Federal contract award

W31P4Q17P0098

4 EACH M/R PC LINK BEARING CUTTER KITS CONSISTING OF 1 EACH PLBC-KIT-AH64 BEARING CUTTER KIT, 1 EACH CPLC-050 COMPRESSION PANCAKE LOAD CELL AND 1 EACH 1078966 MR/TR PC LINK BEARING KIT SHIPPING COSTS INCLUDED. USED TO PERFORM THE REQUIRED MAINTENANCE OF THE AH-64 APACHE THAT IS OWNED BY FOREIGN MILITARY SALES (FMS) CUSTOMER SAUDI ARABIAN NATIONAL GUARD (SANG).THE AH-64 APACHE REQUIRES THAT ITS FLY CUTTING AND PROOF LOAD MEASUREMENT FOR THE MAIN ROTOR PITCH CHANGE LINK BEARING BE REPLACED.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC1615 — Helicopter Rotor Blades, Drive Mechanisms and Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$59.4K
Current contract value$59.4K
Potential contract value / ceiling$59.4K
Start dateMay 10, 2017
Current end dateAug 2, 2017
Potential end dateAug 2, 2017
Latest award activityMay 10, 2017
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 10, 20170$59.4K4 EACH M/R PC LINK BEARING CUTTER KITS CONSISTING OF 1 EACH PLBC-KIT-AH64 BEARING CUTTER KIT, 1 EACH CPLC-050 COMPRESSION PANCAKE LOAD CELL AND 1 EACH 1078966 MR/TR PC LINK BEARING KIT SHIPPING COSTS INCLUDED. USED TO PERFORM THE REQUIRED MAINTENANCE OF THE AH-64 APACHE THAT IS OWNED BY FOREIGN MILITARY SALES (FMS) CUSTOMER SAUDI ARABIAN NATIONAL GUARD (SANG).THE AH-64 APACHE REQUIRES THAT ITS FLY CUTTING AND PROOF LOAD MEASUREMENT FOR THE MAIN ROTOR PITCH CHANGE LINK BEARING BE REPLACED.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.