Federal contract award

W56HZV15CA001

THIS ACTION IS COST PLUS INCENTIVE-FEE (CPIF) 52 MONTH ENGINEERING AND MANUFACTURING DEVELOPMENT CONTRACT, WITH THREE FIXED PRICE INCENTIVE (SUCCESSIVE TARGETS) (FPI(S)) OPTION YEARS OF LOW RATE INITIAL PRODUCTION (LRIP) FOR THE ARMORED MULTI-PURPOSE VEHICLE (AMPV) REQUIREMENT. THE AMPV FAMILY OF VEHICLES (FOV) IS A MATERIEL SOLUTION REPLACEMENT FOR THE M113 FOV TO MITIGATE CURRENT AND FUTURE CAPABILITY GAPS IN FORCE PROTECTION, MOBILITY, RELIABILITY, AND INTEROPERABILITY BY MISSION ROLE VARIANT TO SUPPORT THE ARMORED BRIGADE COMBAT TEAM (ABCT) ACROSS THE SPECTRUM OF CONFLICT. THE AMPV FOV WILL REPLACE THE FIVE MISSION ROLES CURRENTLY PERFORMED BY THE M113 FOV BY TRANSFERRING THE CURRENT M113 MISSION EQUIPMENT PACKAGES (MEP) TO A NEW VEHICLE PLATFORM. THE AMPV VEHICLE FLEET WILL CONSIST OF THE FOLLOWING FIVE VARIANTS TAILORED TO SPECIFIC MISSION ROLES WITHIN ABCT: GENERAL PURPOSE (GP) VEHICLE MISSION COMMAND (MCMD) VEHICLE MORTAR CARRIER (MC) VEHICLE MEDICAL EVACUATION (ME) VEHICLE AND MEDICAL TREATMENT (MT) VEHICLE. A TOTAL QUANTITY OF 29 VEHICLES WILL BE DELIVERED DURING EMD (INCLUDING SYSTEM SUPPORT PACKAGES, SPECIAL TOOLS AND TEST EQUIPMENT, AND BALLISTIC HULLS), WITH 52 (LRIP OPTION YEAR 1), 105 (LRIP OPTION YEAR 2), AND 130 (LRIP OPTION YEAR 3) VEHICLES ANTICIPATED DURING THE LRIP OPTION YEARS. RANGE PRICING IS INCLUDED IN THE CONTRACT FOR OPTION PERIODS 2 AND 3.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS336992 — Military Armored Vehicle, Tank, and Tank Component Manufacturing
PSC2350 — Combat, Assault, and Tactical Vehicles, Tracked
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS INCENTIVE FEE
Obligations$2.0B
Current contract value$2.0B
Potential contract value / ceiling$2.8B
Start dateDec 23, 2014
Current end dateMay 30, 2026
Potential end dateMay 30, 2026
Latest award activityMar 6, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 200 of 205 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 6, 2026P00194$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Mar 6, 2026P00194$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Dec 4, 2025P00193$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Dec 4, 2025P00193$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 11, 2025P00191$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 11, 2025P00191$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 14, 2025P00192$11.5MTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE M113 IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 14, 2025P00192$11.5MTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE M113 IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jun 6, 2025P00190$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jun 6, 2025P00190$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jan 13, 2025P00189$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jan 13, 2025P00189$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 25, 2024P00188$194.1KTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 25, 2024P00188$194.1KTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 30, 2024P00187$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 30, 2024P00187$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 29, 2024P00186$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 29, 2024P00186$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 25, 2024P00185$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 29, 2024P00184$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 30, 2024P00183$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 29, 2024P00182$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 17, 2024P00181$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jun 21, 2024P00180$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
May 23, 2024P00179$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
May 2, 2024P00177$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
May 1, 2024P00178$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Mar 25, 2024P00176$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Feb 28, 2024P00175$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jan 30, 2024P00173$904.3KTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). THIS MODIFICATION FUNDS THE RAMP SEAL RETROFIT AND PRODUCTION CUT-IN.
