Federal contract award
W56KGY19F0025
THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG |
| NAICS | 541712 |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | W15P7T17D0100 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $500.6M |
| Current contract value | $656.4M |
| Potential contract value / ceiling | $656.4M |
| Start date | Feb 26, 2019 |
| Current end date | Oct 31, 2024 |
| Potential end date | Oct 31, 2024 |
| Latest award activity | Apr 21, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 159 of 159 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 21, 2026 | P00159 | $-16.9K | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. |
| Sep 4, 2025 | P00158 | $0 | CHANGE OF PAYMENT OFFICE |
| Aug 7, 2025 | P00157 | $-802.9K | THIS ACTION IS TO REMOVE EXCESS FUNDS FROM SENSORS TECHNOLOGY, OPERATIONS AND READINESS MAINTENANCE. |
| Mar 5, 2025 | P00156 | $0 | THIS ACTION IS FOR OPERATION AND SUSTAINMENT SERVICES FOR SENSOR TECHNOLOGY, OPERATIONS AND READINESS MAINTENANCE. |
| Oct 29, 2024 | P00155 | $-71.3K | THIS ACTION IS TO DEFINITIZE AND FULLY FUND THREE EFFORTS UNDER THE SENSOR TECHNOLOGY, OPERATIONS AND READINESS MAINTENANCE. |
| Aug 22, 2024 | P00154 | $109.8K | THE PURPOSE OF THIS MODIFICATION, P00154, IS TO REALIGN EXCESS FUNDS FROM OY4 GUARDRAIL O&S TO FUND OY5 GUARDRAIL O&S, ADD ADDITIONAL FUNDING TO FUND OY5 GUARDRAIL O&S AND EXTEND THE PERIOD OF PERFORMANCE FOR CSC-R SUPPORT EFFORTS. |
| Aug 8, 2024 | P00153 | $190.1K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. |
| Jul 10, 2024 | P00152 | $0 | STORM GOVERNMENT FURNISHED PROPERTY (GFP) MODIFICATION. |
| Jul 1, 2024 | P00151 | $564.8K | INCREMENTAL FUNDING AND DE-OBLIGATION OF EXCESS FUNDS. |
| Jun 13, 2024 | P00150 | $0 | THE PURPOSE OF THIS MODIFCATION, P00150, IS TO REALIGN EXCESS FUNDS FROM OY4 GUARDRAIL O&S AND GSSM+ TO FUND OY5 GUARDRAIL O&S. |
| May 30, 2024 | P00149 | $450.0K | THE PURPOSE OF THIS MODIFICATION, P00149, IS TO ADD ADDITIONAL FUNDING TO MARSS O&S TO FUND COST. |
| May 24, 2024 | P00148 | $0 | THE PURPOSE OF THIS MODIFICATION, P00148, IS TO REALIGN FUNDS FROM COST TO FEE FOR EMARSS O&S, UPDATE THE PERIOD OF PERFORMANCE FOR THE FOLLOWING EFFORTS (CTK, ESS MOD PHASE II INC II, AND CSC-R+ SUPPORT) AT NO COST TO THE GOVERNMENT, AND UPDATE THE DD 254 ON CONTRACT. |
| May 6, 2024 | P00147 | $0 | THE PURPOSE OF THIS MODIFICATION, P00147, IS TO PROVIDE AN UPDATED GOVERNMENT FURNISHED PROPERTY (GFP) LIST. |
| Apr 25, 2024 | P00146 | $123.4K | THE PURPOSE OF THIS MODIFICATION, P00146, IS TO EXERCISE THE OPTION TO EXTEND GRCS DEPLOYMENT ACTIVITIES (MARSS O&S AND GUARDRAIL O&S) AND ADD FUNDING TO GUARDRAIL O&S. |
| Mar 28, 2024 | P00145 | $-223.4K | THE PURPOSE OF THIS MODIFICATION, P00145, IS TO DESCOPE THE GSSM+ EFFORT AND EXTEND THE PERIOD OF PERFORMANCE OF THE WIP SIGINT PHASE II EFFORT. |
| Mar 5, 2024 | P00144 | $426.2K | THE PURPOSE OF THIS MODIFICATION, P00144, IS TO RE-ALIGN FUNDS FROM COST TO COVER FEE, ADD ADDITIONAL FUNDING TO FEE FOR MARSS OY4, UPDATE THE DD-254 ON CONTRACT, AND UPDATE THE GFP ATTACHMENT ON CONTRACT. |
| Jan 11, 2024 | P00143 | $0 | THE PURPOSE OF THIS MODIFICATION, P00143, IS TO REPLACE FUNDING DUE TO STANDARD OPERATIONS AND MAINTENANCE ARMY RESEARCH AND DEVELOPMENT SYSTEM (SOMARDS) MIGRATION, REALIGN FUNDING TO ADDRESS LAGGING SPARES, UPDATE THE PERIOD OF PERFORMANCE FOR ESS MODERNIZATION PHASE II AND UPDATE THE GFP ATTACHMENT. |
| Dec 14, 2023 | P00142 | $2.5M | THE PURPOSE OF THIS MODIFICATION, P00142, IS TO REALIGN FUNDING FROM GSSM TO COVER LAGGING SPARES, ADD FUNDING ON CONTRACT, AND TO UPDATE THE PERIOD OF PERFORMANCE FOR GSSM+ AT NO COST TO THE GOVERNMENT. |
| Nov 30, 2023 | P00141 | $0 | EXTEND POP DATES AND UPDATE THE DD254 AND PWS. |
| Nov 21, 2023 | P00140 | $30.3K | THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING TO FULLY FUND THE DEFINITIZATION OF THE BANSHEE EFFORT. |
| Nov 16, 2023 | P00139 | $-105.7K | DEFINITIZATION OF PR TITAN EFFORT UNDER STORM |
