Federal contract award

W31P4Q19C0038

IGF::CL::IGF BASE ENGINEERING SERVICE AWARD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSCR425 — Engineering and Technical Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$296.6M
Current contract value$296.6M
Potential contract value / ceiling$518.6M
Start dateDec 11, 2018
Current end dateSep 30, 2026
Potential end dateSep 30, 2026
Latest award activityMar 25, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 226 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00210$0JAVELIN ENGINEERING SERVICES
Mar 25, 2026P00208$0ENGINEERING SERVICES IN SUPPORT OF JAVELIN WEAPONS SYSTEM
Feb 23, 2026P00194$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF THE JAVELIN WEAPON SYSTEM.
Nov 13, 2025P00207$0P00207 EXTENDS THE PERIOD OF PERFORMANCE FOR 'SPIRAL 3 TRANSITION TO PRODUCTION' TO INCLUDE LABOR (2102BY), TRAVEL (2104AS, 2104AV, 2104AY), AND MATERIAL (2106AJ, 2106AQ, 2106AS, AND 2106AT).
Sep 29, 2025P00206$-730.9KENGINEERING SERVICES IN SUPPORT OF JAVELIN WEAPON SYSTEMS.
Sep 17, 2025P00205$0ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPONS SYSTEM
Aug 28, 2025P00204$308.2KENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM
Jul 11, 2025P00203$0ENGINEERING SERVICES IN SUPPORT OF THE JAVELIN WEAPON SYSTEMS.
Jul 7, 2025P00202$-700.9KENGINEERING SERVICE CONTRACT IN SUPPORT OF THE JAVELIN WEAPON SYSTEM.
Jun 17, 2025P00201$0ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM
May 19, 2025P00200$0ENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Apr 29, 2025P00198$-11.1KJAVELIN ENGINEERING SERVICES CONTRACT
Apr 29, 2025P00199$-31.3KENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM
Apr 15, 2025P00197$-114.4KENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Mar 31, 2025P00196$-174.2KENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM
Mar 25, 2025P00195$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Feb 27, 2025P00193$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Feb 26, 2025P00192$475.0KENGINEERING SERVICE CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Feb 20, 2025P00191$-128.9KENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Jan 29, 2025P00190$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Dec 12, 2024P00189$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Oct 28, 2024P00188$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Sep 25, 2024P00186$10.3MJAVELIN WEAPON SYSTEM ENGINEERING SERVICES CONTRACT FOR FISCAL YEARS 2019 THROUGH 2023.
Sep 12, 2024P00185$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Jul 29, 2024P00183$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Jul 29, 2024P00184$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM
Jun 25, 2024P00182$-23.7KENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Jun 17, 2024P00181$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF THE JAVELIN WEAPON SYSTEM. MODIFICATION IS FOR PERIOD OF PERFORMANCE EXTENSIONS OF NON-SEVERABLE ENGINEERING SERVICE MEMORANDUMS (ESMS) 20.04.05 21.04.08 23.04.01 REQUIRED FOR COMPLETION OF EFFORTS AT NO COST.
May 23, 2024P00180$-1.1MENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Apr 24, 2024P00179$-120.5KMODIFICATION P00179 DE-SCOPES FUNDS FOR THE PERFORMANCE OF ESM 19.04.07 JAVELIN SYSTEM QUALIFICATION HARDWARE ($120,473.10)
Apr 12, 2024P00178$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM.
Mar 26, 2024P00177$0ENGINEERING SERVICES CONTRACT IN SUPPORT OF JAVELIN WEAPON SYSTEM. MODIFICATION IS FOR SOMARDS TO GFEBS FUNDING REALIGNMENT REV 2
Mar 1, 2024P00175$0JAVELIN WEAPON SYSTEM ENGINEERING SERVICES CONTRACT MODIFICATION: SOMARDS TO GFEBS REALIGNMENT
Jan 30, 2024P00176$0PERIOD OF PERFORMANCE EXTENSION MODIFICATION TO THE JAVELIN WEAPON SYSTEM ENGINEERING SERVICES CONTRACT
Nov 21, 2023P00173$0ENGINEERING SERVICES CONTRACT SUPPORTING JAVELIN WEAPONS SYSTEM
Nov 21, 2023P00174$0PERIOD OF PERFORMANCE EXTENSION TO ENGINEERING SERVICES CONTRACT SUPPORTING JAVELIN WEAPONS SYSTEM
Jul 28, 2023P00172$-2.4MMODIFICATION TO AWARD BASELINE CONTROL REQUEST FOR LIGHTWEIGHT CLUE AND SPIRAL 3.
