Federal contract award

W56HZV19C0053

NEW FOLLOW-ON CONTRACT EFFORT: THE WORK DIRECTIVES ISSUED HEREUNDER SHALL INVOLVE RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAZ11 — OTHER RESEARCH AND DEVELOPMENT - BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$31.1M
Current contract value$31.1M
Potential contract value / ceiling$31.1M
Start dateMar 22, 2019
Current end dateJan 30, 2026
Potential end dateJan 30, 2026
Latest award activityFeb 20, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 110 of 110 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 20, 2026P00102$-5.5KMTU SHALL PERFORM SPECIFIED RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Feb 20, 2026P00102$-5.5KMTU SHALL PERFORM SPECIFIED RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Dec 10, 2025P00101$-4.3KMTU SHALL INVOLVE RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Dec 10, 2025P00101$-4.3KMTU SHALL INVOLVE RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Jul 14, 2025P00100$-30.6KMTU SHALL PERFORM SPECIFIED RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Jul 14, 2025P00100$-30.6KMTU SHALL PERFORM SPECIFIED RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Jun 9, 2025P00099$-11MTU SHALL PERFORM SPECIFIED RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Jun 9, 2025P00099$-11MTU SHALL PERFORM SPECIFIED RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Dec 19, 2024P00098$-141.1KADMINISTRATIVE MODIFICATION
Dec 19, 2024P00098$-141.1KADMINISTRATIVE MODIFICATION
Aug 19, 2024P00097$0PERIOD OF PERFORMANCE EXTENSION ON WD 043
Jun 17, 2024P00096$-0DEOBLIGATION AND POP EXTENSION
May 20, 2024P00095$-565.0KDE-OBLIGATION OF EXCESS FUNDS AND FUNDING REALIGNMENT
Apr 29, 2024P00094$-192.7KDEOBLIGATION OF EXCESS FUNDS
Mar 6, 2024P00093$4.7MRESEARCH, DEVELOPMENT, TESTING, AND EVALUATION EFFORTS RELATED TO THE DESIGN, ANALYSIS, AND TESTING OF SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIEL SOLUTIONS.
Dec 21, 2023P00092$0NO COST FUNDING SWAP
Dec 18, 2023P00091$149.7KRESEARCH, DEVELOPMENT, TESTING, AND EVALUATION EFFORTS RELATED TO THE DESIGN, ANALYSIS, AND TESTING OF SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIEL SOLUTIONS
Nov 2, 2023P00090$52.8KRESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS FOR THE COMBAT CAPABILITIES DEVELOPMENT COMMAND GROUND VEHICLE SYSTEMS CENTER (DEVCOM GVSC)
Sep 25, 2023P00089$646.6KDESIGN, ANALYSIS, AND TESTING OF SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIEL SOLUTIONS FOR THE COMBAT CAPABILITIES DEVELOPMENT COMMAND GROUND VEHICLE SYSTEMS CENTER (DEVCOM GVSC)
Sep 13, 2023P00088$249.9KDESIGN, ANALYSIS, AND TESTING OF SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIEL SOLUTIONS FOR THE COMBAT CAPABILITIES DEVELOPMENT COMMAND GROUND VEHICLE SYSTEMS CENTER (DEVCOM GVSC).
