Federal contract award
W52P1J19F0400
LOGISTICS CIVIL AUGMENTATION PROGRAM (LOGCAP) V SUPPORT SERVICES IN KUWAIT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RI |
| NAICS | 561210 — Facilities Support Services |
| PSC | R706 — Logistics Support Services |
| Parent award / vehicle | W52P1J19D0045 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $2.3B |
| Current contract value | $2.3B |
| Potential contract value / ceiling | $2.3B |
| Start date | Apr 12, 2019 |
| Current end date | Jun 30, 2026 |
| Potential end date | Jun 30, 2026 |
| Latest award activity | May 26, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 139 of 139 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 26, 2026 | P00138 | $15.9M | MODIFICATION P00138 PROVIDES FY26 INCREMENTAL FUNDS AND DEOBLIGATES EXCESS FUNDS. |
| May 14, 2026 | P00137 | $10.0M | ARCENT INCREMENTAL FUNDING FOR KUWAIT BLS SERVICES. |
| May 8, 2026 | P00136 | $5.0M | KUWAIT BLS |
| Apr 20, 2026 | P00135 | $2.0M | MODIFICATION P00135 DEOBLIGATES EXCESS FUNDING, DEFINITIZES A UCO, PROVIDES FY26 INCREMENTAL FUNDING IN SUPPORT OF OEF, AND INCORPORATES ATTACHMENTS. |
| Mar 25, 2026 | P00134 | $0 | MODIFICATION P00134 DEFINITIZES BACKLOGGED UCOS. |
| Mar 17, 2026 | P00133 | $3.1M | MODIFICATION P00133 OBLIGATES FY26 INCREMENTAL FUNDING. |
| Mar 9, 2026 | P00132 | $-310.8K | MODIFICATION P00132 DEOBLIGATES EXCESS FY21 FUNDS, DEFINITIZES TWO UCOS, AND INCORPORATES FY26 FUNDS FOR 401ST NTV DAMAGES. |
| Feb 26, 2026 | P00131 | $863 | MODIFICATION P00131 EXECUTES UCO VEC-26-0400-KUW001-0002 IN SUPPORT OF 401ST NTV EXCHANGE II AND INCORPORATES + UPDATES ATTACHMENTS. |
| Jan 20, 2026 | P00130 | $134.4K | MODIFICATION P00130 EXECUTES UCO-VEC-26-0400-KUW001-0001 401ST MAILROOM AND DEOBLIGATED FY21 FUNDING. |
| Jan 12, 2026 | P00129 | $357.0K | MODIFICATION P00129 CONTRACTUALLY RECOGNIZES A UCO, PROVIDES FY26 INCREMENTAL FUNDING, UPDATES THE FUNDING TRACKER AND TDP ATTACHMENTS, AND INCORPORATES GFP ATTACHMENTS. |
| Nov 19, 2025 | P00128 | $140.0K | MODIFICATION P00128 PROVIDES FY26 INCREMENTAL FUNDING, CONTRACTUALLY RECOGNIZES A UCO R2, AND INCORPORATES CAP TO GFP ATTACHMENTS. |
| Sep 30, 2025 | P00127 | $60.0M | MODIFICATION P00127 PROVIDES END OF FISCAL YEAR 2025 (FY25) INCREMENTAL FUNDING AND A DEOBLIGATION TO SATISFY AN UNDERRUN. |
| Sep 25, 2025 | P00126 | $46.6M | MODIFICATION P00126 EXECUTES A NEGOTIATED CHANGE ORDER (CO), ONE UNPRICED CHANGE ORDER (UCO), OBLIGATES INCREMENTAL FUNDING, AND INCORPORATES AN UPDATED TDP AND FUNDING TRACKER. |
| Sep 23, 2025 | P00125 | $920.0K | MODIFICATION P00125 EXECUTES A NEGOTIATED CHANGE ORDER (CO), TWO UNPRICED CHANGE ORDERS (UCOS), DEFINITIZES TWO UCOS, RE-OBLIGATES FUNDS TO CORRECT A NULO, AND INCORPORATES AN UPDATED TDP AND FUNDING TRACKER. |
| Sep 2, 2025 | P00124 | $11.3K | THIS MODIFICATION RE-OBLIGATES FUNDS THAT WERE DEOBLIGATED VIA MODIFICATION P00122 WHICH RESULTED IN NEGATIVE UNLIQUIDATED OBLIGATIONS (NULOS), INCORPORATES A GFP ATTACHMENT, AND AN UPDATED FUNDING TRACKER ATTACHMENT. |
| Aug 21, 2025 | P00123 | $21.4K | MODIFICATION P00123 PROVIDES FY24 AND FY25 INCREMENTAL FUNDING. |
| Aug 18, 2025 | P00122 | $97.1M | P00122 DEOBLIGATES EXCESS FUNDING, PROVIDES FY25 INCREMENTAL FUNDING, EXECUTES A NEGOTIATED CHANGE ORDER, AND INCORPORATES AN UPDATED FUNDING TRACKER, TDP, AND NEW GFP ATTACHMENTS. |
