| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC- DTA |
| NAICS | 336992 — Military Armored Vehicle, Tank, and Tank Component Manufacturing |
| PSC | 2350 — Combat, Assault, and Tactical Vehicles, Tracked |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $221.9M |
| Current contract value | $221.9M |
| Potential contract value / ceiling | $221.9M |
| Start date | Sep 30, 2013 |
| Current end date | Nov 15, 2026 |
| Potential end date | Nov 15, 2026 |
| Latest award activity | May 7, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 136 of 136 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 9, 2026 | P00140 | $0 | ADD DEI CLAUSE |
| May 7, 2026 | P00139 | $0 | PSC CODE |
| Jul 8, 2025 | P00137 | $71.9K | CWO L20-047-2 TO PROJECT TO UPGRADE COMPLETE CONTROLS SYSTEM ON TM0039 CWO L21-020R-4R, REPLACEMENT EQUIPMENT FOR CE10 PRESS |
| May 27, 2025 | P00136 | $0 | CWO'S FOR LIMA OHIO |
| Nov 14, 2024 | P00135 | $1.1M | CWO L20-017R-1, BLDG 147 HULL LINE STATION 1 THRU 5 HEAVY WHEELED VEHICLE SYSTEM CWO L20-040R-1, B266 WASH BOOTH PIVOT PAD REPLACEMENT. |
| Jul 15, 2024 | P00133 | $1.2M | SUPPLEMENTAL CWO L21-017-1R OR LABOR AND MATERIAL FOR PAVEMENT AND PIPING REPLACEMENT ON THE WEST SIDE OF BUILDING 147 |
| Jul 15, 2024 | P00134 | $-437.3K | FINAL CAR TO MODIFICATION P00134 TO CONTRACT W56HZV-13-C-0319 |
| Jun 24, 2024 | P00131 | $121.5K | SUPPLEMENTAL CWO L19-010-3 TO ADD FUNDING TO COMPLETE ELEVATOR REPAIR. |
| Feb 5, 2024 | P00132 | $157.5K | THIS ACTION FUNDS 1 COMPANY WORK ORDER AND 3 NO COST COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT MANUFACTURING CENTER AT LIMA, OH. |
| Sep 28, 2023 | P00130 | $0 | NO COST MOD TO CORRECT IDOC ERROR. |
| Sep 22, 2023 | P00128 | $306.1K | XYZ |
| Aug 30, 2023 | P00127 | $3.5M | WORK NECESSARY DURING THE REPLACEMENT OF BUILDING 266 ROOF. WORK NECESSARY DURING THE REPLACEMENT OF BUILDING 142 ROOF. |
| Aug 22, 2023 | P00129 | $545.5K | FUNDS FOR 2 CWOS |
| Mar 2, 2023 | P00126 | $0 | 1006FX - THE ADDITION OF A COLD SAW AND ANCILLARY ITEMS AT NO COST 1006EN - PANEL UP-GRADE FOR MASS NOTIFICATION CENTER AT NO COST |
| Feb 23, 2023 | P00125 | $167.9K | MODIFICATION FOR CWOS |
| Feb 1, 2023 | P00124 | $312.6K | MODIFICATION FOR 1 CWO |
| Dec 8, 2022 | P00122 | $0 | ADMIN MOD TO CHANGE APPROPRIATION DATA |
| Nov 17, 2022 | P00119 | $333.9K | MODIFICATION FOR SUPPLEMENTAL CWOS |
| Sep 20, 2022 | P00121 | $394.0K | MODIFICATION TO CORRECT IDOC ERROR CREATED FROM MOD P000120 ULO MODIFICATION. |
| Sep 6, 2022 | P00120 | $-9.7M | DE-OBLIGATION MODIFICATION |
| Aug 3, 2022 | P00118 | $974.4K | CWO L20-008-2 REPLACE LC20 CUTTING MACHINE, CWO L20-11R-1 CLEAN THE PERIMETER ROAD CULVERTS, VIDEO INSPECTION OF PIPES, AND INSTALLATION OF NEW CULVERT INLET DEBRIS GRATES, CWO L20-039R-2 RECYCLE OLD DOOR REPLACE WITH NEW INSULATED ROLL-UP CURTAIN DOOR WITH NEW OPERATOR, CONTROL, SAFETY EDGE AND WEATHER COVER, CWO L20-047-1R UPGRADE THE INTELLIGENT MACHINING CENTER (IMC) CONTROLS ON TM39, AND CWO L21-020R-1 REPLACE PRESS CE10 ALONG WITH ALL MECHANICAL AND ELECTRICAL COMPONENTS ON IT. |