| Nov 13, 2023 | P00138 | $981.0K | THE PURPOSE OF THIS MODIFICATION, P00138, IS TO REPLACE FUNDING DUE TO STANDARD OPERATIONS AND MAINTENANCE ARMY RESEARCH AND DEVELOPMENT SYSTEM (SOMARDS) MIGRATION. |
| Sep 28, 2023 | P00137 | $0 | THE PURPOSE OF THIS MODIFICATION, P00137, IS TO FIX AN ADMINISTRATIVE ERROR ON CONTRACT AND REALIGN FUNDING FROM ESS MOD P2 INC 2 TO COCO PIII. |
| Sep 21, 2023 | P00136 | $5.2M | THE PURPOSE OF THIS MODIFICATION, P00136, IS TO PROVIDE FUNDING IN THE AMOUNT OF $5,204,052.66 FOR THE: EMARSS O&S, MARSS O&S, EMARSS MAINTENENCE & SUPPORT, GUARDRAIL O&S, AND ESS MOD P2 INC 2 EFFORTS, AS WELL AS UPDATE THE PERIOD OF PERFORMANCE FOR ON THE SS4000 ELINT SHIP SENSOR EFFORT. |
| Sep 14, 2023 | P00134 | $798.5K | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN EXCESS FUNDING FROM WITHIN SCOPE EFFORTS TO COVER ARGON RATE INCREASES, SW DEFECT, AND ESS MOD P2 INC 2. |
| Sep 14, 2023 | P00135 | $-619.6K | THE PURPOSE OF THIS MODIFICATION, P00135, IS TO DEOBLIGATE EXCESS FUNDS IN THE AMOUNT OF $ 619,558.87 AND EXTEND THE PERIOD OF PERFORMANCE FOR THE GSSM+ WITHIN SCOPE EFFORT. |
| Aug 29, 2023 | P00133 | $-5.1M | THE PURPOSE OF THE MODIFICATION IS TO DEOBLIGATE EXCESS FUNDS IN THE AMOUNT OF $5,135,662.84, UPDATE GFP ATTACHMENT, UPDATE PERFORMANCE WORK STATEMENT. |
| Aug 17, 2023 | P00132 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE CONTRACTING OFFICER REPRESENTATIVE (COR). |
| Aug 14, 2023 | P00131 | $-981.0K | THE PURPOSE OF THIS MODIFICATION IS TO REMOVE A SLIN THAT WAS PLACED ON IN ERROR IN A PREVIOUS MODIFICATION. |
| Aug 7, 2023 | P00130 | $2.2M | THE PURPOSE OF THIS MODIFICATION, P00130, IS TO DEFINITIZE THE ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM, (EMARSS) SIGNAL INTELLIGENCE (SIGNIT) (ESS) MODERNIZATION PHASE 2: INCREMENT 2 DEVELOPMENT EFFORT AND UPDATED THE WIDE AREA WORKFLOW CLAUSE. |
| Jul 28, 2023 | P00129 | $5.2M | THE PURPOSE OF MODIFICATION, P00129, ADD FUNDING IN THE AMOUNT OF $5,181,280.61, EXTEND THE PERIOD OF PERFORMANCE ON THREE WITHIN SCOPE EFFORTS, UPDATE THE DD254, AND INCORPORATE CLAUSE 252.225-7007. |
| Jul 26, 2023 | P00128 | $-309.9K | DE-OBLIGATION OF SOMARDS FUNDING |
| Jun 30, 2023 | P00127 | $0 | REDUCED FEE FOR OPTION YEAR 4 AND PERFORMANCE WORK STATEMENT UPDATE |
| Jun 29, 2023 | P00126 | $-417.1K | DESCOPE PERFORMANCE WORK STATEMENT AND ASSOCIATED COST/FEE FOR SIGINT INC 1 DEVELOPMENT EFFORTS |
| Jun 28, 2023 | P00125 | $6.1M | DEFINITIZE THE WIP PHASE 2, ADD INCREMENTAL FUNDING FOR OPTION YEAR 4 AND WITHIN SCOPE EFFORTS. |
| Jun 22, 2023 | P00124 | $1.1M | DEFINITIZE THE SOFTWARE DEFECT RESOLUTION EFFORT, INCREMENTAL FUNDING AND ADD GFP |
| Jun 9, 2023 | P00122 | $852.7K | DEFINITIZE THE CTK DEVELOPMENT EFFORT IN ACCORDANCE WITH DFARS 252.217-7027, AS A COST-PLUS-FIXED-FEE (CPFF) EFFORT IN THE AMOUNT OF $852,661.98 & OPTION PERIOD VALUE REALIGNMENTS |
| Jun 9, 2023 | P00123 | $25.1M | EXERCISE OPTION YEAR 4 AND PROVIDE INCREMENTAL FUNDING |
| May 26, 2023 | P00121 | $5.8M | CHANGE ORDER TO ADD WITHIN SCOPE EFFORT TITLED BANSHEE DF I&D, ADD NEW PERFORMANCE WORK STATEMENTS, INCREMENTALLY FUND OPTION PERIOD 3 AND WITHIN SCOPE EFFORTS, EXTEND PERIOD OF PERFORMANCE OF WITHIN SCOPE EFFORTS |
| May 23, 2023 | P00120 | $-9.6M | DEOBLIGATION OF EXCESS FUNDS FOR OPTION YEAR 3 |
| May 9, 2023 | P00119 | $74.9K | OBLIGATE $74,876.80(49%) OF THE NTE TOTAL OF $152,809.80 FOR THE EFFORT ENTITLED PR TITAN DAT. |
| May 4, 2023 | P00118 | $1.5M | THE PURPOSE OF MODIFICATION P00118, IS TO ADD AND REALIGN FUNDING IN ORDER TO FULLY FUND FEE FOR OY3, AND UPDATE THE GFP ATTACHMENT. |
| Apr 25, 2023 | P00117 | $-10.4M | REMOVE EXCESS FUNDS, AMEND PERIOD OF PERFORMANCE FOR WITHIN-SCOPE WORK, UPDATE TASK ORDER ATTACHMENTS. |
| Mar 30, 2023 | P00116 | $2.1M | THE PURPOSE OF THIS MODIFICATION, P00116, IS TO ADD ADDITIONAL FUNDING IN SUPPORT OF THE DFX ANTENNA MOD EFFORT, REALIGN FUNDING FROM COST TO FULLY FUND FEE FOR EMARSS O&S OY3, ADD FUNDING FOR THE WIP PHASE 2 EFFORT, AND ISSUE A STOP WORK MEMO FOR COCO PHASE III EXTENSION. |