| Aug 6, 2025 | P00121 | $414.6K | THIS MODIFICATION PERFORMS A DEOBLIGATION, FUND REALIGNMENT, UCO DEFINITIZATIONS, AND PROVIDES INCREMENTAL FUNDING. |
| Jul 14, 2025 | P00120 | $0 | LOGCAP V BLS- KUWAIT |
| Jul 9, 2025 | P00119 | $182 | MODIFICATION P00119 PROVIDES FY24 INCREMENTAL FUNDING AND CONTRACTUALLY RECOGNIZES TWO UCOS THAT WERE NTP'D VIA PCO LETTER. |
| Jun 23, 2025 | P00118 | $2.2M | MODIFICATION P00118 PROVIDES FY25 INCREMENTAL FUNDING, REALIGNS FUNDING, DEFINITIZES UCO VEC-22-0400-QAT021-0034, AND INCORPORATES A GFP ATTACHMENT. |
| Jun 12, 2025 | P00117 | $114.9M | THIS MODIFICATION EXECUTES NEGOTIATED CHANGE ORDER (CO) VEC-25-0400-KUW-0001 TO EXERCISE THE OPTION YEAR 4 (OY4) PERIOD OF PERFORMANCE (POP). |
| May 27, 2025 | P00116 | $163.6K | MODIFICATION P00116 DEFINITIZES AN UNPRICED CHANGE ORDER, EXECUTES A NEGOTIATED CHANGE ORDER, PROVIDES INCREMENTAL FUNDING, DEOBLIGATES FUNDING, AND UPDATES THE TDP, FUNDING TRACKER, AND GFP ATTACHMENTS. |
| Apr 28, 2025 | P00115 | $355.6K | MODIFICATION P00115 DEFINITIZES TWO (2) UCOS AND PROVIDES FY25 INCREMENTAL FUNDING. |
| Apr 4, 2025 | P00114 | $-104.6K | MODIFICATION P00114 DEOBLIGATES EXCESS FY20 FUNDING, DEFINITIZES 3 UCOS AND PROVIDES FY22 INCREMENTAL FUNDING. |
| Mar 14, 2025 | P00113 | $12.0M | MODIFICATION P00113 PROVIDES FY25 INCREMENTAL FUNDING, REALIGNS FY24 FUNDS TO COVER A SHORTFALL, AND DEFINITIZES UCO-VEC-25-0400-KUW-0001 FOR TDP UPDATES. |
| Mar 6, 2025 | P00112 | $-92.1K | MODIFICATION P00112 EXECUTES A CO, DEFINITIZES 2 UCOS, INCORPORATES A UCO REVISION, REALIGNS FY24 FUNDING, AND INCORPORATES AN UPDATED TDP AS WELL AS CAP TO GFP ATTACHMENTS. |
| Feb 21, 2025 | P00111 | $75.1M | MOD P00111 PROVIDES FY20 AND FY25 FUNDING, DEFINITIZES 2 UCOS, MAKES AN ADMIN CORRECTION, AND INCORPORATES A GFP ATTACHMENT. |
| Jan 16, 2025 | P00110 | $186.2K | THIS MODIFICATION IS TO DEFINITIZE THE CPFF PORTION OF UCOS #23-47 AND #24-43, AS WELL AS THE OY4 AND 6 MONTH EXTENSION. ALSO, THIS MODIFICATION CONTRACTUALLY RECOGNIZES THE NEGOTIATED AGREEMENT FOR OY2-4 + 6 MONTHS. LASTLY, THIS MODIFICATION PROVIDES FY25 INCREMENTAL FUNDING. |
| Dec 11, 2024 | P00109 | $68.0K | THIS MODIFICATION DEFINITIZES UNPRICED CHANGE ORDERS (UCOS), REALIGNS FUNDING, PROVIDES FISCAL YEAR 2025 (FY25) FUNDING, AND UPDATES THE ATTACHMENT 0020 FUNDING TRACKER. |
| Dec 9, 2024 | P00108 | $7.7M | THIS MODIFICATION OBLIGATES INCREMENTAL FUNDING, DEOBLIGATES AND REALIGNS FUNDING, CONTRACTUALLY RECOGNIZES THE H.2 FEE UNPRICED CHANGE ORDER, EXECUTES A CHANGE ORDER, AND INCORPORATES UPDATED TECH DATA PACKAGE AND FUNDING TRACKER AS WELL AS NEW GOV FURNISHED PROPERTY ATTACHMENT. |
| Nov 13, 2024 | P00107 | $74.7K | THIS MODIFICATION REALIGNS FISCAL YEAR 2023 (FY23) FUNDS THAT WERE DEOBLIGATED ON MODIFICATION P00094 TO RESOLVE SHORTFALLS ON MULTIPLE CLINS. |
| Oct 30, 2024 | P00106 | $10.7M | THIS MODIFICATION REALIGNS FUNDS THAT WERE DEOBLIGATED JN PREVIOUS MODIFICATIONS TO CORRECT SHORTFALLS. ALSO, THIS MODIFICATION EXECUTES UCO-VEC-25-0400-KUW-0001 FOR TDP UPDATES, MAKES ADMINISTRATIVE CORRECTIONS. FINALLY, THIS MODIFICATION UPDATES ATTACHMENT 0001 AND 0020, AND INCORPORATES 0047. |
| Sep 30, 2024 | P00104 | $10.0M | THIS MODIFICATION EXECUTES A NEGOTIATED CHANGE ORDER (CO), REOBLIGATES FUNDING TO RESOLVE NEGATIVE UNLIQUIDATED OBLIGATIONS (NULOS), PROVIDES FY24 INCREMENTAL FUNDING FOR OY3 BLS SERVICES, INCORPORATES AN UPDATED TECHNICAL DATA PACKAGE (TDP) AND FUNDING TRACKER. |
