Federal contract award

W52P1J19F0498

THE PURPOSE OF TASK ORDER W52P1J-19-F-0498 IS TO SUCCESSFULLY COMPLETE A TECHNICAL READINESS REVIEW (TRR) AND FIRST ARTICLE TESTING (FAT) ON THE INTEGRATED HARDWARE ENVIRONMENT (IHE) PROTOTYPES DEFINED, DESIGNED, PROCURED, BUILT, TESTED, INSTALLED, AND VERIFIED DURING TO 0001 WITH THE INCLUSION OF THE RSCCE SUBSYSTEM. FURTHER, AN INITIAL FUNCTIONAL VERSION (IFV) OF THE WIDEBAND SATELLITE COMMUNICATIONS (SATCOM) TREND ANALYSIS AND ANOMALY RESOLUTION SUBSYSTEM (WSTARS) WILL BE DESIGNED, PRODUCED AND IMPLEMENTED TO RUN THROUGH A VIRTUAL DESKTOP INTERFACE ON THE WIDEBAND SATCOM OPERATIONS MANAGEMENT SYSTEM (WSOMS) NETWORK WORKSTATION. FURTHER, THE FOLLOWING SATCOM SUBSYSTEMS WILL BE MIGRATED TO THE COMMON DATA WAREHOUSE (CDW) AND COMMON INFORMATION MANAGEMENT (CIM): CNPS, WRMS, RMCE, RRFIS, RFMOW, JMOS, GTC3S, AND RPTF.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RI
NAICS334220 — Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
PSC7021 — Information Technology Central Processing Unit (CPU, Computer), Digital
Parent award / vehicleW52P1J17D0094
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$9.2M
Current contract value$9.2M
Potential contract value / ceiling$9.2M
Start dateJun 20, 2019
Current end dateDec 24, 2020
Potential end dateDec 24, 2020
Latest award activitySep 16, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 16, 2025P00011$-190.0KTHIS MODIFICATION SERVES TO DEOBLIGATE FUNDS FROM THE REFERENCED TASK ORDER AS A RESULT OF THE FUNDS CANCELLING AT THE END OF FY25.
Sep 16, 2025P00011$-190.0KTHIS MODIFICATION SERVES TO DEOBLIGATE FUNDS FROM THE REFERENCED TASK ORDER AS A RESULT OF THE FUNDS CANCELLING AT THE END OF FY25.
Nov 30, 2020P00010$0THIS MODIFICATION IS AN EXTENSION OF THE POP FROM 30 NOVEMBER 2020 TO 24 DECEMBER 2020 TO COMPLETE THE REMAINDER OF THE REFERENCED TASK ORDER AT NO ADDITIONAL COST TO THE GOVT AS A RESULT OF A LETTER OF CONCERN.
Nov 23, 2020P00009$0MODIFICATION RE-ALIGNS EXISTING FUNDING ON COST CLINS TO ALIGN WITH REMAINING WORK.
Sep 30, 2020P00008$0COST&FEE REALIGNMENT BASED ON AN ESTIMATE TO COMPLETE (ETC) PROVIDED BY NGMS REVIEWED BY A GOVERNMENT COST PRICE ANALYST&ACCEPTED AS PROPOSED.THE REALIGNMENT IS TO COMPLETE TASK ORDER WORK UP TO THE PRELIMINARY QUALIFICATION TEST POP TO END 30NOV20
Aug 31, 2020P00007$0TASK ORDER W52P1J-19-F-0498 BUILDS OUT WSTARS HARDWARE AND SOFTWARE TO PREPARE THE EQUIPMENT FOR PRODUCTION AND FIELDING IN A SUBSEQUENT TASK ORDER. MODIFICATION RE-ALIGNS FUNDING, EXTENDS PERIOD OF PERFORMANCE AND ADDS CLAUSE 52.204-25.
Jul 30, 2020P00006$0THIS IS AN EXTENSION AND COST REALIGNMENT TO ALLOW NGMS TO PROCEED WITH WORK ON A COST ONLY BASIS UNTIL THE ETC CAN BE AGREED UPON. WORK IS CONTINUING WITH CLINS 1, 2, 3, 9, 11, 12, 13, 14,&15. THE REALIGNMENT FUNDS AN EXTENSION TO 31 AUGUST 2020
Jul 29, 2020P00005$0CHANGE ORDER TO DESCOPE ALL WORK ON THE TASK ORDER SO THAT IT CONCLUDES WITH THE PRELIMINARY QUALIFICATION TEST (PQT) WITH ALL REMAINING WORK TO BE EXECUTED ON A SUBSEQUENT TASK ORDER, IF NECESSARY.
