Federal contract award
W50S6Y25CA001
THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, SUPERVISION, AND QUALITY CONTROL NECESSARY, AS SPECIFIED IN SECTION 01 10 00 SUMMARY OF WORK TO CONSTRUCT THE F-35 CWF, 125 FW, JACKSONVILLE, FL.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W7M2 USPFO ACTIVITY FLANG 125 |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1EB — CONSTRUCTION OF MAINTENANCE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $26.1M |
| Current contract value | $26.1M |
| Potential contract value / ceiling | $27.3M |
| Start date | Jun 30, 2025 |
| Current end date | Jan 28, 2028 |
| Potential end date | Jan 28, 2028 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | P00005 | $528.6K | F-35 CONSTRUCT COMBINED WEAPONS FACILITY (CWF) |
| Jan 23, 2026 | P00004 | $6.9M | F-35 CONSTRUCT COMBINED WEAPONS FACILITY (CWF) |
| Jan 17, 2026 | P00003 | $431.5K | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, SUPERVISION, AND QUALITY CONTROL NECESSARY, AS SPECIFIED IN SECTION 01 10 00 SUMMARY OF WORK TO CONSTRUCT THE F-35 CWF, 125 FW, JACKSONVILLE, FL. |
| Sep 15, 2025 | P00002 | $40.3K | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, SUPERVISION, AND QUALITY CONTROL NECESSARY, AS SPECIFIED IN SECTION 01 10 00 SUMMARY OF WORK TO CONSTRUCT THE F-35 CWF, 125 FW, JACKSONVILLE, FL. |
| Aug 1, 2025 | P00001 | $55.3K | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, SUPERVISION, AND QUALITY CONTROL NECESSARY, AS SPECIFIED IN SECTION 01 10 00 SUMMARY OF WORK TO CONSTRUCT THE F-35 CWF, 125 FW, JACKSONVILLE, FL. |
| Jun 4, 2025 | 0 | $18.0M | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, SUPERVISION, AND QUALITY CONTROL NECESSARY, AS SPECIFIED IN SECTION 01 10 00 SUMMARY OF WORK TO CONSTRUCT THE F-35 CWF, 125 FW, JACKSONVILLE, FL. |
Estimated positioning window
Jan 28, 2027 – Jul 28, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-01-28 (453 days from calculation)
- +25 points
- 2 historical awards in this buyer and category group
- +10 points
- 6 recorded award transactions
- +10 points
- Latest award action: 2026-06-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.