| Sep 30, 2024 | P00105 | $1.1M | MODIFICATION P00105 PROVIDES FISCAL YEAR (FY) 2024 INCREMENTAL FUNDING FOR ARCENT BLS SERVICES CLINS. |
| Sep 27, 2024 | P00103 | $98.2M | THIS MODIFICATION OBLIGATES INCREMENTAL FUNDING, EXECUTES MULTIPLE UCOS AND OBLIGATES FUNDING FOR THOSE REQUIREMENTS, AND UPDATES THE TDP AND FUNDING TRACKER ATTACHMENTS. |
| Sep 24, 2024 | P00102 | $3.2M | THIS MODIFICATION EXECUTES NEGOTIATED CHANGE ORDERS (COS) AND INCORPORATES AN UPDATED TECHNICAL DATA PACKAGE (TDP) AND FUNDING TRACKER. |
| Sep 23, 2024 | P00101 | $56.8M | THIS MODIFICATION DEOLIGATES FUNDING AS WELL AS OBLIGATES FISCAL YEAR OMA FUNDING TO SUPPORT MULTIPLE EFFORTS AND UPDATE THE FUNDING TRACKER AND GOVERNMENT FURNISHED PROPERTY ATTACHMENTS. |
| Sep 9, 2024 | P00100 | $1.2M | THIS MODIFICATION OBLIGATES FISCAL YEAR OMA FUNDING TO SUPPORT A NEGOTIATED CHANGE ORDER AS WELL AS PROVIDE FUNDS FOR A LIMITATION OF FUNDS NOTICE AND UPDATE THE TDP, FUNDING AND GFP ATTACHMENTS. |
| Aug 21, 2024 | P00099 | $2.9M | THIS MODIFICATION OBLIGATES FISCAL YEAR OMA FUNDING TO SUPPORT MULTIPLE CHANGE ORDERS AND A NEGOTIATED CHANGE ORDER AS WELL AS UPDATES THE TDP AND FUNDING TRACKER ATTACHMENTS. |
| Jul 29, 2024 | P00098 | $698.4K | THIS MODIFICATION OBLIGATES FISCAL YEAR 2024 INCREMENTAL FUNDING TO SUPPORT MULTIPLE REQUIREMENTS AND MAKES ADMINISTRATIVE CHANGES TO 2 (TWO) UNPRICED CHANGE ORDERS (UCOS). |
| Jun 28, 2024 | P00097 | $1.4M | THIS MODIFICATION OBLIGATES FISCAL YEAR 2024 INCREMENTAL FUNDING TO SUPPORT EXECUTION OF MULTIPLE UNPRICED CHANGE ORDERS (UCOS) AS WELL AS FUNDS SEVERAL NEGOTIATED AGREEMENTS. |
| Jun 26, 2024 | P00096 | $169.0M | THIS MODIFICATION EXECUTES AN UNPRICED CHANGE ORDER (UCO) TO EXERCISE THE OPTION YEAR 3 (OY3) PERIOD OF PERFORMANCE (POP). THIS MODIFICATION ALSO DEFINITIZES A UCO UNDER THE OY2 POP, AS WELL AS PROVIDES INCREMENTAL FUNDS UNDER THE OY2 POP. |
| May 31, 2024 | P00095 | $266.2K | THIS MODIFICATION EXECUTES A CHANGE ORDER (CO), AND OBLIGATES THE ASSOCIATED INCREMENTAL FUNDING. THIS MODIFICATION ALSO INCORPORATES A TDP ATTACHMENT UPDATE, AS WELL AS PROVIDES ADMINISTRATIVE INFORMATION. |
| May 28, 2024 | P00094 | $-4.5M | THIS MODIFICATION DEOBLIGATES FUNDING TO CORRECT FUNDING ERRORS. THIS MODIFICATION ALSO DEOBLIGATES EXCESS FUNDING FROM THE CONTRACT. THIS MODIFICATION ALSO OBLIGATES INCREMENTAL FUNDING TO SUPPORT UNPRICED CHANGE ORDER #23-47. |
| May 3, 2024 | P00093 | $1.8M | THIS MODIFICATION PROVIDES FISCAL YEAR 21/22 OHDACA INCREMENTAL FUNDING TO AN UNPRICED CONTRACT ACTION A NOTICE TO PROCEED FOR AN UNPRICED CHANGE ORDER REALIGNS FUNDS UPDATES THE TECHNICAL DATA PACKAGE AND DELETES A GOVERNMENT FURNISHED PROPERTY. |
| Apr 29, 2024 | P00092 | $1.6M | THIS MODIFICATION PROVIDES FISCAL YEAR 2024 INCREMENTAL FUNDING TO UNPRICED CHANGE ORDERS. THIS MODIFICATION ALSO UPDATES THE TECHNICAL DATA PACKAGE ATTACHMENT 0001. |
| Apr 18, 2024 | P00091 | $-390.1K | THIS MODIFICATION PROVIDES FISCAL YEAR 2024 INCREMENTAL FUNDING TO SUPPORT SEVERAL UNPRICED CHANGE ORDERS. THIS MODIFICATION ALSO DEOBLIGATES FUNDING IN SUPPORT OF A FUND REALIGNMENT. |
| Apr 17, 2024 | P00090 | $1.6M | THIS MODIFICATION PROVIDES FISCAL YEAR (FY) 2024 INCREMENTAL FUNDING TO SUPPORT UNPRICED CHANGE ORDER (UCO) #23-47. THIS MODIFICATION ALSO INCORPORATES GOVERNMENT FURNISHED PROPERTY (GFP) ATTACHMENT UPDATES. |