Dec 13, 2023P00174$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 28, 2023P00172$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 27, 2023P00171$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 14, 2023P00168$0THIS PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLE (AMPV) SET TO REPLACE THE AGING M113 IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 31, 2023P00170$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 27, 2023P00169$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 26, 2023P00167$2.8MTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 31, 2023P00166$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 14, 2023P00165$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 25, 2023P00164$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 20, 2023P00163$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jun 23, 2023P00161$1.4MTHIS PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLE (AMPV) SET TO REPLACE THE AGING M113 IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). THIS MODIFICATION FUNDS THE SCHEDULE SHIFT TO IOT&E.
Jun 22, 2023P00162$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
May 2, 2023P00160$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Mar 31, 2023P00159$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Mar 28, 2023P00158$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Mar 1, 2023P00157$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Feb 23, 2023P00156$173.0KTHIS CONTRACT IS FOR THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE (AMPV) VEHICLES.
Jan 26, 2023P00155$175.1KTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM.
Dec 20, 2022P00154$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Dec 16, 2022P00153$197.7KTHIS CONTRACT IS FOR THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES. THIS MODIFICATION IS AN EQUITABLE ADJUSTMENT FOR NETWORK EVOLUTION CHANGES INTO THE GENERAL PURPOSE AND MISSION COMMAND VARIANTS.
Dec 8, 2022P00152$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 29, 2022P00145$13.3MEQUITABLE ADJUSTMENT FOR THE THIRD WORK STATION AND DUAL PATH COMMUNICATIONS INCORPORATED INTO THE ARMORED MULTI-PURPOSE VEHICLES.
Nov 18, 2022P00151$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM.
Oct 31, 2022P00150$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING MLL3S IN THE ARMORED BRIGADE COMBAT TEAM.
Oct 13, 2022P00149$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLE (AMPVS) SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM.
Sep 30, 2022P00148$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) SET TO REPLACE THE M113S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 28, 2022P00146$728.0KTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 27, 2022P00144$0THE PROCUREMENT OF 457 ARMORED MULTI PURPOSE VEHICLES (AMPVS) SET TO REPLACE THE M113 IN THE ARMORED BRIGADE COMBAT TEAM.
Sep 23, 2022P00147$0PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPVS) TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Sep 22, 2022P00142$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 29, 2022P00143$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 29, 2022P00127$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 6, 2022P00141$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPVS). SET TO REPLACE THE AGING M1113S IN THE ARMORED BRIGADE COMBAT TEAM.
Jun 30, 2022P00140$702.0KTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPVS). SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM.
Jun 16, 2022P00139$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (AABBCCTT).
Jun 3, 2022P00138$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). UPDATED GOVERNMENT FURNISHED PROPERTY INFORMATION.
May 10, 2022P00137$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (AABBCCTT).
Apr 29, 2022P00136$0THE PROCUREMENT OF 457 ARMORED MULTI PURPOSE VEHICLES (AMPVS) SET TO REPLACE THE M113 IN THE ARMORED BRIGADE COMBAT TEAM.
Apr 28, 2022P00135$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Mar 21, 2022P00133$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPVS)SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM.
Mar 10, 2022P00134$0FUND SWAP UNDER ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Jan 27, 2022P00132$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jan 26, 2022P00131$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPVS). SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM.
Jan 19, 2022P00129$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). THIS MODIFICATION UPDATES ATTACHMENT 0006 & ATTACHMENT 0168.
Jan 14, 2022P00130$0ARMORED MULTI-PURPOSE VEHICLES (AMPV) UPDATED SCHEDULE ADJUSTMENT TO SETTLE CLAIM NO. 62807 WITH ARMED SERVICES BOARD OF CONTRACT APPEALS (ASBCA)
Dec 16, 2021P00128$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Dec 10, 2021P00125$0TO MODIFY THE SHIP TO DESTINATION TO ALIGN WITH THE DEPROCESSING SITE IN SUPPORT OF LOW RATE INITIAL PRODUCTION OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Dec 2, 2021P00126$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 23, 2021P00123$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) SET TO REPLACE THE AGING M113S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Nov 23, 2021P00124$6.0MSETTLE CLAIM NO. 62807 WITH THE ARMED SERVICES BOARD OF CONTRACT APPEALS (ASBCA) IN SUPPORT OF LOW RATE INITIAL PRODUCTION OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Nov 16, 2021P00122$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). THIS MODIFICATION UPDATES RFVS.
