Federal contract award
W31P4Q19C0038
IGF::CL::IGF BASE ENGINEERING SERVICE AWARD
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 336414 — Guided Missile and Space Vehicle Manufacturing |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $296.6M |
| Current contract value | $296.6M |
| Potential contract value / ceiling | $518.6M |
| Start date | Dec 11, 2018 |
| Current end date | Sep 30, 2026 |
| Potential end date | Sep 30, 2026 |
| Latest award activity | Mar 25, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 226 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 9, 2026 | P00210 | $0 | JAVELIN ENGINEERING SERVICES |
| Mar 25, 2026 | P00208 | $0 | ENGINEERING SERVICES IN SUPPORT OF JAVELIN WEAPONS SYSTEM |
| Feb 23, 2026 | P00194 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF THE JAVELIN WEAPON SYSTEM. |
| Nov 13, 2025 | P00207 | $0 | P00207 EXTENDS THE PERIOD OF PERFORMANCE FOR 'SPIRAL 3 TRANSITION TO PRODUCTION' TO INCLUDE LABOR (2102BY), TRAVEL (2104AS, 2104AV, 2104AY), AND MATERIAL (2106AJ, 2106AQ, 2106AS, AND 2106AT). |
| Sep 29, 2025 | P00206 | $-730.9K | ENGINEERING SERVICES IN SUPPORT OF JAVELIN WEAPON SYSTEMS. |
| Sep 17, 2025 | P00205 | $0 | ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPONS SYSTEM |
| Aug 28, 2025 | P00204 | $308.2K | ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM |
| Jul 11, 2025 | P00203 | $0 | ENGINEERING SERVICES IN SUPPORT OF THE JAVELIN WEAPON SYSTEMS. |
| Jul 7, 2025 | P00202 | $-700.9K | ENGINEERING SERVICE CONTRACT IN SUPPORT OF THE JAVELIN WEAPON SYSTEM. |
| Jun 17, 2025 | P00201 | $0 | ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM |
| May 19, 2025 | P00200 | $0 | ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Apr 29, 2025 | P00198 | $-11.1K | JAVELIN ENGINEERING SERVICES CONTRACT |
| Apr 29, 2025 | P00199 | $-31.3K | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM |
| Apr 15, 2025 | P00197 | $-114.4K | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Mar 31, 2025 | P00196 | $-174.2K | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM |
| Mar 25, 2025 | P00195 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Feb 27, 2025 | P00193 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Feb 26, 2025 | P00192 | $475.0K | ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Feb 20, 2025 | P00191 | $-128.9K | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Jan 29, 2025 | P00190 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Dec 12, 2024 | P00189 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Oct 28, 2024 | P00188 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Sep 25, 2024 | P00186 | $10.3M | JAVELIN WEAPON SYSTEM ENGINEERING SERVICES CONTRACT FOR FISCAL YEARS 2019 THROUGH 2023. |
| Sep 12, 2024 | P00185 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Jul 29, 2024 | P00183 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Jul 29, 2024 | P00184 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM |
| Jun 25, 2024 | P00182 | $-23.7K | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Jun 17, 2024 | P00181 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF THE JAVELIN WEAPON SYSTEM. MODIFICATION IS FOR PERIOD OF PERFORMANCE EXTENSIONS OF NON-SEVERABLE ENGINEERING SERVICE MEMORANDUMS (ESMS) 20.04.05 21.04.08 23.04.01 REQUIRED FOR COMPLETION OF EFFORTS AT NO COST. |