| Mar 29, 2024 | P00089 | $61.7K | THIS MODIFICATION EXECUTES A NEGOTIATED CHANGE ORDER (CO) AND DEFINITIZES AN UNDEFINITIZED CONTRACTUAL ACTION (UCA). ADDITIONALLY, THIS MODIFICATION OBLIGATES FISCAL YEAR (FY) 24 FUNDING. FINALLY, THIS MODIFICATION INCORPORATES ATTACHMENT UPDATES. |
| Mar 8, 2024 | P00088 | $466.5K | THIS MODIFICATION EXECUTES A NEGOTIATED CHANGE ORDER (CO) AND AN UNPRICED CHANGE ORDER (UCO). ADDITIONALLY, THIS MODIFICATION OBLIGATES FISCAL YEAR (FY) 2024 INCREMENTAL FUNDING. FINALLY, THIS MODIFICATION PROVIDES ATTACHMENT UPDATES. |
| Feb 29, 2024 | P00087 | $302.6K | THIS MODIFICATION EXECUTES TWO DEFINITIZED CHANGE ORDERS (COS). THIS MODIFICATION ALSO PROVIDES FISCAL YEAR (FY) 2024 FUNDING FOR THE AFOREMENTIONED COS. FINALLY, THIS MODIFICATION PROVIDES A TECHNICAL DATA PACKAGE (TDP) ATTACHMENT UPDATE. |
| Feb 23, 2024 | P00086 | $-344.3K | DEOBLIGATE EXCESS FY 2021 FUNDING FROM (UCA) #22-47, UCA VEC-22-0400-QAT021-0002 FOR BASE LIFE SUPPORT (BLS) SERVICES DURING THE OY1 ISO OAW |
| Feb 12, 2024 | P00085 | $3.5M | PROVIDE FY24 INCREMENTAL FUNDING APPLIED TO NEWLY INCORPORATED CLIN 2008AJ FOR UNINTERRUPTED PERFORMANCE FOR OY2 BASE LIFE SUPPORT. |
| Feb 6, 2024 | P00084 | $141.9K | THIS MODIFICATION OBLIGATES FISCAL YEAR 2024 INCREMENTAL FUNDING FOR UNPRICED CHANGE ORDERS (UCOS) UNDER THE OPTION YEAR 2 PERIOD OF PERFORMANCE. THIS MODIFICATION ALSO INCORPORATES GOVERNMENT FURNISHED PROPERTY ATTACHMENT UPDATES. |
| Feb 1, 2024 | P00083 | $-8.5M | THIS MODIFICATION DEFINITIZES UNPRICED CHANGE ORDER #21-31 FOR BASE LIFE SUPPORT SERVICES FOR THE BASE YEAR PERIOD OF PERFORMANCE ON THE TASK ORDER. THIS MODIFICATION ALSO DEOBLIGATES FUNDING RELATIVE TO THE DEFINITIZATION, + UPDATES AN ATTACHMENT. |
| Jan 12, 2024 | P00082 | $1.2M | THIS MODIFICATION EXECUTES A NEGOTIATED CHANGE ORDER, INCORPORATES ADMIN CORRECTIONS, DEOBLIGATES EXCESS FUNDING, PROVIDES ATTACHMENT UPDATES, AND PROVIDES FISCAL YEAR 2024 INCREMENTAL FUNDING. |
| Dec 22, 2023 | P00081 | $123.8K | BLS |
| Dec 13, 2023 | P00080 | $133.2K | INCLUDE GFP ATTACHMENT 0035 AND PROVIDE INCREMENTAL FUNDING FOR FY24 TO CLIN 2008AE FOR OY2 |
| Dec 7, 2023 | P00079 | $15.0M | THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, DEFINITIZE A PORTION OF UNPRICED CHANGE ORDER (UCO) #23-47, AND CONTRACTUALLY RECOGNIZE THE NEGOTIATED AGREEMENT REGARDING REQUEST FOR PROPOSAL (RFP) VEC-23-0400-KUW-0001. |
| Nov 29, 2023 | P00078 | $-59.1K | THIS MODIFICATION DE-OBLIGATES FISCAL YEAR 2019 FUNDING AND INCORPORATE ATTACHMENT UPDATES. |
| Nov 1, 2023 | P00077 | $51.9K | THIS MODIFICATION PROVIDES INCREMENTAL FUNDING FOR THE OPTION YEAR 2 (OY2) PERIOD OF PERFORMANCE (POP) REGARDING UNPRICED CHANGE ORDER (UCO) #23-47. THIS MODIFICATION ALSO INCORPORATES A GOVERNMENT FURNISHED PROPERTY (GFP) ATTACHMENT UPDATE. |
| Sep 29, 2023 | P00076 | $116.0M | THE MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO UNPRICED CHANGE ORDER (UCO) #23-47, FOR BASE LIFE SUPPORT (BLS) SERVICES DURING THE OPTION YEAR 2 (OY2) PERIOD OF PERFORMANCE. |
| Sep 21, 2023 | P00075 | $4.4M | THIS MODIFICATION EXECUTES SEVERAL UNPRICED CHANGE ORDERS (UCOS) IN SUPPORT OF OPERATION SPARTAN SHIELD (OSS). THIS MODIFICATION ALSO UPDATES THE ATTACHMENT 0001 TECHNICAL DATA PACKAGE (TDP). |
| Sep 15, 2023 | P00074 | $2.4M | THIS MODIFICATION EXECUTES & CONTRACTUALLY SERVES AS THE NOTICE TO PROCEED (NTP) FOR SEVERAL NEGOTIATED CHANGE ORDERS (COS). THIS MODIFICATION ALSO INCORPORATES A GOVERNMENT FURNISHED PROPERTY (GFP) UPDATE. |
