Federal contract award
W56HZV23F0062
CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8TO DETERMINE THE ROOT CAUSE OF FLOODING ISSUES WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. DESIGN AND DEVELOP A MATERIAL SOLUTION WITH AN ENGINEERING CHANGE PROPOSAL.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC- DTA |
| NAICS | 541330 — Engineering Services |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | W56HZV18D0077 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $728.0K |
| Current contract value | $728.0K |
| Potential contract value / ceiling | $728.0K |
| Start date | May 3, 2023 |
| Current end date | Jul 31, 2024 |
| Potential end date | Jul 31, 2024 |
| Latest award activity | May 24, 2024 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 24, 2024 | P00004 | $0 | CONDUCT AN ANALYSIS OF GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE ROOT CAUSE FLOODING ISSUES EXPERIENCED WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. |
| Jan 30, 2024 | P00003 | $0 | CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE THE ROOT CAUSE OF FLOODING WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. |
| Jul 18, 2023 | P00002 | $0 | CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE THE ROOT CAUSE OF FLOODING WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. |
| May 30, 2023 | P00001 | $0 | CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE THE ROOT CAUSE OF FLOODING WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. |
| May 3, 2023 | 0 | $728.0K | CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8TO DETERMINE THE ROOT CAUSE OF FLOODING ISSUES WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. DESIGN AND DEVELOP A MATERIAL SOLUTION WITH AN ENGINEERING CHANGE PROPOSAL. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.