Federal contract award

W56KGY23F0007

THIS DELIVERY ORDER IS TO PURCHASE SPARE PARTS AND DEPOT LEVEL REPAIR PARTS NEEDED TO ADDRESS THE TOTAL SYSTEM LIFECYCLE OF THE DUKE FAMILY OF SYSTEMS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-APG
NAICS334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC5865 — Electronic Countermeasures, Counter-Countermeasures and Quick Reaction Capability Equipment
Parent award / vehicleW56KGY21D0002
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$10.0M
Current contract value$10.0M
Potential contract value / ceiling$10.0M
Start dateDec 8, 2022
Current end dateOct 31, 2024
Potential end dateOct 31, 2024
Latest award activityMay 10, 2024
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 17 of 17 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 4, 2024P00016$0THE PURPOSE OF THIS MODIFICATION (P00016) IS TO 1) EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0002, CLIN 0005 AND CLIN 0006 AND 2) INCORPORATE EARLY DELIVERY UNDER CLIN 0001AA AS CONSIDERATION.
Jun 14, 2024P00015$0THIS MODIFICATION IS TO CORRECT THE SHIPPING ADDRESS UNDER CLIN 0003.
May 10, 2024P00014$0THE PURPOSE OF THIS MODIFICATION (P00014) IS TO 1) EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0002 AND CLIN 0006 AND 2) INCORPORATE A CABLE UPGRADE AS CONSIDERATION.
Mar 28, 2024P00013$0THIS MODIFICATION (P00013) IS TO UPDATE THE DELIVERY DATE FOR CLIN 0003AA TO ALLOW EXTRA TIME FOR UPGRADES TO TWO (2) SRC3845-240 CABLES. THE DELIVERY DATE FOR CLIN 0003AA HAS BEEN UPDATED TO 06/30/2024 AS DETAILED BELOW IN SECTION B.
Feb 13, 2024P00012$0THIS MODIFICATION P00012 IS TO UPDATE THE SHIP TO LOCATION FOR CLINS 0001 AND 0003.
Jan 18, 2024P00011$0SHIPPING ADDRESS UPDATE
Sep 27, 2023P00010$0THIS MODIFICATION IS TO CORRECT A TYPOGRAPHICAL ERROR TO THE "SHIP TO" DODAAC ON THE PREVIOUS MODIFICATION P00009.
Sep 26, 2023P00009$0THIS MODIFICATION CHANGES THE SHIPPING LOCATION FOR CLIN(S) 0003 SPARES FROM W50JQF TO SW310Z.
Sep 7, 2023P00008$-585.1KTHIS MODIFICATION INCORPORATES A CHANGE ORDER, DE-OBLIGATES EXCESS FUNDS, REALIGNS FUNDS, EXTENDS THE PERIOD OF PERFORMANCE, AND INCORPORATES A REVISED PERFORMANCE WORK STATEMENT.
Jul 26, 2023P00007$-11.7KTHIS MODIFICATION IS TO UPDATE THE QUANTITY OF SLIN 0003AA TO REFLECT THE CHANGES MADE TO THE PERFORMANCE WORK STATEMENT WITH MODIFICATION P00006.
Jul 21, 2023P00006$0THIS MODIFICATION IS TO INCORPORATE A REVISED PERFORMANCE WORK STATEMENT.
May 19, 2023P00005$-123.4KTHIS MODIFICATION IS TO INCORPORATE A CHANGE ORDER, DE-OBLIGATE EXCESS FUNDS, UPDATE THE DELIVERY AND WARRANTY DATE, AND INCORPORATE A REVISED PERFORMANCE WORK STATEMENT.
Jan 17, 2023P00004$5.3MTHIS MODIFICATION P00004 TO DELIVERY ORDER W56KGY23F0007 IS TO PROVIDE FUNDING TO SUPPORT CONTRACT LABOR. 1. $5,291,305.88 IN FUNDING WILL BE PROVIDED FOR CONTRACT LABOR EXPENSES AS DESCRIBED IN SECTION B & G.
Jan 9, 2023P00003$0THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR TO SLIN 0003AB, INCORPORATE A REVISED CONTRACT DATA REQUIREMENT LIST (CDRL), AND INCORPORATE A REVISED PERFORMANCE WORK STATEMENT.
Dec 20, 2022P00002$3.6MTHIS MODIFICATION IS TO RE-OBLIGATE FUNDING IN THE AMOUNT OF $3,617,312.90 AND RECREATE CLINS 0001 AND 0003 THAT WERE DELETED WITH MODIFICATION P00001 TO CORRECT AN ADMINISTRATIVE ERROR AND UPDATE THE WIDE AREA WORKFLOW (WAWF) ROUTING DATA TABLE.
Dec 15, 2022P00001$-3.6MTHE PURPOSE OF THIS MODIFICATION P00001 TO DELIVERY ORDER W56KGY23F0007 TO 1) DE-OBLIGATE $3,617,312.90 AND 2) SIGNED SECURITY DOCUMENTS.
Dec 8, 20220$5.4MTHIS DELIVERY ORDER IS TO PURCHASE SPARE PARTS AND DEPOT LEVEL REPAIR PARTS NEEDED TO ADDRESS THE TOTAL SYSTEM LIFECYCLE OF THE DUKE FAMILY OF SYSTEMS.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.