Jul 20, 2023P00171$818.2KTHIS MODIFICATION IS A REQUEST FOR EQUITABLE ADJUSTMENT FOR THE OUTDOOR TRAINER PHASE II.
Jul 18, 2023P00168$13.5MAWARDED MODIFICATION TO FUND ENGINEERING SERVICE MEMORANDUM 23.04.01 REV D SPIRAL 3 SYSTEM QUALIFICATION TO DETERMINE ROOT CAUSE AND CORRECTIVE ACTION VERIFICATION.
Jul 14, 2023P00169$0PERIOD OF PERFORMANCE EXTENSION
Jul 14, 2023P00170$0REALIGNMENT OF FISCAL YEAR (FY) 2022 MATERIAL DOLLARS TO FY 2021 MATERIAL DOLLARS TO AWARD AN EQUITABLE ADJUSTMENT MODIFICATION.
May 17, 2023P00167$1.1MMODIFICATION TO AWARD SPIRAL 3 ENGINEERING SERVICE MEMORANDUM 20.04.05.
Mar 31, 2023P00166$0REALIGNMENT FROM LABOR CEILING FISCAL YEAR (FY)23 TO FY20 MATERIAL CEILING AND FY23 TRAVEL CEILING.
Mar 29, 2023P00165$0THIS MODIFICATION WILL CORRECT THE EFFECTIVE OF MODIFICATION P00157 TO 15 AUGUST 2022.
Mar 23, 2023P00164$0JAVELIN ENGINEERING SERVICES FY19-FY20
Mar 9, 2023P00163$1.2MTHIS MODIFICATION WILL EXERCISE OPTION 3 BY FUNDING MATERIAL FOR THE SPIRAL 3 TRANSITION TO PRODUCTION.
Feb 28, 2023P00162$13.5MENGINEERING SERVICE MEMORANDUM 21.04.07 REVISION B - LIGHT WEIGHT COMMAND LAUNCH (LWCLU) SYSTEM QUALIFICATION EXECUTION (SQE). ADDITIONAL SCOPE TO SUPPORT WINTER LIMITED USER TEST (LUT) AND SUMMER OPERATIONAL TESTS (OT) EVENTS.
Feb 22, 2023P00161$0REALIGNMENT FROM LABOR CEILING FISCAL YEAR (FY)23 TO FY21 MATERIAL CEILING AND FY23 TRAVEL CEILING.
Feb 21, 2023P00160$44.9MENGINEERING SERVICE MEMORANDUM 21.04.07 REVISION B - LIGHT WEIGHT COMMAND LAUNCH (LWCLU) TRANSITION TO PRODUCTION (TTP). ADDITIONAL BUILD OF PILOT LINE HARDWARE.
Jan 26, 2023P00159$822.9KTHIS MODIFICATION WILL EXERCISE OPTION 5 BY FUNDING OPTION 5 LABOR AND TRAVEL FOR THE JAVELIN VEHICLE LAUNCHER ELECTRONICS FAILURE REVIEW BOARD.
Jan 19, 2023P00158$-391JAVELIN ENGINEERING SERVICE
Dec 21, 2022P00157$25.2MTHIS MODIFICATION WILL EXERCISE OPTION 5 AND FUND OPTION 5 LABOR, MATERIAL, AND TRAVEL FOR THE JAVELIN OUTDOOR TRAINER SYSTEM QUALIFICATION THROUGH FULL MATERIAL RELEASE.
Dec 20, 2022P00156$1.3MJAVELIN ENGINEERING SERVICE
Dec 12, 2022P00154$0INCORPORATE OY5 SMALL BUSINESS CONTRACTING PLAN AS ATTACHMENT J-0009
Dec 5, 2022P00150$0TRANSFER OF GOVERNMENT FURNISHED PROPERTY (GFP) FROM W31P4Q17D0005 TO W31P4Q19C0038. ADDING LIST OF GFP IN SECTION J AS ATTACHMENT 0018.
Dec 5, 2022P00155$0THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE ON SLINS 2202AY, 2204AC, 2206AC, AND 2206AD.
Nov 28, 2022P00153$0REALIGNING FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUM (ESM) FOR JAVELIN WEAPON SYSTEM.
Sep 21, 2022P00152$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE.
Sep 14, 2022P00149$0REALIGNMENT OF FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUMS FOR THE JAVELIN WEAPON SYSTEM.
Aug 25, 2022P00151$0THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE ON SLINS 2202AW, 2204AB, AND 2206AB.
