Federal contract award

W56HZV23F0486

DESIGN AN IMPROVED BOW RAMP SECURING MECHANISM, WITH AN IMPROVED REDUNDANT (BACKUP) SECURING METHOD, AND COMPLETE PRELIMINARY AND CRITICAL DESIGN REVIEWS FOR THE LCU-2000 CLASS VESSELS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS541330 — Engineering Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleW56HZV23D0064
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$260.1K
Current contract value$260.1K
Potential contract value / ceiling$260.1K
Start dateSep 29, 2023
Current end dateSep 30, 2024
Potential end dateSep 30, 2024
Latest award activityMar 9, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 9, 2026P00006$-79PRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
Mar 9, 2026P00006$-79PRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
Aug 11, 2025P00005$-16.7KPRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
Aug 11, 2025P00005$-16.7KPRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
Aug 30, 2024P00004$0PRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
Jul 31, 2024P00003$0PRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
May 17, 2024P00002$0PRODUCE A DESIGN TO UPGRADE THE LCU 2000 BOW RAMP SECURING MECHANISM.
Feb 15, 2024P00001$0PRODUCE A DESIGN TO UPGRADE THE LCU-2000 BOW RAMP SECURING MECHANISM.
Sep 29, 20230$276.8KDESIGN AN IMPROVED BOW RAMP SECURING MECHANISM, WITH AN IMPROVED REDUNDANT (BACKUP) SECURING METHOD, AND COMPLETE PRELIMINARY AND CRITICAL DESIGN REVIEWS FOR THE LCU-2000 CLASS VESSELS.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.