| Jun 24, 2022 | ARZ996 | $0 | COMBAT, ASSAULT, AND TACTICAL VEHICLES, TRACKED |
| Apr 20, 2022 | P00117 | $140.2K | SUPPLEMENTAL CWOS FOR ABRAMS TANK EFFORT. |
| Sep 30, 2021 | P00113 | $56.6K | CORRECTION MODIFICATION TO INCREASE THE AMOUNT ON SUBCLIN 100186 BY #56,641.43 TO MATCH THE ALREADY DISBURSED AMOUNT. THE CONTRACT IS FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT FURNISHED PROPERTY AT JOINT SYSTEMS MANUFACTURING CENTER, LIMA, OHIO. |
| Sep 29, 2021 | P00114 | $0 | THIS ACTION FUNDS 1 COMPANY WORK ORDER FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH. |
| Sep 24, 2021 | P00094 | $-693.7K | DEOBLIGATION MODIFICATION OF FY16 AND FY17 FUNDS FROM THE FACILITY CONTRACT OF JOINT SYSTEMS MANUFACTURING CENTER, LIMA, OH |
| Sep 24, 2021 | P00110 | $0 | CORRECTION MODIFICATION |
| Sep 24, 2021 | P00112 | $5.5M | THIS ACTION FUND 2 COMPANY WORK ORDERS FOR THE REPLACEMENT AND REFURBISHMENT OF ELECTRICAL BUSBAR AT THE JOINT SYSTEMS MANUFACTURING CENTER, LIMA, OH. |
| Sep 23, 2021 | P00111 | $1.5M | THIS ACTION FUNDS 5 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIME, OH |
| Sep 20, 2021 | P00105 | $3.8M | THIS ACTION FUNDS 2 COMPANY WORK ORDERS, AND ADDS FUNDING TO EMERGENCY CLIN 2001 FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH. |
| Sep 13, 2021 | P00107 | $2.3M | COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER IN LIMA, OH. |
| Aug 31, 2021 | P00104 | $7.8M | CWO L21-017 TO REPLACE THE PAVEMENT AND UNDERGROUND DOMESTIC WATER,SANITARY PIPING, AND FIRE PROTECTION PIPING FROM BUILDING 66 TO THE LIFT STATION LOCATED PLANT SOUTH OF BUILDING 143. |
| Aug 4, 2021 | P00106 | $1.5M | CWOS FOR JSMC-LIMA EQUIPMENT PROCUREMENT AND PROPERTY REPAIR |
| Jul 22, 2021 | P00102 | $2.1M | THIS ACTION FUNDS 6 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH. |
| Jun 29, 2021 | P00103 | $2.9M | MODIFICATION FOR PROCUREMENT OF PRODUCTION EQUIPMENT AT JSMC-L. |
| Jun 19, 2021 | P00100 | $487.7K | COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA,OH. |
| Jun 9, 2021 | P00101 | $-216.0K | DEOBLIGATION |
| Jun 4, 2021 | P00096 | $847.4K | THIS ACTION FUNDS 4 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH. |
| May 24, 2021 | P00099 | $1.7M | THIS ACTION FUNDS 5 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH. |
| May 12, 2021 | P00098 | $1.3M | MOD TO FUND WORK ORDERS FOR JSMC-L. CWOS FOR FACILITY REPAIRS AND EQUIPMENT UPDATES AND REPAIRS. |
| Apr 29, 2021 | P00097 | $304.0K | THIS ACTION FUNDS 3 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH. |
| Apr 7, 2021 | P00093 | $2.6M | THIS ACTION FUNDS 3 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GFP AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH |
| Mar 22, 2021 | P00095 | $0 | MODIFICATION TO EXERCISE OPTIONS TO EXTEND SERVICES 6 MONTHS FOR JSMC-L FACILITIES CONTRACT. |