Jul 29, 2022P00145$-7.5KTHE REQUIREMENT IS AWARDED TO DE-SCOPE LABOR HOURS FOR THE PRODUCT ASSURANCE SUSTAINING SUPPORT ENGINEERING SERVICES MEMORANDUM.
Jul 29, 2022P00147$4.6MTHIS MODIFICATION IS TO AWARD SUSTAINING SUPPORT FOR JAVELIN ENGINEERING SERVICES.
Jul 28, 2022P00146$0THIS MODIFICATION INCREASES THE FISCAL YEAR (FY) 23 CEILING FOR LABOR, MATERIAL, AND TRAVEL ON THE JAVELIN ENGINEERING SERVICE CONTRACT.
Jun 16, 2022P00144$2.2MMODIFICATION PROVIDES SUPPORT TO ADVANCE THE LIGHT WEIGHT COMMAND LAUNCH UNIT (LWCLU) BEYOND THE CRITICAL DESIGN PHASE INTO SYSTEM QUALIFICATION. THIS ESM ADDRESSES SYSTEM QUALIFICATION EXECUTION TASKS FOR THE LWCLU, AS PART OF THE JAVELIN WEAPON SYSTEMMODERNIZATION. THE EFFORT INCLUDES FUNDING FOR THE MATURATION OF TEST EQUIPMENT INTEGRATED PRODUCT TEAM(IPT) LEADS SOFTWARE DEVELOPMENT AND INTEGRATION MATERIAL RECEIPT, MANAGEMENT, AND TECHNICAL DATA PACKAGE REFINEMENT AND RELEASE.
Jun 1, 2022P00143$0MODIFICATION P00143 IS TO REALIGN THE LABOR, TRAVEL, AND MATERIAL CEILING.
May 31, 2022P00142$0THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE AT NO ADDITIONAL COST FOR ENGINEERING SERVICES MEMORANDUM 19.04.06 REV F, COMPONENT QUALIFICATION AND SYSTEM DESIGN.
May 25, 2022P00140$527.5KTHE PURPOSE OF THIS ACTION IS TO REQUEST THAT PROGRAM MANAGEMENT SUSTAINING SUPPORT FUND INCREMENT 2 LABOR HOURS.
May 25, 2022P00141$2.7MMODIFICATION P00141 FUNDS ENGINEERING SERVICES MEMORANDUM 20.04.05C AND EXTENDS THE PERIOD OF PERFORMANCE FOR 20.04.04C AND 20.04.05C.
May 24, 2022P00139$10.0MMODIFICATION TO INCREMENTALLY FUND SPIRAL 3 TRANSITION TO PRODUCTION PHASE 1 LABOR AND TRAVEL.
May 18, 2022P00138$-87.8KTHIS MODIFICATION DE-OBLIGATES FUNDS.
May 13, 2022P00137$0MODIFICATION P00137 IS TO REALIGN THE LABOR, TRAVEL, AND MATERIAL FUNDING CEILING.
Apr 26, 2022P00136$198.8KMODIFICATION P00136 FUNDS ENGINEERING SERVICES MEMORANDUM 22.03.01A AND EXTEND THE PERIOD OF PERFORMANCE FOR 20.05.01 REVISION D AND 21.03.03 REVISION B.
Mar 31, 2022P00133$4.2MMODIFICATION P00133 IS AWARDING ENGINEERING SERVICE MEMORANDUM 21.04.08 REVISION - SPIRAL 3 TRANSITION TO PRODUCTION PHASE 1.
Mar 31, 2022P00134$31.3KTHE PURPOSE OF THIS MODIFICATION IS TO SWAP FUNDING FROM NORWAY FUNDS TO ARMY FUNDS.
Mar 31, 2022P00134$-31.3KTHE PURPOSE OF THIS MODIFICATION IS TO SWAP FUNDING FROM NORWAY FUNDS TO ARMY FUNDS.
Mar 31, 2022P00135$0PERIOD OF PERFORMANCE EXTENSION.
Mar 16, 2022P00132$0REALIGNMENT TO AWARD SPIRAL 3 TRANSITION TO PRODUCTION (INCREMENT 2).
Feb 16, 2022P00131$7.6MMODIFICATION TO AWARD SPIRAL 3 SYSTEM QUALIFICATION COMPLETION INCREMENT 2 AND LIGHT WEIGHT COMMAND LAUNCH UNIT TRANSITION TO PRODUCTION PHASE 1 INCREMENT 2
Feb 10, 2022P00130$0REALIGNMENT OF LABOR AND TRAVEL CEILING FROM FISCAL YEAR 23 TO FISCAL YEAR 21.