Oct 18, 2021P00121$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Oct 14, 2021P00120$0UCO TO CHANGE PAINT FROM TRI-COLOR TO GREEN. $0 ISSUED AT TIME OF UCO AWARD.
Sep 27, 2021P00116$2.9MUPGRADING THE TACTICAL CROSS-DOMAIN SOLUTION DURING LOW RATE INITIAL PRODUCTION OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Sep 22, 2021P00119$2.9MTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Aug 25, 2021P00118$0UPDATE THE GOVERNMENT FURNISHED PROPERTY ATTACHMENT IN SUPPORT OF LOW RATE INITIAL PRODUCTION OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Aug 9, 2021P00112$0ADMINISTRATIVE MODIFICATION IN SUPPORT OF LOW RATE INITIAL PRODUCTION OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Aug 9, 2021P00117$1.3MTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jul 16, 2021P00115$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). THIS MODIFICATION UPDATES RFVS.
Jun 16, 2021P00114$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jun 11, 2021P00113$4.2MARMORED MULTI-PURPOSE VEHICLES (AMPV)
May 27, 2021P00111$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT). THIS MODIFICATION ADDS 2 REQUEST FOR VARIANCES TO ATTACHMENT 0155.
May 21, 2021P00108$1.3MARMORED MULTI-PURPOSE VEHICLE DEVELOPMENT AND LOW RATE INITIAL PRODUCTION
May 14, 2021P00110$15.7MDEVELOPMENT AND PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Apr 30, 2021P00109$0APPROVED REQUEST FOR VARIANCES IN SUPPORT OF DELIVERY OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Apr 2, 2021P00106$7.5MINCREMENTAL FUNDING OF ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Apr 1, 2021P00103$20.5MTHE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Mar 26, 2021P00107$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Feb 25, 2021P00105$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jan 21, 2021P00104$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Dec 17, 2020P00102$0PRODUCTION OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Nov 30, 2020P00101$0PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Nov 13, 2020P00097$0DEVELOP AND PROCURE 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Sep 28, 2020P00099$3.4MTO CHANGE PAINT PATTERN FROM SOLID GREEN TO TRI-COLOR CAMOUFLAGE FOR 393 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Sep 18, 2020P00100$12.5MINCREMENTAL FUNDING OF ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) IN SUPPORT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Sep 10, 2020P00098$0FUND SWAP LOW RATE INITIAL PRODUCTION (LRIP) - 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Aug 30, 2020P00096$0PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES UNDER LOW RATE INITIAL PRODUCTION
Aug 28, 2020P00094$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV)
Aug 28, 2020P00095$57.0MINCREASE FUNDING WITHIN CEILING PRICE FOR THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Aug 6, 2020P00091$0LOW RATE INITIAL PRODUCTION (LRIP) OF 457 ARMORED MULTI-PURPOSE VEHICLES.
Aug 4, 2020P00093$0LOW RATE INITIAL PRODUCTION OF 457 ARMORED MULTI PURPOSE VEHICLES.
Jul 2, 2020P00092$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV). SET TO REPLACE THE AGING M113'S IN THE ARMORED BRIGADE COMBAT TEAM (ABCT).
Jun 19, 2020P00062$0ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Jun 4, 2020P00088$0ARMORED MULTIPURPOSE VEHICLE. NO COST BILATERAL SUPPLEMENTAL AGREEMENT TO CLARIFY SECTION E.
Jun 1, 2020P00086$0CONTRACT FOR DEVELOPMENT AND PROCUREMENT OF ARMORED MULTI-PURPOSE VEHICLES (AMPV).
May 12, 2020P00082$93.8KARMORED MULTI-PURPOSE VEHICLE
May 7, 2020P00090$0ARMORED MULTI-PURPOSE VEHICLE UCO TO MODIFY SPECIFICATIONS FOR CDRL.
