Federal contract award
W58RGZ16C0023
W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DCMA VERTICAL LIFT MESA |
| NAICS | 336411 — Aircraft Manufacturing |
| PSC | 5342 — Hardware, Weapon System |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $4.3B |
| Current contract value | $4.3B |
| Potential contract value / ceiling | $7.0B |
| Start date | Mar 21, 2016 |
| Current end date | Aug 31, 2027 |
| Potential end date | Aug 31, 2027 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 355 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | A00274 | $0 | ADMINISTRATIVE MODIFICATION TO ADD TAC CODE TO SUPPORT SHIPPING OF MATERIALS. |
| Jun 1, 2026 | A00273 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| Apr 30, 2026 | P00134 | $7.3M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Apr 8, 2026 | A00272 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| Mar 19, 2026 | P00132 | $0 | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Mar 3, 2026 | P00131 | $61.3M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Feb 12, 2026 | P00130 | $0 | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| Feb 12, 2026 | P00130 | $551.2K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| Feb 3, 2026 | A00271 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| Nov 13, 2025 | P00124 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Nov 13, 2025 | P00124 | $7.3M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Oct 2, 2025 | A00265 | $0 | ADMINISTRATIVE MODIFICATION TO ADD FMS TAC CODE |
| Oct 2, 2025 | A00270 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT SHIP-TO DODAAC |
| Sep 23, 2025 | P00129 | $569.0K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| Sep 15, 2025 | A00263 | $0 | DOCUMENT PROPERTY TRANSFER |
| Aug 25, 2025 | P00128 | $-334.6K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| Aug 19, 2025 | A00260 | $0 | CORRECT ATTACHMENT 01 FROM MOD A00258. |
| Aug 5, 2025 | P00127 | $12.5M | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| Aug 1, 2025 | P00125 | $1.8M | APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| Aug 1, 2025 | P00125 | $1.2M | APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| Jul 28, 2025 | P00126 | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 7-11 |
| Jul 22, 2025 | A00259 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| Jul 2, 2025 | A00258 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| Jun 2, 2025 | A00257 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| May 30, 2025 | A00256 | $0 | MODIFICATION TO CHANGE INSPECTION/ACCEPTANCE ON CLIN 9105AD FROM DESTINATION TO ORIGIN |
| May 28, 2025 | A00255 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| May 15, 2025 | A00251 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| Apr 22, 2025 | A00250 | $0 | ADD SHIPMENT INFORMATION FOR GFP |
| Apr 18, 2025 | A00247 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| Apr 18, 2025 | A00248 | $0 | DOCUMENT TRANSFER OF PROPERTY. |
| Apr 15, 2025 | A00244 | $0 | CHANGE INSPECTION/ACCEPTANCE CRITERIA FOR CLINS 9104AA AND 9104AB |
| Mar 13, 2025 | P00123 | $1.4M | MOD TO ADD FUNDS TO MULTIPLE SUBCLINS IN SUPPORT OF EFFORTS FOR MY1 APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| Mar 5, 2025 | A00242 | $0 | DOCUMENT GFP TRANSFER |
| Feb 20, 2025 | P00120 | $-938.7K | MOD TO EXTEND SUBCLINS POP AT NO ADDL COST, DEOB A SUBCLIN, DELETE A SUBCLIN, UPDATE REFERENCES, AND UPDATE ATTACHMENTS. EFFORT IS FOR MY1 APACHE AH-64E FULL RATE PRODUCTION LOTS 7-11. |
| Feb 19, 2025 | P00122 | $0 | TO EXTEND PERIOD OF PERFORMANCE FOR SUBCLIN 9125AA, ADD SUPPLEMENTARY ADDRESS AND TO ADD UPDATED PARTS LIST ATTACHMENT. |
| Feb 19, 2025 | P00122 | $0 | TO EXTEND PERIOD OF PERFORMANCE FOR SUBCLIN 9125AA, ADD SUPPLEMENTARY ADDRESS AND TO ADD UPDATED PARTS LIST ATTACHEMENT. |
| Feb 12, 2025 | A00241 | $0 | ADD SHIPPING INSTRUCTIONS FOR GFP |
| Feb 4, 2025 | A00239 | $0 | ADD SHIP-TO INFORMATION TO CLIN 9125AA |
| Feb 4, 2025 | A00240 | $0 | ADD SHIPPING INSTRUCTIONS FOR GFP |