Feb 7, 2022P00128$0THE PURPOSE OF W31P4Q-19-C-0038 P00128 IS TO REVISE ATTACHMENT 0013 GOVERNMENT FURNISHED PROPERTY BY REMOVING THE HALT/HASS ENGINEERING SYSTEM FROM THE PROPERTY LIST.
Jan 31, 2022P00127$83.7KTHIS MODIFICATION IS A PERIOD OF PERFORMANCE EXTENSION FOR JAVELIN LIGHT WEIGHT COMMAND LAUNCH UNIT BASIC SKILLS TRAINER DEVELOPMENT VERIFICATION TESTING SUPPORT, AND AN INCREASE IN LABOR HOURS FOR TEST AND EVALUATION MISSION SUPPORT.
Jan 27, 2022P00129$394.6KAWARD OF ENGINEERING SERVICES MEMORANDUM 22.01.04 REV A FOR DIGITAL TECHNOLOGY/INFORMATION ASSURANCE (DT/IA) SUSTAINING. THE EFFORT INCLUDES RISK MANAGEMENT FRAMEWORK REQUIREMENTS AND UPGRADES OF SYSTEM WORKSTATIONS.
Jan 7, 2022P00125$-11.6KTHIS MODIFICATION DE-OBLIGATES FUNDS.
Dec 22, 2021P00126$0MODIFICATION TO ADD CONTRACT DATA REQUIREMENTS LIST(CDRL) AND TWO REPORTS UNDER THE CDRL. EXTEND THE PERIOD OF PERFORMANCE OF 1901AU AND 1904AM.
Dec 15, 2021P00124$1.7MMODIFICATION TO AWARD ENGINEERING SERVICE MEMORANDUM 19.04.07 REV B, JAVELIN SYSTEM QUALIFICATION HARDWARE.
Dec 14, 2021P00122$0THIS MODIFICATION IS TO INCORPORATE CONTRACT DATA REQUIREMENTS LIST A028 AND THE REQUIREMENT FOR THE GUIDANCE THERMAL TEST REPORT AND AUTO GUIDANCE FINAL TEST REPORT AT NO ADDITIONAL COST AS A RESULT OF ENGINEERING SERVICES MEMORANDUM 20.04.07A.
Dec 9, 2021P00121$0THIS MODIFICATION IS A PERIOD OF PERFORMANCE EXTENSION FOR ENGINEERING SERVICES MEMORANDUM 19.04.06 REV E, COMPONENT QUALIFICATION AND SYSTEM DESIGN.
Dec 9, 2021P00123$0REALIGNMENT OF LABOR AND MATERIAL FUNDING CEILING FROM FISCAL YEAR (FY) 23 TO FY 19.
Dec 3, 2021P00120$0MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR ENGINEERING SERVICE MEMORANDUM 21.02.05B FOR SOFTWARE VERSION 11.08 REPROGRAMMING AND INCORPORATE DFARS CLAUSE 252.223-7999, ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (DEVIATION 2021-O0009).
Oct 27, 2021P00119$104.8KFUNDING FOR OPTION 4: LABOR, MATERIAL, AND TRAVEL
Oct 27, 2021P00119$713.4KFUNDING OPTION 4: LABOR, TRAVEL, AND MATERIAL
Oct 18, 2021P00117$-121.2KDEOBLIGATION
Oct 18, 2021P00117$-65.4KDEOBLIGATION
Oct 18, 2021P00118$0PERIOD OF PERFORMANCE EXTENSION FOR ENGINEERING SERVICE MEMORANDUM 21.03.03 REVIEW FOR SECOND SOURCE ENGINEERING CHANGE PROPOSAL.
Sep 28, 2021P00114$1.5MAWARDING ENGINEERING SERVICES MEMORANDUM 22.05.01 FOR JAVELIN OUTDOOR TRAINER SYSTEM-STRYKER EVALUATION UNITS.
Sep 28, 2021P00115$97.3KOPTION 3-FUNDING FOR LABOR AND TRAVEL
Sep 28, 2021P00116$0PERIOD OF PERFORMANCE EXTENSION FOR ENGINEERING SERVICE MEMORANDUMS 21.01.02B AND 21.03.01B.
Sep 23, 2021P00112$1.2MOPTION 4 FUNDING: LABOR, MATERIAL, AND TRAVEL
Sep 23, 2021P00113$0PERIOD OF PERFORMANCE EXTENSION AND CONTRACT DATA REQUIREMENTS LIST (CDRL) CHANGE.