| Mar 23, 2023 | P00115 | $200.0K | THE PURPOSE OF THIS MODIFICATION, P00115, IS TO ADD FUNDING TO EMARSS_053 EFFORT, AND REALIGN FUNDING TO SUPPORT ROM EMARSS_059. |
| Mar 16, 2023 | P00114 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN UPDATED GOVERNMENT FURNISHED PROPERTY LIST. |
| Mar 1, 2023 | P00113 | $2.4M | THE PURPOSE OF THIS MODIFICATION, P00113,IS TO PROVIDE ADDITIONAL FUNDING TO SUPPORT NTE AWARD OF ESS MOD P2 INC 2 WITHIN SCOPE EFFORT. |
| Feb 23, 2023 | P00112 | $11.9M | THIS MODIFICATION IS DONE TO ADD ADDITIONAL FUNDING IN THE AMOUNT OF $12,064,970.13, REMOVE THE "CTK NTE" FROM THE CONTRACT, EXTEND THE PERIOD OF PERFORMANCE FOR THE DFX ANTENNA AND EMARSS SS 4000 BAND 6, AND UPDATE THE DD254. |
| Feb 9, 2023 | P00111 | $0 | THE PURPOSE OF THIS MODIFICATION, P00111, IS TO ISSUE STOP WORK ORDERS ON THE ESS MODIFICATION AIRCRAFT #1 FAI&T (1.1C). |
| Feb 8, 2023 | P00110 | $657.4K | THIS MODIFICATION P00110, IS DONE TO ADD ADDITIONAL FUNDING IN SUPPORT OF ESS SOFTWARE AND ESS MOD P2 INC 2. |
| Jan 31, 2023 | P00109 | $3.2M | THE PURPOSE OF THIS MODIFICATION, P00109, IS TO MOVE UNUSED COST CEILING FROM OPTION PERIOD II TO OPTION PERIOD III, INCREASE THE NTE AMOUNT FOR THE GRCS CEILING INCREASE ADD ADDITIONAL FUNDING UNDER NEW SLINS TO FUND EMARSS O&S AND EMARSS MAINTENANCE SUPPORT, UPDATE THE PERIOD OF PERFORMANCE FOR THE DFX ANTENNA EFFORT, AND UPDATE THE GFP ATTACHMENT. |
| Jan 17, 2023 | P00108 | $8.3M | THE PURPOSE OF THIS MODIFICATION, P00108, IS TO DEFINITIZE AND FULLY FIND THE CSC-R + SERVER EFFORT AS WELL AS ADD ADDITIONAL FUNDING TO SUPPORT THE EMARSS O&S EFFORT. EMARSS O&S. |
| Jan 6, 2023 | P00107 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO FIX ADMINISTRATIVE ERRORS FROM MODIFICATIONS P00105 AND P00106. |
| Dec 20, 2022 | P00106 | $2.6M | THE PURPOSE OF THE MODIFICATION P00106 IS TO MOVE UNUSED COST CEILING FROM OPTION PERIOD II TO OPTION PERIOD III, INCREASE THE NTE AMOUNT FOR GRCS CEILING INCREASE AND CSC-R EFFORTS, DEFINITIZE GSSM 1/2 DELTA PROPOSAL AND CY 22 RATE INCREASES, ADD ADDITIONAL FUNDING TO EMARSS O&S EFFORT AND EMARSS MAINTENANCE & SUPPORT EFFORT. |
| Dec 16, 2022 | P00105 | $6.7M | THE PURPOSE OF THE MODIFICATION P00105 IS TO MOVE UNUSED COST CEILING FROM OPTION PERIOD II TO OPTION PERIOD III, OBLIGATE THE NTE AMOUNT FOR GRCS CEILING INCREASE AND ESS SOFTWARE DEFECT EFFORTS, ADD ADDITIONAL FUNDING TO EMARSS O & S EFFORT, AND DE-OBLIGATE EXCESS FUNDS. |
| Dec 7, 2022 | P00104 | $638.9K | THE PURPOSE OF THIS MODIFICATION, P00104, IS TO INCREMENTALLY FUND THE CTK EFFORT, PROVIDE FUNDING FOR THE EMARSS SPARES, EXTEND THE PERIOD OF PERFORMANCE FOR THE GSSM EFFORT, UPDATE THE GFP LIST, AND INCORPORATE DFARS 252.245-7004 CLASS DEVIATION NOV 2021. |
| Nov 22, 2022 | P00103 | $402.0K | DEFINIZATION OF NEW WITHIN SCOPE EFFORT FOR MODERNIZATION OF AC#2 AND NO COST POP EXTENSION. |
| Nov 14, 2022 | P00102 | $1.4M | THE PURPOSE OF THIS MODIFICATION, P00102, IS TO ADD ADDITIONAL FUNDING TO THE EMARSS MAINTENANCE AND SUPPORT EFFORT, AND DE-OBLIGATE EXCESS FUNDS. |
| Oct 27, 2022 | P00101 | $4.7M | THE PURPOSE OF THE MODIFICATION P00101 OF CONTRACT W15P7T-17-D-0100, W56KGY-19-F-0025 IS TO ADD ADDITIONAL FUNDING FOR EMARSS O&S OP3 EFFORT, TO INCREASE THE NTE AMOUNT FOR CSC-R + SERVER, TO PROVIDE AN UPDATED GOVERNMENT FURNISHED PROPERTY (GFP) LIST, AND CORRECT AN ERROR IN THE A NARRATIVE A0101. |
| Oct 13, 2022 | P00100 | $154.6K | THE PURPOSE OF THIS MODIFICATION, P00100 IS TO CREATE A NEW SLIN TO FUND THE ADDITIONAL HOURS FOR THE GRCS DFX ANTENNA EFFORT, AND EXTEND THE POP DATE FOR THE GRCS DFX ANTENNA EFFORT. |
| Oct 6, 2022 | P00099 | $0 | THE PURPOSE OF THIS MODIFICATION, P00099, IS TO PROVIDE AN UPDATED GOVERNMENT FURNISHED PROPERTY (GFP) LIST. |
| Sep 26, 2022 | P00098 | $633.0K | THE PURPOSE OF THIS MODIFICATION, P00098 IS TO ADD FUNDING IN THE AMOUNT OF $632,974.49, AND CORRECT THE FEE AMOUNT ON SLIN 6000BN. |