Jul 27, 2023P00086$749.9KDEVELOPMENT OF A FIRE CONTROL SYSTEM (FCS) FOR AN ADAPTIVE ARMOR (AA) SUBSYSTEM FOR THE COMBAT CAPABILITIES DEVELOPMENT COMMAND GROUND VEHICLE SYSTEMS CENTER (DEVCOM GVSC)
Jul 27, 2023P00087$590.5KUNMANNED DEEP SENSING OF RADAR EMITTING THREATS IN THE INDO-PACIFIC FOR THE COMBAT CAPABILITIES DEVELOPMENT COMMAND GROUND VEHICLE SYSTEMS CENTER (DEVCOM GVSC)
Jul 26, 2023P00085$249.9KWD 046 REV 000 BRAVO
Jul 24, 2023P00084$-14PERIOD OF PERFORMANCE EXTENSION AND ULO
Jul 3, 2023P00083$1.2MWORK DIRECTIVE 040 REV 001
May 25, 2023P00082$360.7KWORK DIRECTIVE 45 REV 000 MTRIC
May 9, 2023P00081$49.9KWORK DIRECTIVE 042 REV 001
Apr 27, 2023P00080$227.2KMODIFICATION P00080 AGAINST W56HZV-19-C-0053 WD 023 REV 005
Apr 14, 2023P00079$806.0KWORK DIRECTIVE 0018 REV 004
Apr 12, 2023P00078$0NCE ON WD 043 AND 035
Mar 28, 2023P00077$1.3MWD 043 REV 000 UNDER W56HZV-19-C-0053
Mar 3, 2023P00076$120.0KWORK DIRECTIVE 044 REV 000
Feb 28, 2023P00075$110.0KWORK DIRECTIVE 023 REV 004
Feb 8, 2023P00074$75.0KWD 042 CRREL TESTING
Feb 1, 2023P00073$0PERIOD OF PERFORMANCE EXTENSION ON WD 027 AND WD 028
Dec 13, 2022P00072$0CORRECTION FOR CDR. CORRECTS MOD P00064
Dec 7, 2022P00071$-1.2KDE-OBLIGATION OF EXCESS FUNDS ON WD 14
Sep 16, 2022P00070$300.0KW56HZV-19-C-0053 MODIFICATION P00070 WD 040 REV 000
Sep 8, 2022P00069$0NO COST PERIOD OF PERFORMANCE EXTENSION ON WD 033
Sep 6, 2022A00002$0MTU SERVICES
Sep 6, 2022P00068$-657DE-OBLIGATION OF EXCESS FUNDS
Aug 30, 2022P00067$150.0KWORK DIRECTIVE 037 REV 001 AGAINST W56HZV-19-C-0053
Aug 23, 2022P00066$125.3KWD 28 REV 004 P00066 AGAINST W56HZV-19-C-0053
Aug 16, 2022P00065$245.0KWORK DIRECTIVE 041 AGAINST MTU CONTRACT W56HZV-19-C-0053
Jul 29, 2022P00064$100.0KWD 039 REV 000 AS PART OF W56HZV-19-C-0053
Jul 26, 2022P00063$1.2MWD 38 AS PART OF W56HZV-19-C-0053
Jun 29, 2022P00062$118.7KMODIFICATION P00062 AGAINST MTU
Jun 17, 2022P00061$37.3KMODIFICATION P00061 WD 036 AGAINST W56HZV-19-C-0053 WITH MTU.
May 24, 2022P00060$583.7KMTU MODIFICATION P00060 WD 28 REV 001
May 11, 2022P00059$62.9KMODIFICATION P00059 AGAINST MTU
May 10, 2022P00058$71.7KWORK DIRECTIVE 034 AGAINST W56HZV-19-C-0053
Apr 29, 2022P00057$508.3KMODIFICATION P00057 AGAINST W56HZV-19-C-0053
Apr 21, 2022P00056$434.3KP00056 AGAINST MTU/KRC CONTRACT NEW WORK DIRECTIVE 032 FOR WATER BISON
Apr 12, 2022P00055$215.0KMTU KRC MODIFICATION P00055 WD 033 FOGHAT
Apr 4, 2022P00054$162.0KW56HZV-19-C-0053 MODIFICATION P00054 WD 18 REV 003 CASSINO
Feb 16, 2022P00053$0WD 009 REV 004 POP EXTENSION
Jan 25, 2022P00052$175.0KWD 31 REV 000
Jan 18, 2022P00051$112.8KWD 023 REV 002
Nov 30, 2021P00049$0EO14042 ADDITION TO MTU GVSC CONTRACT
Nov 30, 2021P00050$0W56HZV-19-C-0053 PERIOD OF PERFORMANCE EXTENSION ON WD 16 AND WD 18
Nov 1, 2021P00048$59.9KCONTRACT W56HZV-19-C-0053 MTU/KRC WORK DIRECTIVE CONTRACT, WD 29 FOR SNOW MOBILITY
Oct 15, 2021P00047$-949DE-OBLIGATIONS OF EXCESS FUNDS ON WD 003 ON W56HZV-19-C-0053
Sep 28, 2021ARZ999$0NEW FOLLOW-ON CONTRACT EFFORT: THE WORK DIRECTIVES ISSUED HEREUNDER SHALL INVOLVE RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.
