Federal contract award
W56KGY20F0067
THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT OF THE STAMP FOLLOW-ON REQUIREMENT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | W15P7T19D0174 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $405.7M |
| Current contract value | $694.7M |
| Potential contract value / ceiling | $694.7M |
| Start date | Jul 31, 2020 |
| Current end date | Jul 31, 2026 |
| Potential end date | Jul 31, 2026 |
| Latest award activity | Mar 20, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 72 of 72 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 20, 2026 | P00058 | $0 | PROJECT DIRECTOR SENSORS-AERIAL INTELLIGENCE (PD SAI) IS CHARTERED TO PROVIDE TACTICALLY RELEVANT MANNED AERIAL INTELLIGENCE RECONNAISSANCE AND SURVEILLANCE (AISR) TO USSOCOM IN SUPPORT OF CURRENT AND EMERGING OVERSEAS CONTINGENCY OPERATIONS. |
| Mar 20, 2026 | P00058 | $0 | PROJECT DIRECTOR SENSORS-AERIAL INTELLIGENCE (PD SAI) IS CHARTERED TO PROVIDE TACTICALLY RELEVANT MANNED AERIAL INTELLIGENCE RECONNAISSANCE AND SURVEILLANCE (AISR) TO USSOCOM IN SUPPORT OF CURRENT AND EMERGING OVERSEAS CONTINGENCY OPERATIONS. |
| Mar 10, 2026 | P00057 | $0 | PROJECT DIRECTOR SENSORS-AERIAL INTELLIGENCE (PD SAI) IS CHARTERED TO PROVIDE TACTICALLY RELEVANT MANNED AERIAL INTELLIGENCE, RECONNAISSANCE AND SURVEILLANCE (AISR) TO THE UNITED STATES SPECIAL OPERATIONS COMMAND (USSOCOM) IN SUPPORT OF (OCO). |
| Mar 10, 2026 | P00057 | $0 | PROJECT DIRECTOR SENSORS-AERIAL INTELLIGENCE (PD SAI) IS CHARTERED TO PROVIDE TACTICALLY RELEVANT MANNED AERIAL INTELLIGENCE, RECONNAISSANCE AND SURVEILLANCE (AISR) TO THE UNITED STATES SPECIAL OPERATIONS COMMAND (USSOCOM) IN SUPPORT OF (OCO). |
| Jan 29, 2026 | P00056 | $0 | PROJECT DIRECTOR SENSORS-AERIAL INTELLIGENCE (PD SAI) IS CHARTERED TO PROVIDE TACTICALLY RELEVANT MANNED AERIAL INTELLIGENCE, RECONNAISSANCE AND SURVEILLANCE (AISR) TO THE UNITED STATES SPECIAL OPERATIONS COMMAND (USSOCOM). |
| Jan 29, 2026 | P00056 | $0 | PROJECT DIRECTOR SENSORS-AERIAL INTELLIGENCE (PD SAI) IS CHARTERED TO PROVIDE TACTICALLY RELEVANT MANNED AERIAL INTELLIGENCE, RECONNAISSANCE AND SURVEILLANCE (AISR) TO THE UNITED STATES SPECIAL OPERATIONS COMMAND (USSOCOM). |
| Jan 26, 2026 | P00055 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSORS PLATFORM II (STAMP II) IS TO PROVIDE CONTRACTOR SERVICES THAT INCLUDE MISSION PLANNING, AIRCRAFT OPERATIONS, MAINTENANCE, SYSTEM INTEGRATION AND ENGINEERING SERVICES. |
| Jan 26, 2026 | P00055 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSORS PLATFORM II (STAMP II) IS TO PROVIDE CONTRACTOR SERVICES THAT INCLUDE MISSION PLANNING, AIRCRAFT OPERATIONS, MAINTENANCE, SYSTEM INTEGRATION AND ENGINEERING SERVICES. |
| Nov 5, 2025 | P00054 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTIC SUPPORT FOR BOTH CONTINENTAL UNITED STATES AND OUTSIDE OF THE UNITED STATES. |
| Nov 5, 2025 | P00054 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTIC SUPPORT FOR BOTH CONTINENTAL UNITED STATES AND OUTSIDE OF THE UNITED STATES. |
| Sep 25, 2025 | P00053 | $5.0M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MILTI-SENSOR PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTIC SUPPORT FOR BOTH CONTINENTAL UNITED STATES AND OUTSIDE OF THE UNITED STATES |
| Sep 25, 2025 | P00053 | $5.0M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MILTI-SENSOR PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTIC SUPPORT FOR BOTH CONTINENTAL UNITED STATES AND OUTSIDE OF THE UNITED STATES |
