Federal contract award
W519TC23F0191
FORT POLK TASK ORDER TO PROVIDE CONTRACT SERVICES IN SUPPORT OF THE ARMY SUSTAINMENT COMMAND (ASC) - SHALL SUPPLY THE FUNCTIONS REQUIRED FOR LOGISTICS SUPPORT SERVICES INCLUDING MAINTENANCE, SUPPLY, AND TRANSPORTATION FUNCTIONAL AREAS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RI |
| NAICS | 561210 — Facilities Support Services |
| PSC | J025 — Maintenance, Repair and Rebuilding of Equipment: Vehicular Equipment Components |
| Parent award / vehicle | W52P1J17G0091 |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $153.6M |
| Current contract value | $153.6M |
| Potential contract value / ceiling | $153.6M |
| Start date | Apr 26, 2023 |
| Current end date | May 17, 2027 |
| Potential end date | May 17, 2027 |
| Latest award activity | May 26, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 87 of 87 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 26, 2026 | P00086 | $1.6M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND UPDATE ATTACHMENTS ON FPLA EAGLE TASK ORDER. |
| May 14, 2026 | P00085 | $8.4M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR 3 FOR FPLA EAGLE TASK ORDER. |
| May 13, 2026 | P00084 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ASC PASSBACK INCREASE, A/DACG INCREASE, AND OY3 RTUS. |
| May 6, 2026 | P00083 | $691.3K | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH RTU 26-07 AND PROVIDE REALIGNMENTS TO FPLA EAGLE TASK ORDER. |
| Apr 20, 2026 | P00082 | $105.1K | REALIGN FUNDS TO CORRECT IDOC ERROR. |
| Apr 9, 2026 | P00081 | $478.9K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, DEOBLIGATIONS, AND REALIGNMENTS TO FPLA EAGLE TASK ORDER. |
| Mar 19, 2026 | P00080 | $1.5M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CTC T2COM FSE ABLS, ESTABLISH NEW CLINS, AND PROVIDE INCREMENTAL FUNDING. |
| Mar 2, 2026 | P00079 | $6.6M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO FPLA EAGLE TASK ORDER. |
| Feb 26, 2026 | P00078 | $133.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE MDRS DESCOPE, 10TH MTN NEW REQUIREMENT, DEOBLIGATIONS, AND INCREMENTAL FUNDING. |
| Jan 30, 2026 | P00077 | $50.0K | THE PURPOSE OF THIS MOD IS TO PROVIDE FUNDING FOR THE FPLA EAGLE TASK ORDER. |
| Jan 14, 2026 | P00076 | $178.3K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO FPLA EAGLE TASK ORDER. |
| Jan 7, 2026 | P00075 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO FPLA EAGLE TASK ORDER. |
| Dec 2, 2025 | P00074 | $8.1M | THE PURPOSE OF THIS ACTION IS TO PROVIDE FY26 FUNDING TO SUPPORT OY2. |
| Oct 30, 2025 | P00073 | $3.4M | INCREMENTAL FUNDING FY26. |
| Sep 30, 2025 | P00072 | $3.4M | THE PURPOSE OF THIS MOD IS FUNDING ACTION FOR FORT POLK, LA. EAGLE |
| Sep 18, 2025 | P00071 | $1.4M | THE PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FUNDING TO FPLA EAGLE TASK ORDER. |
| Sep 8, 2025 | P00070 | $1.4M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Aug 15, 2025 | P00069 | $541.2K | THE PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FUNDING. |
| Aug 1, 2025 | P00068 | $414.9K | THE PURPOSE OF THIS MOD IS TO PROVIDE CHANGE ORDER FOR 3-10TH ABLS CLS SERVICES AND ASC PASSBACK DESCOPE. |