| Jan 29, 2025 | P00121 | $122.3K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 12, 2024 | P00118 | $2.2M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Nov 14, 2024 | P00119 | $600.0K | ADMIN MOD TO INCREASE FUNDING FOR SLIN 9109AA UAE O AND A. EFFORT IS FOR FMS THE UNIQUE MODS TO THE UAE DELTA 10 NEW BUILD AND 26 REMAN APACHE AH 64E, 2 REMAN LCTS, AND PGSE TO SUPPORT FIELDING AND TRAINING SCHEDULES. |
| Oct 18, 2024 | P00115 | $63.1M | DEFINITIZE THE CHANGE ORDER FOR THE UNIQUE PORTION OF THE AH-64E AIRCRAFT FOR THE UNITED ARAB EMIRATES (UAE) FMS CUSTOMER |
| Sep 25, 2024 | A00237 | $0 | DOCUMENT TRANSFER OF PROPERTY |
| Sep 10, 2024 | P00116 | $150.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES (FMS). |
| Aug 29, 2024 | P00117 | $-1.8M | APACHE ATTACK HELICOPTER (AH64E) FULL RATE PRODUCTION (LOTS 7-11) USG AND FOREIGN MILITARY SALES. |
| Aug 2, 2024 | A00235 | $0 | DOCUMENT TRANSFER OF PROPERTY |
| Jul 16, 2024 | A00233 | $0 | DOCUMENT TRANSFER OF PROPERTY |
| Jul 15, 2024 | A00232 | $0 | DOCUMENT MODIFIED MESSAGE - PROPERTY PROVIDED |
| Jul 10, 2024 | A00234 | $0 | DOCUMENT RFAMS, PROPERTY BORROW/PAYBACK |
| Jun 24, 2024 | A00231 | $0 | DOCUMENT THE TRANSFER OF GFP |
| Jun 18, 2024 | A00230 | $0 | DOCUMENT THE TRANSFER OF GFP |
| May 31, 2024 | P00113 | $0 | THIS MODIFICATION IS FOR EXTENDING THE PERIOD OF PERFORMANCE FROM 31 MAY 2024 TO 31 DECEMBER 2025. |
| May 31, 2024 | P00114 | $0 | EXTEND THE PERIOD OF PERFORMANCE FROM 29 FEB 2024 TO 31 OCT 2024 FOR SUBCLIN 9033AA, UK, DIGITAL DETECTOR HEAD (DDH). |
| May 29, 2024 | A00228 | $0 | DOCUMENT THE TRANSFER OF GFP |
| May 28, 2024 | A00226 | $0 | DOCUMENT THE DOWNWARD EQUITABLE ADJUSTMENT FOR MODIFIED MESSAGE CFM TO GFM |
| May 16, 2024 | A00225 | $0 | DOCUMENT THE TRANSFER OF GFP |
| May 7, 2024 | P00112 | $598.5K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| May 7, 2024 | P00112 | $-2.1M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| May 2, 2024 | A00224 | $0 | DOCUMENT THE TRANSFER OF GFP |
| Apr 25, 2024 | A00223 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Apr 5, 2024 | P00111 | $11.5M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Feb 20, 2024 | A00215 | $0 | MODIFICATION TO DOCUMENT THE DOWNWARD EQUITABLE ADJUSTMENT OF MY7096 & MY7097. |
| Feb 12, 2024 | A00212 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Feb 7, 2024 | P00109 | $500.0K | APACHE ATTACK HELICOPTER (AH -64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES. |
| Jan 30, 2024 | A00210 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 22, 2024 | A00209 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 22, 2024 | A00211 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 22, 2024 | A00213 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 19, 2024 | A00208 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 12, 2024 | A00203 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Jan 12, 2024 | A00204 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
| Jan 12, 2024 | A00207 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP. |
| Jan 12, 2024 | P00110 | $13.0M | APACHE ATTACK HELICOPTER (AH64E) FULL RATE PRODUCTION (LOTS 7-11) FOR USG AND FOREIGN MILITARY SALES. THIS MOD P00110 IS TO INCREASE OBLIGATED FUNDS FOR THE ASSOCIATED UAE UNIQUES EFFORTS. |
| Dec 15, 2023 | P00108 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 15, 2023 | P00108 | $598.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Nov 9, 2023 | A00201 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Nov 9, 2023 | A00202 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Oct 25, 2023 | A00197 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Sep 29, 2023 | P00107 | $2.6M | CONTRACT IS FOR APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FMS CUSTOMERS. THIS MOD IMPACTS UNITED KINGDOM (UK) AND UNITED ARAB EMIRATES (UAE) |
| Sep 25, 2023 | A00198 | $0 | MODIFICATION TO DOCUMENT THE AUTHORIZATION FOR BORROW/PAYBACK OF GFP VIA RFAM. |