Aug 13, 2021P00046$50.0KWD 26 REV 001
Jul 29, 2021P00045$1.4MP00045 AGAINST MTU WD 23 REV 001
Jul 16, 2021P00044$930.5KWD 28 ONR PAM
Jul 2, 2021P00042$275.0KWD 30
Jul 2, 2021P00043$0PERIOD OF PERFORMANCE EXTENSION
May 28, 2021P00041$848.9KWD 27
May 17, 2021P00040$250.0KWD 26
May 6, 2021P00039$-17.9KCHANGE ORDER
Apr 23, 2021P00038$100.0KWD 025
Feb 26, 2021P00037$0EXTENSION
Feb 18, 2021P00036$400.0KWD 18 REV 001
Dec 23, 2020P00035$0WD 016 DEFENSE MOBILITY
Nov 13, 2020P00033$148.9KWD 024 JLTV CHAIN TESTING
Nov 8, 2020P00034$0WD 004 JTLV NOISE REDUCTION
Sep 23, 2020P00032$296.0KWD 009 REV 002 MULTI-MISSION PROTECTED VEHICLE SYSTEMS (MPVS) AND ENABLERS.
Sep 18, 2020P00023$2.4MASSURED MOBILITY&MANEUVER SUPPORT: WD 016 DEFENSE MOBILITY SYSTEM
Sep 17, 2020P00030$850.4KWD 023 ADAPTIVE ARMOR SYSTEMS
Sep 14, 2020P00031$118.5KWD 015 REV 001 SNOW MOBILITY&SOIL TESTING
Jul 23, 2020P00029$699.9KASSURE MOBILITY&MANEUVER SUPPORT: WD 022 HIPPO PROTOTYPE
Jul 16, 2020P00027$350.0KASSURED MOBILITY&SURVIVIBILITY WD 008 REV 002 M1E1 TRACK LOADS
Jul 13, 2020P00026$115.0KASSURED MOBILITY&SURVIVIABILITY WD 021 HEMTT
Jul 1, 2020P00025$100.0KASSURED MOBILITY&SURVIVIBILITY: WD 020 BCS MINE CLEARING BLADE
Jun 24, 2020P00024$514.6KASSURE MOBILITY ASSURANCE: WD 019 ONR PAM
Jun 22, 2020P00028$0ASSURED VEHICLE MOBILITY: WD 011 HMMWV BRACKET POP EXTENSION
Jun 11, 2020P00022$500.0KWD 018 CASSINO PROGRAM SUBSYSTEMS ON A GCV PLATFORM
Jun 8, 2020P00021$148.5KEXPLORATORY STUDY OF THE METHODS AND PROCESS FOR DEVELOPING A VEHICLE LEVEL MODEL OF THE DESIGN AND USAGE LOADS FOR A MILITARY GROUND VEHICLE
May 15, 2020P00020$257.9KWD 009 REV 001 DESIGNING, DEVELOPING, ANALYZING, DOCUMENTING, INTEGRATING, TESTING, AND DELIVERING PRODUCT IMPROVEMENTS TO THE MULTI-MISSION PROTECTED VEHICLE SYSTEMS (MPVS) AND ENABLERS.
Apr 15, 2020P00019$200.0KWD 015 SNOW MOBILITY&SOIL TESTING
Mar 11, 2020P00018$321.7KWD 14 RCIS TESTING
Feb 25, 2020P00017$198.0KWD 14: CONTRACTOR SHALL EVALUATE THE NOISE AND VIBRATION PERFORMANCE OF THE LEAD EVACUATION FAN SYSTEM USED IN THE M109 HOWITZER. THE CONTRACTOR WILL SUPPORT DATA COLLECTION ON BASELINE SYSTEM HARDWARE AS WELL AS MODIFICATIONS/TREATMENTS GUIDED BY COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSIS PROVIDED BY A SUBCONTRACTED ENGINEERING SERVICE. AN ALTERNATIVE LEAD EVACUATION FAN SHALL BE ACQUIRED BY THE CONTRACTOR AS GOVERNMENT OWNED EQUIPMENT WHICH WILL BE COMPARED TO THE BASELINE FAN.
