Federal contract award
W56KGU23F0011
FMS FUNDING UNDER CONTRACT W56KGU19D0002
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG |
| NAICS | 488190 — Other Support Activities for Air Transportation |
| PSC | AC12 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH |
| Parent award / vehicle | W56KGU19D0002 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $45.6M |
| Current contract value | $45.6M |
| Potential contract value / ceiling | $49.1M |
| Start date | Aug 10, 2023 |
| Current end date | Dec 29, 2026 |
| Potential end date | Dec 29, 2026 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 95 of 95 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | P00067 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| May 29, 2026 | P00066 | $-43.1K | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| May 18, 2026 | P00065 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Apr 30, 2026 | P00064 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Apr 30, 2026 | P00064 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Apr 3, 2026 | P00063 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Apr 3, 2026 | P00063 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Mar 20, 2026 | P00062 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Mar 20, 2026 | P00062 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Feb 5, 2026 | P00061 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Feb 5, 2026 | P00061 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Jan 12, 2026 | P00060 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Jan 12, 2026 | P00060 | $0 | COST PLUS FIXED FEE CONTRACT FOR PREDICTIVE GEOSPATIAL ANALYSIS TOOL (PGAT) PHASE III ACTIVITIES IN SUPPORT OF COMPLETING ADDITIONAL RESEARCH AND DEVELOPMENTAL AND INTEGRATION TASKS THAT EXTEND OR ARE DERIVED FROM THE EARLIER SBIR I AND SBIR II WORK |
| Dec 18, 2025 | P00059 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Dec 18, 2025 | P00059 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Dec 5, 2025 | P00058 | $43.1K | TO ADD RETRO FUNDS FOR CONTINUAL SUPPORT FOR YULISTA |
| Dec 5, 2025 | P00058 | $43.1K | TO ADD RETRO FUNDS FOR CONTINUAL SUPPORT FOR YULISTA |
| Nov 20, 2025 | P00057 | $0 | COST PLUS FIXED FEE (CPFF) TASK ORDER FOR FLIGHT ACTIVITY MAINTENANCE AND MODIFICATION SUPPORT SERVICES (FAMMSS), ENGINEERING SUPPORT AND INTEGRATION (ESI) DIRECTORATE, FLIGHT ACTIVITY UTILITY HELICOPTER PROJECT OFFICE (UH PO) MODERNIZATION. |
| Nov 20, 2025 | P00057 | $0 | COST PLUS FIXED FEE (CPFF) TASK ORDER FOR FLIGHT ACTIVITY MAINTENANCE AND MODIFICATION SUPPORT SERVICES (FAMMSS), ENGINEERING SUPPORT AND INTEGRATION (ESI) DIRECTORATE, FLIGHT ACTIVITY UTILITY HELICOPTER PROJECT OFFICE (UH PO) MODERNIZATION. |
| Sep 11, 2025 | P00056 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Sep 11, 2025 | P00056 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Aug 29, 2025 | P00055 | $0 | TO REALIGN FUNDS FOR MATERIAL NEEDED FOR CONTINUAL WORK |
| Aug 29, 2025 | P00055 | $0 | TO REALIGN FUNDS FOR MATERIAL NEEDED FOR CONTINUAL WORK |
| Aug 5, 2025 | P00054 | $0 | COST PLUS FIXED FEE. ELECTRICAL/AVIONICS AND STRUCTURAL/MECHANICAL DESIGN ENGINEERING, SYSTEMS INTEGRATION ENGINEERING AND AIRCRAFT INSTALLATION SUPPORT SERVICES NECESSARY TO SATISFY THE RAPID DEVELOPMENT AND/OR MODIFICATION OF AIRCRAFT SYSTEMS. |
