Federal contract award

W50S7825CA003

THE TEXAS ARMY NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE PURLIN BEARING UNIT METAL ROOF COVERING, THE REPLACEMENT OF 3 HVAC ROOF TOP UNITS, AND THE REPAIR OF LEAKING SINGLE-PLY MEMBRANE ROOF LOCATED ON CAMP SWIFT TRAINING CENTER.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW7N2 USPFO ACTIVITY TXANG 149
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$736.9K
Current contract value$736.9K
Potential contract value / ceiling$736.9K
Start dateSep 30, 2025
Current end dateSep 30, 2026
Potential end dateSep 30, 2026
Latest award activityJun 9, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00002$116.5KTHE TEXAS ARMY NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE PURLIN BEARING UNIT METAL ROOF COVERING, THE REPLACEMENT OF 3 HVAC ROOF TOP UNITS, AND THE REPAIR OF LEAKING SINGLE-PLY MEMBRANE ROOF LOCATED ON CAMP SWIFT TRAINING CENTER.
Mar 19, 2026P00001$0THE TEXAS ARMY NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE PURLIN BEARING UNIT METAL ROOF COVERING, THE REPLACEMENT OF 3 HVAC ROOF TOP UNITS, AND THE REPAIR OF LEAKING SINGLE-PLY MEMBRANE ROOF LOCATED ON CAMP SWIFT TRAINING CENTER.
Sep 26, 20250$620.4KTHE TEXAS ARMY NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE PURLIN BEARING UNIT METAL ROOF COVERING, THE REPLACEMENT OF 3 HVAC ROOF TOP UNITS, AND THE REPAIR OF LEAKING SINGLE-PLY MEMBRANE ROOF LOCATED ON CAMP SWIFT TRAINING CENTER.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.