| Mar 5, 2021 | P00091 | $2.5M | THIS ACTION FUNDS 5 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT FURNISHED PROPERTY AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY LOCATED AT THE JOINT SYSTEMS MANUFACTURING CENTER, LIMA, OH. |
| Feb 11, 2021 | P00092 | $1.1M | THIS ACTION FUNDS 3 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER AT LIMA, OH |
| Dec 17, 2020 | P00090 | $846.3K | THIS ACTION FUNDS 4 COMPANY WORK ORDERS PLUS THE EMERGENCY CLIN FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Oct 29, 2020 | P00089 | $3.6M | THIS ACTION FUNDS 1 COMPANY WORK ORDER FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Sep 30, 2020 | P00086 | $1.8M | THIS ACTION FUNDS 6 COMPANY WORK ORDERS PLUS THE EMERGENCY CLIN FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Sep 29, 2020 | P00085 | $1.3M | THIS ACTION FUNDS 4 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Sep 29, 2020 | P00088 | $909.8K | THIS ACTION FUNDS 2 COMPANY WORK ORDERS FOR THE REPAIR AND MAINTENANCE OF THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Sep 18, 2020 | P00087 | $0 | MODIFICATION TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE BY 6 MONTHS WITH A 6 MONTH OPTION. |
| Jun 19, 2020 | P00084 | $952.1K | FUNDING FOR 4 COMPANY WORK ORDERS AND EMERGENCY CLIN FOR MAINTENANCE AND REPAIR OF GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA, OHIO |
| May 29, 2020 | P00083 | $504.0K | FUNDING FOR COMPANY WORK ORDER AT GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA, OH |
| May 18, 2020 | P00082 | $636.3K | FUNDING 4FOR 4 COMPANY WORK ORDERS FOR MAINTENANCE AND REPAIR AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Apr 30, 2020 | P00081 | $911.1K | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE |
| Apr 1, 2020 | P00080 | $1.7M | FUNDING FOR 4 CONTRACTOR WORK ORDERS PLUS EMERGENCY REPAIRS AT THE GOVERNMENT OWNED CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA, OH. |
| Mar 12, 2020 | P00079 | $811.8K | FUNDING FOR 4 CONTRACTOR WORK ORDERS FOR MAINTENANCE AND REPAIR AT JOINT SYSTEMS MANUFACTURING CENTER LIMA, OH |
| Feb 6, 2020 | P00078 | $1.0M | FUNDING FOR 5 CONTRACTOR WORK ORDERS FOR MAINTENANCE AND REPAIR AT JOINT SYSTEMS MANUFACTURING CENTER LIMA, OH |
| Nov 20, 2019 | P00077 | $5.3M | JSMC-LIMA GUTTERS&ROOF, ROBOTIC BLAST BOOTH, STORM WATER INLET REPLACEMENT |
| Nov 1, 2019 | P00076 | $2.0M | REPLACING OVERHEAD CRANES AT JSMC-L |
| Oct 24, 2019 | P00075 | $4.9M | THIS ACTION IS TO FUND 8 CONTRACTOR WORK ORDERS FOR MAINTENANCE AND REPAIR OF FACILITIES AT THE GOVERNMENT OWNED, CONTRACTOR OPERATED FACILITY AT JOINT SYSTEMS MANUFACTURING CENTER LIMA OHIO. |
| Sep 26, 2019 | P00074 | $3.1M | WORK ORDERS FOR JSMC FACILITY |
| Sep 20, 2019 | P00073 | $8.2M | WORK ORDERS FOR JSMC LIMA FACILITY |
| Sep 19, 2019 | P00072 | $13.8M | INSTALL TWO NEW HORIZONTAL BORING MILLS |
| Sep 6, 2019 | P00071 | $15.0M | EXTENDING PERFORMANCE TO 30 SEP 2020; PURCHASE AND INSTALL OF HORIZONTAL BORING MACHINES; CULVERT EMERGENCY REPAIR |
| Aug 27, 2019 | P00070 | $14.7M | LIMA FACILITIES WORK ORDERS |