| May 23, 2024 | P00180 | $-1.1M | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Apr 24, 2024 | P00179 | $-120.5K | MODIFICATION P00179 DE-SCOPES FUNDS FOR THE PERFORMANCE OF ESM 19.04.07 JAVELIN SYSTEM QUALIFICATION HARDWARE ($120,473.10) |
| Apr 12, 2024 | P00178 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. |
| Mar 26, 2024 | P00177 | $0 | ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. MODIFICATION IS FOR SOMARDS TO GFEBS FUNDING REALIGNMENT REV 2 |
| Mar 1, 2024 | P00175 | $0 | JAVELIN WEAPON SYSTEM ENGINEERING SERVICES CONTRACT MODIFICATION: SOMARDS TO GFEBS REALIGNMENT |
| Jan 30, 2024 | P00176 | $0 | PERIOD OF PERFORMANCE EXTENSION MODIFICATION TO THE JAVELIN WEAPON SYSTEM ENGINEERING SERVICES CONTRACT |
| Nov 21, 2023 | P00173 | $0 | ENGINEERING SERVICES CONTRACT SUPPORTING JAVELIN WEAPONS SYSTEM |
| Nov 21, 2023 | P00174 | $0 | PERIOD OF PERFORMANCE EXTENSION TO ENGINEERING SERVICES CONTRACT SUPPORTING JAVELIN WEAPONS SYSTEM |
| Jul 28, 2023 | P00172 | $-2.4M | MODIFICATION TO AWARD BASELINE CONTROL REQUEST FOR LIGHTWEIGHT CLUE AND SPIRAL 3. |
| Jul 20, 2023 | P00171 | $818.2K | THIS MODIFICATION IS A REQUEST FOR EQUITABLE ADJUSTMENT FOR THE OUTDOOR TRAINER PHASE II. |
| Jul 18, 2023 | P00168 | $13.5M | AWARDED MODIFICATION TO FUND ENGINEERING SERVICE MEMORANDUM 23.04.01 REV D SPIRAL 3 SYSTEM QUALIFICATION TO DETERMINE ROOT CAUSE AND CORRECTIVE ACTION VERIFICATION. |
| Jul 14, 2023 | P00169 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Jul 14, 2023 | P00170 | $0 | REALIGNMENT OF FISCAL YEAR (FY) 2022 MATERIAL DOLLARS TO FY 2021 MATERIAL DOLLARS TO AWARD AN EQUITABLE ADJUSTMENT MODIFICATION. |
| May 17, 2023 | P00167 | $1.1M | MODIFICATION TO AWARD SPIRAL 3 ENGINEERING SERVICE MEMORANDUM 20.04.05. |
| Mar 31, 2023 | P00166 | $0 | REALIGNMENT FROM LABOR CEILING FISCAL YEAR (FY)23 TO FY20 MATERIAL CEILING AND FY23 TRAVEL CEILING. |
| Mar 29, 2023 | P00165 | $0 | THIS MODIFICATION WILL CORRECT THE EFFECTIVE OF MODIFICATION P00157 TO 15 AUGUST 2022. |
| Mar 23, 2023 | P00164 | $0 | JAVELIN ENGINEERING SERVICES FY19-FY20 |
| Mar 9, 2023 | P00163 | $1.2M | THIS MODIFICATION WILL EXERCISE OPTION 3 BY FUNDING MATERIAL FOR THE SPIRAL 3 TRANSITION TO PRODUCTION. |
| Feb 28, 2023 | P00162 | $13.5M | ENGINEERING SERVICE MEMORANDUM 21.04.07 REVISION B - LIGHT WEIGHT COMMAND LAUNCH (LWCLU) SYSTEM QUALIFICATION EXECUTION (SQE). ADDITIONAL SCOPE TO SUPPORT WINTER LIMITED USER TEST (LUT) AND SUMMER OPERATIONAL TESTS (OT) EVENTS. |
| Feb 22, 2023 | P00161 | $0 | REALIGNMENT FROM LABOR CEILING FISCAL YEAR (FY)23 TO FY21 MATERIAL CEILING AND FY23 TRAVEL CEILING. |
| Feb 21, 2023 | P00160 | $44.9M | ENGINEERING SERVICE MEMORANDUM 21.04.07 REVISION B - LIGHT WEIGHT COMMAND LAUNCH (LWCLU) TRANSITION TO PRODUCTION (TTP). ADDITIONAL BUILD OF PILOT LINE HARDWARE. |
| Jan 26, 2023 | P00159 | $822.9K | THIS MODIFICATION WILL EXERCISE OPTION 5 BY FUNDING OPTION 5 LABOR AND TRAVEL FOR THE JAVELIN VEHICLE LAUNCHER ELECTRONICS FAILURE REVIEW BOARD. |