| Sep 10, 2025 | P00052 | $6.4M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSORS PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR BOTH CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Sep 10, 2025 | P00052 | $6.4M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSORS PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR BOTH CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Aug 13, 2025 | P00051 | $5.0M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSORS PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR BOTH THE CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Aug 13, 2025 | P00051 | $5.0M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSORS PLATFORMS II (STAMP) IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR BOTH THE CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| May 12, 2025 | P00050 | $229.6K | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI- SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| May 12, 2025 | P00050 | $229.6K | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI- SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Apr 23, 2025 | P00049 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI- SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Apr 23, 2025 | P00049 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI- SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Jan 28, 2025 | P00048 | $32.1M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Jan 28, 2025 | P00048 | $32.1M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Dec 2, 2024 | P00047 | $6.6M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Dec 2, 2024 | P00047 | $6.6M | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Oct 2, 2024 | P00046 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Oct 2, 2024 | P00046 | $0 | THE PURPOSE OF SPECIAL OPERATIONS COMMAND TACTICAL AIRBORNE MULTI-SENSOR PLATFORMS II IS TO PROVIDE CONTRACTOR LOGISTICS SUPPORT FOR CONTINENTAL UNITED STATES AND OUTSIDE OF THE CONTINENTAL UNITED STATES. |
| Sep 11, 2024 | P00045 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE A LINE OF ACCOUNTING. |
| Sep 9, 2024 | P00044 | $54.1K | PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $54,127.00 PURSUANT TO FAR 52.232-22 "LIMITATIONS OF FUNDS". |
| Aug 15, 2024 | P00043 | $31.8M | EXERCISE OPTION PERIOD FOUR AND PROVIDE INCREMENTAL FUNDING ON OPTION PERIOD THREE AND FOUR. |
| Jun 6, 2024 | P00042 | $4.0M | PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $4,000,000.00 IAW 52.232-22 "LIMITATION OF FUNDS". |
| Apr 30, 2024 | P00041 | $196.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS AND UPDATE THE GFP LIST. |
| Feb 28, 2024 | P00040 | $23.5M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS AND UPDATE CONTRACT LANGUAGE IN SECTION H OF THE TASK ORDER. |
| Jan 29, 2024 | P00039 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GFP LIST. |
| Dec 14, 2023 | P00038 | $13.3M | TO APPLY INCREMENTAL FUNDING FOR OPTION PERIOD 3 |
| Dec 1, 2023 | P00037 | $3.2M | DEFINITIZE THE FOXHOUND FLEET UPGRADES SET 4.0 ECP IN ACCORDANCE WITH DFARS 252.217-7027, AS A COST-PLUS-FIXED FEE (CPFF) |
| Nov 13, 2023 | P00036 | $6.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS AND INCORPORATE WAGE DETERMINATION REVISIONS. |
| Oct 19, 2023 | P00035 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED PROPERTY LIST. |
| Sep 29, 2023 | P00034 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDS TO THE CORRECT ALLOCATION OF FUNDS ACROSS LABOR AND MATERIALS. |
| Sep 25, 2023 | P00033 | $0 | STAMPII CONTRACTING OFFICER REPRESENTATIVE (COR) CHANGE. |