Apr 30, 2020P00089$0LOW RATE INITIAL PRODUCTION (LRIP) OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Apr 17, 2020P00087$14.1MDEVELOPMENT AND PRODUCTION OF THE ARMORED MULTI-PURPOSE VEHICLE (AMPV) SET TO REPLACE THE M113.
Mar 27, 2020ARZ999$0COVID-19 DIB. COMBAT, ASSAULT, AND TACTICAL VEHICLES, TRACKED
Mar 16, 2020P00084$0ARMORED MULTI-PURPOSE VEHICLE
Mar 6, 2020P00085$0THE PROCUREMENT OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV).
Feb 27, 2020P00083$0LOW RATE INITIAL PRODUCTION (LRIP) OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) SET TO REPLACE THE AGING FLEET OF M113'S.
Feb 19, 2020P00081$0ARMORED MULTI-PURPOSE VEHICLES
Jan 21, 2020P00080$400.9MTO PROCURE 160 ARMORED MULTI-PURPOSE VEHICLES (AMPV) UNDER OPTION 3 OF THE LOW RATE INITIAL PRODUCTION (LRIP) CONTRACT.
Jan 8, 2020P00078$-417.1MLOW RATE INITIAL PRODUCTION (LRIP) OF 457 ARMORED MULTI-PURPOSE VEHICLES (AMPV) - STEP 1 OF FUND SWAP (DEOBLIGATION).
Jan 8, 2020P00079$416.5MLOW RATE INITIAL PRODUCTION (LRIP) OF 297 ARMORED MULTI-PURPOSE VEHICLES (AMPV). STEP 2 OF FUND SWAP (RE-OBLIGATION).
Dec 20, 2019P00077$0LOW RATE INITIAL PRODUCTION OF THE ARMORED MULTI-PURPOSE VEHICLE.
Dec 19, 2019P00074$0LOW RATE INITIAL PRODUCTION OF THE ARMORED MULTI-PURPOSE VEHICLE.
Dec 17, 2019P00076$0ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) / LOW RATE INITIAL PRODUCTION (LRIP) FOR THE ARMORED MULTI-PURPOSE VEHICLE (AMPV).
Nov 22, 2019P00075$27.4MTO FUND ENGINEERING AND DEVELOPMENT (EMD) IN SUPPORT OF THE ARMORED MULTI-PURPOSE VEHICLE (AMPV)
Sep 26, 2019P00073$11.0KENGINEERING AND MANUFACTURING DEVELOPMENT IN SUPPORT OF THE ARMORED MULTI-PURPOSE VEHICLE PRODUCTION.
Sep 25, 2019P00072$3.0MENGINEERING AND MANUFACTURING DEVELOPMENT IN SUPPORT OF ARMORED MULTI-PURPOSE VEHICLE.
Aug 30, 2019P00071$9.0MARMORED MULTI PURPOSE VEHICLE (AMPV) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) / LOW RATE INITIAL PRODUCTION (LRIP).
Jul 25, 2019P00070$0ARMORED MULTI-PURPOSE VEHICLE. EXTEND THE EMD PORTION OF THE CONTRACT FOR ONE MONTH.
Jul 18, 2019P00069$0CHANGE ORDER
Jun 27, 2019P00068$0ARMORED MULTI-PURPOSE VEHICLE CLIN EXTENSION
May 29, 2019P00066$0MODIFICATION TO PERFORM FUNDS SWAP. NET CHANGE IS $0.
May 22, 2019P00067$0ARMORED MULTI-PURPOSE VEHICLE. EXTENDING THE EMD PERIOD OF PERFORMANCE FOR 30 DAYS.