| Jun 26, 2019 | P00069 | $3.5M | 7 CWO'S AND FUNDING FOR EMERGENCY CLIN AT JSMC LIMA PLANT FOR NO COST FACILITIES WORK ORDERS PERFORMED BY GDLS. |
| May 2, 2019 | P00068 | $4.6M | REPAIR&SERVICE WORK ORDERS FOR LIMA FACILITY. |
| Apr 18, 2019 | P00067 | $1.6M | REPAIR&SERVICE WORK ORDERS FOR LIMA FACILITY |
| Feb 25, 2019 | P00066 | $1.2M | CONTRACTOR WORK ORDERS FOR LIMA FACILITY |
| Dec 18, 2018 | P00065 | $165.3K | JSMC-LIMA FACILITIES COMTRACT |
| Oct 22, 2018 | P00064 | $0 | GDLS FACILITIES CONTRACT |
| Sep 24, 2018 | P00063 | $547.3K | LIMA FACILITIES CONTRACT |
| Sep 12, 2018 | P00062 | $1.9M | LIMA FACILITIES CONTRACT |
| Aug 16, 2018 | P00061 | $1.5M | FACILITIES CONTRACT AT JSMC-LIMA |
| Jun 29, 2018 | P00060 | $9.2M | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ONE CWO AND ONE EMERGENCY REPAIR CWO IN THE AMOUNT OF $9.2M. |
| Apr 20, 2018 | P00059 | $1.1M | ADD 3 CWOS |
| Feb 27, 2018 | P00058 | $0 | MODIFICATION TO PERFORM A CLIN SWAP BY DELETING SUBCLIN 100505 AND CREATING SUBCLIN 100252 FOR CWO LR16-032R-1. |
| Feb 8, 2018 | P00057 | $33.8K | CWOS FOR BOILER INSPECTIONS AND CONDENSATE TANK MAINTENANCE |
| Jan 22, 2018 | P00056 | $49.7K | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ONE COMPANY WORK ORDER FOR THE WATERJET GARNET REMOVAL AT THE JSMC FACILITY. |
| Dec 5, 2017 | P00055 | $511.7K | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. THE PURPOSE OF THIS MODIFICATION IS TO FUND ONE CWO AND PROVIDE FUNDING FOR EMERGENCY REPAIRS. |
| Nov 17, 2017 | P00054 | $1.3M | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. THIS MODIFICATION FUNDS TO CWOS IN THE AMOUNT OF $1.3M FOR WORK AT THE JSMC FACILITY. |
| Sep 18, 2017 | P00053 | $126.5K | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. THIS MODIFICATION INCORPORATES THREE CWOS AND INCREASE FUNDING FOR ONE EMERGENCY REPAIR CLIN. |
| Aug 21, 2017 | P00052 | $4.2M | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. MODIFICATION P00052 FUNDS THREE CWOS IN THE AMOUNT OF $4.2M. |
| Aug 4, 2017 | P00051 | $1.2M | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE FACILITY. THE PURPOSE OF MODIFICATION P00051 IS TO AWARD 3 CWOS IN THE AMOUNT OF 1.2M TO DE-OBLIGATE $553 IN EXCESS FUNDS. |
| Jul 3, 2017 | P00050 | $373.1K | ENGINE TEST CELL; JSMC-L DCMA OFFICE |
| Jun 7, 2017 | P00049 | $-1.8K | THIS CONTRACT IS FOR THE ACQUISITION OF NEW CONTRACTOR ACQUIRED INDUSTRIAL AND OTHER PLANT EQUIPMENT, REAL ESTATE AND INSTALLED SYSTEMS, REPLACEMENT AND REHABILITATION, INSTALLATION, USE, MAINTENANCE AND REPAIR, PRESERVATION, PROTECTION AND SURVEILLANCE, ACCOUNTABILITY, AND DISPOSITION OF THE GOVERNMENT OWNED ASSETS WITHIN THE JSMC LIMA. |
| May 3, 2017 | P00048 | $1.4M | MODIFICATION P00048 AWARDS THREE CWOS IN THE AMOUNT OF $1,383,646 |
| Apr 13, 2017 | P00047 | $914.1K | MODIFICATION P00047 AWARDS THREE CWOS IN THE AMOUNT OF $914,071. |
| Mar 6, 2017 | P00046 | $292.8K | MODIFICATION P00046 AWARDS FOUR CWOS IN THE AMOUNT OF $292,831.50. |
| Feb 1, 2017 | P00045 | $438.0K | MOD TO FUND 1 CWO IN THE AMOUNT OF $37,960 AND $400K IN EMERGENCY REPAIRS. |