| Jul 24, 2025 | P00067 | $7.0K | THE PURPOSE OF THIS MOD IS TO CHANGE THE PAY OFFICE BACK TO INDY. |
| Jul 22, 2025 | P00066 | $1.7M | THE PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FUNDING AND CHANGE SITE NAME VIA PWS UPDATE. |
| Jun 25, 2025 | P00065 | $1.8K | THE PURPOSE OF THIS MOD IS TO REOBLIGATE FUNDING TO 1003CB TO FIX A USG SYSTEM ERROR. |
| Jun 18, 2025 | P00064 | $-281.0K | THE PURPOSE OF THIS MOD IS TO PROVIDE FUNDING, DEOBS, AND A/DACG REQUIREMENTS FOR OY2. |
| Jun 9, 2025 | P00063 | $-797.3K | THE PURPOSE OF THIS MOD IS TO INCORPORATE OY2 RTUS AND PROVIDE DEOBLIGATIONS TO FIX ASC SYSTEMS. |
| May 28, 2025 | P00062 | $9.6M | FORSCOM INCREMENTAL FUNDING FOR FT. JOHNSON EAGLE TASK ORDER. |
| May 17, 2025 | P00061 | $5.3M | THIS MOD SERVES TO EXERCISE OPTION YEAR 2 (OY2) AT FJLA UNDER THE EAGLE/FORT JOHNSON, LA. |
| Apr 16, 2025 | P00060 | $974.0K | THE PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FUNDING AND FUND RTU 25-07. |
| Apr 2, 2025 | P00059 | $34.8K | THE PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTALLY FUNDING TO THE FJLA TASK ORDER. |
| Mar 14, 2025 | P00058 | $958.9K | THE PURPOSE OF THIS MOD IS TO ESTABLISH AND INCREMENTALLY FUND CLIN 1008HA, ADJUST THE POP FOR CLIN 1008KA, FUNDS REALIGNMENT AND CHANGE THE TITLE OF ATTACHMENT 0001 |
| Feb 6, 2025 | P00057 | $-180.0K | THE PURPOSE OF THIS MODIFICATION P00057 TO CONTRACT W52P1J-17-G-0091 TASK ORDER W519TC23F0191 IS TO DEOBLIGATE FUNDS AND DELETE CLIN 1006SC TO FIX USG SYSTEMS ERROR. THIS ACTION IS WITHIN SCOPE OF THE CONTRACT. |
| Jan 31, 2025 | P00056 | $3.9M | INCREMENTAL FUNDING FOR OY1 POP FOR EAGLE FJLA TASK ORDER IN SUPPORT OF ASC AND FORSCOM REQUIREMENTS. |
| Dec 23, 2024 | P00055 | $181.3K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND ADMINISTRATIVE CHANGES. |
| Dec 12, 2024 | P00054 | $235.1K | OPFOR FORT LIBERTY NEW REQUIREMENT, FY25 INCREMENTAL FUNDING, AND ADMIN CHANGES. |
| Nov 26, 2024 | P00053 | $7.2M | BUILD FY25 CONTINUATION CLINS FOR INCREMENTAL FUNDING, REVISE PWS AND CD-02. |
| Oct 9, 2024 | P00052 | $635.0K | INCREMENTALLY FUNDS THE RTU 25-02 REQUIREMENT DURING THE OY1 POP WITH FY24 FUNDS AND UPDATE EXHIBIT G - GOVERNMENT FURNISHED EQUIPMENT WITH NEWEST VERSION DATED 01OCT24. |
| Sep 26, 2024 | P00050 | $74.0K | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND MDRS SUPPLY LABOR CLIN. |
| Sep 26, 2024 | P00051 | $20.9K | THE PURPOSE OF THIS MODIFICATION IS TO RE-OBLIGATE FUNDS TO RTU 23-08.5 TO FIX A USG SYSTEMS ERROR. |
| Sep 24, 2024 | P00049 | $25.1K | THE PURPOSE OF THIS MODIFICATION IS TO FIX CLIN ISSUES FROM MOD P00049. |
| Sep 18, 2024 | P00048 | $808.9K | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND FORSCOM CLINS AND DEOBLIGATE FY24 FUNDS. |
| Aug 27, 2024 | P00047 | $405.1K | THE PURPOSE OF THIS MOD IS TO INCREMENTALLY FUND 3-10 MTN UME MAINTENANCE REQUIREMENT. |
| Aug 22, 2024 | P00046 | $3.7M | THE PURPOSE OF THIS MOD IS TO DEFINITIZE 3-10 MTN UME MAINTENANCE REQUIREMENT, FULLY FUNDED RTU 24-11, AND INCREMENTALLY FUND EAGLE/FJLA TASK ORDER. |