| Sep 5, 2023 | P00073 | $3.2M | THIS MODIFICATION PROVIDES FISCAL YEAR (FY) 2023 INCREMENTAL FUNDING FOR UNPRICED CHANGE ORDER (UCO) #23-47, UCO VEC-23-0400-KUW-0002 KUW-APO OY2 OPTION YEAR 2 (OY2) BASE LIFE SUPPORT (BLS) SERVICES. THIS MODIFICATION ALSO REALIGNS FY21 FUNDING. |
| Aug 30, 2023 | P00072 | $-1.3M | MODIFICATION P00072 DEFINITIZES MULTIPLE UNPRICED CHANGE ORDERS (UCOS) AND DEOBLIGATES FUNDS ACCORDINGLY. ADDITIONALLY, P00072 DEOBLIGATES EXCESS FISCAL YEAR (FY) 2022 AND 2023 FUNDS. |
| Aug 28, 2023 | P00071 | $107.5K | MODIFICATION P00071 REALIGNS FUNDING AND PROVIDES FY23 INCREMENTAL FUNDING FOR UNPRICED CHANGE ORDER (UCO) #23-47 UNDER OPTION YEAR 2 (OY2). P00071 INCORPORATES ATTACHMENTS 0032 AND 0033 FOR GOVERNMENT FURNISHED PROPERTY (GFP). |
| Aug 10, 2023 | P00070 | $2.5M | P00070 REALIGNS FUNDS THAT WERE DEOBLIGATED ON P00069 AND INCORPORATES GOVERNMENT FURNISHED PROPERTY (GFP) ATTACHMENTS 0030 AND 0031. |
| Jul 25, 2023 | P00069 | $-2.5M | THIS MODIFICATION IS TO REALIGN FISCAL YEAR (FY) 2021, 2022, & 2023 FUNDING, TO CORRECTLY ALIGN WITH THE FINAL NEGOTIATED OPTION YEAR 1 (OY1) PROPOSAL, TITLED "LCV KUW-APO TO - OY PROPOSAL-CE-D20230411." THIS MODIFICATION ALSO UPDATES AN ATTACHMENT. |
| Jul 17, 2023 | P00068 | $285.4K | THIS MODIFICATION PROVIDES FISCAL YEAR 2022 FUNDING FOR UNPRICED CHANGE ORDERS (UCOS) VEC-23-0400-QAT021-0003 AND VEC-23-0400-QAT021-0006. THIS ACTION IS IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). THIS MODIFICATION UPDATES ATTACHMENT 0001. |
| Jun 30, 2023 | P00067 | $682.8K | THIS MODIFICATION IS TO EXECUTED UNPRICED CHANGE ORDER (UCO) TITLED UCO-VEC-23-0400-QAT021-0006 CAMP AS SAYLIYAH (CAS) BLDG 212 BUILDOUT. THIS MODIFICATION ALSO INCORPORATES GOVERNMENT FURNISHED PROPERTY ATTACHMENTS. |
| Jun 28, 2023 | P00066 | $10.0M | THIS MODIFICATION IS TO PROVIDE FISCAL YEAR (FY) 2022 & 2023 INCREMENTAL FUNDING DUE TO A COST RUN THAT OCCURRED IN THE OPTION YEAR 1 (OY1) PERIOD OF PERFORMANCE UNDER UNPRICED CHANGE ORDER (UCO) #22-40. ADDITIONALLY, TO INCORPORATE PROPERTY ATTACHMENTS. |
| Jun 21, 2023 | P00065 | $8.5M | THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR THE CAMP AS SAYLIYAH (CAS) QATAR PORTION OF OPTION YEAR 1 (OY1) IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). |
| Jun 16, 2023 | P00064 | $-9.9M | DEOBLIGATE FUNDING FROM UNPRICED CHANGE ORDER (UCO) #23-47 TO REOBLIGATE IN A FUTURE MODIFICATION UNDER UCO #22-40 DUE TO A COST OVERRUN IN THE OPTION YEAR 1 (OY1) PERIOD OF PERFORMANCE (POP). ADD INCREMENTAL FUNDING UNDER UCO #23-47. |
| Jun 14, 2023 | P00063 | $-1.7M | THIS MODIFICATION DEFINITIZES MULTIPLE UNPRICED CHANGE ORDERS (UCOS) AND DEOBLIGATES EXCESS FUNDS AS A RESULT OF DEFINITIZING ON MULTIPLE CONTRACT LINE ITEM NUMBERS (CLINS) UNDER THE KUW-APO TASK ORDER. |
| May 25, 2023 | P00062 | $293.4M | THIS MODIFICATION EXERCISES OPTION YEAR 2 (OY2) FOR THE KUWAIT - ARABIAN PENINSULA OTHER (KUW-APO) TASK ORDER, VIA UNPRICED CHANGE ORDER (UCO) #23-47. ADDITIONALLY, THIS MODIFICATION PROVIDES ADMINISTRATIVE CORRECTIONS & INCORPORATES AN ATTACHMENT. |
| May 19, 2023 | P00061 | $12.1K | THIS MODIFICATION REVISES THE PRICE CEILING AND OBLIGATES INCREMENTAL FUNDING FOR UNPRICED CHANGE ORDER (UCO) VEC-23-0400-QAT021-0003. |
| May 12, 2023 | P00060 | $-6.0M | THIS MODIFICATION EXECUTES UNPRICED CHANGE ORDER (UCO) VEC-23-0400-KUW001-0005. THIS MODIFICATION ALSO DEFINITIZES UCO #22-40 & UNDEFINITIZED CONTRACTUAL ACTION (UCA) #22-47 FOR BASE LIFE SUPPORT (BLS) SERVICES ON THE TASK ORDER. |