| Sep 14, 2023 | P00032 | $2.1M | STAMPII KING AIR DESCOPE, VALUE REALIGNMENTS AND INCREMENTAL FUNDING |
| Aug 24, 2023 | P00031 | $16.9M | EXERCISE OPTION PERIOD 3 PURSUANT TO FAR 52.217-9, "OPTION TO EXTEND TERM OF THE CONTRACT" AND INCORPORATE THE CLAUSE AT FAR 52.204-27, "PROHIBITION ON A BYTEDANCE COVERED APPLICATION". |
| Jul 31, 2023 | P00030 | $2.4M | IN ACCORDANCE WITH DFARS 243.204-70-4 LIMITATIONS ON OBLIGATIONS, THE GOVERNMENT WILL OBLIGATE $2,372,755.19, 49% OF THE NTE TOTAL $4,842,357.52 PRIOR TO THE RECEIPT OF A QUALIFYING PROPOSAL FOR THE EFFORT ENTITLED FOXHOUND FLEET UPGRADES SET 4.0. |
| Jun 20, 2023 | P00029 | $12.9M | APPLYING INCREMENTAL FUNDING FOR OY2 IN THE AMOUNT OF $12,936,084.00 |
| Mar 10, 2023 | P00027 | $17.1M | INCREMENTAL FUNDING FOR OP2, FUNDS RE-ALIGNMENT FROM SLIN 1002AD TO 1001AC, ATTACHED UPDATED DD254, GFP LIST AND MOD LOG SUMMARY. |
| Feb 24, 2023 | P00028 | $0 | UPDATED DD FORM 254/ UPDATED AT/OPSEC |
| Jan 25, 2023 | P00026 | $-269.1K | DEFINITIZE THE SANTA FE AND MX15 EFFORT IN ACCORDANCE WITH DFARS 252.217-7027 AS A COST-PLUS-FIXED-FEE (CPFF) EFFORT IN THE AMOUNT OF $1,008,063.54. THE SANTA FE PORTION HAS BEEN DESCOPED. |
| Dec 16, 2022 | P00025 | $12.6M | INCREMENTAL FUNDING FOR OY 2. |
| Oct 31, 2022 | P00024 | $0 | ADMINISTRATIVE CORRECTION OF OBLIGATION CODES FOR PROPER DISBURSEMENTS. |
| Sep 14, 2022 | P00023 | $33.7K | OBLIGATING EXPIRING OMA FUNDS. |
| Sep 8, 2022 | P00022 | $24.8M | EXERCISING OPTION YEAR 2, AND ISSUING A NTE TO START THE FOXHOUND FLEET TECHNICAL UPGRADES - SANTA FE SYSTEM. |
| Jul 13, 2022 | P00021 | $4.1M | DEFINITIZATION OF FOXHOUND UPGRADES AND FUNDING. |
| May 19, 2022 | P00020 | $21.9M | FUNDING ACTION. |
| Apr 22, 2022 | P00019 | $5.9M | FUNDING THE FOXHOUND AIRCRAFT EXTENSION OF SERVICE PROGRAM. |
| Mar 31, 2022 | P00018 | $7.2M | NOT TO EXCEED FUNDING FOR AIRCRAFT TECHNICAL UPGRADES SET 2 AND A REALIGNMENT OF COST CEILING VALUE. |
| Mar 18, 2022 | P00017 | $5.3M | THE DEFINITIZATION OF THE STAMP FOXHOUND FLEET UPGRADES COST. |
| Jan 24, 2022 | P00016 | $0 | DEFINITIZATION OF CHANGE ORDER FOR ADDITIONAL O&S SUPPORT. |
| Dec 2, 2021 | P00015 | $17.3M | EO14042 UPDATED GUIDANCE FOR REPORTING COVID-19 RELATED ACTIONS TO THE FEDERAL PROCUREMENT DATA SYSTEM, DATED APRIL 30, 2020. EXECUTING STAMP II OPTION YEAR 1. |
| Nov 3, 2021 | P00014 | $0 | CORRECTED THE LONG LINE OF ACCOUNTING. |
| Oct 8, 2021 | P00013 | $6.1M | FUND THE STAMP FEET TECHNICAL UPGRADES ON A 49% NTE BASIS. |
| Sep 24, 2021 | P00012 | $16.3M | ACQUISITION OF TWO FOXHOUND AIRCRAFT. |
| Jul 15, 2021 | P00011 | $0 | UPDATING THE DD 254, PWS, AND REALIGNING FUNDS. |
| Jun 16, 2021 | P00010 | $0 | A DEOBLIGATION AND REALIGNMENT OF FUNDS ON CLIN 5001/5002. |
| May 6, 2021 | P00009 | $50.0M | STAMP II FUNDING INCREMENT. |
| Apr 13, 2021 | P00008 | $0 | MODIFICATION TO ADD LANGUAGE AND WAGE DETERMINATIONS. |
| Feb 4, 2021 | P00007 | $0 | MODIFICATION TO CORRECT LINE OF ACCOUNTING, REVISE PWS, AND CDRLS. |
| Jan 29, 2021 | P00006 | $0 | MODIFICATION TO CORRECT LINE OF ACCOUNTING. |
| Jan 14, 2021 | P00005 | $48.3M | PROVIDE FUNDING AND CORRECT THE CLIN STRUCTURE. |
| Jan 6, 2021 | P00004 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE CLIN STRUCTURE CODING IN PADDS. |
| Dec 5, 2020 | P00003 | $0 | UPDATED PERIOD OF PERFORMANCE TO REFLECT BEGINNING OF TRANSITION PERIOD UP TO STOP WORK ORDER. |
| Dec 4, 2020 | P00002 | $0 | LIFT CICA STAY |
| Aug 26, 2020 | P00001 | $0 | STOP WORK ORDER |
| Jul 31, 2020 | 0 | $2.8M | THIS TASK ORDER IS CREATED FOR OPERATION AND SUSTAINMENT OF THE STAMP FOLLOW-ON REQUIREMENT. |