| Jan 12, 2017 | P00044 | $631.4K | MOD TO FUND 2 REPAIR WORK CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $631K. |
| Nov 23, 2016 | P00043 | $1.7M | MOD TO FUND 7 REPAIR WORK CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $1.7M. |
| Sep 26, 2016 | P00042 | $4.9M | MOD TO FUND 14 REPAIR WORK CWO'S AT JSMC LIMA. |
| Sep 15, 2016 | P00041 | $4.0M | MOD TO FUND 2 REPAIR WORK CWO'S AT JSMC LIMA VALUED AT $4M. |
| Aug 26, 2016 | P00040 | $5.0M | MODIFICATION TO FUND 1- REPAIR WORK CWO'S AT JSMC LIMA, VALUED AT $4.9M. |
| Aug 11, 2016 | P00039 | $500.0K | MODIFICATION TO FUND $500K IN EMERGENCY REPAIRS. |
| Aug 9, 2016 | P00038 | $4.2M | MOD TO FUND 9 REPAIR WORK CWO'S AT JSMC, VALUED AT $4.1M. |
| Jul 22, 2016 | P00037 | $4.7M | MODIFICATION TO FUND 7 REPAIR WORK CWO'S AT JSMC LIMA. |
| Jun 17, 2016 | P00036 | $250.0K | MODIFICATION TO FUND $250K FOR EMERGENCY REPAIRS FUNDING CLIN AT JSMC LIMA. |
| Jun 16, 2016 | P00035 | $16.0M | MOD TO FUND 4 REPAIR WORK CWO'S AT JSMC, TOTAL VALUE $15.9M. |
| Apr 29, 2016 | P00034 | $2.9M | MOD TO FUND 3 REPAIR WORK CWO'S AT JSMC LIMA. |
| Mar 31, 2016 | P00033 | $4.1M | MODIFICATION TO FUND 7 REPAIR WORK ORDERS AT JSMC LIMA, IN THE AMOUNT OF $4M. |
| Mar 3, 2016 | P00032 | $4.9M | MOD TO FUN 1 CWO AND PROVIDE EMERGENCY REPAIRS FUNDING. |
| Feb 22, 2016 | P00031 | $660.6K | MODIFICATION TO EXTEND CONTRACT TO 30-SEP-2017, AND FUND 8 CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $660K. |
| Jan 29, 2016 | P00030 | $914.7K | MODIFICATION TO FUND 1 CWO TO REPAIR A PORTION OF THE TEST TRACK ACCESS ROAD AT LIMA, VALUED AT $772K. |
| Dec 21, 2015 | P00029 | $1.6M | MODIFICATION TO FUND 2 REPAIR WORK CWO'S AT JSMC LIME, $1.6M. |
| Dec 11, 2015 | P00028 | $2.9K | MODIFICATION TO FUND 1 CWO TO SUPPORT ARMY COE EFFORT AT JSMC, VALUED AT $2K. |
| Nov 30, 2015 | P00027 | $1.6M | MODIFICATION TO FUND 1 REPAIR WORK CWO TO UPGRADE ABRAMS BRIDGE CRANES, $1.5M. |
| Oct 30, 2015 | P00026 | $106.0K | MODIFICATION TO PROVIDE SUPPLEMENTAL FUNDING FOR 5 CWO'S AND FUND 3 NEW REPAIR WORK CWO'S. |
| Oct 27, 2015 | P00025 | $2.6M | MODIFICATION TO FUND 2 REPAIR WORK CWO'S AT JSMC LIMA IN THE AMOUNT OF $2.6M. |
| Sep 16, 2015 | P00024 | $602.4K | MODIFICATION TO FUND 4 REPAIR WORK CWO'S IN THE AMOUNT OF $602,429. |
| Aug 31, 2015 | P00023 | $191.9K | MODIFICATION TO PROVIDE SUPPLEMENTAL FUNDING FOR PREVIOUSLY AWARDED CWO'S IN THE TOTAL AMOUNT OF $200,474. |
| Aug 5, 2015 | P00022 | $477.2K | MODIFICATION TO FUND 2 REPAIR WORK CWO'S AND DELETE ONE REPAIR WORK CWO AT JSMC LIMA. |
| Jul 8, 2015 | P00021 | $131.2K | MODIFICATION TO PROVIDE $131K IN EMERGENCY FUNDING AND EXERCISE OPTION 0003AA TO EXTEND CONTRACT THRU 30 SEPT 2016. |
| Jun 23, 2015 | P00020 | $281.3K | MODIFICATION TO PROVIDE FUNDING FOR REPAIR CWO L15-009R AND L15-011R IN THE TOTAL AMOUNT OF $281,336 AT JSMC LIMA. |
| Apr 20, 2015 | P00019 | $105.2K | MODIFICATION TO FUND 2 ABRAMS SPECIFIC REPAIR WORK CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $105K. |