| May 8, 2023 | P00059 | $9.6M | THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR UNDEFINITIZED CONTRACTUAL ACTION (UCA) VEC-22-0400-QAT021-0002 FOR BASE LIFE SUPPORT (BLS) SERVICES AT CAMP AS SAYLIYAH (CAS), QATAR, IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). |
| May 1, 2023 | P00058 | $127.0K | THIS MODIFICATION CONTRACTUALLY RECOGNIZES THE NOTICE TO PROCEED (NTP) FOR UNPRICED CHANGE ORDER (UCO) VEC-23-0400-QAT021-0005. ADDITIONALLY, THIS MODIFICATION REALIGNS FUNDS, CORRECTS ADMINISTRATIVE ERRORS, AND UPDATES A TECHNICAL DATA PACKAGE (TDP). THESE ACTIONS ARE IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). |
| Apr 25, 2023 | P00057 | $18.5M | THIS MODIFICATION EXECUTES UNPRICED CHANGE ORDER (UCO) #23-42, FOR DINING FACILITY (DFAC) SERVICES AT CAMP ARIFJAN & CAMP BUEHRING, KUWAIT. IN ADDITION, THIS MODIFICATION INCORPORATES GOVERNMENT FURNISHED PROPERTY (GFP) ATTACHMENT # 0019. |
| Apr 21, 2023 | P00056 | $43.1M | THIS MODIFICATION OBLIGATES FISCAL YEAR 2023 INCREMENTAL FUNDING FOR UNPRICED CHANGE ORDER (UCO) VEC-22-0400-KUW-0001. THIS MODIFICATION CONTRACTUALLY RECOGNIZES THE NOTICE TO PROCEED (NTP) AND EXECUTES UCO VEC-23-0400-KUW001-0004. |
| Apr 10, 2023 | P00055 | $441.0K | THIS MODIFICATION CONTRACTUALLY RECOGNIZES NOTICE TO PROCEED (NTP) AND EXECUTES UNPRICED CHANGE ORDER (UCO) VEC-23-0400-QAT021-0004, IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). THIS MOD UPDATES THE TECHNICAL DATA PACKAGE (TDP) AND GFP ATTACHMENTS. |
| Mar 30, 2023 | P00054 | $192.9K | CONTRACTUALLY RECOGNIZE NOTICE TO PROCEED (NTP) AND EXECUTE UNPRICED CHANGE ORDER (UCO) VEC-23-0400-QAT021-0003. THIS ACTION IS IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). ADDITIONALLY, UPDATE TDPS AND REALIGN FISCAL YEAR (FY) 2022 FUNDING. |
| Mar 6, 2023 | P00053 | $10.0M | PROVIDE INCREMENTAL FUNDING FOR THE UNINTERRUPTED PERFORMANCE OF UNDEFINITIZED CONTRACT ACTION (UCA)#22-47, TITLED UCA VEC-22-0400-QAT021-0002 CAMP AS SAYLIYAH (CAS) QATAR OY1. THIS ACTION IS IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). |
| Feb 24, 2023 | P00052 | $40.0M | THIS MODIFICATION IS TO PROVIDE FISCAL YEAR (FY) 2023 INCREMENTAL FUNDING FOR THE UNINTERRUPTED PERFORMANCE OF UNPRICED CHANGE ORDER (UCO) VEC-22-0400-KUW-0001 FOR THE OPTION YEAR 1 (OY1) PERIOD OF PERFORMANCE. |
| Feb 17, 2023 | P00051 | $4.8M | THIS MODIFICATION EXECUTES AN UNPRICED CHANGE ORDER (UCO) FOR ELECTRICAL METERS AT CAMP ARIFJAN, KUWAIT. ADDITIONALLY, THIS MODIFICATION PROVIDES INCREMENTAL FUNDING FOR UCO #22-40. |
| Feb 15, 2023 | P00050 | $118.6K | EXECUTE UNPRICED CHANGE ORDER (UCO) VEC-23-KUW001-0001R1 FOR TT1005 STRENGTH CENTER AT CAMP ARIFJAN, KUWAIT, AND UPDATE TECHNICAL DATA PACKAGES (TDPS) ATTACHMENTS. |
| Feb 10, 2023 | P00049 | $96.1K | MODIFICATION P00049 IS TO REALIGN FISCAL YEAR (FY) 2022 FUNDS, PROVIDE FY23 INCREMENTAL FUNDING FOR UNPRICED CHANGE ORDER (UCO) VEC-22-0400-KUW-0001, AND TO MAKE ADMINISTRATIVE CHANGES TO THE OPTION YEAR 1 (OY1) DLA-TIRE-CYLINDER CLIN. |
| Feb 2, 2023 | P00048 | $-12.1K | THIS MODIFICATION IS TO REALIGN FUNDING FROM CONTRACT LINE ITEM NUMBER (CLIN) 1008AA TO 1008AF. ADDITIONALLY, TO MAKE ADMINISTRATIVE CORRECTIONS FROM ERRORS IN MODIFICATION P00045. FINALLY, TO DEFINITIZE AN UNPRICED CHANGE ORDER. |