| Sep 22, 2022 | P00097 | $3.3M | THE PURPOSE OF THIS MODIFICATION, P00097 IS TO ADD FUNDING IN THE AMOUNT OF $3,343,362.83. |
| Sep 19, 2022 | P00096 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO FINALIZE CONSIDERATION GIVEN TO THE GOVERNMENT FOR 2022 INDIRECT RATE INCREASES. |
| Sep 12, 2022 | P00095 | $-214.0K | THE PURPOSE OF THIS MODIFICATION P00095 IS TO DE-OBLIGATE $214,000.00 IN EXCESS FUNDS. |
| Sep 2, 2022 | P00094 | $240.7K | THE PURPOSE OF THIS MODIFICATION, P00094, IS TO ADD ADDITIONAL FUNDS IN THE AMOUNT OF $240,693.57, AND UPDATE THE GFP ATTACHMENT. |
| Aug 30, 2022 | P00092 | $2.1M | THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDS TO 1.1C AND A/C 2 EFFORT AND RESTORE FUNDING THAT WAS REQUESTED TO BE TAKEN OFF BY THE CONTRACTOR IN ERROR. |
| Aug 30, 2022 | P00093 | $3.9M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR THE EMARSS MAINTENANCE AND SUPPORT AND EMARSS O&S EFFORTS, DEOBLIGATE EXCESS FUNDS FOR OPTION PERIOD 2, AND EXTEND THE PERIOD OF PERFORMANCE FOR THREE WITHIN SCOPE EFFORTS. |
| Aug 18, 2022 | P00091 | $-4.1M | THE PURPOSE OF THIS MODIFICATION, P00091, IS TO DE-OBLIGATE $4,106,826.84 IN EXCESS FUNDS, AND ADD ADDITIONAL TRAVEL IN SUPPORT OF STORM ESS MODERNIZATION PHASE II DEV EFFORT. |
| Aug 16, 2022 | P00090 | $3.6M | THE PURPOSE OF THIS MODIFICATION, P00090, IS TO EXERCISE OPTION YEAR THREE (3) CLIN 3011 FOR THE MARSS O&S EFFORT, INCREMENTALLY FUND THE EMARSS O&S, AND INCORPORATE THREE (3) PERFORMANCE WORK STATEMENTS. |
| Aug 4, 2022 | P00089 | $5.0M | THE PURPOSE OF THIS MODIFICATION, P00089, IS TO PROVIDE INCREMENTALLY FUND GUARDRAIL O&S AND EMARSS O&S, AND UPDATE THE GFP LIST |
| Jul 29, 2022 | P00088 | $118.4K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE AND FULLY FUND THE EMARSS-S SIGNT 1.1A AND COCO PHASE II COST OVERRUNS. |
| Jul 28, 2022 | P00087 | $10.1M | THE PURPOSE OF THIS MODIFICATION, P00087, IS TO PARTIALLY FUND THE CSC R+SERVER EFFORT. |
| Jul 26, 2022 | P00086 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE PERIOD OF PERFORMANCE DATES OF THREE SUBCONTRACT LINE ITEM NUMBERS ESTABLISHED ON MODIFICATION P00084. |
| Jul 25, 2022 | P00085 | $25.2K | THE PURPOSE OF THE MODIFICATION P00085 OF CONTRACT W15P7T-17-0100, W56KGY-19-F-0025 IS TO CORRECT SLIN 6000BS FUNDING TYPE ESTABLISHED IN THE NARRATIVE OF P00084, AND INCREMENTALLY FUND THE EMARSS MAINTENANCE AND SUPPORT EFFORT. |
| Jun 24, 2022 | P00083 | $353.1K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING. |
| Jun 16, 2022 | P00082 | $6.3M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR EMARSS S SIGINT AIRCRAFT 2 INSTALL AND REALIGN FUNDS. |
| Jun 14, 2022 | P00081 | $20.9M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE CERTAIN OPTION PERIOD 3 CONTRACT LINE ITEM NUMBERS AND EXTEND THE PERIOD OF PERFORMANCE AT NO ADDITIONAL COST TO THE GOVERNMENT FOR ONE EFFORT. |
| Jun 14, 2022 | P00084 | $863.8K | THE PURPOSE OF THE MODIFICATION P00084 OF CONTRACT W15P7T-17-0100, W56KGY-19-F-0025 IS TO ADD INCREMENTAL FUNDING FOR EMARSS O&S AND EMARSS-B200 O&S, PARTIALLY FUND EMARSS-S SIGINT 1.1A COST OVERRUN, UPDATE CONTRACT DATA REQUIREMENTS LIST EXHIBIT N, AND UPDATE THE CONTRACTING OFFICER. |
| Jun 1, 2022 | P00080 | $-6.3M | THE PURPOSE OF THIS MODIFICATION, P00080, IS TO DE-OBLIGATE EXCESS FUNDS, REALIGN FUNDS, ADD ADDITIONAL FUNDS, AND UPDATE CDRL. |
| May 25, 2022 | P00079 | $17.6M | AWARD THE GSSM+ EFFORT UNDER THE GRCS PROGRAM |
| May 19, 2022 | P00078 | $-430.8K | THE PURPOSE OF THIS MODIFICATION IS TO DESCOPE AND REMOVE MARSS EFFORT FROM OPTION YEAR 2, DE-OBLIGATE EXCESS FUNDS, EXTEND THE PERIOD OF PERFORMANCE FOR CERTAIN EFFORTS, AND UPDATE DD254. |
| May 12, 2022 | P00077 | $3.6M | THE PURPOSE OF MODIFICATION P00077 OF CONTRACT W15P7T-17-D-0100, W56KGY-19-F-0025 IS TO ADD THE FINAL NEGOTIATED PRICE FOR THE COMINT CORE PHASE III EFFORT IN SUPPORT OF THE GRCS PROGRAM |
