF OPTIONS AND FUNDING RE-ALIGNMENT FOR 2015 OPTION |
| Jun 12, 2015 | P00123 | $4.0M | MODIFICATION TO EXERCISE OPTION FOR FY 14 EXTENDED PERIOD FOR SENTINEL ES |
| Jun 8, 2015 | P00122 | $-3.8M | DE-OBLIGATION OF FUNDS |
| Jun 1, 2015 | P00121 | $0 | MODIFICATION TO EXTEND CONTRACT POP THROUGH 30 JUL 2015 |
| May 22, 2015 | P00120 | $546.8K | EXERCISE OPTIONS |
| May 14, 2015 | P00119 | $173.7K | MODIFICATION TO EXERCISE OPTIONS FOR CY 2014 |
| Apr 28, 2015 | P00118 | $1.9M | EXERCISE OPTIONS USING RDTE FUNDING FOR FY15 |
| Apr 23, 2015 | P00117 | $3.0M | MODIFICATION TO EXERCISE OPTIONS WITH OMA FUNDING FOR CY15 |
| Apr 16, 2015 | P00116 | $1.2M | EXERCISE OF OPTIONS FOR CY15 |
| Apr 1, 2015 | P00115 | $0 | NO ADDITIONAL COST MODIFICATION TO UPDATE ESM REVISION |
| Mar 25, 2015 | P00114 | $33.7K | MODIFICATION TO EXERCISE OPTIONS FOR RDTE ENGINEERING INCIDENTALS |
| Mar 19, 2015 | P00113 | $283.5K | EXERCISE OPTIONS FOR SENTINEL ENGINEERING SERVICES FUNCTION CM/DM USING OMA FUNDING. |
| Mar 13, 2015 | P00112 | $300.0K | MODIFICATION TO EXERCISE OPTIONS FOR STOP STARE AND TRACK PHASE 4 EXERCISE FOR SENTINEL ENGINEERING SERVICES. |
| Mar 11, 2015 | P00111 | $300.0K | MODIFICATION TO EXERCISE OPTION WITH RDT&E FUNDS FOR RANGE ENHANCEMENT ON MOD P00111. |
| Mar 4, 2015 | P00110 | $1.6M | SENTINEL ENGINEERING SERVICES MODIFICATION TO EXERCISE OPTIONS USING RDTE MONEY |
| Feb 17, 2015 | P00109 | $200.0K | EXERCISE OPTIONS FOR SENTINEL ES CONTRACT |
| Feb 17, 2015 | P00109 | $29.9K | MODIFICATION TO EXCERSISE FMS OPTIONS, CASE DESIGNATOR EG-B-VDP |
| Jan 12, 2015 | P00108 | $220.5K | EXERCISE OF OPTIONS RDTE |
| Jan 7, 2015 | P00107 | $0 | MODIFICATION P00107 SENTINEL ENGINEERING SERVICES FOR THE PURPOSE OF RE-ALIGNING FUNDS. |
| Dec 16, 2014 | P00106 | $0 | MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE OF THE CONTRACT BEYOND THE 5 YEAR LIMIT VIA FAR CLAUSE 52.217-8 |
| Dec 15, 2014 | P00105 | $3.6M | SENTINEL ENGINEERING SERVICES MOD P00105 TO EXERCISE OPTIONS FOR OMAN FMS |
| Dec 9, 2014 | P00104 | $601.9K | MODIFICATION TO EXERCISE OPTIONS FOR SENTINEL ENGINEERING SERVICES |
| Nov 25, 2014 | P00103 | $515.6K | MODIFICATION TO REALIGN FUNDING, OBLIGATE FUNDS, ADD HOURS AND ADD NO COST REVISION ESM VIA MOD P00103 TO SENTINEL ENGINEERING SERVICES CY 10-14. |
| Nov 13, 2014 | P00102 | $0 | MODIFICATION TO REALIGN FUNDING AND TO OBLIGATE FUNDING FOR OPTION YEAR 4 |
| Nov 10, 2014 | P00102 | $52.8K | MODIFICATION TO REALIGN FUNDING AND TO OBLIGATE FUNDING FOR OPTINO YEAR 4. |
| Oct 30, 2014 | P00101 | $0 | RE-ALIGNMENT OF DOLLARS FROM TRAVEL TO LABOR |