Apr 18, 2019P00064$0ARMORED MULTI-PURPOSE VEHICLE - REVISED AGREEMENT FOR OPTIONAL EXCHANGE VEHICLES
Apr 11, 2019P00065$15.0MINCREMENTAL FUNDING FOR ARMORED MULTI-PURPOSE VEHICLE - ENGINEERING AND MANUFACTURING DEVELOPMENT
Feb 7, 2019P00063$446.6MARMORED MULTIPURPOSE VEHICLE LOW RATE INITIAL PRODUCTION - OPTION EXERCISE
Jan 25, 2019P00061$128.3MARMORED MULTI-PURPOSE VEHICLE LOW RATE INITIAL PRODUCTION OPTION EXERCISE
Jan 7, 2019P00060$15.5MINCREMENTAL FUNDING - ARMORED MULTI-PURPOSE VEHICLE ENGINEERING AND MANUFACTURING DEVELOPMENT PHASE
Dec 19, 2018P00059$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) - LOW RATE INITIAL PRODUCTION RESTRUCTURE OF OPTION TERMS
Dec 17, 2018P00058$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) - MODIFICATION TO INCORPORATE 29 PM APPROVED RFVS
Oct 9, 2018P00053$0MODIFICATION TO INCORPORATE CHANGES TO THE MATERIAL AND EQUIPMENT MATRIX (MEM)
Sep 24, 2018P00056$0ARMORED MULTI-PURPOSE VEHICLE. NO COST BILATERAL MOD TO INCORPORATE SOW, CDRL, ATTACHMENT, AND CLAUSE CHANGES.
Sep 24, 2018P00057$13.6MARMORED MULTI-PURPOSE VEHICLE. MOD TO ADD INCREMENTAL FUNDING FOR EMD THROUGH DEC.2018
Aug 31, 2018P00055$298.4MARMORED MULTI-PURPOSE VEHICLE - AMPV CLIN RESTRUCTURE AND EARLY ORDER FUNDING
Aug 17, 2018P00054$2.3MARMORED MULTI-PURPOSE VEHICLE. CHANGE ORDER TO INCORPORATE DVE WIDE REQUIREMENT
Jul 19, 2018P00051$0ARMORED MULTI-PURPOSE VEHICLE. NO COST BILATERAL MOD TO INCORPORATE REVISED REFURB LANGUAGE AND CONTRACTOR ACQUIRED PROPERTY (CAP) CLIN.
Jun 22, 2018P00052$0ARMORED MULTI-PURPOSE VEHICLE. NO COST MOD TO CHANGE SHIPPING REQUIREMENTS.
May 24, 2018P00050$27.0MARMORED MULTI-PURPOSE VEHICLE -- MOD TO ADD FY18 INCREMENTAL FUNDING FOR EMD EFFORT.
May 10, 2018P00049$0ARMORED MULTI-PURPOSE VEHICLE. NO COST ADMIN MOD TO APPROVED PROHIBITED MATERIAL WAIVERS
May 2, 2018P00048$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) NO COST ADMINISTRATIVE MOD
Apr 3, 2018P00047$30.0MAMPV EMD EFFORT
Mar 29, 2018P00037$6.2MARMORED MULTI-PURPOSE VEHICLE. DEFINITIZATION OF NETWORK EVOLUTION UCO.
Mar 12, 2018P00046$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) ADMINISTRATIVE MODIFICATION
Jan 31, 2018P00039$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND LOW RATE INITIAL PRODUCTION (LRIP) ADMINISTRATIVE MODIFICATION TO REFLECT CHANGES IN GOVERNMENT FURNISHED PROPERTY.
Jan 29, 2018P00042$0ARMORED MULTIPURPOSE VEHICLE (AMPV) - NO COST BILATERAL MOD TO INCORPORATE REVISED VEHICLE PROTOTYPE DELIVERY SCHEDULE AND TEST SCHEDULE
Jan 26, 2018P00043$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) NO COST ADMINISTRATIVE MODIFICATION TO UPDATE CDRLS AND APPROVED VARIANCES.
Dec 21, 2017P00045$15.0MARMORED MULTI-PURPOSE VEHICLE (AMPV) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) EFFORT - INCREMENTAL FUNDING
Dec 18, 2017P00044$1.2MAMPV PROGRAM OF RECORD, EMD EFFORT MFOCS MODIFICATION
Nov 21, 2017P00041$0ARMORED MULTI-PURPOSE VEHICLE (AMPV) ENGINEERING AND MANUFACTURING DEVELOPMENT NO COST MODIFICATION TO ADD ADDITIONAL ASSERTIONS OF RESTRICTIONS IN TECHNICAL DATA AND COMPUTER SOFTWARE
Nov 3, 2017P00033$0ARMORED MULTI-PURPOSE VEHICLE (AMPV). ECONOMIC ADJUSTMENT FOR CHANGE OF VEHICLE TRACK TYPE.