| May 9, 2022 | P00076 | $356.6K | THE PURPOSE OF THIS MODIFICATION IS TO ADD SOFTWARE LICENSE AND MAINTENANCE FOR EMARSS-S SIGINT MODERNIZATION 1.1C FAIT AND ADD INCREMENTAL FUNDING FOR GRCS INSCOM UNDER THE GUARDRAIL O&S PROGRAM. |
| Mar 31, 2022 | P00075 | $8.9M | THE PURPOSE OF MODIFICATION P00075 OF CONTRACT W15P7T-17-D-0100, W56KGY19-F-0025 IS TO AWARD WIP INTEROPERABILITY,EMARSS-S SIGINT MODERNIZATION PHASE 2: INCREMENT 1, ESS MODERNIZATION NRE 1.1B SERVER END OF LIFE SPARES AND INCREMENTAL FUNDING. |
| Feb 24, 2022 | P00074 | $446.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND REALIGN AVAILABLE FUNDING. |
| Jan 31, 2022 | P00073 | $3.8M | THE PURPOSE OF THIS MODIFICATION, P00073 IS TO INCREASE CEILINGS IN SUPPORT OF THE E-BAT MINOTAUR INTEGRATION AND ENHANCED MEDIUM ALTITUDE RECONNAISSANCE SURVEILLANCE SYSTEM (EMARSS) SIGNAL INTELLIGENCE (SIGINT) MODERNIZATION 1.1B EFFORTS ALSO FUND THE MULTI-DOMAIN SENSING SOLUTION (MDSS)\~ELECTRONIC INTELLIGENCE (ELINT) SS-4000 SENSOR EFFORT. |
| Jan 20, 2022 | P00072 | $0 | THE PURPOSE OF THIS MODIFICATION, P00072 IS TO EXTEND THE PERIOD OF PERFORMANCE FOR SEVERAL SLINS AND INCORPORATE A REVISED PERFORMANCE WORK STATEMENT. |
| Dec 21, 2021 | P00071 | $14.3M | 1 DEFINITIZE: A)GUARDRAIL COMMON SENSOR (GRCS) SIGNAL INTELLIGENCE (SIGINT) SUITE MODIFICATION (GSSM) ADDITIONAL EFFORTS. B)GUARDRAIL COMMON SENSOR (GRCS) DIRECTION FINDING EXTENSION (DFX) ANTENNA MODIFICATION EFFORT. 2) DE-OBLIGATE AVAILABLE FUNDING IN SUPPORT OF MARSS O&S EFFORT 3) PROVIDE INCREMENTAL FUNDING IN SUPPORT OF: A)EMARSS O&S B)GRCS O&S C)EMARSS VADER CFSR 4) EXTEND THE PERIOD OF PERFORMANCE TO SUPPORT COMPLETION OF: A)THE SS-4000 BAND 6 EFFORT B)THE GEN5ADDER / DIGITAL RECEIVER TECHNOLOGY (DRT) SOFTWARE PORT AND INTEGRATION EFFORT |
| Nov 24, 2021 | P00070 | $0 | NOVATION AGREEMENT |
| Nov 19, 2021 | P00069 | $3.5M | DEFINITIZE GEN5 ADDER / DIGITAL RECEIVER TECHNOLOGY (DRT) SOFTWARE PORT AND INTEGRATION, DEFINITIZE VADER/STI EFFORT, REALIGN FUNDING GRCS XM PORT - RDTE AND INCREMENTAL FUNDING FOR EMARSS O&S |
| Nov 12, 2021 | P00068 | $86.3K | DEFINITIZE FUNDING IN SUPPORT OF NGSHAL SW EFFORT |
| Oct 29, 2021 | P00067 | $2.6M | THE PURPOSE OF MODIFICATION P00067 OF CONTRACT W15P7T-17-D-0100 W56KGY-19-F0025 IS TO: 1. PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $1,707,018.02 PURSUANT TO FAR 52.232-22, "LIMITATION OF FUNDS". |
| Oct 22, 2021 | P00066 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS PROVIDE CHANGES PURSUANT TO FAR 52.243-2(A), "CHANGES - COST REIMBURSEMENT. |
| Sep 27, 2021 | P00065 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS, AND INCREASE FUNDING FOR EMARSS |
| Sep 24, 2021 | P00064 | $2.8M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Sep 20, 2021 | P00063 | $237.6K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND REALIGN AVAILABLE FUNDING. |
| Sep 2, 2021 | P00062 | $1.9M | THE PURPOSE OF THIS MODIFICATION P00062 OF CONTRACT W15P7T-17-D-0100, TASK ORDER W56KGY19F0025 IS TO OBLIGATE FUNDS AND CREATE SLINS. |
| Aug 30, 2021 | P00061 | $505.0K | THE SCOPE OF THIS EFFORT IS TO DEFINITIZE REMAINING FUNDS FOR TNG LAB SUPPORT EFFORT AND TO OBLIGATE 49% OF FUNDS NTE TOWARDS E-BAT/MINOTAUR DEVELOPMENT AND INTEGRATION. |
| Aug 25, 2021 | P00060 | $120.4K | THE SCOPE OF THIS EFFORT IS TO DEFINITIZED THE GEN5 ADDER/ DRT UPGRADE INTEGRATION EFFORT |
| Aug 10, 2021 | P00059 | $0 | REALIGN 8 SLINS AND EXTEND POP OF SLIN 6000AQ FROM 11 AUGUST, 2021 TO 31 AUGUST 2021 TO SUPPORT THE NGSHAL EFFORT. |
| Aug 2, 2021 | P00057 | $0 | TO UPDATE THE LINES OF ACCOUNTING (LOA) ON ACRN CB DUE TO AN ERROR IN THE GOVERNMENT BUDGET SYSTEM |
| Jul 30, 2021 | P00058 | $4.3M | THE PURPOSE OF THIS MODIFICATION, P00058, IS TO PROVIDE FUNDING IN THE AMOUNT OF $4,282,000.00 PURSUANT TO FAR 52.232-22, LIMITATION OF FUNDS. |
| Jul 14, 2021 | P00056 | $3.8M | THE PURPOSE OF THIS MODIFICATION IS FOR ADMINISTRATIVE CHANGES AND TO ADD FUNDING. |
| Jun 17, 2021 | P00055 | $20.3M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR 2. |