Sep 16, 2021P00111$0REALIGNMENT OF FUNDING CEILING TO AWARD ENGINEERING SERVICES MEMORANDUM 21.05.01A.
Sep 14, 2021P00110$0CORRECTION TO P00104 ENGINEERING SERVICE MEMORANDUM NUMBERS ON 2202AA AND 2202AM.
Aug 23, 2021P00109$0PERIOD OF PERFORMANCE EXTENSION FOR SPIRAL 3 COMPONENT QUALIFICATION AND SYSTEM DESIGN REVIEW #2.
Aug 17, 2021P00108$3.1MFUNDING FOR OPTION 2 LABOR AND MATERIAL
Aug 10, 2021P00107$0REALIGNMENT OF LABOR AND MATERIAL FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUM 20.04.07 REVISION A - SPIRAL 3 SYSTEM QUALIFICATION.
Aug 6, 2021P00106$-899DE-OBLIGATION
Jul 30, 2021P00105$0MODIFICATION TO EXTEND THE ORDERING PERIOD DUE TO PERFORMANCE EXTENSION IN MODIFICATION P00101.
Jul 29, 2021P00104$247.7KAWARD ENGINEERING SERVICE MEMORANDUMS FOR SUSTAINING SUPPORT FOR CONFIGURATION MANAGEMENT AND DATA MANAGEMENT, TEST AND EVALUATION MISSION SUPPORT, PROGRAM MANAGEMENT SUSTAINING SUPPORT, AND DIGITAL TECHNOLOGY AND INFORMATION ASSURANCE SUSTAINING.
Jul 29, 2021P00104$2.2MAWARD ENGINEERING SERVICE MEMORANDUMS FOR SUSTAINING SUPPORT FOR CONFIGURATION MANAGEMENT AND DATA MANAGEMENT, TEST AND EVALUATION MISSION SUPPORT, PROGRAM MANAGEMENT SUSTAINING SUPPORT, AND DIGITAL TECHNOLOGY AND INFORMATION ASSURANCE SUSTAINING.
Jul 28, 2021P00103$2.4MFUNDING FOR OPTION 2: LABOR, TRAVEL, AND MATERIAL
Jul 27, 2021P00102$6.7MMODIFICATION TO AWARD ENGINEERING SERVICE MEMORANDUM 21.04.08 FOR TEST EQUIPMENT MATURATION ACTIVITIES SUPPLIER READINESS ACTIVITIES INCLUDING THE COMPLETION OF NON-RECURRING ENGINEERING ACTIVITIES UPDATES TO AND MATURATION OF THE FINAL CONFIGURATION TEST SET.
Jul 23, 2021P00101$0PERIOD OF PERFORMANCE EXTENSION
Jul 22, 2021P00100$0REALIGNMENT OF LABOR, MATERIAL, AND TRAVEL FUNDING CEILING TO AWARD ENGINEERING SERVICE MEMORANDUMS 21.04.08 AND 20.04.05 REV B.
Jul 15, 2021P00099$5.0MREALIGNMENT OF LABOR AND TRAVEL. FUNDING OF ENGINEERING SERVICE MEMORANDUM 21.04.07 FOR LIGHT WEIGHT COMMAND LAUNCH UNIT TRANSITION-TO-PRODUCTION.
Jul 15, 2021P00099$3.6MREALIGNMENT OF LABOR AND TRAVEL. FUNDING OF ENGINEERING SERVICE MEMORANDUM 21.04.07 FOR LIGHT WEIGHT COMMAND LAUNCH UNIT TRANSITION-TO-PRODUCTION.
Jul 14, 2021P00098$0ADMINISTRATIVE CDRL CHANGE.
Jul 1, 2021P00097$4.6MFUNDING FOR OPTION 3: LABOR AND TRAVEL
Jun 24, 2021P00096$31.3KFUNDING FOR OPTION 3 LABOR
Jun 15, 2021P00093$0TRANSFER OF GOVERNMENT FURNISHED PROPERTY FROM W31P4Q-17-D-0005 TO W31P4Q-19-C-0038. THE LIST OF TRANSFERRED PROPERTY IS IN ATTACHMENT 0016.
Jun 15, 2021P00094$-356.4KDE-SCOPING AND DE-OBLIGATING ENGINEERING SERVICE MEMORANDUM 20.03.02 ADDING ATTACHMENT 0017 IN SECTION J OF THE CONTRACT EXTENDING THE PERIOD OF PERFORMANCE FROM 30JUN2021 TO 22SEP2021.