| Jan 19, 2023 | P00158 | $-391 | JAVELIN ENGINEERING SERVICE |
| Dec 21, 2022 | P00157 | $25.2M | THIS MODIFICATION WILL EXERCISE OPTION 5 AND FUND OPTION 5 LABOR, MATERIAL, AND TRAVEL FOR THE JAVELIN OUTDOOR TRAINER SYSTEM QUALIFICATION THROUGH FULL MATERIAL RELEASE. |
| Dec 20, 2022 | P00156 | $1.3M | JAVELIN ENGINEERING SERVICE |
| Dec 12, 2022 | P00154 | $0 | INCORPORATE OY5 SMALL BUSINESS CONTRACTING PLAN AS ATTACHMENT J-0009 |
| Dec 5, 2022 | P00150 | $0 | TRANSFER OF GOVERNMENT FURNISHED PROPERTY (GFP) FROM W31P4Q17D0005 TO W31P4Q19C0038. ADDING LIST OF GFP IN SECTION J AS ATTACHMENT 0018. |
| Dec 5, 2022 | P00155 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE ON SLINS 2202AY, 2204AC, 2206AC, AND 2206AD. |
| Nov 28, 2022 | P00153 | $0 | REALIGNING FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUM (ESM) FOR JAVELIN WEAPON SYSTEM. |
| Sep 21, 2022 | P00152 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE. |
| Sep 14, 2022 | P00149 | $0 | REALIGNMENT OF FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUMS FOR THE JAVELIN WEAPON SYSTEM. |
| Aug 25, 2022 | P00151 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE ON SLINS 2202AW, 2204AB, AND 2206AB. |
| Jul 29, 2022 | P00145 | $-7.5K | THE REQUIREMENT IS AWARDED TO DE-SCOPE LABOR HOURS FOR THE PRODUCT ASSURANCE SUSTAINING SUPPORT ENGINEERING SERVICES MEMORANDUM. |
| Jul 29, 2022 | P00147 | $4.6M | THIS MODIFICATION IS TO AWARD SUSTAINING SUPPORT FOR JAVELIN ENGINEERING SERVICES. |
| Jul 28, 2022 | P00146 | $0 | THIS MODIFICATION INCREASES THE FISCAL YEAR (FY) 23 CEILING FOR LABOR, MATERIAL, AND TRAVEL ON THE JAVELIN ENGINEERING SERVICE CONTRACT. |
| Jun 16, 2022 | P00144 | $2.2M | MODIFICATION PROVIDES SUPPORT TO ADVANCE THE LIGHT WEIGHT COMMAND LAUNCH UNIT (LWCLU) BEYOND THE CRITICAL DESIGN PHASE INTO SYSTEM QUALIFICATION. THIS ESM ADDRESSES SYSTEM QUALIFICATION EXECUTION TASKS FOR THE LWCLU, AS PART OF THE JAVELIN WEAPON SYSTEMMODERNIZATION. THE EFFORT INCLUDES FUNDING FOR THE MATURATION OF TEST EQUIPMENT INTEGRATED PRODUCT TEAM(IPT) LEADS SOFTWARE DEVELOPMENT AND INTEGRATION MATERIAL RECEIPT, MANAGEMENT, AND TECHNICAL DATA PACKAGE REFINEMENT AND RELEASE. |
| Jun 1, 2022 | P00143 | $0 | MODIFICATION P00143 IS TO REALIGN THE LABOR, TRAVEL, AND MATERIAL CEILING. |
| May 31, 2022 | P00142 | $0 | THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE AT NO ADDITIONAL COST FOR ENGINEERING SERVICES MEMORANDUM 19.04.06 REV F, COMPONENT QUALIFICATION AND SYSTEM DESIGN. |
| May 25, 2022 | P00140 | $527.5K | THE PURPOSE OF THIS ACTION IS TO REQUEST THAT PROGRAM MANAGEMENT SUSTAINING SUPPORT FUND INCREMENT 2 LABOR HOURS. |
| May 25, 2022 | P00141 | $2.7M | MODIFICATION P00141 FUNDS ENGINEERING SERVICES MEMORANDUM 20.04.05C AND EXTENDS THE PERIOD OF PERFORMANCE FOR 20.04.04C AND 20.04.05C. |
| May 24, 2022 | P00139 | $10.0M | MODIFICATION TO INCREMENTALLY FUND SPIRAL 3 TRANSITION TO PRODUCTION PHASE 1 LABOR AND TRAVEL. |
| May 18, 2022 | P00138 | $-87.8K | THIS MODIFICATION DE-OBLIGATES FUNDS. |
| May 13, 2022 | P00137 | $0 | MODIFICATION P00137 IS TO REALIGN THE LABOR, TRAVEL, AND MATERIAL FUNDING CEILING. |