| Oct 22, 2014 | P00100 | $-183.8K | MODIFICATION TO RE-ALIGN, DE-OBLIGATE AND OBLIGATE FUNDING FOR ESMS AND ESM REVISIONS. |
| Sep 25, 2014 | P00099 | $45.6K | REALIGN FUNDING FOR REBURDENING AND EXERCISE OPTIONS. |
| Sep 22, 2014 | P00098 | $1.5M | EXERCISE OPTION FOR YEAR END REQUIREMENTS FOR SENTINEL ENGINEERING SERVICES MOD P00098. |
| Sep 18, 2014 | P00097 | $678.7K | EXERCISE OPTIONS |
| Sep 12, 2014 | P00095 | $591.8K | EXERCISE OPTIONS FOR ESMS E12-02AX AND M14-01S |
| Sep 12, 2014 | P00096 | $0 | RE-ALIGN FUNDING FROM LABOR AND TRAVEL TO COVER MATERIAL. FROM SLIN 0013AV AND 0014AM TO 0015AK |
| Sep 4, 2014 | P00094 | $0 | RE-ALIGNMENT OF MATERIAL DOLLARS TO LABOR FOR COST OVERRUN. |
| Aug 25, 2014 | P00093 | $102.7K | MODIFICATION TO EXERCISE OPTIONS FOR SENTINEL ENGINEERING SERVICES - EGYPT |
| Jul 31, 2014 | P00092 | $2.9M | EXERCISE OPTIONS FOR SENTINEL ENGINEERING SERVICES |
| Jul 9, 2014 | P00091 | $237.8K | FMS FUNDING MODIFICATION FOR TURKEY AND EGYPT. |
| Jul 3, 2014 | P00090 | $536.6K | FMS FW SOFTWARE FUNDING OF ESM |
| Jun 25, 2014 | P00089 | $160.0K | OBLIGATION OF FUNDS FOR ESM FOR LABOR, TRAVEL AND MATERIAL AND FMS. |
| Jun 25, 2014 | P00089 | $57.2K | MOD TO OBLIGATE FUNDING FOR CY 2014 |
| Jun 17, 2014 | P00088 | $0 | NO COST ESM REVISION |
| Jun 10, 2014 | P00087 | $818.9K | OBLIGATION OF FUNDS UNDER CY 14 |
| Jun 3, 2014 | P00086 | $-610.0K | DE-OBLIGATION OF FUNDS AND NO COST REVISION TO AN ESM. |
| May 22, 2014 | P00085 | $176.9K | OBLIGATION OF FUNDS UNDER CY 14 OPTION YEAR. |
| May 22, 2014 | P00085 | $30.6K | OBLIGATION OF FUNDS UNDER CY OPTION 2014 |
| May 21, 2014 | P00084 | $785.3K | OBLIGATION OF FUNDS FOR CY14 |
| May 13, 2014 | P00083 | $0 | REDUCE HOURS ON SLIN 0017AF AND CREATE NEW SLIN 0019AC. ALSO INCORPORATE NEW NO ADDITIONAL COST SCOPE CHANGES TO TASK 2.1 |
| Apr 25, 2014 | P00082 | $382.8K | EXECISE OF OPTIONS IAW FAR 17.207 |
| Apr 2, 2014 | P00081 | $0 | RE-ALIGNMENT OF FUNDS FOR A3 TEST |
| Mar 20, 2014 | P00080 | $389.4K | TO EXERCISE OPTIONS |
| Feb 27, 2014 | P00079 | $20.7K | MODIFICATION P00079 IS TO EXERCISE OPTION FOR FMS CUSTOMER NORWAY FOR F1 SW DEVELOPEMENT. |
| Feb 6, 2014 | P00078 | $1.9M | RE-ALIGNMENT OF FUNDS AND EXERCISE OF OPTIONS UNDER SENTINEL ENGINEERING SERVICES CONTRACT W31P4Q-10-C-0348 MODIFICATION P00078. |
| Jan 28, 2014 | P00077 | $499.7K | MODIFICATION TO EXERCISE OPTIONS |
| Jan 23, 2014 | P00076 | $299.9K | MODIFICATION TO EXERCISE OPTIONS. |
| Dec 12, 2013 | P00075 | $0 | MODIFICATION TO REVISE ESM E11-02G TO E11-02J. |
| Dec 6, 2013 | P00074 | $3.2M | MODIFICATION TO EXERCISE FMS OPTIONS, RE-ALIGN FUNDING AND REVISE ESMS. |
