Federal contract award

W56HZV23F0062

CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8TO DETERMINE THE ROOT CAUSE OF FLOODING ISSUES WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. DESIGN AND DEVELOP A MATERIAL SOLUTION WITH AN ENGINEERING CHANGE PROPOSAL.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS541330 — Engineering Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleW56HZV18D0077
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$728.0K
Current contract value$728.0K
Potential contract value / ceiling$728.0K
Start dateMay 3, 2023
Current end dateJul 31, 2024
Potential end dateJul 31, 2024
Latest award activityMay 24, 2024
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 24, 2024P00004$0CONDUCT AN ANALYSIS OF GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE ROOT CAUSE FLOODING ISSUES EXPERIENCED WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE.
Jan 30, 2024P00003$0CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE THE ROOT CAUSE OF FLOODING WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE.
Jul 18, 2023P00002$0CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE THE ROOT CAUSE OF FLOODING WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE.
May 30, 2023P00001$0CONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8 TO DETERMINE THE ROOT CAUSE OF FLOODING WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE.
May 3, 20230$728.0KCONDUCT AN ANALYSIS OF THE GREY WATER PIPING SYSTEMS ON LSV-7 AND LSV-8TO DETERMINE THE ROOT CAUSE OF FLOODING ISSUES WHEN THE 03 LEVEL SHOWERS AND TOILETS ARE IN USE. DESIGN AND DEVELOP A MATERIAL SOLUTION WITH AN ENGINEERING CHANGE PROPOSAL.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.