Nov 3, 2017P00040$11.0MINCREMENTAL FUNDING MOD
Sep 21, 2017P00038$0MOD P00038 ADD INCREMENTAL FUNDING VIA NEW SLIN 000111 AND REDUCES FUNDING FOR THE SAME AMOUNT ON SLIN 000108. THE RESULT IS A ZERO NET CHANGE.
Sep 20, 2017P00032$0AMPV EMD CONTRACT ADMINISTRATIVE MODIFICATION
Sep 20, 2017P00036$2.3MMOD P00036 ADDS INCREMENTAL FUNDING
Sep 1, 2017P00035$0ARMORED MULTI-PURPOSE VEHICLE (AMPV)
Aug 11, 2017P00029$0ARMORED MULTI-PURPOSE VEHICLE ENGINEERING MANUFACTURING DEVELOPMENT PHASE - MISCELLANEOUS NO-COST CHANGES
Jul 10, 2017P00034$4.3MARMORED MULTI-PURPOSE VEHICLE ENGINEERING AND MANUFACTURING DEVELOPMENT CONTRACT, UNPRICED CHANGE ORDER MODIFICATION FOR NETWORK EVOLUTION REQUIREMENTS
Jun 30, 2017P00031$106.0KAMPV EMD CONTRACT. MODIFY REQUIREMENTS FOR COLD START KITS.
Jun 12, 2017P00030$55.5MARMORED MULTI-PURPOSE VEHICLE CONTRACT. ADD INCREMENTAL FUNDING TO ENGINEERING AND MANUFACTURING DEVELOPMENT PHASE FOR AMPV.
Jun 9, 2017P00028$162.5KARMORED MULTI-PURPOSE VEHICLE BASE CONTRACT AWARD FOR EMD AND LRIP. MODIFICATION FOR SOFTWARE CHANGE
May 15, 2017P00026$0ARMORED MULTI-PURPOSE VEHICLE. NO COST-MODIFICATION FOR CHANGES WITHIN SCOPE AND ADMINISTRATIVE CHANGES.
Mar 31, 2017P00027$0MOD TO CORRECT BASE CLIN VALUES AND INCREMENTAL FUNDING SCHEDULE.
Mar 3, 2017P00024$4.1MDUAL PATH UCO DEFINITIZATION
Feb 14, 2017P00019$0MOD TO INCORPORATE NO-COST CHANGES TO THE MEM AND PSPEC.
Jan 19, 2017P00025$58.8MINCREMENTAL FUNDING MODIFICATION
Dec 30, 2016P00023$0MOD TO EXTEND UCO
Nov 29, 2016P00022$15.0MUNILATERAL MODIFICATION TO ADD FY17 INCREMENTAL FUNDING AND CORRECT TYPO ERROR ON MOD P00014.
Nov 23, 2016P00021$0INCORPORATE VARIANCE INTO AMPV CONTRACT. DELETE CLINS 000105 AND 000106 AND TRANSFER FUNDING TO EXISTING CLINS 000102 AND 000103.
Sep 15, 2016P00020$16.9MINCREMENTAL FUNDING MODIFICATION. $16,924,353.89
Aug 16, 2016P00018$0AMPV ADMIN MODIFICATION TO INCORPORATE NEW COR.
Jul 27, 2016P00017$0MODIFICATION TO CHANGE LANGUAGE OF FIVE CDRLS. NO COST, ADMINISTRATIVE MOD.
Jul 1, 2016P00016$4.0MUCO TO INCORPORATE A 3RD WORKSTATION AND DUAL PATH DESIGN APPROACH FOR HMS/SINCGARS AND TACSAT.
