Federal contract award

W50S7W25CA008

SECURITY LIGHTING - INSTALLATION AND REPAIRS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW7M7 USPFO ACTIVITY INANG 122
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCJ063 — Maintenance, Repair and Rebuilding of Equipment: Alarm, Signal, and Security Detection Systems
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$395.6K
Current contract value$395.6K
Potential contract value / ceiling$395.6K
Start dateOct 21, 2025
Current end dateJul 3, 2026
Potential end dateJul 3, 2026
Latest award activityMay 12, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 12, 2026P00005$1.5KINSTALLATION OF SECURITY LIGHTING POLES WITH ELECTRICAL INFRASTRUCTURE, FOUNDATIONS, CONDUIT SYSTEMS, AND UTILITY COORDINATION ADJACENT TO RAILROAD TRACKS AND FLIGHTLINE TO ENHANCE PERIMETER SECURITY AND OPERATIONAL SAFETY.
Apr 30, 2026P00004$12.0KINSTALLATION OF SECURITY LIGHTING POLES WITH ELECTRICAL INFRASTRUCTURE, FOUNDATIONS, CONDUIT SYSTEMS, AND UTILITY COORDINATION ADJACENT TO RAILROAD TRACKS AND FLIGHTLINE TO ENHANCE PERIMETER SECURITY AND OPERATIONAL SAFETY.
Feb 12, 2026P00003$16.0KSECURITY LIGHTING - INSTALLATION AND REPAIRS UNFORESEEN SITE CONDITIONS: NEW 110V CIRCUIT REQUIRED FOR CRASH BARRIER, ADDITIONAL 4FT SLEEVE NEEDS RAN UNDER ASPHALT TO BUILDING. UNEXPECTED 50 LF OF BURIED CONCRETE ENCOUNTERED DURING TRENCHING.
Jan 14, 2026P00002$0SECURITY LIGHTING - INSTALLATION AND REPAIRS UNFORESEEN SITE CONDITIONS: NEW 110V CIRCUIT REQUIRED FOR CRASH BARRIER, ADDITIONAL 4FT SLEEVE NEEDS RAN UNDER ASPHALT TO BUILDING. UNEXPECTED 50 LF OF BURIED CONCRETE ENCOUNTERED DURING TRENCHING.
Oct 1, 2025P00001$0SECURITY LIGHTING - INSTALLATION AND REPAIRS
Sep 11, 20250$366.0KSECURITY LIGHTING - INSTALLATION AND REPAIRS

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.