| Jun 10, 2021 | P00054 | $4.9K | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) IN SUPPORT OF OPTION YEAR 1 EMARRS B-200 OPERATIONS AND SUSTAINMENT AS WELL AS ADD REMAINING FUNDING IN OF TNG LAB SUPPORT EFFORT. |
| May 20, 2021 | P00052 | $720.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING IN THE AMOUNT OF $720,490.43 FOR THE GEN5 ADDER/DIGITAL RECEIVER (DRT) SOFTWARE FOR SENSOR TECHNOLOGY,OPERATIONS, AND READINESS MAINTENANCE (STORM)AS WELL AS EXTEND PERIOD OF PERFORMANCE (POP). |
| May 6, 2021 | P00051 | $574.1K | THIS MODIFICATION ADDS $574,105.21 FOR TNG LAB SUPPORT AND EXTENDS THE POP FOR SLIN 1001AU TO 2/10/2022. |
| Apr 15, 2021 | P00050 | $1.8M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN AVAILABLE FUNDING FROM SLIN 0001AQ TO SLIN 1001 IN THE AMOUNT OF $10,000.00 CORRECT THE LINE OF ACCOUNT ON SLIN 6000AR, 6000AS, 6000AQ, AND 7000AR AND, PROVIDE FUNDING IN THE AMOUNT OF $1,690,546.50 IN SUPPORT OF THE GUARDRAIL COBHAM DBIA EFFORT. |
| Mar 25, 2021 | P00049 | $2.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, REALIGN FUNDING, EXTEND THE PERIOD OF PERFORMANCE AT NO ADDITIONAL COST TO THE GOVERNMENT FOR SLIN 6000AB, 6000AC, 6000AD, 6000AE, 6000AF, 6000AG, AND 7000AF. |
| Mar 11, 2021 | P00048 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE LINE OF ACCOUNTING (LOA) FOR THE FOLLOWING SLINS: 1001AN, 1001BB, 7000AN, 1001AR, 1020BA, 1001BC, 6000AR, 6000AS, 6000AQ, 7000AR, 6000AT, AND 6000AU. |
| Feb 25, 2021 | P00047 | $12.8M | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE WITHIN SCOPE EFFORT CEILING BY $91,105,068.00 IN ACCORDANCE WITH THE APPROVED JUSTIFICATION & APPROVAL (J&A), REALIGN OPTION PERIOD CEILING, PROVIDE INCREMENTAL FUNDING, REALIGN FUNDING, AWARD THE NEXT GENERATION HARDWARE ABSTRACTION LAYER (NGSHAL) EFFORT, AND ESTABLISH A NEW ALTERNATE CONTRACTING OFFICER'S REPRESENTATIVE (COR). |
| Feb 5, 2021 | P00046 | $10.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, REALIGN AVAILABLE CEILING FROM OPTION YEAR 4 GUARDRAIL IN SUPPORT OF OPTION YEAR 1 GUARDRAIL, AND INCORPORATE DFARS 252.245-7002. |
| Jan 22, 2021 | P00045 | $526.7K | THE PURPOSE OF THIS MODIFICATION IS TO OLIGATE FUNDING TOWARDS THE THEATER NET-CENTRIC GEOLOCATION (TNG) LAB SUPPORT EFFORT NOT-TO-EXCEED (NTE) AND ESTABLISH THE JOINT INTERFACE CONTROL DOCUMENT (JICD) DATA THROUGHPUT STUDY EFFORT. |
| Jan 19, 2021 | P00044 | $655.1K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF GUARDRAIL OPERATIONS AND SUSTAINMENT AND REALIGN AVAILABLE FUNDING IN SUPPORT OF THE GEN5 ADDER EFFORT. |
| Dec 22, 2020 | P00043 | $27.8M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE GUARDRAIL COMMON SENSOR SIGNALS INTELLIGENCE SUITE MODIFICATION (GSSM) EFFORT, PROVIDE INCREMENTAL FUNDING FOR OPTION PERIOD I ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS) OPERATIONS & SUSTAINMENT (O&S), REALIGN FUNDING FOR THE EMARSS SIGNALS INTELLIGENCE (EMARSS-S) MODERNIZATION EFFORT, AND EXTEND THE PERIOD OF PERFORMANCE ON THE GEN5ADDER EFFORT AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Nov 25, 2020 | P00042 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN AVAILABLE FUNDING, PROVIDE INCREMENTAL FUNDING FOR ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS) OPERATIONS&SUSTAINMENT (O&S), AND PROVIDE FUNDING FOR THE JOINT INTERFACE CONTROL DOCUMENTS (JICD) ELECTRONIC INTELLIGENCE (ELINT) 4.2 TASKER EFFORT. |
| Oct 29, 2020 | P00041 | $1.0M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBLINE ITEM NUMBERS (SLINS) IN SUPPORT OF THE VEHICLE AND DISMOUNT EXPLOITATION RADAR (VADER) SYSTEM TRAINING INTERFACE (STI), JOINT INTERFACE CONTROL DOCUMENT (JICD) 4.2 ELECTRONICS INTELLIGENCE (ELINT) TASKER, AND COMMUNICATIONS INTELLIGENCE (COMINT) BLIND TASKER EFFORTS AS WELL AS INCORPORATE A REVISED PERFORMANCE WORK STATEMENT (PWS) AND FUNDING SUMMARY. |
| Sep 30, 2020 | P00040 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE AVAILABLE FUNDING IN THE AMOUNT OF $6,450,000.00 TO CORRECT THE LINE OF ACCOUNTING AND PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $6,450,000.00. |
