Federal contract award
W56HZV19C0036
MOBILE PROTECTED FIREPOWER ENGINEERING MANUFACTURING AND DEVELOPMENT / MIDDLE TIER ACQUISITION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC- DTA |
| NAICS | 336992 — Military Armored Vehicle, Tank, and Tank Component Manufacturing |
| PSC | 2350 — Combat, Assault, and Tactical Vehicles, Tracked |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.4B |
| Current contract value | $1.4B |
| Potential contract value / ceiling | $1.6B |
| Start date | Dec 17, 2018 |
| Current end date | Oct 17, 2026 |
| Potential end date | Aug 15, 2028 |
| Latest award activity | Apr 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 134 of 134 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 27, 2026 | P00135 | $-3.5M | RESOLED CONDITIONAL ACCEPTANCE FOR LRIP 2 AND ADJUSTED CLIN 1007 DE-OBLIGATION. |
| Apr 1, 2026 | P00134 | $0 | ADMINISTRATION UPDATE FOR DFAS PAY OFFICE AND SECTION H.16. |
| Mar 25, 2026 | P00133 | $-9.3K | CLIN 0001AL DEOBLIGATION AND CA FOR PD30, PD31, PD32, PD34, PD37, 35, AND 42. |
| Mar 13, 2026 | P00132 | $-5.4M | UPDATED THE CONDITIONAL ACCEPTANCE FOR ALL LRIP 1 VEHICLES. |
| Sep 11, 2025 | P00131 | $-247.5K | DEOBLIGATING CLIN 0001AM. |
| Jul 21, 2025 | P00130 | $-1.5M | DEOBLIGATION OF CLIN 5001AF, CLIN 5002AK AND CLIN 5002AL. |
| Jun 4, 2025 | P00129 | $-903 | DEOBLIGATION OF 5002AC AND POP EXTENSION FOR WD013 DATA PLATES FOR LRIP VEHICLES. |
| May 30, 2025 | P00128 | $-2.2K | CLIN 100814 DEOBLIGATION DUE TO MRP USG PROCURED, BMO CDRL UPDATES AND ATTACHMENT 009 UPDATE. |
| May 20, 2025 | P00127 | $0 | CD2025 UPDATES, DEOBLIGATION OF CLIN 1008 FOR MRP, UPDATE BMO CDRLS AND ATTACHMENT 0009. |
| Mar 26, 2025 | P00126 | $-43.6K | CONDITIONAL ACCEPTANCE FOR PD26, DEOBLIGATION OF WD010, WD007 AND ATTACHMENT 009 UPDATE. |
| Mar 4, 2025 | P00125 | $0 | SECTION H.5 LRIP RELIABILITY PERFORMANCE INCENTIVE REVISION SECTION H.17 TRANSMISSION CONSIDERATION REVISION SECTION J, WD005 AND WD013 POP EXTENSIONS, ATTACHMENT 0123, LRIP 1-3 INSTALLATION KITS REVISION (R2) |
| Mar 3, 2025 | P00124 | $-45.7K | PDR8 RFV DE-OBLIGATION MRP AND ATT0009 UPDATE DODAAC UPDATES CONDITIONAL ACCEPTANCE FOR PDR8, PD23, PD24 AND PD25 TRANSMISSION CONSIDERATION UNIVERSAL COMBAT LOCK REMOVAL DEVICE CONSIDERATION ATT0125 AND 0126 UPDATES |
| Jan 21, 2025 | P00123 | $0 | CONDITIONAL ACCEPTANCE FOR PD18, PD20, PD21 AND PD22. |
| Dec 5, 2024 | P00122 | $972.1K | INCREMENTAL FUNDING FOR CLIN 1008 AND 1009, POP EXTENSION FOR CLIN 1009, POP EXTENSION FOR WD05 AND WD10, ATTACHMENT 009 UPDATE FOR MRP AND MANUAL FIRE BOX AND ATTACHMENT 021 UPDATE. |
| Nov 26, 2024 | P00121 | $0 | CONDITIONAL ACCEPTANCE OF PDR7, PD17, PD19 AND DEOBLIGATION FOR PD16. |