| Sep 22, 2023 | A00199 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Sep 6, 2023 | A00194 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFP TO BE USED FOR THE PERFORMANCE OF THIS CONTRACT. |
| Aug 21, 2023 | P00106 | $4.9M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES. DEFINITIZATION OF GENERATOR FEEDER FAULT AND FLIGHT MANAGEMENT COMPUTER EFFORTS, FUNDING FOR OVER AND ABOVE FOR LONGBOW CREW TRAINERS, INCORPORATION OF PURCHASE OF VARIABLE LOAD ENERGY ABSORBERS |
| Aug 21, 2023 | P00106 | $940.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES. DEFINITIZATION OF GENERATOR FEEDER FAULT AND FLIGHT MANAGEMENT COMPUTER EFFORTS, FUNDING FOR OVER AND ABOVE FOR LONGBOW CREW TRAINERS, INCORPORATION OF PURCHASE OF VARIABLE LOAD ENERGY ABSORBERS |
| Aug 11, 2023 | P00105 | $2.4M | TO UPDATE THE SHIP IN PLACE DODAACS. |
| Jul 24, 2023 | A00190 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Jul 14, 2023 | A00192 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 12, 2023 | A00180 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 12, 2023 | A00189 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 12, 2023 | A00191 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| May 17, 2023 | P00104 | $-3.0M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| May 17, 2023 | P00104 | $300.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| May 2, 2023 | P00102 | $27.9M | UAE 9102AB 18 REMAN & 9111AD 1 NEW BUILD & UK 9004AB POP EXT TO 31SEP2023 & UPDATE SOW, CDRL, ADD CSDR |
| Apr 7, 2023 | A00188 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Mar 17, 2023 | A00182 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP. |
| Mar 17, 2023 | A00183 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP. |
| Mar 17, 2023 | A00186 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Mar 15, 2023 | P00103 | $0 | W58RGZ-16-C-0023 FULL RATE PRODUCTION OF APACHE ATTACK HELICOPTER LOTS 7-11 MULTI-YEAR CONTRACT |
| Mar 1, 2023 | P00101 | $4.2M | APACHE ATTACK HELICOPTER (AH-64E) OVER & ABOVE FUNDING AND LOADOUT DIRECTED CHANGE |
| Feb 2, 2023 | P00100 | $6.1M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Jan 24, 2023 | A00181 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 12, 2023 | A00175 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 12, 2023 | A00176 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP FROM THIS CONTRACT TO ANOTHER CONTRACT. |
| Jan 12, 2023 | A00177 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Jan 12, 2023 | A00178 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP FROM THIS CONTRACT. |
| Jan 12, 2023 | A00179 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Dec 22, 2022 | P00099 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Nov 12, 2022 | P00098 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILIARY SALES |
| Oct 25, 2022 | A00173 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Oct 19, 2022 | A00170 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Sep 26, 2022 | P00097 | $16.4M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Sep 23, 2022 | A00168 | $0 | W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS. |
| Sep 23, 2022 | A00169 | $0 | W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS. |
| Sep 23, 2022 | A00171 | $0 | MOD TO DOCUMENT TRANSFER OF GFP TO THIS CONTRACT. |
| Sep 23, 2022 | A00172 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP FROM THIS CONTRACT. |
| Sep 20, 2022 | P00095 | $485.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Sep 20, 2022 | P00095 | $8.8M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Jul 29, 2022 | A00164 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 29, 2022 | A00167 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 15, 2022 | A00160 | $0 | MODIFICATION TO DOCUMENT REQUISITION OF GFM PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 15, 2022 | A00161 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Jul 15, 2022 | A00162 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 15, 2022 | A00163 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jun 30, 2022 | P00096 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Jun 29, 2022 | A00159 | $0 | W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS. |