Jun 15, 2021P00095$0PERIOD OF PERFORMANCE EXTENSION
Jun 9, 2021P00092$-318.5KDE-OBLIGATION OF FUNDS
Jun 9, 2021P00092$-4.4KDE-OBLIGATION OF FUNDS
May 20, 2021P00091$98.4KFUNDING FOR OPTION 3: LABOR
May 6, 2021P00090$0REALIGNMENT TO FUND LIGHT WEIGHT COMMAND LAUNCH UNIT CONFIGURATION AND BUILD INITIATION.
May 6, 2021P00090$379.1KREALIGNMENT TO FUND LIGHT WEIGHT COMMAND LAUNCH UNIT CONFIGURATION PROCUREMENT AND BUILD INITIATION
Apr 30, 2021P00089$3.1MFUNDING FOR OPTION3: LABOR, MATERIAL, AND TRAVEL
Apr 16, 2021P00088$0PERIOD OF PERFORMANCE EXTENSION ONLY
Apr 14, 2021P00087$295.4KP00087 MODIFICATION IS FOR THE DEVELOPMENT OF SOFTWARE FOR THE JAVELIN MISSILE TO ADDRESS SYSTEMS ENGINEERING AND SOFTWARE TASK AS PART OF THE MISSILE MODERNIZATION.
Apr 2, 2021P00086$2.4MMODIFICATION TO AWARD ENGINEERING SERVICE MEMORANDUM 19.04.07 REV A JAVELIN SYSTEM QUALIFICATION HARDWARE FOR FABRICATION, VALIDATION AND VERIFICATION OF TEST EQUIPMENT TO SUPPORT SYSTEM QUALIFICATION HARDWARE FABRICATION AND ACCEPTANCE TESTING.
Mar 24, 2021P00085$380.6KMODIFICATION TO AWARD AN ENGINEERING SERVICE MEMORANDUM FOR 1,984 LABOR HOURS FOR PROGRAM MANAGEMENT SUSTAINING SUPPORT.
Mar 15, 2021P00083$0PERIOD OF PERFORMANCE EXTENSION
Mar 15, 2021P00084$55.1KMODIFICATION AWARDED TO SUPPORT THE ENGINEERING SERVICES MEMORANDUM (ESM) 21.03.03 FOR WARHEAD ENGINEERING CHANGE PROPOSAL REVIEW.
Mar 4, 2021P00082$267.0KREALIGNMENT OF LABOR CEILING AND AWARD OF ENGINEERING SERVICE MEMORANDUM 20.04.04A.
Feb 25, 2021P00081$0PERIOD OF PERFORMANCE EXTENSION
Feb 17, 2021P00080$4.2MFUNDING FOR OPTION 3 LABOR
Feb 17, 2021P00080$15.0KFUNDING FOR MATERIAL AND TRAVEL
Feb 10, 2021P00079$4.7MFUNDING FOR OPTION 3 LABOR
Jan 28, 2021P00078$217.2KFUNDING FOR OPTION 3 LABOR, MATERIAL, AND TRAVEL
Jan 21, 2021P00077$0ADMIN CHANGE TO PERIOD OF PERFORMANCE
Jan 15, 2021P00075$692.8KFUNDING FOR OPTION 3 LABOR
Jan 14, 2021P00076$0PERIOD OF PERFORMANCE EXTENSION.
Dec 22, 2020P00074$150.1KCEILING REALIGNMENT AND FUNDING FOR ENGINEERING SERVICE MEMORANDUM (ESM) 20.02.04 REV A FOR MODULAR HANDGRIP BATTERY SUPPORT.
Dec 22, 2020P00074$0FUNDING FOR OPTION 3 LABOR.
Dec 18, 2020P00073$0MODIFICATION IS FOR A PERIOD OF PERFORMANCE EXTENSION AND TO RECORD THE TRANSFER OF CONTRACTOR ACQUIRED PROPERTY (CAP) FROM CONTRACT W31P4Q-13-C-0186 TO CONTRACT W31P4Q-19C-0038 AS GOVERNMENT FURNISHED PROPERTY (GFP).
Dec 16, 2020P00072$1.1MREALIGNMENT AND FUNDING FOR ENGINEERING SERVICE MEMORANDUM 20.04.09A.
Dec 16, 2020P00072$628.7KFUNDING FOR OPTION 2 LABOR AND MATERIAL
Dec 11, 2020P00070$0ADMINISTRATIVE UPDATE TO CONTRACTOR MANPOWER REPORTING LANGUAGE.