| Nov 19, 2024 | P00120 | $-4.0M | DEOBLIGATION FOR WD006 AND WD009. |
| Oct 29, 2024 | P00119 | $0 | CONDITIONAL ACCEPTANCE PD14, PD15, PD16 AND SECTION C.2.8.4.5 UPDATE. |
| Oct 22, 2024 | P00118 | $0 | UPDATED GROUP 1 AND GROUP 2 DATES OF CONDITIONAL ACCEPTANCES. |
| Oct 3, 2024 | P00117 | $0 | CONDITIONAL ACCEPTANCE PD11, PD12 AND PD13. |
| Sep 18, 2024 | P00115 | $0 | FPVI SCOPE UPDATE, WD005 POP EXTENSION, AND DODAAC. |
| Sep 18, 2024 | P00116 | $2.5M | INCREMENTAL FUNDING MOD AND GFP ADD |
| Aug 30, 2024 | P00114 | $0 | CONDITIONAL ACCEPTANCE PDR5 & PD10. |
| Aug 26, 2024 | P00113 | $-21.1K | DE-OBLIGATION OF WD09 AND WD12. |
| Aug 13, 2024 | P00112 | $0 | CONDITIONAL ACCEPTANCE FOR PD9. |
| Jul 29, 2024 | P00111 | $-14.2K | DEOBLIGATION OF 100811 TO REFLECT REQUISITION ON MANDATORY REPLACEMENT PARTS. |
| Jul 16, 2024 | P00110 | $0 | CONDITIONAL ACCEPTANCE PD5. |
| Jul 1, 2024 | P00109 | $0 | CONDITIONAL ACCEPTANCE PD7 AND PD8. UPDATE TO C.2.10. |
| Jun 27, 2024 | P00108 | $322.7M | LRIP 3 |
| Jun 24, 2024 | P00106 | $5.2M | WD014 CONTRACTOR TEST SUPPORT IOT&E AND WD015 PM SUPPORT Y3 |
| Jun 24, 2024 | P00107 | $202.5K | WD015 PM SUPPORT Y3. |
| Jun 12, 2024 | P00105 | $0 | CONDITIONAL ACCEPTANCE FOR PD6 AND PDR6. |
| Jun 7, 2024 | P00104 | $0 | UPDATE TO ATT 009. |
| May 22, 2024 | P00103 | $7.2M | INCREMENTAL FUNDING #9 FOR 1008/1009 AND PD4 CONDITIONAL ACCEPTANCE. |
| May 8, 2024 | P00102 | $237.2K | CONDITIONAL ACCEPTANCE PDR4, WD13 AND UPDATE TO WD06. |
| May 1, 2024 | P00101 | $113.3K | INCREMENT #9 FOR 1008, 1009, WD10 AND WD13. |
| Apr 29, 2024 | P00100 | $0 | MODIFICATION TO INCORPORATE CONSIDERATION FOR TRANSMISSION ISSUE. |
| Apr 24, 2024 | P00099 | $0 | CONDITIONAL ACCEPTANCE FOR PDR3. |
| Apr 22, 2024 | P00098 | $-16.6K | ATTACHMENT 009 UPDATE AND WD5 DE-OBLIGATION. |
| Apr 11, 2024 | P00097 | $0 | CONDITIONAL ACCEPTANCE FOR PD3. |
| Apr 3, 2024 | P00096 | $0 | CONDITIONAL ACCEPTANCE FOR PD2. |
| Mar 18, 2024 | P00095 | $0 | MODIFICATION TO INCORPORATE CONDITIONAL ACCEPTANCE AGREEMENT FOR PDR2. |
| Mar 12, 2024 | P00094 | $5.5M | WD07 OVERRUN, WD09 TRAVEL, INCREMENTAL FUNDING 1008 AND 1009, INCREMENT 8. |
| Feb 29, 2024 | P00093 | $0 | CONDITIONAL ACCEPTANCE, STERILIZATION AND ATT 09 UPDATE. |
| Jan 30, 2024 | P00091 | $300.1K | WD009 PLUS UP. |
| Jan 30, 2024 | P00092 | $0 | ATT 09 UPDATE. |
| Jan 11, 2024 | P00090 | $13.2M | INCREMENTAL 7 FUNDING FOR 1007,1008, 1009. |
| Dec 11, 2023 | P00089 | $5.8M | MODIFICATION TO FUND REMAINING HOURS ON WD06 |
| Dec 4, 2023 | P00088 | $0 | REFURB VEHICLES |
| Nov 22, 2023 | P00086 | $0 | MODIFICATION TO INCORPORATE DE-OBLIGATION, REVISE SCOPE, AND ADMINISTRATIVE UPDATES. |
| Oct 31, 2023 | P00087 | $1.4M | CLIN 1008 AND 1009 INCREMENTAL FUNDING #6. |
