Federal contract award

W56HZV21C0030

PHASE II SBIR WITH PRECISION COMBUSTION INC.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAJ11 — GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeCOST PLUS FIXED FEE
Obligations$1.1M
Current contract value$1.1M
Potential contract value / ceiling$1.1M
Start dateMay 26, 2021
Current end dateAug 3, 2025
Potential end dateAug 3, 2025
Latest award activityMay 2, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 2, 2025P00007$0PHOTOVOLTAIC POWERED LOW POWER DEHUMIDIFICATION SYSTEMS FOR INDIVIDUAL COMBAT VEHICLE INTERIORS
May 2, 2025P00007$0PHOTOVOLTAIC POWERED LOW POWER DEHUMIDIFICATION SYSTEMS FOR INDIVIDUAL COMBAT VEHICLE INTERIORS
Nov 21, 2024P00006$0NO COST EXTENSION MODIFICATION WITH PRECISION COMBUSTION, INC.
Nov 21, 2024P00006$0NO COST EXTENSION MODIFICATION WITH PRECISION COMBUSTION, INC.
Jun 3, 2024P00005$0PH II SBIR WITH PRECISION COMBUSTION TO DEVELOP, DEMONSTRATE AND DELIVER TO THE ARMY A DEHUMIDIFIER PROTOTYPE TO OPERATE WITHIN A STATIONED STRYKER VEHICLE. THE PROTOTYPE CAN MAINTAIN THE HUMIDITY LEVEL INSIDE THE CABIN AT OPTIMUM LEVELS.
Nov 8, 2023P00004$0NO COST PERIOD OF PERFORMANCE EXTENSION MODIFICATION.
Sep 15, 2022P00003$0MODIFICATION TO EXTEND POP
Jun 13, 2022P00002$551.3KMODIFICATION TO FUND SECOND INCREMENT.
Nov 30, 2021P00001$0EO 14042 PHASE II SBIR WITH PRECISION COMBUSTION
May 26, 20210$548.6KPHASE II SBIR WITH PRECISION COMBUSTION INC.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.