Nov 25, 2020P00071$305.8KINCREMENTAL FUNDING FOR ENGINEERING SYSTEM 20.04.10C
Nov 10, 2020P00069$-205.9KDE-OBLIGATION OF FUNDING ON SPIRAL 3 G MODEL COMPONENT&ENGINEERING FLIGHT TESTING, SYSTEM ENGINEERING DOCUMENTS.
Oct 30, 2020P00068$1.9MREALIGNMENT OF LABOR HOURS AND DOLLARS CEILING AND FUNDING OF ENGINEERING SERVICES MEMORANDUM 20.04.08A
Oct 30, 2020P00068$0REALIGNED LABOR CEILING DOLLARS AND HOURS TO COMPLETE ENGINEERING SERVICE MEMORANDUM (ESM) 20.04.08A. ALSO, FUNDED ESM 20.04.08A.
Oct 22, 2020P00067$-3.8KDE-OBLIGATION OF TRAVEL FUNDS FROM OPTION 2
Oct 13, 2020P00066$92.5KENGINEERING SERVICES MEMORANDUM (ESM) 21.02.01 FOR THE RECONDITIONING OF 20 COMMAND LAUNCH UNITS (CLUS).
Sep 24, 2020P00064$-702.9KDE-SCOPE AND DE-OBLIGATION OF ESM 19.04.02
Sep 24, 2020P00065$691.1KFUNDING FOR OPTION 2 MATERIAL AND OPTION 3 LABOR
Sep 17, 2020P00062$0TRANSFERRING PROPERTY FROM W31P4Q-13-C-0186 AND W31P4Q-10-C-0263 TO CONTRACT W31P4Q-19-C-0038 FOR CONTINUED USE BY THE JAVELIN PROGRAM.
Sep 17, 2020P00063$929.5KFUNDING FOR ENGINEERING SERVICE MEMORANDUM (ESM) 20.03.02A OBSOLESCENCE SOLUTIONS.
Sep 14, 2020P00059$725.6KAWARD OF ENGINEERING SERVICES MEMORANDUM (ESM) 20.05.01 REV A TO IMPLEMENT MODIFICATIONS TO REDUCE PROCUREMENT LEAD TIMES.
Sep 3, 2020P00060$0POP EXTENSION ONLY
Sep 2, 2020P00058$0ADMINISTRATIVE MODIFICATION TO RENUMBER SLINS
Aug 31, 2020P00061$0ADDITION OF FAR CLAUSES TO MEET REQUIREMENT OF SECTION 889 REGULATION.
Aug 12, 2020P00057$1.9MFUNDING FOR OPTION 3: MATERIALS
Aug 10, 2020P00056$-86.4KENGINEERING SERVICE MEMORANDUM 19.05.01 REV A MODIFICATION TO DE-SCOPE AND DE-OBLIGATE ENGINEERING SERVICE MEMORANDUM 19.05.01.
Jul 29, 2020P00055$585.5KJAVELIN ENGINEERING SERVICES CONTRACT SUSTAINMENT FOR FY21
Jul 29, 2020P00055$2.0MJAVELIN ENGINEERING SERVICES CONTRACT SUSTAINMENT FOR FY21
Jul 23, 2020P00054$1.3MFUNDING FOR OPTION 2: MATERIALS
Jul 17, 2020P00052$0MODIFICATION FOR REALIGNMENT OF FUNDING
Jul 15, 2020P00051$3.3MFUNDING FOR OPTION 2: LABOR AND MATERIAL
Jul 15, 2020P00053$0REVISING CONTRACT LINE ITEM NUMBERS (CLINS) DUE TO AN ISSUE WITH THE CONTRACT WRITING SYSTEM.
Jul 1, 2020P00050$4.1MFUNDING FOR OPTION 2: LABOR AND MATERIAL
Jun 26, 2020P00049$4.4MAWARDING ENGINEERING SYSTEM MEMORANDUM (ESM) 19.04.06B SPIRAL 3 COMPONENT QUALIFICATION AND SYSTEM DESIGN REVIEW #2
Jun 19, 2020P00041$0MODIFICATION TO MOVE CONTRACTOR MANPOWER REPORTING (CMR) FROM AN ELIN TO CLIN, CORRECT 2102, AND EARNED VALUE MANAGEMENT (EVM) APPLICABILITY DETERMINATION ATTACHMENT.
Jun 3, 2020P00048$7.1MFUNDING FOR OPTION 2 LABOR
May 29, 2020P00047$13.8MAWARD OF ENGINEERING SYSTEM MEMORANDUM (ESM) 20.04.07 SPIRAL 3 SYSTEMS QUALIFICATION.