| Nov 19, 2013 | P00073 | $625.3K | MODIFICATION TO EXERCISE OPTIONS FOR FMS ON SENTINEL ENGINEERING SERVICES CONTRACT W31P4Q-10-C-0348 MOD P00073 |
| Nov 8, 2013 | P00072 | $19.6K | EXERCISE OF OPTIONS ON SENTINEL ENGINEERING SERVICES CONTRACT W31P4Q-10-C-0348 P00072, FMS FUNDS |
| Nov 8, 2013 | P00072 | $59.9K | MODIFICATION TO EXERCISE FMS OPTIONS ON SENTINEL ENGINEERING SERVICES CONTRACT W31P4Q-10-C-0348 MOD P00072 |
| Oct 17, 2013 | P00071 | $1.8M | EXERCISE OPTIONS UNDER SENTINEL ENGINEERING SERVICES CONTRACT W31P4Q-10-C-0348 |
| Oct 2, 2013 | P00070 | $0 | ESM REVISION. |
| Sep 27, 2013 | P00069 | $439.6K | MODIFICATION TO EXERCISE OPTIONS |
| Sep 26, 2013 | P00068 | $871.7K | REALIGNMENT OF FUNDS AND EXERCISE OF OPTION HOURS, TRAVEL AND MATERIAL UNDER CY 2013. |
| Sep 19, 2013 | P00067 | $-895.8K | MODIFICATION TO REVISE ESMS AND TO DE-OBLIGATE EXCESS FUNDING FROM THE CONTRACT. |
| Sep 13, 2013 | P00066 | $51.9K | MODIFICATION TO REVISE EXISTING ESM AT NO COST AND TO EXERCISE OPTIONS FOR LOGISTICS, ENGINEERING AND PROGRAM MANAGEMENT LABOR HOURS AS WELL AS FOR TRAVEL AND MATERIAL. |
| Sep 12, 2013 | P00065 | $699.8K | EXERCISE OPTIONS |
| Sep 10, 2013 | P00064 | $112.7K | MODIFICATION TO EXERCISE OPTIONS FOR CY13 LOGISTICS, PM, TRAVEL AND MATERIAL FOR MOD KIT LOGISTICS TASK. |
| Aug 16, 2013 | P00063 | $61.3K | OPTION EXERCICSE OF ENGINEERING SERVICES HOURS AND DOLLARS. |
| Jul 24, 2013 | P00062 | $2.2M | NO COST REVISION TO ESMS AND EXERCISE OF OPTIONS FOR ENGINEERING, CONFIGURATION MGT AND PROGRAM MGT HOURS |
| Jul 15, 2013 | P00058 | $0 | ADMINISTRATIVE MODIFICATION TO ADD CLAUSES NECESSARY FOR THEATRE BUSINESS CLEARANCE TO SEND FIELD SERVICE ENGINEERS TO IRAQ. |
| Jul 15, 2013 | P00061 | $39.2K | EXERCISE OF OPTIONS FOR LOGISTICS AND PROGRAM MANAGEMENT |
| Jul 10, 2013 | P00060 | $-77.2K | EXERCISE OF OPTIONS. REALIGNMENT OF FUNDS. AND DE-OBLIGATION OF FUNDS. |
| Jul 1, 2013 | P00059 | $734.9K | REVISION TO LOGISTICS ESM L12-04(F) AND OPTION EXERCISE. |
| Jun 12, 2013 | P00057 | $1.8M | THIS MODIFICATION P00057 REVISES ESMS AND OBLIGATES FUNDS TO THE CONTRACT FOR NEW TASK. |
| May 9, 2013 | P00056 | $0 | MODIFICATION TO REVISE ESM E12-02T WITH A NEW REVISION ESM E12-02Z AT NO ADDITIONAL COST TO GOVERNMENT |
| Apr 25, 2013 | P00055 | $1.1M | MODIFICATION P00055 IS TO RE-ALIGN FUNDING FROM MATERIAL TO LABOR AND TO OBLIGATE FUNDING FOR IAMD AB KIT INTERFACE - PHASE 2B TASK. |
| Apr 19, 2013 | P00054 | $217.0K | FUNDING RE-ALIGNMENT AND EXERCISE OF OPTIONS |