| Aug 2, 2024 | P00045 | $6.2M | THE PURPOSE OF THIS MOD IS TO INCREMENTALLY FUND EAGLE/FJLA TASK ORDER. |
| Jul 25, 2024 | P00044 | $2.2M | PURPOSE OF THIS MOD IS TO PROVIDE FUNDING FOR THE RTU 24-10 AND INCREMENTAL FY24 OMA FUNDING TO ADDRESS A 12 JULY 2024 AMENTUM LOF AT EAGLE/FORT JOHNSON, LA. |
| Jul 17, 2024 | P00043 | $0 | PURPOSE OF THIS MOD IS TO UPDATE THE FJLA PWS, ANNEX A AND ANNEX B UNDER THE EAGLE/FORT JOHNSO, LA TASK ORDER. |
| Jul 10, 2024 | P00042 | $-257.6K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 INCREMENTAL FUNDING TO PARTIALLY SATISFY AN AMENTUM LOF 24 JUNE 24 AND DE-OBLIGATE EXCESS FY23 & FY24 ULOS AT EAGLE/FORT JOHNSON, LA. |
| Jul 1, 2024 | P00041 | $-562.2K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 INCREMENTAL FUNDING TO PARTIALLY SATISFY A AMENTUM LOF AND DE-OBLIGATE EXCESS FY23 & FY24 ULOS AT EAGLE/FORT JOHNSON, LA. |
| Jun 17, 2024 | P00039 | $547.5K | PURPOSE OF THIS MOD IS TO INCORPORATE THE 4SFAB TRAINING SUPPORT AND PROVIDE FY24 INCREMENTAL FUNDING TO PARTIALLY SATISFY A 20 MAY 24 LOF AT EAGLE/FORT JOHNSON, LA. |
| Jun 11, 2024 | P00038 | $0 | PURPOSE OF THIS MOD IS TO INCORPORATE THE MDRS R2E CHANGES AT EAGLE/FORT JOHNSON, LA. |
| Jun 7, 2024 | P00037 | $316.7K | PURPOSE OF THIS MOD IS TO ADD THE 3-10 CLS EXTENSION AND NON-CTC RANGE G-3 INCREMENTAL FUNDING AT EAGLE/FORT JOHNSON, LA. |
| May 30, 2024 | P00036 | $94.7K | PURPOSE OF THIS MOD IS TO ADD THE ASC A/DACG OPS, CONTAINER YARDS OPS, AND DEPLOYMENT READINESS TRANSPORTATION REQUIREMENTS IN SUPPORT OF THE 3-10 MTN EUCOM DEPLOYMENT. MOD ALSO PROVIDES NEC ABLS INC FUNDING AT EAGLE/FORT JOHNSON, LA. |
| May 20, 2024 | P00040 | $2.8M | PURPOSE OF THIS MOD IS TO INCORPORATE THE 3-10 MTN UME MAINTENANCE REQUIREMENT AS A UCO AT EAGLE/FORT JOHNSON, LA. |
| May 16, 2024 | P00035 | $748.6K | PURPOSE OF THIS MOD IS TO ADD THE 3-10 ABLS CLS MAINTENANCE REQUIREMENT AND ADD FUNDS FOR THE RTU 24-08 AT EAGLE/FORT JOHNSON, LA. |
| May 14, 2024 | P00034 | $15.1M | PURPOSE OF THIS MOD IS TO EXECUTE OY1 AT EAGLE/FORT JOHNSON, LA. |
| Apr 24, 2024 | P00033 | $0 | PURPOSE OF THIS MOD IS TO UPDATE THE ASC TRANSPORTATION REQUIREMENTS TO MORE ACCURATELY REFLECT THE COST OF SERVICE. IN ADDITION, ADD THE RTU BLS REQUIREMENT UNDER OY1 AT EAGLE/FORT JOHNSON, LA. |
| Apr 18, 2024 | P00032 | $260.1K | PURPOSE OF THIS MOD IS INCORPORATE THE CIPBO PARTIAL DESCOPE AND PROVIDE FY24 INCREMENTAL OMA FUNDS TO PARTIALLY SATISFY 9 APRIL 2024 AT EAGLE/FORT JOHNSON, LA. |
| Apr 10, 2024 | P00031 | $599.1K | PURPOSE OF THIS MOD IS TO FUND RTU 24-07 AT EAGLE/FORT JOHNSON, LA. |
| Apr 4, 2024 | P00030 | $195.0K | PURPOSE OF THIS MOD IS TO INCORPORATE THE FORSCOM TRANSPORTATION CHANGE REQUIREMENT AND PROVIDE INCREMENTAL FUNDING TO PARTIALLY SATISFY A 29 MARCH 2024 AMENTUM LOF AT EAGLE/FORT JOHNSON, LA. |
| Mar 28, 2024 | P00029 | $12.5K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 OMA FUNDS FOR BJACH MAINT ODCS TO ALLOW FOR BACKLOG OF PARTS TO BE ORDERED. DELAY COMES FROM AN INTERNAL BUDGET ERROR AT EAGLE/FORT JOHNSON, LA. |