Jun 17, 2016P00015$0ZERO COST ADMINISTRATIVE CHANGES/UPDATES TO CONTRACT SCOPE OF WORK (SOW), CONTRACT ATTACHMENTS, AND CONTRACT DATA REQUIREMENTS (CDRLS).
May 4, 2016P00014$0REDUCTION IN SCOPE TO REMOVE REQUIREMENT FOR ARMOR TILE PURCHASE.
Mar 15, 2016P00013$0MODIFICATION P00013 TO CONTRACT W56HZV-15-C-A001 IS BEING ISSUED AS A SUPPLEMENTAL AGREEMENT PURSUANT TO FAR 43.103(A)(2). THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DEFINITIZE THE UNDEFINITIZED CONTRACT ACTION (UCA) AWARDED UNDER MODIFICATION P0004, DATED 26 MAY 2015. THE PARTIES AGREE THAT THE TOTAL VALUE FOR THIS DEFINITIZATION IS $11,448,341.
Feb 18, 2016P00011$0UPDATE TO SOW AND ATTACHMENTS.
Feb 18, 2016P00012$102.0MINCREMENTAL FUNDING MODIFICATION TO ADD $102,000,000 OF FY16 FUNDING TO THE CONTRACT.
Dec 18, 2015P00010$15.0MTHIS MOD IS TO INCREASE THE INCREMENTAL FUNDING ON CONTRACTING, IN ACCORDANCE WITH THE INCREMENTAL FUNDING SCHEDULE, AND UPDATE THE PAYMENT INSTRUCTIONS IN SECTION G.
Nov 6, 2015P00009$29.0MTHIS MODIFICATION IS TO OBLIGATE ADDITIONAL FUNDING AND TO INCORPORATE ADMINISTRATIVE CHANGES.
Sep 17, 2015P00008$4.8MTHIS IS A FUNDING ONLY MODIFICATION TO OBLIGATE ADDITIONAL FUNDING WITHIN GOVERNMENT'S LIMITATION OF GOVERNMENT LIABILITY.
Sep 16, 2015P00007$0NO COST CHANGE MODIFICATION TO INCORPORATE ADMINISTRATIVE CHANGES, MINOR UPDATES, AND FURTHER CLARIFICATIONS TO CONTRACT SOW. THIS INCLUDES INCORPORATING ADDITIONAL CLAUSES AND A NEW CONTRACT ATTACHMENT, CORRECTING ERRORS, AND ADJUSTING DATES AND CDRL LANGUAGE.
Jul 29, 2015P00006$0MODIFICATION P00006 IS BEING ISSUED TO INCORPORATE NUMEROUS UPDATES, CLARIFICATIONS, AND CHANGES TO THE CONTRACT SCOPE OF WORK (SOW), INCLUDING ADDING NEW ATTACHMENTS AND AMENDING CURRENT ATTACHMENTS AND EXHIBITS, INCLUDING THE CONTRACT DATA REQUIREMENTS LIST (CDRL). WHILE THE BROAD SCOPE REQUIREMENTS HAVE NOT CHANGED, THE REQUIREMENT PARAMETERS HAVE BEEN AMENDED, ADJUSTMENTS HAVE BEEN MADE TO REQUIREMENT TIMEFRAME COMPLETION, MORE DETAILS INCORPORATED FURTHER REFINING TERMINOLOGY, AND NEW ATTACHMENTS HAVE BEEN INCORPORATED AS A RESULT OF REQUIREMENT CLARIFICATIONS. THIS NO COST MODIFICATION.
Jun 2, 2015P00005$21.3MMOD P00004 IS BEING ISSUED TO OBLIGATE FUNDING ON THIS CONTRACT UNDER CLIN 0001. THE FOLLOWING FUNDING ACTIONS ARE TAKING PLACE UNDER FUNDING CLINS 00101&00102: 1. AMENDMENT 04 TO PRON 724221AV72, INCREASING THE AMOUNT OF THE PRON BY $3,000,000, FROM $1,000,000 TO $4,000,000. 2. AMENDMENT 04 TO PRON 725202AV72, INCREASING THE AMOUNT OF THE PRON BY $18,322,000, FROM $41,000,000 TO $59,332,000.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.