Feb 11, 2020P00016$256.9KWD 008 REV 001: SHALL EVALUATE M1E1 TRACK LOADS BY ASSEMBLING COMPONENTS ONTO A GOVERNMENT FURNISHED EQUIPMENT (GFE) M1E1 ABRAMS, INSTALLING INSTRUMENTATION, AND CONDUCTING TESTING. THIS SHALL INCLUDE TESTING BOTH ON ROAD AND OFF ROAD, TEARDOWN, AND POSTTEST ANALYSIS. THIS EFFORT SHALL BUILD UPON THE PREVIOUS NATIONAL ADVANCED MOBILITY CONSORTIUM (NAMC) M1 TRACK LOAD PROJECT CONDUCTED AT MICHIGAN TECHNOLOGICAL UNIVERSITY (MTU) KEWEENAW RESEARCH CENTER (KRC).
Feb 10, 2020P00014$100.0KWD 013 BATTALION COUNTERMINE FOR ASSURED MOBILITY&MANEUVER SUPPORT
Jan 27, 2020P00015$0WD 11 HIGH MOBILITY MULTIPURPOSE WHEELED VEHICLE (HMMWV) SELF PROTECTION ADAPTIVE ROLLER KIT (SPARK)
Oct 4, 2019P00013$76.0KTHE CONTRACTOR SHALL INVESTIGATE, CONDUCT, AND RECORD FROZEN AND THAWING SOIL MOBILITY DATA FOR WHEELED AND TRACKED VEHICLES COORDINATING WITH COLD REGIONS RESEARCH AND ENGINEERING LABORATORY (CRREL)
Sep 24, 2019P00012$0ADMINISTRATIVE MODIFICATION
Sep 10, 2019P00010$250.0KTHE CONTRACTOR SHALL DEMONSTRATE AN AUXILIARY POWER UNIT (APU) THAT MEETS THE REQUIREMENTS AND NEEDS OF THE STRYKER FAMILY OF VEHICLES AS WELL AS POTENTIAL STAND-ALONE POWER GENERATION APPLICATIONS.
Sep 10, 2019P00011$63.0KWD 11 UNDER THIS WORK DIRECTIVE, THE CONTRACTOR SHALL MANUFACTURE SIX (6) HIGH MOBILITY MULTIPURPOSE WHEELED VEHICLE (HMMWV) SELF PROTECTION ADAPTIVE ROLLER KIT (SPARK) INTERFACES FOR THE FOREIGN MILITARY SALES OFFICE TO BE SENT TO UKRAINE.
Aug 28, 2019P00009$1.8MWD 009 ASSURED MOBILITY AND MANEUVER SUPPORT TO INVESTIGATE FIELD PROBLEMS AND VEHICLE FAILURES AND DEVELOP IMPROVEMENTS FOR THE MULTI-MISSION PROTECTED VEHICLE SYSTEMS (MPVS) AND ENABLERS
Jul 30, 2019P00007$197.0KWD 008 M1E1 TRACK LOADS
Jul 28, 2019P00008$0ADMINISTRATIVE CHANGES FOR WD 005
Jul 22, 2019P00006$400.0KWD 007 COUNTERMINE
Jul 1, 2019P00005$125.8KEXERCISE OF OPTION WD 006 COUNTERMINE SYSTEM
Jun 23, 2019P00004$50.0KWD 005 COLD REGIONS RESEARCH AND ENGINEERING LABORATORY (CRREL)
May 31, 2019P00003$150.0KWD 004 NVH PERFORMANCE
May 22, 2019P00002$311.5KWD 003 ASSURED MOBILITY&MANEUVER SUPPORT(USMC) PRODUCT MANAGER (PDM) ARMORED AMPHIBIOUS VEHICLE (AAV)
May 1, 2019P00001$295.4KASSURED MOBILITY&MANEUVER SUPPORT - THE PREDICTIVE ADAPTIVE MOBILITY (PAM) PROGRAM WITH OFFICE OF NAVAL RESEARCH WD 002
Mar 22, 20190$250.0KNEW FOLLOW-ON CONTRACT EFFORT: THE WORK DIRECTIVES ISSUED HEREUNDER SHALL INVOLVE RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.