| Aug 5, 2025 | P00054 | $0 | COST PLUS FIXED FEE. ELECTRICAL/AVIONICS AND STRUCTURAL/MECHANICAL DESIGN ENGINEERING, SYSTEMS INTEGRATION ENGINEERING AND AIRCRAFT INSTALLATION SUPPORT SERVICES NECESSARY TO SATISFY THE RAPID DEVELOPMENT AND/OR MODIFICATION OF AIRCRAFT SYSTEMS. |
| Jul 14, 2025 | P00053 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Jul 14, 2025 | P00053 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Jun 9, 2025 | P00052 | $0 | TO EXTEND PERIOD PEFORMANCE AND TO ADD FUNDS TO LABOR |
| Jun 9, 2025 | P00052 | $0 | TO EXTEND PERIOD PEFORMANCE AND TO ADD FUNDS TO LABOR |
| Apr 21, 2025 | P00051 | $0 | TO REALIGN FUNDS FROM TRAVEL TO LABOR AND MATERIAL TO LABOR |
| Apr 21, 2025 | P00051 | $0 | TO REALIGN FUNDS FROM TRAVEL TO LABOR AND MATERIAL TO LABOR |
| Mar 31, 2025 | P00050 | $0 | TO EXTEND THE PERIOD OF PERFROMANCE FOR AWAITING DELIVERY OF MATERIAL FROM VENDOR TO FINALIZE KITS AND SHIP. |
| Mar 31, 2025 | P00050 | $0 | TO EXTEND THE PERIOD OF PERFROMANCE FOR AWAITING DELIVERY OF MATERIAL FROM VENDOR TO FINALIZE KITS AND SHIP. |
| Mar 6, 2025 | P00049 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Mar 6, 2025 | P00049 | $0 | TO REALIGN FUNDS FROM MATERIAL TO LABOR |
| Feb 27, 2025 | P00048 | $13.0K | TO INCREASE FUNDING FOR LABOR AND MATERIALS |
| Feb 27, 2025 | P00048 | $13.0K | TO INCREASE FUNDING FOR LABOR AND MATERIALS |
| Feb 26, 2025 | P00047 | $0 | TO EXTEND THE PERIOD OF PERFORMANCE BY 6 MONTHS FOR CONTINUAL EFFORTS. TO REALIGN LABOR FUNDS TO MATERIAL FUNDS. |
| Feb 26, 2025 | P00047 | $0 | TO EXTEND THE PERIOD OF PERFORMANCE BY 6 MONTHS FOR CONTINUAL EFFORTS. TO REALIGN LABOR FUNDS TO MATERIAL FUNDS. |
| Jan 23, 2025 | P00046 | $0 | TO REALIGN FUNDS AND EXTEND THE POP FOR CONTINUAL LABOR |
| Jan 23, 2025 | P00046 | $0 | TO REALIGN FUNDS AND EXTEND THE POP FOR CONTINUAL LABOR |
| Dec 19, 2024 | P00045 | $0 | TO EXTEND THE PERIOD OF PERFORMANCE FOR CONTINUED SUPPORT. |
| Dec 19, 2024 | P00045 | $0 | TO EXTEND THE PERIOD OF PERFORMANCE FOR CONTINUED SUPPORT. |
| Nov 25, 2024 | P00044 | $0 | TO REALIGN FUNDS FROM MATERIAL AND LABOR TO TRAVEL. |
| Nov 25, 2024 | P00044 | $0 | TO REALIGN FUNDS FROM MATERIAL AND LABOR TO TRAVEL. |
| Nov 20, 2024 | P00043 | $0 | TO EXTEND THE PERIOD OF PERFORMANCE |
| Nov 20, 2024 | P00043 | $0 | TO EXTEND THE PERIOD OF PERFORMANCE |
| Oct 24, 2024 | P00042 | $0 | ADDITIONAL MATERIAL PURCHASES NEEDED |
| Oct 24, 2024 | P00042 | $0 | ADDITIONAL MATERIAL PURCHASES NEEDED |
| Oct 3, 2024 | P00041 | $0 | MATERIAL FUNDING NEEDED FOR SPECTRUM CONTROL PURCHASE |
| Oct 3, 2024 | P00041 | $0 | MATERIAL FUNDING NEEDED FOR SPECTRUM CONTROL PURCHASE |
| Sep 19, 2024 | P00040 | $0 | REQUIRE ADDITIONAL POP TO FINISH GOVT. FURNISHED REDLINES & BACKLINES TO BE INCORPORATED IN THE TDP. |
| Sep 17, 2024 | P00039 | $49.9K | TO ADD FUNDING FOR LABOR AND MATERIAL |
| Sep 4, 2024 | P00038 | $111.2K | OBLIGATE FUNDS FOR ATK'S FOR THAILAND |
| Aug 30, 2024 | P00037 | $115.4K | OBLIGATE FUNDS FOR OUTRIDER MINI SUPPORT |
| Aug 28, 2024 | P00036 | $53.7K | TSR SUPPORT FUNDING |
| Aug 22, 2024 | P00035 | $515.2K | TO OBLIGATE FUNDING, EXTEND PERFORMANCE DATES, AND REALIGN FUNDS FOR CONTINUOUS WORK. |
| Aug 13, 2024 | P00034 | $151.3K | TO ADD FUNDING FOR LABOR |