| Jan 27, 2023 | P00047 | $6.8M | THIS MODIFICATION IS TO CONTRACTUALLY RECOGNIZE THE NOTICE TO PROCEED (NTP) AND EXECUTE AN UNPRICED CHANGE ORDER (UCO) FOR THE RENOVATION OF BENEFICIARY HOUSING AT CAMP AS SAYLIYAH (CAS) QATAR, IN SUPPORT OF OPERATION ALLIES WELCOME. |
| Dec 23, 2022 | P00046 | $1.1M | THIS MODIFICATION PROVIDES NOTICE TO PROCEED (NTP) AND EXCECUTES AN UNPRICED CHANGE ORDER (UCO) FOR SUPPORT OF ABLUTION TRAILER INCREASE AT CAMP AS SAYLIYAH (CAS) IN SUPPORT OF OPERATION ALLIES WELCOME (OAW) AND INCORPORATES ATTACHMENT UPDATE. |
| Nov 23, 2022 | P00045 | $683.5K | NTP ISSUANCE ELECTRIC METERS + FUNDS OBLIGATION WAREHOUSE MOVE + FUNDING REALIGNMENT + INCREMENTAL FUNDING |
| Nov 22, 2022 | P00044 | $0 | UPDATE TECHNICAL DATA PACKAGE |
| Oct 12, 2022 | P00043 | $117.3K | INCREASE NTE AND ADD INCREMENTAL FUNDING |
| Oct 7, 2022 | P00042 | $0 | GRAY WATER DESCOPE |
| Sep 29, 2022 | P00041 | $-11.4K | THIS MODIFICATION IS TO DEOBLIGATE FISCAL YEAR (FY) 2021 OHDACA INCREMENTAL FUNDING FROM UNDEFINTIZED CONTRACTUAL ACTION (UCA) #22-47 FOR BASE LIFE SUPPORT (BLS) SERVICES AT CAMP AS SAYLIYAH (CAS), QATAR, IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). |
| Sep 28, 2022 | P00039 | $1.2M | MODIFICATION P00038 EXECUTES THE NOTICE TO PROCEED (NTP) FOR A REQUIREMENT OF HVAC SERVICES AT BLDG 306 AT CAMP ARIFJAN, KUWAIT. |
| Sep 28, 2022 | P00040 | $34.3K | MODIFICATION P00040 ADDS FISCAL YEAR 2021-2022 OHDACA INCREMENTAL FUNDING TO UNDEFINITIZED CONTRACTUAL ACTION (UCA) #22-47 FOR BASE LIFE SUPPORT (BLS) SERVICES AT CAMP AS SAYLIYAH (CAS) QATAR, IN SUPPORT OF (ISO) OPERATION ALLIES WELCOME (OAW). |
| Sep 23, 2022 | P00038 | $6.5M | INCORPORATE REVISION 1 TO UNDEFINITIZED CHANGE ORDER (UCO) #22-40. DEFINTIZE 3 UCOS FROM FISCAL YEAR (FY) 2021. ADMIN CHANGE TO CONTRACT VALUE. ADD FY22 INCREMENTAL FUNDING FOR UCO #22-40. |
| Sep 19, 2022 | P00037 | $35.4M | EXECUTE NOTICE TO PROCEED FOR CUSTODIAL SERVICES AT CAMP AS SAYLIYAH (CAS) QATAR, IN SUPPORT OF OPERATION ALLIES WELCOME (OAW). DEFINITIZE UCA #21-53 FOR ZONE 7 CAMP BUEHRING KUWAIT. INCORPORATE R1 TO UCA #22-47. ADD INC. FUNDS TO UCA #22-47. |
| Aug 29, 2022 | P00036 | $630.2K | MODIFICATION P00036 IS TO EXECUTE AN UNDEFINITIZED CHANGE ORDER (UCO) AT CAMP AS SAYLIYAH (CAS) QATAR, IN SUPPORT OF OPERATION ALLIES REFUGE/OPERATION ALLIES WELCOME (OAR/OAW). ADDITIONALLY, UPDATE ATTACHMENT 0011, AND INCORPORATE ATTACHMENT 0015. |
| Jul 29, 2022 | P00035 | $-19.3M | THE PURPOSE OF MODIFICATION P00035 IS TO ADD INCREMENTAL FUNDING FOR OPTION YEAR 1, UPDATED THE GOVERNMENT FURNISHED PROPERTY (GFP) ATTACHMENT, AND DEOBLIGATE ULIQUIDATED OBLIGATIONS CONTAINING FISCAL YEAR 2021 FUNDING. |
| Jun 29, 2022 | P00034 | $27.4M | EXERCISE OPTION YEAR 1 PERIOD OF PERFORMANCE AT CAMP AS SAYLIYAH (CAS) QATAR. ADDITIONALLY, REALIGN FUNDING AND UPDATE GOVERNMENT FURNISHED PROPERTY (GFP) ATTACHMENT. |
| Jun 9, 2022 | P00033 | $12.9K | ADD INCREMENTAL FUNDING FOR FIREGUARD UCO + REALIGN FUNDING FROM BASE YEAR CLIN FOR PWOS |
| Jun 3, 2022 | P00032 | $271.5M | MODIFICATION TO EXERCISE OPTION YEAR 1 OF THE KUWAIT - ARABIAN PENINSULA OTHER (KUW-APO) TASK ORDER. ADDITIONALLY, CONTRACTUALLY RECOGNIZE NOTICE TO PROCEED(S) FOR UNDEFINITIZED CHANGE ORDERS. ALSO, CONTRACTUALLY RECOGNIZE TECHNICAL DATA PACKAGE (TDP) UPDATES. |
| Mar 17, 2022 | P00031 | $-12.1M | EXECUTE UNDEFINITIZED CHANGE ORDER (UCO)"VEC-22-0400-KUW0001-0002." ADDITIONALLY, DE-OBLIGATE EXCESS FISCAL YEAR 2021 FUNDING IN THE AMOUNT OF $18,063,335.00. |