| Sep 25, 2023 | P00085 | $777.7K | INCREMENTAL FUNDING ON CLIN 1007 |
| Sep 15, 2023 | P00084 | $-817.0K | DEOBLIGATION OF EXCESS FUNDS. |
| Sep 5, 2023 | P00082 | $2.0M | CONTRACTOR TEST SUPPORT |
| Sep 5, 2023 | P00083 | $150.1K | MODIFICATION TO AWARD YEAR 2 OF PM SUPPORT. |
| Aug 2, 2023 | P00081 | $202.8K | ADDIND WD007 |
| Jul 7, 2023 | P00080 | $0 | MODIFICATION TO UPDATE MILSTRIP |
| Jun 30, 2023 | P00079 | $3.6M | MODIFICATION TO ADD SCOPE, REVISE WD 02, AND ADD WD 05. |
| Jun 26, 2023 | P00078 | $257.6M | EXERCISE LRIP 2 OPTION FOR 25 VEHICLES. |
| Jun 22, 2023 | P00077 | $0 | ADMIN MOD TO UPDATE NSN |
| May 23, 2023 | P00076 | $319.1K | MODIFICATION TO INCREASE FUNDING FOR MPF PROGRAM MANAGEMENT AND ADD ADMINISTRATIVE CHANGES. |
| May 19, 2023 | P00075 | $10.3M | INCREMENTAL FUNDING AND ADMINISTRATIVE UPDATES |
| May 8, 2023 | P00072 | $0 | ADMINISTRATIVE CHANGES |
| Apr 19, 2023 | P00074 | $175.2K | WD002 TOXIC FUMES RE-TEST R4 |
| Apr 7, 2023 | P00073 | $75.0K | WD001 R2 AND WD002 R3 |
| Mar 28, 2023 | P00071 | $0 | WD002 R2 EXTENSION OF POP |
| Mar 27, 2023 | P00070 | $15.6M | LRIP OPTION 1 26TH VEHICLE AND LRIP OPTION 2 LONG LEAD MATERIAL |
| Mar 1, 2023 | P00069 | $15.5M | INCREMENTAL FUNDING |
| Feb 8, 2023 | P00068 | $7.0M | INCREMENTAL FUNDING FOR CLINS 1007, 1008, AND 1009 AND ATT 0009 UPDATE. |
| Jan 24, 2023 | P00067 | $77.5K | WD001 REVISION 1 |
| Jan 20, 2023 | P00066 | $0 | FUND SWAP AND ADMINISTRATIVE CHANGES |
| Dec 15, 2022 | P00065 | $10.0M | INCREMENTAL FUNDING ACTION |
| Dec 12, 2022 | P00064 | $143.7K | WORK DIRECTIVE 04 PROGRAM MANAGEMENT LABOR HOUR OPTION AWARD |
| Nov 29, 2022 | P00063 | $0 | ADMINISTRATIVE CHANGES |
| Nov 7, 2022 | P00062 | $846.7K | WD003 CORROSION VEHICLE UPDATE |
| Oct 26, 2022 | P00061 | $8.8M | INCREMENTAL FUNDING FOR CLINS 1007, 1008, 1009 |
| Oct 18, 2022 | P00059 | $0 | ADMINISTRATIVE CHANGES |
| Oct 13, 2022 | P00060 | $1.2M | AWARD OF WD002 |
| Oct 3, 2022 | P00058 | $0 | UPDATE ATTACHMENT 0009 TO INCLUDE PVS 1 THRU 10. |
| Sep 27, 2022 | P00057 | $4.6M | INCREMENTAL FUNDING |
| Sep 8, 2022 | P00056 | $1.8M | AWARD OF WD001 AND WD004, VARIOUS ADMINISTRATIVE CORRECTIONS |
| Aug 18, 2022 | P00055 | $-0 | VARIOUS ADMINISTRATIVE UPDATES AND CORRECTIONS |
| Aug 4, 2022 | P00054 | $0 | FUND SWAP |
| Aug 2, 2022 | P00053 | $0 | EXTEND SOWM DATE REQUIREMENT, CHANGE CLIN B001 INSPECTION TO "DESTINATION", VARIOUS ADMINISTRATIVE CHANGES |
| Jul 29, 2022 | P00049 | $0 | INCORPORATE GOVERNMENT TRADEOFF CONSIDERATIONS IN LIEU OF COMPENSATION FOR CONTRACTOR EFFORTS REGARDING TOXIC FUMES AND SVA/LUT. |
| Jul 7, 2022 | P00052 | $0 | UPDATE ATT 9 - MPF GOVERNMENT FURNISHED PROPERTY LISTING |