May 27, 2020P00045$0MODIFICATION TO INCREASE THE LABOR DOLLARS CEILING AND LABOR HOURS.
May 27, 2020P00046$0ADMINISTRATIVE MODIFICATION FOR A PERIOD OF PERFORMANCE EXTENSION
May 7, 2020P00046$0ADMINISTRATIVE MODIFICATION FOR A PERIOD OF PERFORMANCE EXTENSION
May 1, 2020P00044$454.1KFUNDING FOR OPTION 2: LABOR AND MATERIAL
Apr 22, 2020P00042$346.7KFUNDING FOR OPTION2: LABOR, MATERIAL, AND TRAVEL
Apr 15, 2020P00040$1.6MENGINEERING SERVICES MEMORANDUM (ESM) 20.04.05 SPIRAL 3 ATK LTA SOURCING
Apr 15, 2020P00043$0ADMINISTRATIVE MODIFICATION TO REMOVE SLIN/CLIN LANGUAGE.
Apr 8, 2020P00038$0INCORPORATING TABLE 1, PERFORMANCE STANDARDS, FROM THE QASP INTO THE CONTRACT.
Apr 8, 2020P00038$518.7KENGINEERING SERVICE MEMORANDUM (ESM) 20.01.03 REV B FOR SUSTAINING SUPPORT (LABOR AND TRAVEL).
Feb 28, 2020P00037$4.7MFUNDING FOR OPTION 2: LABOR AND TRAVEL
Feb 28, 2020P00037$613.6KFUNDING FOR OPTION 2: LABOR AND MATERIAL
Feb 18, 2020P00036$179.0KFUNDING FOR OPTION 2 LABOR.
Feb 7, 2020P00035$0INCORPORATE SECURITY CLASSIFICATION GUIDE AS ATTACHMENT 0011.
Feb 6, 2020P00034$237.0KFUNDING FOR OPTION 2 LABOR AND TRAVEL.
Jan 30, 2020P00031$253.6KENGINEERING SYSTEM MEMORANDUM 20.03.01 DOORS UPDATE AND SUSTAINING
Jan 30, 2020P00032$54.4KMODIFICATION TO PROVIDE STOCKPILE RELIABILITY PROGRAM FLIGHT TEST AND TEAR DOWN/DISASSEMBLY SUPPORT.
Jan 28, 2020P00030$641.8KINCREMENTAL FUNDING FOR OPTION 2 MATERIAL, LABOR, AND TRAVEL.
Jan 20, 2020P00033$0ENGINEERING SYSTEM MEMORANDUM ADMINISTRATIVE CORRECTION TO PERIOD OF PERFORMANCE
Jan 9, 2020P00029$0MODIFICATION TO INCORPORATE THE DD254 (CONTRACT SECURITY CLASSIFICATION SPECIFICATION) TO INCLUDE ITEM 13 - SECURITY GUIDANCE (CONTINUATION SHEET).
Dec 4, 2019P00027$12.1KINCREMENTAL FUNDING FOR THE SUSTAINING JAVELIN ENGINEERING SUPPORT TO COVER TRAVEL.
Dec 3, 2019P00028$0PERIOD OF PERFORMANCE EXTENSION FOR FABRICATION, ASSEMBLY,AND INTEGRATION UNDER ENGINEERING SYSTEMS MEMORANDUM (ESM) 19.02.05 REVISION A
Sep 26, 2019P00026$830.4KFUNDING ENGINEERING SYSTEM MEMORANDUM (ESM) 20.04.03
Sep 25, 2019P00025$888.2KREALIGNMENT OF FUNDING FROM OPTION 2 TO OPTION 1 AND ADDITIONAL FUNDING FOR OPTION 1 TO PROCURE ENGINEERING SERVICE MEMORANDUM 19.04.01 REVISION B - PROJECT SPIRAL 3-G MODEL COMPONENT&ENGINEERING FLIGHT TESTING.
Sep 24, 2019P00024$79.1KINCREMENTAL FUNDING FOR ENGINEERING SERVICES MEMORANDUM 20.02.02 REV A
Sep 13, 2019P00020$0PERIOD OF PERFORMANCE REVISION DUE TO INCREMENTAL FUNDING AND CHANGE IN ORIGINAL SCHEDULE.
Sep 13, 2019P00023$253.3KEXERCISING OPTION 2 ESM 20.01.0320.01.0120.02.0220.04.02

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.