| Apr 26, 2022 | P00136 | $198.8K | MODIFICATION P00136 FUNDS ENGINEERING SERVICES MEMORANDUM 22.03.01A AND EXTEND THE PERIOD OF PERFORMANCE FOR 20.05.01 REVISION D AND 21.03.03 REVISION B. |
| Mar 31, 2022 | P00133 | $4.2M | MODIFICATION P00133 IS AWARDING ENGINEERING SERVICE MEMORANDUM 21.04.08 REVISION - SPIRAL 3 TRANSITION TO PRODUCTION PHASE 1. |
| Mar 31, 2022 | P00134 | $31.3K | THE PURPOSE OF THIS MODIFICATION IS TO SWAP FUNDING FROM NORWAY FUNDS TO ARMY FUNDS. |
| Mar 31, 2022 | P00134 | $-31.3K | THE PURPOSE OF THIS MODIFICATION IS TO SWAP FUNDING FROM NORWAY FUNDS TO ARMY FUNDS. |
| Mar 31, 2022 | P00135 | $0 | PERIOD OF PERFORMANCE EXTENSION. |
| Mar 16, 2022 | P00132 | $0 | REALIGNMENT TO AWARD SPIRAL 3 TRANSITION TO PRODUCTION (INCREMENT 2). |
| Feb 16, 2022 | P00131 | $7.6M | MODIFICATION TO AWARD SPIRAL 3 SYSTEM QUALIFICATION COMPLETION INCREMENT 2 AND LIGHT WEIGHT COMMAND LAUNCH UNIT TRANSITION TO PRODUCTION PHASE 1 INCREMENT 2 |
| Feb 10, 2022 | P00130 | $0 | REALIGNMENT OF LABOR AND TRAVEL CEILING FROM FISCAL YEAR 23 TO FISCAL YEAR 21. |
| Feb 7, 2022 | P00128 | $0 | THE PURPOSE OF W31P4Q-19-C-0038 P00128 IS TO REVISE ATTACHMENT 0013 GOVERNMENT FURNISHED PROPERTY BY REMOVING THE HALT/HASS ENGINEERING SYSTEM FROM THE PROPERTY LIST. |
| Jan 31, 2022 | P00127 | $83.7K | THIS MODIFICATION IS A PERIOD OF PERFORMANCE EXTENSION FOR JAVELIN LIGHT WEIGHT COMMAND LAUNCH UNIT BASIC SKILLS TRAINER DEVELOPMENT VERIFICATION TESTING SUPPORT, AND AN INCREASE IN LABOR HOURS FOR TEST AND EVALUATION MISSION SUPPORT. |
| Jan 27, 2022 | P00129 | $394.6K | AWARD OF ENGINEERING SERVICES MEMORANDUM 22.01.04 REV A FOR DIGITAL TECHNOLOGY/INFORMATION ASSURANCE (DT/IA) SUSTAINING. THE EFFORT INCLUDES RISK MANAGEMENT FRAMEWORK REQUIREMENTS AND UPGRADES OF SYSTEM WORKSTATIONS. |
| Jan 7, 2022 | P00125 | $-11.6K | THIS MODIFICATION DE-OBLIGATES FUNDS. |
| Dec 22, 2021 | P00126 | $0 | MODIFICATION TO ADD CONTRACT DATA REQUIREMENTS LIST(CDRL) AND TWO REPORTS UNDER THE CDRL. EXTEND THE PERIOD OF PERFORMANCE OF 1901AU AND 1904AM. |
| Dec 15, 2021 | P00124 | $1.7M | MODIFICATION TO AWARD ENGINEERING SERVICE MEMORANDUM 19.04.07 REV B, JAVELIN SYSTEM QUALIFICATION HARDWARE. |
| Dec 14, 2021 | P00122 | $0 | THIS MODIFICATION IS TO INCORPORATE CONTRACT DATA REQUIREMENTS LIST A028 AND THE REQUIREMENT FOR THE GUIDANCE THERMAL TEST REPORT AND AUTO GUIDANCE FINAL TEST REPORT AT NO ADDITIONAL COST AS A RESULT OF ENGINEERING SERVICES MEMORANDUM 20.04.07A. |
| Dec 9, 2021 | P00121 | $0 | THIS MODIFICATION IS A PERIOD OF PERFORMANCE EXTENSION FOR ENGINEERING SERVICES MEMORANDUM 19.04.06 REV E, COMPONENT QUALIFICATION AND SYSTEM DESIGN. |
| Dec 9, 2021 | P00123 | $0 | REALIGNMENT OF LABOR AND MATERIAL FUNDING CEILING FROM FISCAL YEAR (FY) 23 TO FY 19. |
| Dec 3, 2021 | P00120 | $0 | MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR ENGINEERING SERVICE MEMORANDUM 21.02.05B FOR SOFTWARE VERSION 11.08 REPROGRAMMING AND INCORPORATE DFARS CLAUSE 252.223-7999, ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 2021-O0009). |
| Oct 27, 2021 | P00119 | $104.8K | FUNDING FOR OPTION 4: LABOR, MATERIAL, AND TRAVEL |
| Oct 27, 2021 | P00119 | $713.4K | FUNDING OPTION 4: LABOR, TRAVEL, AND MATERIAL |