| Jun 28, 2022 | P00050 | $320.3M | MOBILE PROTECTED FIREPOWER (MPF) LRIP OPTION 1 AWARD |
| Jun 24, 2022 | ARZ995 | $0 | MOBILE PROTECTED FIREPOWER ENGINEERING MANUFACTURING AND DEVELOPMENT / MIDDLE TIER ACQUISITION |
| Jun 10, 2022 | P00051 | $0 | INCORPORATE DODAAC W56HZV AND CHANGE INSPECTION/ACCEPTANCE FOR SUB-CLINS 0001AA THROUGH 0001AL 2)INCORPORATE IN SECTION J REVISED REQUEST FOR VARIANCES(RFV)TO UPDATE THE TECHNICAL DATA PACKAGE(TDP)3)AUTHORIZE EXTENSION OF RENT FREE NON-INTERFERENCE USE OF GOVERNMENT FURNISHED EQUIPMENT(GFE)4)REVISE SECTION C TO INCORPORATE SCOPE NO-COST CHANGES FOR GFE EXTENSION. |
| May 4, 2022 | P00047 | $427.8K | MAINTENANCE & STORAGE SERVICES FOR TWELVE (12) PROTOTYPE VEHICLES UNTIL DD250. |
| Dec 21, 2021 | P00046 | $0 | MAINTENANCE & STORAGE SERVICES FOR TWELVE (12) PROTOTYPE VEHICLES UNTIL DD250. |
| Nov 5, 2021 | P00045 | $1.1M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING. |
| Oct 28, 2021 | P00044 | $4.4M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING. |
| Sep 29, 2021 | P00043 | $2.6M | CY21 INCREMENT 4C FUNDING IN THE AMOUNT OF 2,633,912.33 FOR MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA)RAPID PROTOTYPING. |
| Sep 10, 2021 | P00040 | $0 | UPDATE ATTACHMENT 1 AND ATTACHMENT 5 IN SECTION J IAW 43.103(A): 1. SECTION J: LIST OF ATTACHMENTS A) UPDATES ATTACHMENT 0001 DD254 AS OF 16 JULY 2021. B) UPDATES ATTACHMENT 0005 MPF SECURITY CLASSIFICATION GUIDE WITH CHANGE LETTER NO. 2 C) TOTAL CONTRACT OBLIGATED AMOUNT OF $331,640,684.79 REMAINS THE SAME. |
| Sep 7, 2021 | P00042 | $441.0K | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Aug 23, 2021 | P00041 | $1.5M | THE PURPOSE OF BILATERAL MODIFICATION P00041 TO CONTRACT W56HZV-19-C-0036 (IS TO MAKE THE FOLLOWING UPDATES) UPDATES SECTIONS B, C AND J TO INCORPORATE A SHIFT IN THE GOVERNMENT TEST SCHEDULE OF THE LIMITED USER TEST (LUT) BY APPROXIMATELY 6 WEEKS. |
| Jul 13, 2021 | P00039 | $1.6M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Jun 10, 2021 | P00038 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Apr 28, 2021 | P00037 | $1.5M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Mar 31, 2021 | P00036 | $13.8K | COVID-19 3610 MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Jan 26, 2021 | P00035 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Dec 29, 2020 | P00034 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Dec 10, 2020 | P00033 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Dec 8, 2020 | P00030 | $17.1M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Nov 25, 2020 | P00032 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Nov 5, 2020 | P00016 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Nov 5, 2020 | P00029 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Oct 