| Mar 8, 2022 | P00030 | $719.5K | INCREMENTAL FUNDING |
| Feb 3, 2022 | P00029 | $-1.0M | UPDATE GFP ATTACHMENT + REALIGN PWO FUNDING + FY20 DEOBLIGATIONS |
| Dec 23, 2021 | P00028 | $250.3K | FIREGUARD EXTENSION + GATEWAY FUNDING |
| Dec 16, 2021 | P00027 | $16.0K | NOTICE TO PROCEED FOR SUPPORT AT BUILDING T2150 |
| Dec 3, 2021 | P00026 | $443.0K | INCREMENTAL FUNDING |
| Dec 2, 2021 | P00025 | $44.5M | INCREMENTAL FUNDING |
| Nov 15, 2021 | P00024 | $0 | MODIFICATION TO EXECUTE AMENDMENT 2 TO UNDEFINITIZED CONTRACTUAL ACTION 21-53 FOR ZONE 7 AT CAMP BUEHRING, KUWAIT. |
| Nov 1, 2021 | P00023 | $0 | MODIFICATION TO INCORPORATE THE TECHNICAL DATA PACKAGE (TDP) FOR CAMP AS SAYLIYAH (CAS) QATAR. |
| Oct 28, 2021 | P00022 | $0 | MODIFICATION TO INCORPORATE UPDATED GOVERNMENT FURNISHED PROPERTY (GFP)ATTACHMENT. |
| Oct 13, 2021 | P00021 | $0 | THIS MODIFICATION IS TO EXECUTE CHANGES TO THE TECHNICAL DATA PACKAGE (TDP). |
| Sep 29, 2021 | P00020 | $73.6M | OBLIGATE FUNDING FOR PCO LETTER 21-007 UCOS + BASE YEAR INCREMENTAL FUNDING |
| Sep 27, 2021 | P00019 | $45.3M | CONTRACTUALLY RECOGNIZE UCA VEC-21-0400-QAT021-0001 (#21-57), AND PROVIDE FISCAL YEAR (FY) 2021 INCREMENTAL FUNDING IN THE AMOUNT OF $45,254,787.29. |
| Sep 22, 2021 | P00018 | $-13.4M | TO DE-OBLIGATE FISCAL YEAR (FY) 2020 FUNDING IN THE AMOUNT OF $13,408,514.00. |
| Sep 17, 2021 | P00017 | $0 | ADMINISTRATIVE CHANGE TO CORRECT PAYING OFFICE TO HQ0697. |
| Sep 14, 2021 | P00016 | $2.2M | CONTRACTUALLY RECOGNIZE UCO FOR APS 5 WAREHOUSE AND SUNSHADE PROJECT AND REOBLIGATE PHARMACY UCO FUNDING. |
| Sep 1, 2021 | P00015 | $9.1M | AMENDMENT 1 TO UNDEFINITIZED CONTRACTUAL ACTION #21-53 FOR EXPANSION OF SERVICES TO ZONE 7 QUADRANT 2A CAMP BUEHRING, KUWAIT. |
| Aug 19, 2021 | P00014 | $11.1M | INC FUNDING |
| Aug 9, 2021 | P00013 | $18.2M | NTP FOR UCA VEC-21-0400-KUW002-0001 |
| Jul 27, 2021 | P00012 | $132.8K | REVISE PHARMACY UCO AND UPDATE GFP |
| Jun 30, 2021 | P00011 | $306.2M | ISSUANCE OF NTP FOR BASE YEAR FOC PERFORMANCE LCV |
| Apr 9, 2021 | P00010 | $40.3K | NTP PHARMACY SUPPORT |
| Mar 31, 2021 | P00009 | $0 | DEFINITIZATION OF TRANSITION POPS LCV |
| Sep 1, 2020 | P00008 | $10.1M | CHANGE ORDER 1, UNPRICED CHANGE ORDER IS FOR REBASELINED REQUIREMENT TRANSITION AND TO PROVIDE A NOTICE TO PROCEED WITH PHASE TWO OF A DEVELOPED A TWO PHASED TRANSITION APPROACH TO ACCOMMODATE MISSION DELAYS AND MEET MISSION REQUIREMENTS. |
| Aug 6, 2020 | P00007 | $-799.9K | DEOBLIGATE TFS FUNDING |
| Jul 8, 2020 | P00006 | $0 | UPDATE WAWF CLAUSE |
| Jun 4, 2020 | P00005 | $0 | MODIFICATION P00005 IS TO INCORPORATE THE FINALIZED DD 254 CONTRACT SECURITY CLARIFICATION SPECIFICATION KUW-APO FINAL 03JUN2020 |
| Jun 1, 2020 | P00004 | $0 | LOGISTICS CIVIL AUGMENTATION PROGRAM V- KUWAIT/ARABIAN PENN MODIFICATION TO ADJUST TO NARRATIVE CONCERNING AORS, ADJUST CLIN 0003AB POP, AND REALIGN BASE YEAR FUNDING. |
| Apr 2, 2020 | P00003 | $5.8M | LOGISTICS CIVIL AUGMENTATION PROGRAM V- KUWAIT/ARABIAN PENN MODIFICATION TO ADJUST PERIOD OF PERFORMANCE DUE TO STOP WORK CANCELLATION |
| Mar 18, 2020 | P00002 | $-5.0M | MODIFICATION TO DEOBLIGATE FUNDING AND DELETE CLIN IN ORDER TO CORRECT ERROR ON THE PRON |
| Nov 15, 2019 | P00001 | $35.0M | MODIFICATION TO ADD FUNDING TO KUWAIT TASK ORDER FOR LOGCAP SERVICES |
| Apr 12, 2019 | 0 | $5.0M | LOGISTICS CIVIL AUGMENTATION PROGRAM (LOGCAP) V SUPPORT SERVICES IN KUWAIT |