| Mar 25, 2024 | P00028 | $296.0K | PURPOSE OF THIS MOD IS TO ESTABLISH RTU 24-06 SUPPORT UNDER THE RTU BLS NEGOTIATED PRICING. IN ADDITION, PROVIDE NCR TO CAR LANGUAGE UPDATE AND MULTIPLE ATTACHMENT AND EXHIBIT UPDATES AT EAGLE/FORT JOHNSON, LA. |
| Mar 15, 2024 | P00027 | $1.0M | PURPOSE OF THIS MOD IS TO PROVIDE FY24 OMA FUNDS TO PARTIALLY SATISFY 28 FEB 2024 LOF AT EAGLE/FORT JOHNSON, LA. |
| Mar 8, 2024 | P00026 | $818.6K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 OMA FUNDS TO PARTIALLY SATISFY 28 FEBRUARY 2024 LOF AND UPDATE ANNEX C PRS TRANSPORATION AND VALCORP CBA ATTACHMENTS AT EAGLE/FORT JOHNSON, LA. |
| Feb 23, 2024 | P00025 | $5.4M | PURPOSE OF THIS MOD IS TO ADD THE 3-10 MTN ABLS MAINT REQUIREMENT TO SUPPORT THE UPCOMING EUCOM DEPLOYMENT AT EAGLE/FORT JOHNSON, LA. |
| Feb 14, 2024 | P00024 | $597.6K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 OMA FUNDS TO SUPPORT RTU 24-05 THAT WAS ESTABLISHED MOD P00001 WITH RTU BLS AT EAGLE/FORT JOHNSON, LA. |
| Feb 9, 2024 | P00023 | $282.8K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 OMA FUNDS TO PARTIALLY SATISFY 2 FEBRUARY 2024 LOF WHILE ALSO REALIGNING FUNDS TO SUPPORT MISSION AT EAGLE/FORT JOHNSON, LA. |
| Jan 29, 2024 | P00022 | $1.0M | PURPOSE OF THIS MOD IS TO INCORPORATE THE 3-353RD DESCOPE, CV REALIGNMENT, LOF INCREMENTAL FUNDING, AND DE-OBLIGATION AT EAGLE/FORT CARSON, CO. |
| Jan 11, 2024 | P00021 | $78.8K | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY24 OMA FUNDS TO PARTIALLY SATISFY 5 JANUARY 2024 LOF AT EAGLE/FORT JOHNSON, LA. |
| Dec 20, 2023 | P00020 | $863.4K | PURPOSE OF THIS MOD IS TO ESTABLISH AND INCORPORATE THE 3-10 MTN BRAKE TESTING ABLS MAINTENANCE SUPPORT REQUIREMENT AT EAGLE/FORT JOHNSON, LA. |
| Dec 6, 2023 | P00019 | $633.6K | PURPOSE OF THIS MOD IS TO EXECUTE RTU 24-03 AND PROVIDE FY24 INC FUNDING FOR FCTX FIRE TRUCK EVAC ODC CLIN AT EAGLE/FORT JOHNSON, LA. |
| Nov 30, 2023 | P00018 | $1.2M | PURPOSE OF THIS MOD IS TO PROVIDE FY24 INCREMENTAL FUNDING FOR ASC CLINS TO PARTIALLY SATISFY A 13 NOV 23 LOF AT EAGLE/FORT JOHNSON, LA. |
| Nov 22, 2023 | P00017 | $53.1K | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY24 OMA FUNDS TO PARTIALLY SATISFY 13 NOVEMBER 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Nov 14, 2023 | P00016 | $9.0K | PURPOSE OF THIS MOD IS TO INCORPORATE THE BJACH ABLS MAINT SUPPORT REQUIREMENT AT EAGLE/FORT JOHNSON, LA. |
| Nov 8, 2023 | P00015 | $30.0K | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY24 OMA FUNDS FOR AN ASC TRANSPORTATION CLIN TO PARTIALLY SATISFY A 20 OCTOBER 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Nov 2, 2023 | P00014 | $115.0K | PURPOSE OF THIS MOD IS TO PROVIDE FY24 INCREMENTAL FUNDING FOR ODC CLINS IN ORDER TO PARTIALLY SATISFY 20 OCTOBER 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Oct 26, 2023 | P00013 | $294.5K | PURPOSE OF THIS MOD IS TO DEFINITIZE REQS INCORPORATED MOD P00002, PROVIDE FY24 INCREMENTAL FUNDING, DEOBLIATE AND REALIGN FY23 FUNDS, WHILE DESCOPING CONTRACT VALUE FROM EAGLE/FORT JOHNSON, LA. |