30, 2020 | P00027 | $13.0M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Oct 23, 2020 | P00028 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Oct 8, 2020 | P00026 | $7.0M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Oct 7, 2020 | P00025 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Sep 23, 2020 | P00024 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Sep 22, 2020 | P00023 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Aug 31, 2020 | P00021 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA)RAPID PROTOTYPING |
| Jul 30, 2020 | P00018 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Jul 6, 2020 | P00019 | $0 | MOBILE PROTECTED FIREPOWER- MIDDLE TIER ACQUISITION RAPID PROTOTYPING |
| Jun 25, 2020 | P00017 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| May 15, 2020 | P00020 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Apr 15, 2020 | P00009 | $0 | MOBILE PROTECTED FIREPOWER - MPF |
| Mar 27, 2020 | ARZ999 | $0 | COVID-19 DIB. MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Feb 14, 2020 | P00014 | $59.9M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Feb 14, 2020 | P00015 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Jan 23, 2020 | P00012 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION |
| Dec 31, 2019 | P00013 | $34.6M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Dec 12, 2019 | P00011 | $0 | MOBILE PROTECTED FIREPOWER |
| Dec 3, 2019 | P00010 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Nov 22, 2019 | P00008 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) |
| Nov 19, 2019 | P00007 | $20.0M | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION (MTA) RAPID PROTOTYPING |
| Oct 30, 2019 | P00005 | $0 | MOBILE PROTECTED FIREPOWER - MIDDLE TIER ACQUISITION |
| Sep 23, 2019 | P00006 | $0 | MOBILE PROTECTED FIREPOWER (MPF) - MIDDLE TIER ACQUISITION |
| Jul 22, 2019 | P00004 | $0 | MPF VEHICLE MOD FOR FUND SWAP |
| Jun 14, 2019 | P00002 | $0 | MOBILE PROTECTED FIREPOWER (MPF) MIDDLE TIER ACQUISITION - MODIFICATION FOR DD254 UPDATE AND PAYMENT TERMS |
| Jun 6, 2019 | P00001 | $0 | MOBILE PROTECTED FIREPOWER - MIDDLE TIER ACQUISITION - ADMINISTRATIVE MODIFICATION FOR CLARIFICATION |
| Dec 17, 2018 | 0 | $175.0M | MOBILE PROTECTED FIREPOWER ENGINEERING MANUFACTURING AND DEVELOPMENT / MIDDLE TIER ACQUISITION |
Estimated positioning window
Aug 15, 2027 – Feb 15, 2028
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-08-15 (653 days from calculation)
- +25 points
- 69 historical awards in this buyer and category group
- +15 points
- 134 recorded award transactions
- +10 points
- Latest award action: 2026-04-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.