| Jun 4, 2022 | A00156 | $0 | W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS. |
| Jun 3, 2022 | A00157 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GOVERNMENT PROPERTY TO ANOTHER CONTRACT (LOSING MOD). |
| May 27, 2022 | P00094 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| May 24, 2022 | P00091 | $6.2M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| May 2, 2022 | A00154 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE USED IN PERFORMANCE OF THIS CONTRACT. |
| May 2, 2022 | A00155 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE USED IN PERFORMANCE OF THIS CONTRACT. |
| Apr 25, 2022 | P00093 | $100.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Apr 13, 2022 | A00151 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. ALSO CANCELS MOD A00126. |
| Apr 13, 2022 | A00152 | $0 | MODIFICATION TO DOCUMENT THE BORROW/PAYBACK TRANSFER OF GFP VIA RFAM. |
| Apr 13, 2022 | A00153 | $0 | MODIFICATION TO DOCUMENT REQUISITION OF GFM VIA MOD MESSAGE. |
| Mar 19, 2022 | P00092 | $29.1K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Feb 17, 2022 | P00090 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Feb 15, 2022 | P00089 | $11.1M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Feb 14, 2022 | A00148 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
| Jan 18, 2022 | A00146 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jan 3, 2022 | A00145 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP FROM THIS CONTRACT. |
| Dec 15, 2021 | P00088 | $2.1M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 15, 2021 | P00088 | $2.2M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 10, 2021 | A00143 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Dec 10, 2021 | A00144 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Oct 29, 2021 | P00087 | $525.0K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Oct 1, 2021 | A00139 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Oct 1, 2021 | A00140 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Sep 24, 2021 | A00138 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Sep 21, 2021 | P00086 | $27.3M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Sep 21, 2021 | P00086 | $2.0M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Sep 13, 2021 | A00137 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Sep 8, 2021 | A00136 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Aug 31, 2021 | P00085 | $2.3M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Aug 31, 2021 | P00085 | $30.9M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Aug 18, 2021 | A00133 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Aug 18, 2021 | A00134 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 29, 2021 | A00131 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 29, 2021 | A00132 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 27, 2021 | P00084 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Jul 22, 2021 | A00125 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 22, 2021 | A00130 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 21, 2021 | A00126 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jul 21, 2021 | A00129 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
| Jul 16, 2021 | A00128 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF MATERIAL TO BE PROVIDED FOR USE UNDER THIS CONTRACT AS GOVERNMENT FURNISHED. |
| Jul 16, 2021 | P00083 | $12.4K | DEFINITIZE A DIRECTED CHANGE FOR CONTRACT DATA REQUIREMENTS. |
| Jul 16, 2021 | P00083 | $-28.3M | THE PURPOSE OF THIS MODIFICATION IS TO RETROFIT OF LCT 16 FOR THE USFK V6 FIELDING AND REMAN OF LCT 20 V6 FIELDING AND DE-COMMIT THE PWD FUNDING IN TOTAL SO THAT NEW PWDS CAN BE CREATED IN ORDER TO CORRECT THE MILSTRIP, DOC NUMBER, REQ NUMBER AND SUPPADD. |