| Apr 10, 2015 | P00018 | $583.7K | MODIFICATION TO PROVIDE FUNDING FOR 4 REPAIR WORK CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $583K. |
| Apr 2, 2015 | P00017 | $500.0K | MODIFICATION TO PROVIDE $500K IN EMERGENCY REPAIR FUNDS UNDER CLIN 200107. |
| Mar 25, 2015 | P00016 | $630.9K | MODIFICATION TO FUND 7 ABRAMS RELATED CWOS AT JSMC LIMA IN THE TOTAL AMOUNT OF $630K. |
| Mar 19, 2015 | P00015 | $264.3K | MODIFICATION TO FUND 7 REPAIR WORK CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $264,302. |
| Mar 10, 2015 | P00014 | $519.4K | MODIFICATION TO FUND 7 REPAIR WORK CWO'S AT JSMC LIMA IN THE TOTAL AMOUNT OF $519,350. |
| Mar 5, 2015 | P00013 | $386.0K | MODIFICATION TO FUND 6 CONTRACTOR WORK ORDERS (CWOS) FOR VARIOUS REPAIR WORK AT JSMC LIMA. |
| Feb 20, 2015 | P00012 | $165.9K | MODIFICATION TO PROVIDE SUPPLEMENTAL FUNDING FOR CWO LR13-027R2 IN THE AMOUNT OF $165,881 UNDER SUBCLIN 100112. |
| Jan 26, 2015 | P00011 | $20.4K | MODIFICATION TO INCREASE FUNDING ON SUBCLIN 100111 AND UPDATE CDRLS. |
| Nov 14, 2014 | P00010 | $200.0K | MODIFICATION TO PROVIDE FUNDING FOR SUBCLIN 200106 IN THE AMOUNT OF $200K FOR EMERGENCY REPAIR FUNDING AT JSMC LIMA. |
| Oct 22, 2014 | P00009 | $39.6K | MODIFICATION TO FUND SUBCLIN 100111 IN THE AMOUNT OF $39,557 FOR INSTALLATION SUPPORT OF THE MASS NOTIFICATION SYSTEM AT JSMC. |
| Sep 22, 2014 | P00008 | $150.0K | MODIFICATION TO INCREASE FUNDING ON SUBCLIN 200105 BY $150K FOR EMERGENCY REPAIRS. |
| Sep 15, 2014 | P00007 | $150.0K | MODIFICATION TO PROVIDE EMERGENCY REPAIRS FUNDING UNDER SUBCLIN 200105 AND EXERCISE OPTION 1 CLIN 0002AA. |
| Jun 5, 2014 | P00006 | $233.0K | MODIFICATION TO FUND VARIOUS CONTRACTOR WORK ORDERS IN THE TOTAL AMOUNT OF $239,071 AND ADD DFARS CLAUSE 252.2004-0005. |
| Apr 23, 2014 | P00005 | $118.0K | MODIFICATION TO ADD EMERGENCY FUNDING IN THE TOTAL AMOUNT OF $118,042 UNDER SUBCLINS 200103 AND 200104. |
| Apr 4, 2014 | P00004 | $286.9K | MODIFICATION TO FUND CLIN 100102 IN THE AMOUNT OF $236,588 FOR LABOR AND MATERIAL TO REPLACE ELLIOT COMPRESSOR CONTROLS AT JSMC-LIMA IN ACCORDANCE WITH CWO L12-050 AND CLIN 100103 IN THE AMOUNT OF $50,299 FOR LABOR AND MATERIAL TO REPAIR/REPLACE THE BRICK ARCH AND RIGHT AND LEFT SIDEWALLS OF BOILER #6 AT JSMC-LIMA IN ACCORDANCE WITH CWO L14-005. |
| Feb 14, 2014 | P00003 | $145.3K | MODIFICATION TO FUND SUBCLIN 100101 FOR CWO L13-036 FOR DU ARMOR RADIATION FOR CY 2014. |
| Jan 28, 2014 | P00002 | $100.0K | MODIFICATION TO FUND CLIN 200102 IN THE AMOUNT OF $100K FOR EMERGENCY REPAIRS. |
| Oct 21, 2013 | P00001 | $109.9K | FUNDING FOR EMERGENCY REPAIRS |
| Sep 30, 2013 | 0 | $1 | IGF::OT::IGF |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-11-15 (14 days from calculation)
- +35 points
- 69 historical awards in this buyer and category group
- +15 points
- 136 recorded award transactions
- +10 points
- Latest award action: 2026-05-07
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.