| Sep 28, 2020 | P00039 | $1.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR EMARSS MAINTENANCE SUPPORT. |
| Sep 25, 2020 | P00038 | $28.5K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING IN SUPPORT OF THE GEN5ADDER EFFORT. |
| Sep 22, 2020 | P00037 | $3.3M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE GUARDRAIL COMMON SENSOR (GRCS) COMMUNICATIONS INTELLIGENCE (COMINT) CORE SUBSYSTEM (COCO) EFFORT, PROVIDE FUNDING FOR THE ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS) SIGNALS INTELLIGENCE (SIGINT) EFFORT, AND REALIGN AVAILABLE FUNDING. |
| Sep 3, 2020 | P00036 | $1.3M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR GUARDRAIL COMMON SENSOR (GRCS) OPERATIONS AND SUSTAINMENT (O&S), OBLIGATE FUNDING TOWARDS THE VEHICLE AND DISMOUNT EXPLOITATION RADAR (VADAR) SYSTEM TRAINING INTERFACE (STI) EFFORT, AND UPDATE ONE OF THE CONTRACTING OFFICER'S REPRESENTATIVES (COR) ON THE TASK ORDER. |
| Aug 31, 2020 | P00035 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE LINE OF ACCOUNTING (LOA) FOR SLIN 1001AM. |
| Aug 25, 2020 | P00034 | $5.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE OPTION PERIOD I INCREMENTAL FUNDING IN SUPPORT OF ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS), EMARSS B-200, AND GUARDRAIL COMMON SENSOR (GRCS) OPERATIONS AND SUSTAINMENT. |
| Aug 18, 2020 | P00033 | $9.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, PROVIDE FUNDING FOR THE ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS)-S SIGNALS INTELLIGENCE (SIGINT) MODERNIZATION EFFORT, INCORPORATE FAR 52.246-11, AND UPDATED FAR 52.204-24 AND 52.204-25. |
| Jul 30, 2020 | P00032 | $6.7M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $6,340,000.00 TO ESTABLISH SLIN 1001AJ IN SUPPORT OF THE THEATER NET-CENTRIC GEOLOCATION (TNG) SYSTEM ENGINEERING SUPPORT (SES) EFFORT IN THE AMOUNT OF $313,547.87 AND, TO INCORPORATE AN UPDATED DD FORM 254 - REV 3. |
| Jul 27, 2020 | P00031 | $-2.6M | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FISCAL YEAR (FY) 2020 OPERATION&MAINTENANCE ARMY (OMA) FUNDS FROM THE TASK ORDER, PROVIDE INCREMENTAL FUNDING, AND INCORPORATE FAR CLAUSES 52.204-24 AND 52.204-25. |
| Jul 15, 2020 | P00030 | $5.8M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $5,768,191.93 IN ACCORDANCE WITH SECTION 3610 OF THE CORONAVIRUS AID RELIEF AND ECONOMIC SECURITY (CARES) ACT. |
| Jul 14, 2020 | P00029 | $8.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS) OPERATIONS&SUSTAINMENT (O&S), MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (MARSS) O&S, AND ESTABLISH SUBLINE ITEM NUMBER (SLIN) 1001AX FOR THE GEN5ADDER EFFORT AND 1020AN FOR THE X-MIDAS PORT EFFORT. |
| Jul 8, 2020 | P00028 | $1.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS) B-200 OPERATIONS AND SUSTAINMENT, PROVIDE FUNDING FOR THE EMARSS PRISM FEASIBILITY STUDY, AND REALIGNMENT REMAINING FUNDING FROM THE BASE PERIOD TO OPTION PERIOD I ON THE TASK ORDER. |
| Jul 6, 2020 | P00027 | $3.9M | FUNDING FOR WITHIN SCOPE EFFORTS. |
| Jun 12, 2020 | P00025 | $41.2M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD I ON THE TASK ORDER, PROVIDE INCREMENTAL FUNDING, REALIGN FUNDING, INCORPORATE FAR CLAUSE FAR 52.222-50, INCORPORATE A REVISED FUNDING SUMMARY, INCORPORATE A REVISED PERFORMANCE WORK STATEMENT, AND INCORPORATE A REVISED DD FORM 254. |
| Jun 8, 2020 | P00026 | $3.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $3,474,926.30 IN ACCORDANCE WITH SECTION 3610 OF THE CORONAVIRUS AID RELIEF AND ECONOMIC (CARES) ACT. |
| May 29, 2020 | P00024 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO FULLY FUND THE FEE FOR THE BASE YEAR OF THIS TASK ORDER. |
| Apr 28, 2020 | P00022 | $10.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF GUARDRAIL COMMON SENSOR (GRCS) OPERATIONS AND SUSTAINMENT (O&S) AND TO ESTABLISH THE GRCS X-MIDAS PORT EFFORT. |
| Apr 8, 2020 | P00021 | $1.9M | THIS PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, UPDATE THE FUNDING SUMMARY AND REMOVE GFP. |