| Oct 18, 2021 | P00117 | $-121.2K | DEOBLIGATION |
| Oct 18, 2021 | P00117 | $-65.4K | DEOBLIGATION |
| Oct 18, 2021 | P00118 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR ENGINEERING SERVICE MEMORANDUM 21.03.03 REVIEW FOR SECOND SOURCE ENGINEERING CHANGE PROPOSAL. |
| Sep 28, 2021 | P00114 | $1.5M | AWARDING ENGINEERING SERVICES MEMORANDUM 22.05.01 FOR JAVELIN OUTDOOR TRAINER SYSTEM-STRYKER EVALUATION UNITS. |
| Sep 28, 2021 | P00115 | $97.3K | OPTION 3-FUNDING FOR LABOR AND TRAVEL |
| Sep 28, 2021 | P00116 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR ENGINEERING SERVICE MEMORANDUMS 21.01.02B AND 21.03.01B. |
| Sep 23, 2021 | P00112 | $1.2M | OPTION 4 FUNDING: LABOR, MATERIAL, AND TRAVEL |
| Sep 23, 2021 | P00113 | $0 | PERIOD OF PERFORMANCE EXTENSION AND CONTRACT DATA REQUIREMENTS LIST (CDRL) CHANGE. |
| Sep 16, 2021 | P00111 | $0 | REALIGNMENT OF FUNDING CEILING TO AWARD ENGINEERING SERVICES MEMORANDUM 21.05.01A. |
| Sep 14, 2021 | P00110 | $0 | CORRECTION TO P00104 ENGINEERING SERVICE MEMORANDUM NUMBERS ON 2202AA AND 2202AM. |
| Aug 23, 2021 | P00109 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR SPIRAL 3 COMPONENT QUALIFICATION AND SYSTEM DESIGN REVIEW #2. |
| Aug 17, 2021 | P00108 | $3.1M | FUNDING FOR OPTION 2 LABOR AND MATERIAL |
| Aug 10, 2021 | P00107 | $0 | REALIGNMENT OF LABOR AND MATERIAL FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUM 20.04.07 REVISION A - SPIRAL 3 SYSTEM QUALIFICATION. |
| Aug 6, 2021 | P00106 | $-899 | DE-OBLIGATION |
| Jul 30, 2021 | P00105 | $0 | MODIFICATION TO EXTEND THE ORDERING PERIOD DUE TO PERFORMANCE EXTENSION IN MODIFICATION P00101. |
| Jul 29, 2021 | P00104 | $247.7K | AWARD ENGINEERING SERVICE MEMORANDUMS FOR SUSTAINING SUPPORT FOR CONFIGURATION MANAGEMENT AND DATA MANAGEMENT, TEST AND EVALUATION MISSION SUPPORT, PROGRAM MANAGEMENT SUSTAINING SUPPORT, AND DIGITAL TECHNOLOGY AND INFORMATION ASSURANCE SUSTAINING. |
| Jul 29, 2021 | P00104 | $2.2M | AWARD ENGINEERING SERVICE MEMORANDUMS FOR SUSTAINING SUPPORT FOR CONFIGURATION MANAGEMENT AND DATA MANAGEMENT, TEST AND EVALUATION MISSION SUPPORT, PROGRAM MANAGEMENT SUSTAINING SUPPORT, AND DIGITAL TECHNOLOGY AND INFORMATION ASSURANCE SUSTAINING. |
| Jul 28, 2021 | P00103 | $2.4M | FUNDING FOR OPTION 2: LABOR, TRAVEL, AND MATERIAL |
| Jul 27, 2021 | P00102 | $6.7M | MODIFICATION TO AWARD ENGINEERING SERVICE MEMORANDUM 21.04.08 FOR TEST EQUIPMENT MATURATION ACTIVITIES SUPPLIER READINESS ACTIVITIES INCLUDING THE COMPLETION OF NON-RECURRING ENGINEERING ACTIVITIES UPDATES TO AND MATURATION OF THE FINAL CONFIGURATION TEST SET. |
| Jul 23, 2021 | P00101 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Jul 22, 2021 | P00100 | $0 | REALIGNMENT OF LABOR, MATERIAL, AND TRAVEL FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUMS 21.04.08 AND 20.04.05 REV B. |
| Jul 15, 2021 | P00099 | $5.0M | REALIGNMENT OF LABOR AND TRAVEL. FUNDING OF ENGINEERING SERVICE MEMORANDUM 21.04.07 FOR LIGHT WEIGHT COMMAND LAUNCH UNIT TRANSITION-TO-PRODUCTION. |
| Jul 15, 2021 | P00099 | $3.6M | REALIGNMENT OF LABOR AND TRAVEL. FUNDING OF ENGINEERING SERVICE MEMORANDUM 21.04.07 FOR LIGHT WEIGHT COMMAND LAUNCH UNIT TRANSITION-TO-PRODUCTION. |
