Federal contract award

W52P1J21F0259

INSTALLATION OF FIRE PROTECTION SYSTEMS IN THE AREAS OF THE AMMUNITION MANUFACTURING BUILDINGS 1, 2 & 3 THAT CURRENTLY DO NOT HAVE A WET OR DRY FIRE SPRINKLER SYSTEMS. THIS IS IN SUPPORT OF LAKE CITY ARMY AMMUNITION PLANT (LCAAP).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RI
NAICS332992 — Small Arms Ammunition Manufacturing
PSC1305 — Ammunition, through 30 mm
Parent award / vehicleW52P1J19D0085
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$76.2M
Current contract value$76.2M
Potential contract value / ceiling$76.2M
Start dateMay 28, 2021
Current end dateApr 30, 2029
Potential end dateApr 30, 2029
Latest award activityMar 10, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 29 of 29 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 10, 2026P00021$0POP CORRECTION
Mar 10, 2026P00021$0POP CORRECTION
Mar 5, 2026P00020$14.0MLCAAP- HVAC R22 REFRIGERANT ELIMINATION EFFORT
Mar 5, 2026P00020$14.0MLCAAP- HVAC R22 REFRIGERANT ELIMINATION EFFORT
Aug 29, 2025P00019$0PERIOD OF PERFORMANCE END DATE CORRECTION
Aug 29, 2025P00019$0PERIOD OF PERFORMANCE END DATE CORRECTION
Aug 26, 2025P00018$373.2KFY25 AMC BUILDER SUSTAINMENT EFFORT AT LCAAP
Aug 26, 2025P00018$373.2KFY25 AMC BUILDER SUSTAINMENT EFFORT AT LCAAP
Jun 25, 2025P00017$-63.7KLCAAP RATE REOPENER ON CYBER SECURITY PHASE II FOR G&A RATES.
Jun 25, 2025P00017$-63.7KLCAAP RATE REOPENER ON CYBER SECURITY PHASE II FOR G&A RATES.
May 30, 2025P00016$14.6MB121 SERIES ROOF ASBESTOS ENCAPSULATION PROJECT AT LAKE CITY ARMY AMMUNITION PLANT.
May 30, 2025P00016$14.6MB121 SERIES ROOF ASBESTOS ENCAPSULATION PROJECT AT LAKE CITY ARMY AMMUNITION PLANT.
Nov 18, 2024P00015$0REVISE FY24 AMC BUILDER SUSTAINMENT PILOT SOW
Nov 18, 2024P00015$0REVISE FY24 AMC BUILDER SUSTAINMENT PILOT SOW
Jun 4, 2024P00014$0UPDATE OF P00013 NARRATIVES.
May 13, 2024P00013$17.1MCYBER SECURITY MODERN PHASE II
May 2, 2024P00012$606.7KAWARD THE FISCAL YEAR 24 (FY24) ARMY MATERIALS COMMAND (AMC) BUILDER SUSTAINMENT PILOT PROJECT AT LAKE CITY ARMY AMMUNITION PLANT (LCAAP)
Oct 30, 2023P00011$0CORRECT POP ON MODIFICATION P00010 FROM 24 MONTHS TO 29 MONTHS.
Sep 27, 2023P00010$7.2MBUILDING 8 AND 45 BALLISTIC TESTING SYSTEMS CYBERSECURITY (SECTION 889 COMPLIANCE OBSOLESCENCE) PROJECT AT LAKE CITY ARMY AMMUNITION PLANT (LCAAP)
Aug 2, 2023P00009$647.8KBUILDING 1 WEST ROOF OPTIONAL WORK.
Mar 10, 2023P00008$4.9MBUILDING 1 WEST ROOF REPLACEMENT FOR LCAAP.
Dec 13, 2022P00007$2.0MAWARDING CYBER SECURITY MODERNIZATION PROJECT CHANGE ORDER IAW FAR 52.243-1 ALT 1
Oct 21, 2022P00006$4.3MLCAAP B1 STRUCTURAL UPGRADES
Sep 21, 2022P00005$2.2MTHE PURPOSE OF THIS MODIFICATION IS TO AWARD THE B35 ROOF REPLACEMENT AND STRUCTURAL UPGRADES PROJECT.
Mar 25, 2022P00004$2.8MAWARD THE LIGHTNING PROTECTION REPLACEMENT BUILDING 19 SERIES AT LCAAP.
Dec 9, 2021P00003$0EXTENDING THE PERIOD OF PERFORMANCE FOR CLIN 1301AA FROM 14 MAY 2023 TO 14 JULY 2023 TO PROVIDE SUFFICIENT TIME FOR COMPLETION OF GOVERNMENT REVIEW AND RECEIPT OF PROJECT ACCEPTANCE.
Sep 28, 2021P00002$0UPDATE AND CORRECT DFAS PAYMENT OFFICE
Aug 11, 2021P00001$431.8KTHE PURPOSE OF THIS MODIFICATION IS TO AWARD THE HVAC UPGRADE SOW FOR THE DESIGN EFFORT.
May 28, 20210$4.1MINSTALLATION OF FIRE PROTECTION SYSTEMS IN THE AREAS OF THE AMMUNITION MANUFACTURING BUILDINGS 1, 2 & 3 THAT CURRENTLY DO NOT HAVE A WET OR DRY FIRE SPRINKLER SYSTEMS. THIS IS IN SUPPORT OF LAKE CITY ARMY AMMUNITION PLANT (LCAAP).

Estimated positioning window

Apr 30, 2028 – Oct 30, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2029-04-30 (918 days from calculation)
+15 points
25 historical awards in this buyer and category group
+15 points
29 recorded award transactions
+10 points
Latest award action: 2026-03-10
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.