Jun 19, 2020P00004$0THIS IS AN EXTENSION AND COST REALIGNMENT TO ALLOW NGMS TO PROCEED WITH WORK ON A COST ONLY BASIS UNTIL THE ETC CAN BE AGREED UPON. WORK IS ALSO STOPPED FOR CLINS 4,5,6,7,&10 FOR THE PURPOSES OF STOPPING THE BURN UNTIL A WAY FWD IS KNOWN.
May 22, 2020P00003$0THE ACTION IS A REALIGNMENT TO CONTINUE WORK ON THE IFV PRODUCTION ARTICLES, THE AMOUNT REALIGNED WILL BE ENOUGH FOR NGMS TO CONTINUE THROUGH THE END OF THE PERIOD OF PERFORMANCE BASED ON A MEDIAN BURN RATE OF $7,211.07. CLIN 0014 IS FOR THE FUNDING
Apr 30, 2020P00002$0THE ACTION IS A REALIGNMENT TO CONTINUE WORK ON THE INITIAL FUNCTIONAL VERSION (IFV) DESIGN, THE AMOUNT REALIGNED WILL BE ENOUGH FOR NORTHROP GRUMMAN MISSION SYSTEMS (NGMS) TO CONTINUE PERFORMING APPROXIMATELY 20 MORE DAYS AT THEIR CURRENT BURN RATE OF $16,500 PER DAY. DURING THIS TIME, THE PROGRAM OFFICE WILL VIEW HOW THEIR PERFORMANCE LINES UP WITH THEIR MASTER SCHEDULE AND WILL CARRY ON FUNDING THE WORK AS PROGRESS IS MADE. THE REALIGNMENT IS MADE IN LIEU OF FURTHER PROGRAM FUNDING, AS THIS IS A COST CONTRACT THE AMOUNT REALIGNED IS CARRY ON WORK AND PAY FOR FURTHER ALLOWABLE COSTS AS NECESSARY TO AVOID ANY EXCUSABLE DELAYS.
Dec 18, 2019P00001$0THIS IS A CHANGE ORDER TO CHANGES FROM THE INITIAL VERSION DATED 19 FEBRUARY 2019 TO REVISION 1 DATED 22 NOVEMBER 2019, CHANGING THE DESIGN SPECIFICATIONS OF THE INITIAL FUNCTIONING VERSION (IFV) TO REMOVE (1) INSTALLATION FOR SYSTEM READINESS TEST (SRT) AND (2) THE MITIGATION AND ANTI-JAM ENHANCEMENTS (MAJE). THE MODIFICATION WILL FURTHER SERVE TO (3) UPDATE A PLACE OF SERVICE DELIVERY FROM JOINT SATCOM ENGINEERING CENTER (JSEC) LOCATION AT ABERDEEN PROVING GROUND (APG) TO THE WIDEBAND INTEGRATION CENTER (WIC) AT TOBYHANNA ARMY DEPOT (TYAD) AND (4) MAKING SITE SURVEYS DELIVERED ON LOCATIONS OUTLINED IN THE BASE CRS OPTIONAL UNLESS DIRECTED BY THE GOVERNMENT.
Jun 20, 20190$9.4MTHE PURPOSE OF TASK ORDER W52P1J-19-F-0498 IS TO SUCCESSFULLY COMPLETE A TECHNICAL READINESS REVIEW (TRR) AND FIRST ARTICLE TESTING (FAT) ON THE INTEGRATED HARDWARE ENVIRONMENT (IHE) PROTOTYPES DEFINED, DESIGNED, PROCURED, BUILT, TESTED, INSTALLED, AND VERIFIED DURING TO 0001 WITH THE INCLUSION OF THE RSCCE SUBSYSTEM. FURTHER, AN INITIAL FUNCTIONAL VERSION (IFV) OF THE WIDEBAND SATELLITE COMMUNICATIONS (SATCOM) TREND ANALYSIS AND ANOMALY RESOLUTION SUBSYSTEM (WSTARS) WILL BE DESIGNED, PRODUCED AND IMPLEMENTED TO RUN THROUGH A VIRTUAL DESKTOP INTERFACE ON THE WIDEBAND SATCOM OPERATIONS MANAGEMENT SYSTEM (WSOMS) NETWORK WORKSTATION. FURTHER, THE FOLLOWING SATCOM SUBSYSTEMS WILL BE MIGRATED TO THE COMMON DATA WAREHOUSE (CDW) AND COMMON INFORMATION MANAGEMENT (CIM): CNPS, WRMS, RMCE, RRFIS, RFMOW, JMOS, GTC3S, AND RPTF.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.