| Jul 14, 2021 | P00098 | $0 | ADMINISTRATIVE CDRL CHANGE. |
| Jul 1, 2021 | P00097 | $4.6M | FUNDING FOR OPTION 3: LABOR AND TRAVEL |
| Jun 24, 2021 | P00096 | $31.3K | FUNDING FOR OPTION 3 LABOR |
| Jun 15, 2021 | P00093 | $0 | TRANSFER OF GOVERNMENT FURNISHED PROPERTY FROM W31P4Q-17-D-0005 TO W31P4Q-19-C-0038. THE LIST OF TRANSFERRED PROPERTY IS IN ATTACHMENT 0016. |
| Jun 15, 2021 | P00094 | $-356.4K | DE-SCOPING AND DE-OBLIGATING ENGINEERING SERVICE MEMORANDUM 20.03.02 ADDING ATTACHMENT 0017 IN SECTION J OF THE CONTRACT EXTENDING THE PERIOD OF PERFORMANCE FROM 30JUN2021 TO 22SEP2021. |
| Jun 15, 2021 | P00095 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Jun 9, 2021 | P00092 | $-318.5K | DE-OBLIGATION OF FUNDS |
| Jun 9, 2021 | P00092 | $-4.4K | DE-OBLIGATION OF FUNDS |
| May 20, 2021 | P00091 | $98.4K | FUNDING FOR OPTION 3: LABOR |
| May 6, 2021 | P00090 | $0 | REALIGNMENT TO FUND LIGHT WEIGHT COMMAND LAUNCH UNIT CONFIGURATION AND BUILD INITIATION. |
| May 6, 2021 | P00090 | $379.1K | REALIGNMENT TO FUND LIGHT WEIGHT COMMAND LAUNCH UNIT CONFIGURATION PROCUREMENT AND BUILD INITIATION |
| Apr 30, 2021 | P00089 | $3.1M | FUNDING FOR OPTION3: LABOR, MATERIAL, AND TRAVEL |
| Apr 16, 2021 | P00088 | $0 | PERIOD OF PERFORMANCE EXTENSION ONLY |
| Apr 14, 2021 | P00087 | $295.4K | P00087 MODIFICATION IS FOR THE DEVELOPMENT OF SOFTWARE FOR THE JAVELIN MISSILE TO ADDRESS SYSTEMS ENGINEERING AND SOFTWARE TASK AS PART OF THE MISSILE MODERNIZATION. |
| Apr 2, 2021 | P00086 | $2.4M | MODIFICATION TO AWARD ENGINEERING SERVICE MEMORANDUM 19.04.07 REV A JAVELIN SYSTEM QUALIFICATION HARDWARE FOR FABRICATION, VALIDATION AND VERIFICATION OF TEST EQUIPMENT TO SUPPORT SYSTEM QUALIFICATION HARDWARE FABRICATION AND ACCEPTANCE TESTING. |
| Mar 24, 2021 | P00085 | $380.6K | MODIFICATION TO AWARD AN ENGINEERING SERVICE MEMORANDUM FOR 1,984 LABOR HOURS FOR PROGRAM MANAGEMENT SUSTAINING SUPPORT. |
| Mar 15, 2021 | P00083 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Mar 15, 2021 | P00084 | $55.1K | MODIFICATION AWARDED TO SUPPORT THE ENGINEERING SERVICES MEMORANDUM (ESM) 21.03.03 FOR WARHEAD ENGINEERING CHANGE PROPOSAL REVIEW. |
| Mar 4, 2021 | P00082 | $267.0K | REALIGNMENT OF LABOR CEILING AND AWARD OF ENGINEERING SERVICE MEMORANDUM 20.04.04A. |
| Feb 25, 2021 | P00081 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Feb 17, 2021 | P00080 | $4.2M | FUNDING FOR OPTION 3 LABOR |
| Feb 17, 2021 | P00080 | $15.0K | FUNDING FOR MATERIAL AND TRAVEL |
| Feb 10, 2021 | P00079 | $4.7M | FUNDING FOR OPTION 3 LABOR |
| Jan 28, 2021 | P00078 | $217.2K | FUNDING FOR OPTION 3 LABOR, MATERIAL, AND TRAVEL |
| Jan 21, 2021 | P00077 | $0 | ADMIN CHANGE TO PERIOD OF PERFORMANCE |
| Jan 15, 2021 | P00075 | $692.8K | FUNDING FOR OPTION 3 LABOR |
| Jan 14, 2021 | P00076 | $0 | PERIOD OF PERFORMANCE EXTENSION. |
| Dec 22, 2020 | P00074 | $150.1K | CEILING REALIGNMENT AND FUNDING FOR ENGINEERING SERVICE MEMORANDUM (ESM) 20.02.04 REV A FOR MODULAR HANDGRIP BATTERY SUPPORT. |
| Dec 22, 2020 | P00074 | $0 | FUNDING FOR OPTION 3 LABOR. |
