Federal contract award

W56HZV23F0395

THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS336992 — Military Armored Vehicle, Tank, and Tank Component Manufacturing
PSC2350 — Combat, Assault, and Tactical Vehicles, Tracked
Parent award / vehicleW56HZV22D0083
Set-asideNot reported
Pricing typeFIXED PRICE INCENTIVE
Obligations$893.5M
Current contract value$893.5M
Potential contract value / ceiling$893.5M
Start dateAug 31, 2023
Current end dateFeb 28, 2027
Potential end dateFeb 28, 2027
Latest award activityMay 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 39 of 39 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 27, 2026P00038$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
May 6, 2026P00037$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Apr 23, 2026P00036$-2THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Mar 27, 2026P00033$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Mar 27, 2026P00035$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Mar 26, 2026P00032$-21.9MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS
Mar 25, 2026P00034$57.3KHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Jan 21, 2026P00031$33.8KINCREASE LRU CLIN FOR COST OVERRUN. CHANGE SHIP TO LOCATION & DELIVERY SCHEDULE UNDER CLINS 2300AA/AB
Dec 5, 2025P00028$0MOD TO AUTHORIZE ADDITIONAL AMOUNT UNDER O&A CLIN 2405AA
Dec 5, 2025P00030$-28.8KDEOBLIGATE RAIL CLIN TO ACCOUNT FOR CONSIDERATION AGREEMENT.
Oct 29, 2025P00029$30.7KTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Sep 12, 2025P00027$8.8KADDS TWO VEHICLES UNDER HEAT ABATEMENT CLIN 2020AA.
Aug 25, 2025P00026$17.6KMODIFICATION TO ADD 4 VEHICLES FOR HAK REPAIR UNDER CLIN 2020AA. INCREASE CLIN FUNDING.
Aug 14, 2025P00021$123.2KMOD TO ESTABLISH CLIN 2500AA TO FUND REMOVAL OF CORROSION FROM ECP1 KITS.
Aug 8, 2025P00025$0MODIFICATION TO AUTHORIZE MORE FUNDING ON THE OVER AND ABOVE CLIN FOR THE OUT OF SCOPE TOP PLATE REPAIR EFFORT.
Jul 31, 2025P00024$0MOD TO UPDATE DELIVERY SCHEDULE UNDER CLIN 2003AA
Jun 30, 2025P00023$9.0MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Jun 26, 2025P00022$0ADMINISTRATIVE MOD TO CORRECT RAIL CLIN DELIVERY SCHEDULE TO ACCOUNT FOR BUILDING VEHICLES OUT OF SEQUENCE AND A SERIAL NUMBER CORRECTION TO HAK CLIN.
Jun 10, 2025P00020$255.9KINCREASE FUNDING ON CLIN 2030AC LRU REPAIR AND REPLACE FOR COST OVERRUN.
Apr 4, 2025P00019$0MOD TO UPDATE DELIVERY SCHEDULE UNDER CLIN'S 2004AA, 2004AB, AND 2200AB.
Mar 12, 2025P00018$274.1KFUND ADDITIONAL COST FOR OVERRUN OF CLIN 2030AC LRU REPAIR AND REPLACE OP2.
Feb 27, 2025P00016$0ORDERING PERIOD 2 (OP2) DELIVERY ORDER FOR OVER & ABOVE WORK TO BE PERFORMED ON M2A2 ODS SOURCE VEHICLES WHICH WILL BE SEPARATELY AUTHORIZED BY THE PCO. A BREAKOUT OF THE FUNDING BEING ESTABLISHED AND AWARDED VIA MODIFICATIONS.
Feb 27, 2025P00017$61.5KTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Oct 29, 2024P00015$-64.8KTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Sep 26, 2024P00013$5.0MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Sep 26, 2024P00014$24.0MMODIFICATION IS FOR A UCO FOR PAINT UPDATE. AS A RESULT, CLIN 2099AA, 2099AB AND CLN 2099AC ARE CREATED FOR THE OP 2 PAINT UPDATE. THIS CLIN IS IN A TOTAL AMOUNT OF $24,012,000.00 AND 138 BRADLEY VEHICLES.
Sep 5, 2024P00012$121.4MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Apr 4, 2024P00011$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Jan 29, 2024P00010$39.6KTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Dec 14, 2023P00009$78.4MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Nov 27, 2023P00008$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Nov 3, 2023P00007$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Oct 24, 2023P00006$0MODIFY DELIVERY SCHEDULE FOR M2A4/M7A4 VEHICLES TO FT. CAVASOS. INCORPORATE DELIVERY SCHEDULE FOR M2A4/M7A4 VEHICLES TO ABERDEEN PROVING GROUNDS.
Oct 18, 2023P00005$-12.3MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Sep 27, 2023P00004$288.2MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Sep 25, 2023P00002$343.6KMODIFICATION P00002 IS ADDING RAIL SHIPMENT TO M2A4 AND M7A4 BFV VEHICLES FROM MODS P00001 AND P00003.
Sep 19, 2023P00003$128.7MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Sep 11, 2023P00001$0THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
Aug 31, 20230$274.1MTHE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-02-28 (126 days from calculation)
+35 points
69 historical awards in this buyer and category group
+15 points
39 recorded award transactions
+10 points
Latest award action: 2026-05-27
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.