| Apr 8, 2013 | P00053 | $791.1K | MODIFICATION P00053 CORRECTS ESM E12-07 WITH REVISION A AT NO COST. MOD ALSO OBLIGATES FUNDING FOR ENGINEERING HOURS AND TRAVEL FOR TASK. |
| Mar 28, 2013 | P00052 | $495.4K | MODIFICATION TO EXERCISE OPTIONS AND PLACE ESMS AND FUNDING ON CONTRACT FOR ENGINEERING, CONFIGURATION MANAGEMENT AND PROGRAM MANAGEMENT ALONG WITH TRAVEL AND MATERIAL. |
| Mar 7, 2013 | P00051 | $0 | MODIFICATION P00051 REVISES ESM E12-02 WITH REVISITION "U" WHICH CORRECTS THE READING OF THE TASK ON THE ESM TO READ "A3" INSTEAD OF "ENHANCED" ON SHEET 2, SECTION 18.4 LINE 1. |
| Feb 13, 2013 | P00050 | $207.7K | MODIFICATION TO EXERCISE OPTIONS FOR ENGINEERING, CONFIGURATATION MANAGEMENT AND PROGRAM MANAGEMENT HOURS FOR TASK 3.2 IMPROVED SENTINEL V5.8.4 I&T/SVT CLOSEOUT. |
| Jan 29, 2013 | P00049 | $2.0M | MODIFICATION FOR THE EXERCISE OF OPTIONS FOR F1 SW, NORWEGIAN CUSTOMER |
| Dec 20, 2012 | P00048 | $132.7K | MODIFICATION TO FUND FMS ESMS FOR F1 SOFTWARE DEVELOPMENT |
| Dec 18, 2012 | P00047 | $690.5K | MODIFICATION TO EXERCISE OPTIONS FOR ENGINEERING AND PROGRAM MANAGEMENT HOURS AND FOR MATERIAL COSTS. |
| Dec 4, 2012 | P00046 | $975.8K | MODIFICATION TO EXERCISE OPTIONS ON P00046 |
| Nov 29, 2012 | P00045 | $117.0K | EXERCISE OF OPTION FOR ENGINEERING AND PM HOURS |
| Nov 20, 2012 | P00044 | $100.2K | MODIFICATION TO OBLIGATE FUNDING UNDER CLIN 0009 FOR LOGISTICS AND PM HOURS |
| Nov 8, 2012 | P00043 | $0 | MODIFICATION TO ADD HOURS TO THE CONTRACT. |
| Oct 31, 2012 | P00042 | $0 | MODIFICATION TO INCLUDE GFE ON CONTRACT AND ADD ATTACHMENT 0040 |
| Oct 25, 2012 | P00041 | $0 | MODIFICATION P00041 ATTACHES 2 ESMS THAT HAVE BEEN REVISED |
| Oct 23, 2012 | P00040 | $0 | MODIFICATION TO INCLUDE CLAUSES FOR ESM L12-04 TASK 2.0 IRAQ SENTINEL F1 NET |
| Sep 28, 2012 | P00039 | $186.6K | EXERCISE OPTIONS |
| Sep 27, 2012 | P00038 | $3.4M | EXERCISE OPTIONS |
| Sep 14, 2012 | P00037 | $0 | MODIFICATION TO DEOBLIGATE FUNDING (RDT&E) AND OBLIGATE IT IN ANOTHER PLACE USING DIFFERENT TYPE OF FUNDS (FMS). |
| Aug 27, 2012 | P00036 | $3.3M | EXERCISE OF OPTIONS |
| Aug 16, 2012 | P00035 | $714.7K | EXERCISE OF OPTIONS FOR CY 2012 |
| Aug 1, 2012 | P00034 | $1.3M | EXERCISE OPTIONS FOR LABOR AND TRAVEL |
| Jun 21, 2012 | P00033 | $1.9M | OBLIGATION OF FUNDING TO CONTRACT FOR LABOR, TRAVEL AND MATERIAL. |
| Jun 18, 2012 | P00032 | $2.7M | OBLIGATE FUNDING TO THE CONTRACT FOR HOURS, TRAVEL AND MATERIAL |
| Jun 6, 2012 | P00031 | $1.8M | MODIFICAITON TO OBLIGATE FUNDING. |
| Apr 11, 2012 | P00030 | $374.5K | EXERCISE OF OPTIONS FOR SW ENGINEERING. |
| Apr 5, 2012 | P00029 | $1.8M | FUNDING OBLIGATION FOR HOURS AND MATERIAL UNDER CALENDAR YEAR 12 |