| Dec 18, 2020 | P00073 | $0 | MODIFICATION IS FOR A PERIOD OF PERFORMANCE EXTENSION AND TO RECORD THE TRANSFER OF CONTRACTOR ACQUIRED PROPERTY (CAP) FROM CONTRACT W31P4Q-13-C-0186 TO CONTRACT W31P4Q-19C-0038 AS GOVERNMENT FURNISHED PROPERTY (GFP). |
| Dec 16, 2020 | P00072 | $1.1M | REALIGNMENT AND FUNDING FOR ENGINEERING SERVICE MEMORANDUM 20.04.09A. |
| Dec 16, 2020 | P00072 | $628.7K | FUNDING FOR OPTION 2 LABOR AND MATERIAL |
| Dec 11, 2020 | P00070 | $0 | ADMINISTRATIVE UPDATE TO CONTRACTOR MANPOWER REPORTING LANGUAGE. |
| Nov 25, 2020 | P00071 | $305.8K | INCREMENTAL FUNDING FOR ENGINEERING SYSTEM 20.04.10C |
| Nov 10, 2020 | P00069 | $-205.9K | DE-OBLIGATION OF FUNDING ON SPIRAL 3 G MODEL COMPONENT&ENGINEERING FLIGHT TESTING, SYSTEM ENGINEERING DOCUMENTS. |
| Oct 30, 2020 | P00068 | $1.9M | REALIGNMENT OF LABOR HOURS AND DOLLARS CEILING AND FUNDING OF ENGINEERING SERVICES MEMORANDUM 20.04.08A |
| Oct 30, 2020 | P00068 | $0 | REALIGNED LABOR CEILING DOLLARS AND HOURS TO COMPLETE ENGINEERING SERVICE MEMORANDUM (ESM) 20.04.08A. ALSO, FUNDED ESM 20.04.08A. |
| Oct 22, 2020 | P00067 | $-3.8K | DE-OBLIGATION OF TRAVEL FUNDS FROM OPTION 2 |
| Oct 13, 2020 | P00066 | $92.5K | ENGINEERING SERVICES MEMORANDUM (ESM) 21.02.01 FOR THE RECONDITIONING OF 20 COMMAND LAUNCH UNITS (CLUS). |
| Sep 24, 2020 | P00064 | $-702.9K | DE-SCOPE AND DE-OBLIGATION OF ESM 19.04.02 |
| Sep 24, 2020 | P00065 | $691.1K | FUNDING FOR OPTION 2 MATERIAL AND OPTION 3 LABOR |
| Sep 17, 2020 | P00062 | $0 | TRANSFERRING PROPERTY FROM W31P4Q-13-C-0186 AND W31P4Q-10-C-0263 TO CONTRACT W31P4Q-19-C-0038 FOR CONTINUED USE BY THE JAVELIN PROGRAM. |
| Sep 17, 2020 | P00063 | $929.5K | FUNDING FOR ENGINEERING SERVICE MEMORANDUM (ESM) 20.03.02A OBSOLESCENCE SOLUTIONS. |
| Sep 14, 2020 | P00059 | $725.6K | AWARD OF ENGINEERING SERVICES MEMORANDUM (ESM) 20.05.01 REV A TO IMPLEMENT MODIFICATIONS TO REDUCE PROCUREMENT LEAD TIMES. |
| Sep 3, 2020 | P00060 | $0 | POP EXTENSION ONLY |
| Sep 2, 2020 | P00058 | $0 | ADMINISTRATIVE MODIFICATION TO RENUMBER SLINS |
| Aug 31, 2020 | P00061 | $0 | ADDITION OF FAR CLAUSES TO MEET REQUIREMENT OF SECTION 889 REGULATION. |
| Aug 12, 2020 | P00057 | $1.9M | FUNDING FOR OPTION 3: MATERIALS |
| Aug 10, 2020 | P00056 | $-86.4K | ENGINEERING SERVICE MEMORANDUM 19.05.01 REV A MODIFICATION TO DE-SCOPE AND DE-OBLIGATE ENGINEERING SERVICE MEMORANDUM 19.05.01. |
| Jul 29, 2020 | P00055 | $585.5K | JAVELIN ENGINEERING SERVICES CONTRACT SUSTAINMENT FOR FY21 |
| Jul 29, 2020 | P00055 | $2.0M | JAVELIN ENGINEERING SERVICES CONTRACT SUSTAINMENT FOR FY21 |
| Jul 23, 2020 | P00054 | $1.3M | FUNDING FOR OPTION 2: MATERIALS |
| Jul 17, 2020 | P00052 | $0 | MODIFICATION FOR REALIGNMENT OF FUNDING |
| Jul 15, 2020 | P00051 | $3.3M | FUNDING FOR OPTION 2: LABOR AND MATERIAL |
| Jul 15, 2020 | P00053 | $0 | REVISING CONTRACT LINE ITEM NUMBERS (CLINS) DUE TO AN ISSUE WITH THE CONTRACT WRITING SYSTEM. |
| Jul 1, 2020 | P00050 | $4.1M | FUNDING FOR OPTION 2: LABOR AND MATERIAL |
| Jun 26, 2020 | P00049 | $4.4M | AWARDING ENGINEERING SYSTEM MEMORANDUM (ESM) 19.04.06B SPIRAL 3 COMPONENT QUALIFICATION AND SYSTEM DESIGN REVIEW #2 |
| Jun 19, 2020 | P00041 | $0 | MODIFICATION TO MOVE CONTRACTOR MANPOWER REPORTING (CMR) FROM AN ELIN TO CLIN, CORRECT 2102, AND EARNED VALUE MANAGEMENT (EVM) APPLICABILITY DETERMINATION ATTACHMENT. |