| Oct 18, 2023 | P00012 | $10.9M | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY24 OMA FUNDING FOR FORSCOM CTC CLINS TO PARTIALLY SATISFY A 29 SEPTEMBER 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Oct 12, 2023 | P00011 | $1.6M | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY24 FUNDING TO ESTABLISH CONTINUATION CLINS AS WELL AS INCORPORATE THE MEDIUM TRUCK DRIVER REQUIREMENT DISBURSED AMONGST ALL PMO CLINS AT EAGLE/FORT JOHNSON, LA. |
| Sep 26, 2023 | P00010 | $2.5M | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY23 OMA FUNDING TO CXL SWOS FOR FORSCOM CTC AND PARTIALLY SATISFY 15 SEPTEMBER 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Sep 21, 2023 | P00009 | $61.4K | PURPOSE OF THIS MOD IS TO PROVIDE INCREMENTAL FY23 OMA FUNDS TO PARTIALLY SATISFY 15 SEPTEMBER 2023 LOF. IN ADDITION, INCORPORATE UPDATED CDRLS AND INCLUDE LANGUAGE IN NARRATIVE A THAT SHOWS PAY OFFICE CHANGE AT EAGLE/FORT JOHNSON, LA. |
| Sep 13, 2023 | P00008 | $60.0K | PURPOSE OF THIS MOD IS TO ADD FY23 INCREMENTAL FUNDING TO ASC ODC BASOPS CLIN AT EAGLE/FORT JOHNSON, LA. |
| Sep 7, 2023 | P00007 | $603.2K | PURPOSE OF THIS MOD IS TO ADD FY23 FUNDING FROM THE LEGACY EAGLE TO IN ORDER TO PARTIALLY SATISFY 11 AUGUST 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Aug 23, 2023 | P00006 | $2.2M | PURPOSE OF THIS MOD IS TO ADD THE NEC ABLS MAINTENANCE REQUIREMENT AND ADD REPURPOSED INCREMENTAL FY23 FUNDING FROM THE LEGACY EAGLE TO IN ORDER TO PARTIALLY SATISFY 11 AUGUST 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Aug 11, 2023 | P00005 | $22.5K | PURPOSE OF THIS MOD IS TO PROVIDE FY23 INCREMENTAL OMA FUNDING TO ASC ODC CLIN 1006SA TO PARTIALLY SATISFY 20 JULY 2023 LOF AT EAGLE/FORT JOHNSON, LA. |
| Aug 1, 2023 | P00004 | $1.3M | PURPOSE OF THIS MOD IS TO PROVIDE FY23 INCREMENTAL OMA FUNDING FOR RTU 23-10 THAT WAS ESTABLISHED MOD P00001 WITH RTU BLS AT EAGLE/FORT JOHNSON, LA. |
| Jul 27, 2023 | P00003 | $1.5M | PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES IN NEGOTIATED VALUES AND PROVIDE FY23 INCREMENTAL FUNDING TO BY CLINS AT EAGLE/FORT JOHNSON, LA. |
| Jul 17, 2023 | P00002 | $5.9M | PURPOSE OF MOD P00002 IS TO ESTABLISH BY MAINT, SUPPLY, AND TRANS CLINS IN SUPPORT OF ASC AND MULTIPLE NON-ASC CUSTOMERS AT EAGLE/FT. JOHNSON, LOUISIANA. |
| Jun 30, 2023 | P00001 | $1.2M | PURPOSE OF THIS MOD IS TO ESTABLISH RTU BLS 23-08.5 AND 23-09 RTUS AND INCORPORATE REQUIREMENTS CHANGES AT EAGLE/FORT JOHNSON, LA. |
| Apr 26, 2023 | 0 | $330.5K | FORT POLK TASK ORDER TO PROVIDE CONTRACT SERVICES IN SUPPORT OF THE ARMY SUSTAINMENT COMMAND (ASC) - SHALL SUPPLY THE FUNCTIONS REQUIRED FOR LOGISTICS SUPPORT SERVICES INCLUDING MAINTENANCE, SUPPLY, AND TRANSPORTATION FUNCTIONAL AREAS. |
Estimated positioning window
Oct 18, 2026 – Jan 16, 2027
Modeled likelihood: 75%. These are AcornBids estimates, not confirmed solicitation dates.
{
"psc": "J025",
"naics": "561210",
"agency": "Department of Defense",
"office": "W6QK ACC-RI",
"vehicle": "W52P1J17G0091",
"incumbent": "AMENTUM SERVICES, INC.",
"known_forecast": false,
"option_end_date": "2027-05-17",
"contract_end_date": "2027-05-17",
"latest_action_date": "2026-05-26",
"modification_count": 87,
"historical_award_count": 146,
"historical_cadence_days": 25
}Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.