| Mar 29, 2012 | P00028 | $1.2M | SENTINEL ENGINEERING SERVICES EXERCISE OF OPTIONS |
| Mar 5, 2012 | P00027 | $538.7K | MODIFICATION TO OBLIGATE FUNDING UNDER OPTION YEAR 2 |
| Feb 16, 2012 | P00026 | $0 | MODIFICATION TO RE-ALIGN HOUR FROM PRIOR OPTION PERIODS TO THE CURRENT OPTION PERIOD. |
| Feb 10, 2012 | P00025 | $0 | MODIFICATION TO REALIGN FUNDING TO COVER REBURDENING COST |
| Dec 22, 2011 | P00024 | $546.3K | MODIFICATION TO EXERCISE OPTIONS |
| Oct 26, 2011 | P00023 | $32.7K | EXERCISE OF OPTIONS |
| Oct 12, 2011 | P00022 | $17.9K | MOD TO EXERCISE OPTIONS |
| Sep 28, 2011 | P00021 | $6.8M | MODIFICATION TO EXERCISE OPTIONS |
| Sep 9, 2011 | P00020 | $3.4M | MODIFICATION OF EXERCISE OPTIONS |
| Sep 1, 2011 | P00019 | $81.3K | EXERCISE OPTIONS |
| Aug 9, 2011 | P00018 | $642.5K | EXERCISE OF OPTIONS |
| Jul 28, 2011 | P00017 | $54.3K | EXERCISE OPTIONS/OBLIGATE FUNDING |
| Jul 14, 2011 | P00016 | $342.7K | ENGINEERING SERVICES HOURS |
| Jul 12, 2011 | P00015 | $350.0K | MODIFICATION TO OBLIGATE FUNDING UNDER SUPPLEMENTAL AGREEMENT TO SCOPE OF WORK |
| Jul 8, 2011 | P00014 | $317.2K | MODIFICATION TO EXERCISE OPTIONS |
| Jun 28, 2011 | P00013 | $69.3K | MODIFICATION TO EXERCISE OPTIONS |
| Jun 16, 2011 | PZ0012 | $0 | MODIFICATION TO DEFINITIZE UCA W31P4Q10C0348 |
| Jun 9, 2011 | P00011 | $28.5K | MODIFICATION TO FUND ADDITIONAL TEST WITHIN SCOPE |
| Jun 6, 2011 | P00010 | $33.3K | FUNDING FOR ADDITIONAL TEST ACTIVITIES FOR SENTINEL ENGINEERING SERVICES |
| May 31, 2011 | P00009 | $95.3K | FUNDING WORK UNDER UCA |
| Mar 30, 2011 | P00008 | $503.0K | MODIFICATION TO INCREASE CONTRACT AMOUNT UNDER UCA |
| Mar 17, 2011 | P00007 | $0 | MODIFICATION TO CORRECT PRON NUMBERS AND RE-ALIGN FUNDING ACCORDING TO THE CORRECTED PRON NUMBERS TO NEW SLINS |
| Feb 17, 2011 | P00006 | $249.8K | RE-ALIGNMENT OF FUNDS AND EXTENSION OF POP |
| Dec 17, 2010 | P00005 | $1.2M | MODIFICATION TO EXECUTE OPTIONS |
| Dec 14, 2010 | P00004 | $0 | MODIFICATION TO EXTEND THE POP FOR ALL SLINS ON CONTRACT TO DATE |
| Oct 26, 2010 | P00003 | $3.9M | MODIFICATION TO RECONSTRUCT SLINS WITH REVISED BASE ESMS |
| Oct 21, 2010 | P00002 | $-3.9M | MOD TO DELETE ALL SLINS ON CONTRACT TO DATE. THOSE SLINS WILL BE REBUILT ON MOD P00003 WITH CORRECTED AMOUNTS OF HOURS AND FUNDING. |
| Sep 30, 2010 | P00001 | $0 | MOD TO INCOPORATE CLAUSES AND TO PULL IN DATA ITEMS ALSO TO DECREASE AND OBLIGATED FUNDING IN THE SAME AMOUNT. |
| Sep 9, 2010 | 0 | $3.9M | UCA AWARD FOR SENTINEL ENGINEERING SERVICES FOLLOW ON CONTRACT FY10-14 |
| Sep 9, 2010 | 0 | $0 | SENTINEL ENGINEERING SERVICES CONTRACT W31P4Q-10-C-0348 |