| Jun 3, 2020 | P00048 | $7.1M | FUNDING FOR OPTION 2 LABOR |
| May 29, 2020 | P00047 | $13.8M | AWARD OF ENGINEERING SYSTEM MEMORANDUM (ESM) 20.04.07 SPIRAL 3 SYSTEMS QUALIFICATION. |
| May 27, 2020 | P00045 | $0 | MODIFICATION TO INCREASE THE LABOR DOLLARS CEILING AND LABOR HOURS. |
| May 27, 2020 | P00046 | $0 | ADMINISTRATIVE MODIFICATION FOR A PERIOD OF PERFORMANCE EXTENSION |
| May 7, 2020 | P00046 | $0 | ADMINISTRATIVE MODIFICATION FOR A PERIOD OF PERFORMANCE EXTENSION |
| May 1, 2020 | P00044 | $454.1K | FUNDING FOR OPTION 2: LABOR AND MATERIAL |
| Apr 22, 2020 | P00042 | $346.7K | FUNDING FOR OPTION2: LABOR, MATERIAL, AND TRAVEL |
| Apr 15, 2020 | P00040 | $1.6M | ENGINEERING SERVICES MEMORANDUM (ESM) 20.04.05 SPIRAL 3 ATK LTA SOURCING |
| Apr 15, 2020 | P00043 | $0 | ADMINISTRATIVE MODIFICATION TO REMOVE SLIN/CLIN LANGUAGE. |
| Apr 8, 2020 | P00038 | $0 | INCORPORATING TABLE 1, PERFORMANCE STANDARDS, FROM THE QASP INTO THE CONTRACT. |
| Apr 8, 2020 | P00038 | $518.7K | ENGINEERING SERVICE MEMORANDUM (ESM) 20.01.03 REV B FOR SUSTAINING SUPPORT (LABOR AND TRAVEL). |
| Feb 28, 2020 | P00037 | $4.7M | FUNDING FOR OPTION 2: LABOR AND TRAVEL |
| Feb 28, 2020 | P00037 | $613.6K | FUNDING FOR OPTION 2: LABOR AND MATERIAL |
| Feb 18, 2020 | P00036 | $179.0K | FUNDING FOR OPTION 2 LABOR. |
| Feb 7, 2020 | P00035 | $0 | INCORPORATE SECURITY CLASSIFICATION GUIDE AS ATTACHMENT 0011. |
| Feb 6, 2020 | P00034 | $237.0K | FUNDING FOR OPTION 2 LABOR AND TRAVEL. |
| Jan 30, 2020 | P00031 | $253.6K | ENGINEERING SYSTEM MEMORANDUM 20.03.01 DOORS UPDATE AND SUSTAINING |
| Jan 30, 2020 | P00032 | $54.4K | MODIFICATION TO PROVIDE STOCKPILE RELIABILITY PROGRAM FLIGHT TEST AND TEAR DOWN/DISASSEMBLY SUPPORT. |
| Jan 28, 2020 | P00030 | $641.8K | INCREMENTAL FUNDING FOR OPTION 2 MATERIAL, LABOR, AND TRAVEL. |
| Jan 20, 2020 | P00033 | $0 | ENGINEERING SYSTEM MEMORANDUM ADMINISTRATIVE CORRECTION TO PERIOD OF PERFORMANCE |
| Jan 9, 2020 | P00029 | $0 | MODIFICATION TO INCORPORATE THE DD254 (CONTRACT SECURITY CLASSIFICATION SPECIFICATION) TO INCLUDE ITEM 13 - SECURITY GUIDANCE (CONTINUATION SHEET). |
| Dec 4, 2019 | P00027 | $12.1K | INCREMENTAL FUNDING FOR THE SUSTAINING JAVELIN ENGINEERING SUPPORT TO COVER TRAVEL. |
| Dec 3, 2019 | P00028 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR FABRICATION, ASSEMBLY,AND INTEGRATION UNDER ENGINEERING SYSTEMS MEMORANDUM (ESM) 19.02.05 REVISION A |
| Sep 26, 2019 | P00026 | $830.4K | FUNDING ENGINEERING SYSTEM MEMORANDUM (ESM) 20.04.03 |
| Sep 25, 2019 | P00025 | $888.2K | REALIGNMENT OF FUNDING FROM OPTION 2 TO OPTION 1 AND ADDITIONAL FUNDING FOR OPTION 1 TO PROCURE ENGINEERING SERVICE MEMORANDUM 19.04.01 REVISION B - PROJECT SPIRAL 3-G MODEL COMPONENT&ENGINEERING FLIGHT TESTING. |
| Sep 24, 2019 | P00024 | $79.1K | INCREMENTAL FUNDING FOR ENGINEERING SERVICES MEMORANDUM 20.02.02 REV A |
| Sep 13, 2019 | P00020 | $0 | PERIOD OF PERFORMANCE REVISION DUE TO INCREMENTAL FUNDING AND CHANGE IN ORIGINAL SCHEDULE. |
| Sep 13, 2019 | P00023 | $253.3K | EXERCISING OPTION 2 ESM 20.01.0320.01.0120.02.0220.04.02 |