| Aug 7, 2024 | P00033 | $2.3M | TO ADD FUNDING FOR LABOR, TRAVEL, AND MATERIAL TO OMA, RDTE, AWCF, & APA |
| Jul 25, 2024 | P00032 | $0 | TRAVEL FUNDING NEEDED TO SUPPORT HI LITE TRAVEL JULY 2024 |
| Jul 15, 2024 | P00031 | $0 | POP EXTENSION REQUIRED AND NEEDED IN ORDER TO PROVIDE UNINTERRUPTED CUSTOMER/PROJECT SUPPORT AND SUPPORT TO MODERNIZATION EFFORTS FOR THE WARFIGHTER. |
| Jul 9, 2024 | P00030 | $905.0K | AIE MODS |
| Jun 27, 2024 | P00029 | $453.3K | AEVEX FUNDS |
| Jun 25, 2024 | P00028 | $27.2K | TO ADD FUNDING TO LABOR AND MATERIALS |
| Jun 18, 2024 | P00027 | $448.0K | FUNDS FOR LABOR AND AIR SUPPORT |
| Jun 11, 2024 | P00026 | $307.0K | AIE MODS & MX |
| May 29, 2024 | P00025 | $18.8K | FUNDING FOR LABOR AND MATERIALS |
| May 23, 2024 | P00024 | $919.5K | FUNDING FOR A-KITS, DELTA KITS, & HI-LITE SUPPORT FOR HH-60'S. |
| May 16, 2024 | P00023 | $375.2K | FORCEMATE BUSHING KITS |
| May 7, 2024 | P00022 | $382.5K | FUNDS FOR KWAJELEN SUPPORT & 'POP EXTENSIONS REQUIRED IN ORDER TO PROVIDE UNINTERRUPTED CUSTOMER AND PROJECT SUPPORT. |
| Apr 19, 2024 | P00021 | $38.0K | FUNDS FOR YULISTA SUPPORT |
| Apr 12, 2024 | P00020 | $1.6M | TO PURCHASE KITS |
| Mar 27, 2024 | P00019 | $7.5K | ADD FUNDS FOR JUMPER KITS |
| Mar 27, 2024 | P00019 | $312.0K | FUNDS FOR AIRFIELD SUPPORT |
| Mar 19, 2024 | P00018 | $69.8K | TO ADD FUNDING FOR APA MATERIAL |
| Feb 29, 2024 | P00017 | $402.9K | FUNDS FOR CONTINUOUS WORK AND SUPPLIES |
| Feb 21, 2024 | P00016 | $496.7K | FUNDS FOR CONTINUOUS WORK & SUPPLIES |
| Feb 14, 2024 | P00015 | $175.0K | ADD FUNDS FOR MX |
| Feb 7, 2024 | P00014 | $184.8K | FUNDS FOR AIE MODS |
| Jan 31, 2024 | P00013 | $177.5K | OBLIGATE FUNDS FOR MODS & MAINTENANCE |
| Jan 17, 2024 | P00012 | $4.7K | OBLIGATE FUNDS FOR HILITE SUPPORT |
| Jan 5, 2024 | P00011 | $520.5K | OBLIGATE FUNDS FOR MATERIAL |
| Dec 22, 2023 | P00010 | $425.0K | FUNDING FOR MODIFICATIONS |
| Dec 14, 2023 | P00009 | $1.2M | TO OBLIGATE FUNDING FOR REVISIONS |
| Dec 11, 2023 | P00008 | $0 | REALIGN MISPLACED FUNDS AND ADD FAR CLAUSES |
| Nov 27, 2023 | P00007 | $2.1M | TO OBLIGATE FUNDING FOR LABOR AND MATERIALS |
| Nov 15, 2023 | P00006 | $0 | REALIGN FUNDS FOR CONTRACTOR FEE |
| Nov 8, 2023 | P00005 | $4.2M | TO ADD FUNDING FOR POST PRODUCTION |
| Oct 31, 2023 | P00004 | $65.1K | TO OBLIGATE FUNDS FOR LIGHT KITS AND EXTEND POPS FOR GOVERNMENT ACTIONS. |
| Sep 22, 2023 | P00003 | $22.3M | TO OBLIGATE FUNDS FOR AIRCRAFT PART INSTALLATION AND MAINTENANCE |
| Sep 12, 2023 | P00002 | $121.5K | TO OBLIGATE FUNDS |
| Sep 12, 2023 | P00002 | $40.6K | TO OBLIGATE FUNDS FOR FURTHER WORK |
| Aug 30, 2023 | P00001 | $209.4K | TO ADD FUNDING FOR JUMPER KITS |
| Aug 10, 2023 | 0 | $0 | FMS FUNDING UNDER CONTRACT W56KGU19D0002 |
| Aug 10, 2023 | 0 | $4.3M | THIS AWARD PROVIDES SUPPORT UNDER W56KGU19D0002 WHICH INCLUDES MAINTENANCE, MODERNIZATION, MODIFICATION, AVIONICS SUPPORT, ENGINNEERING, AND PROJECT SUPPORT FOR THE H60 ROTARY WING AIRCRAFT |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-12-29 (65 days from calculation)
- +35 points
- 14 historical awards in this buyer and category group
- +15 points
- 95 recorded award transactions
- +10 points
- Latest award action: 2026-06-04
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.