| Apr 7, 2020 | P00023 | $848.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF GUARDRAIL COMMON SENSOR (GRCS) OPERATIONS&SUSTAINMENT (O&S). |
| Mar 25, 2020 | P00020 | $4.7M | THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SLINS 0001BE AND 0001BF IN SUPPORT OF THE GUARDRAIL COMMON SENSOR (GRCS) ELECTRONIC INTELLIGENCE (ELINT) PHASE II EFFORT, AND RECEIVE GOVERNMENT FURNISHED PROPERTY (GFP). |
| Mar 16, 2020 | P00019 | $11.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF EMARSS, MARSS, AND GRCS OPERATIONS AND SUSTAINMENT AND REALIGN CEILING FROM OPTION YEAR 4 TO THE BASE YEAR. |
| Feb 27, 2020 | P00018 | $691.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF ENHANCED MEDIUM ALTITUDE RECONNAISSANCE AND SURVEILLANCE SYSTEM (EMARSS) OPERATIONS AND SUSTAINMENT AND GUARDRAIL COMMON SENSOR (GRCS) OPERATIONS AND SUSTAINMENT. ALSO, THIS MODIFICATION RECEIVES GOVERNMENT FURNISHED PROPERTY (GFP) AS WELL AS TRANSFERS GFP OFF OF THE TASK ORDER. |
| Jan 30, 2020 | P00017 | $14.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF MARSS, EMARSS, AND GUARDRAIL OPERATIONS AND SUSTAINMENT IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. |
| Jan 24, 2020 | P00016 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF EMARSS GEN5 ADDER OPERATIONS AND SUSTAINMENT, PROVIDE AN UPDATED PWS AND ADD DFARS 252.225-7013. |
| Dec 18, 2019 | P00015 | $12.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF EMARSS AND MARSS OPERATIONS AND SUSTAINMENT IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. |
| Dec 11, 2019 | P00014 | $4.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR EMARSS MAINTENANCE SUPPORT AND TO RECEIVE GOVERNMENT FURNISHED PROPERTY (GFP) ONTO THE TASK ORDER. |
| Dec 3, 2019 | P00013 | $1.6M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING TO ESTABLISH THE COMMON SIGINT CHASSIS (CSC-R) EFFORT. |
| Dec 2, 2019 | P00012 | $6.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF GUARDRAIL OPERATIONS AND SUSTAINMENT AND ESTABLISH THE SS-4000 BAND 6 ADD-ON EFFORT. |
| Nov 18, 2019 | P00011 | $876.9K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF GUARDRAIL OPERATIONS AND SUSTAINMENT. |
| Oct 29, 2019 | P00010 | $690.0K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN SUPPORT OF EMARSS MAINTENANCE SUPPORT. |
| Oct 23, 2019 | P00009 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING IN SUPPORT OF THE MX-15 HAND CONTROLLER UNIT (HCU) BUY, INCORPORATE A REVISED SPARES LIST, INCORPORATE A REVISED FUNDING SUMMARY, AND REMOVE THE DD250 REQUIREMENT FROM DFARS 252.232-7006. |
| Oct 8, 2019 | P00008 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE MX-15 HAND CONTROLLER UNIT (HCU) SPARES LIST. |
| Sep 26, 2019 | P00007 | $0 | AMEND THE NARRATIVE AND PERIOD OF PERFORMANCE ON SLINS 0001AM AND 0001AN, REALIGN FUNDING FROM FEE TO COST ON SLIN 0001AM, AND REALIGN FUNDING FROM SLIN 0001AK TO SLIN 0001AQ IN SUPPORT OF THE ONE ORION EFFORT. |
| Sep 11, 2019 | P00006 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR THE BASE PERIOD OF THIS TASK ORDER TO UPDATE THE CLIN STRUCTURE. |
| Aug 29, 2019 | P00005 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR THE BASE PERIOD OF THIS TASK ORDER. |
| Aug 27, 2019 | P00004 | $13.9M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING TO THIS BASE PERIOD OF THIS TASK ORDER AND CHANGE THE CONTRACT ADMINISTRATION OFFICE. |
| Aug 13, 2019 | P00003 | $3.8K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, INCORPORATE A REVISED PWS, INCORPORATE A REVISED DD 254, AND INCORPORATE A REVISED FUNDING SUMMARY. |
| Jul 23, 2019 | P00002 | $8.8M | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE PERIOD OF PERFORMANCE DUE TO PROTEST BEING DENIED AND, TO ADD INCREMENTAL FUNDING. |
| Apr 30, 2019 | P00001 | $-35.5M | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING. |
| Feb 26, 2019 | 0 | $81.1M | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT SERVICES FOR THE STORM REQUIREMENT. |