| Jun 30, 2021 | A00127 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Jun 17, 2021 | P00082 | $32.6M | THE PURPOSE OF THIS MODIFICATION P00082 IS TO INCORPORATE, PURSUANT TO FEDERAL ACQUISITION REGULATION (FAR) 52.243-1, CHANGES-FIXED PRICE, A DIRECTED CHANGE ORDER FOR THE REMANUFACTURE OF TWELVE (12) APACHE AIRCRAFT AND FIVE (5) PART NUMBERS FOR THE TAIL ROTOR BLADES FOR THE UNITED KINGDOM (UK). |
| Jun 8, 2021 | P00079 | $39.7M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE UNITED STATES GOVERNMENT AND FOREIGN MILITARY SALES |
| May 19, 2021 | P00080 | $4.9M | THE PURPOSE OF THIS MODIFICATION P00080 IS TO INCORPORATE, PURSUANT TO FEDERAL ACQUISITION REGULATION (FAR) 52.243-1, CHANGES-FIXED PRICE, A DIRECTED CHANGE ORDER FOR INTEGRATION OF THE LEGACY STRAP PACK AND FAILSAFE COLLAR REPLACEMENT DIRECTED CHANGE. THIS DIRECTED CHANGE ORDER MODIFICATION AT A NOT-TO-EXCEED (NTE) CEILING PRICE PER BOEING NTE LETTER 21-005104-ME-MY-STRAPPACK_NTE DATED 7 MAY 2021, FOR THE PERFORMANCE OF THIS EFFORT. |
| May 19, 2021 | P00080 | $2.8M | THE PURPOSE OF THIS MODIFICATION P00080 IS TO INCORPORATE, PURSUANT TO FEDERAL ACQUISITION REGULATION (FAR) 52.243-1, CHANGES-FIXED PRICE, A DIRECTED CHANGE ORDER FOR INTEGRATION OF THE LEGACY STRAP PACK AND FAILSAFE COLLAR REPLACEMENT DIRECTED CHANGE. THIS DIRECTED CHANGE ORDER MODIFICATION AT A NOT-TO-EXCEED (NTE) CEILING PRICE PER BOEING NTE LETTER 21-005104-ME-MY-STRAPPACK_NTE DATED 7 MAY 2021, FOR THE PERFORMANCE OF THIS EFFORT. |
| May 13, 2021 | A00122 | $0 | W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS. |
| Apr 30, 2021 | P00078 | $60.8M | EXERCISE OPT 5 RAMAN AC & OPT 13 NEW BUILD AC |
| Apr 29, 2021 | A00120 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Apr 20, 2021 | P00077 | $436.7M | THE PURPOSE THIS MODIFICATION IS TO FUND LOT 11 SUBCLINS |
| Mar 29, 2021 | P00076 | $19.6K | UNDIFINITIZED DIRECTED CHANGE ORDER FOR THE CONFIGUARTION MANAGEMENT FOR THE CDRL'S UNDER THE APACHE PROGRAM. |
| Mar 8, 2021 | A00117 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Mar 5, 2021 | P00074 | $2.1M | DEFINITIZE DIRECTED CHANGE ORDER FOR THE UNITED KINGDOM SAFETY ASSESSMENT UNDER THE APACHE PROGRAM. |
| Mar 4, 2021 | P00073 | $150.0K | MODIFICATION P00073 IS TO ESTABLISH & FUND SUBCLIN'S 8008AB & 9022AB FOR OVER AND ABOVE FOR MNG PANTHER RADIO SUITE & UK TAIL ROTOR BLADES. |
| Feb 25, 2021 | A00150 | $0 | MODIFICATION TO DOCUMENT THE REQUISITION OF GFM TO BE PROVIDED FOR USE UNDER THIS CONTRACT. |
| Feb 11, 2021 | P00072 | $1.0M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11), DIRECTED CHANGE ORDER TO APPLY AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT PAINT TO THE COMPOSITE MAIN ROTOR BLADES. |
| Feb 1, 2021 | P00071 | $660.4K | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE UNITED KINGDOM |
| Jan 29, 2021 | P00070 | $4.5M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE UNITED STATES GOVERNMENT AND FOREIGN MILITARY SALES |
| Jan 29, 2021 | P00070 | $15.8M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE UNITED STATES GOVERNMENT AND FOREIGN MILITARY SALES |
| Jan 28, 2021 | P00069 | $25.3M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 17, 2020 | P00054 | $0 | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 17, 2020 | P00054 | $67.4M | APACHE ATTACK HELICOPTER (AH-64E) FULL RATE PRODUCTION (LOTS 7-11) FOR THE USG AND FOREIGN MILITARY SALES |
| Dec 10, 2020 | P00066 | $2.8M | APACHE FULL RATE PRODUCTION LOTS 7-11 MULTI-YEAR CONTRACT. |
| Nov 18, 2020 | A00116 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP VIA RFAM TO THIS CONTRACT. |
| Oct 27, 2020 | A00112 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Oct 27, 2020 | A00113 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP TO THIS CONTRACT. |
| Oct 27, 2020 | A00114 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO THIS CONTRACT. |
| Oct 16, 2020 | P00067 | $1.2M | MODIFICATION IS TO INCREASE THE NOT-TO-EXCEED VALUE FOR UNITED KINGDOM SAFETY ASSESSMENT DIRECTED CHANGE, ADD ADDITIONAL FUNDING AND EXTEND THE PERIOD OF PERFORMANCE. |
| Oct 13, 2020 | A00111 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
| Sep 4, 2020 | P00048 | $0 | ADMINISTRATIVE MODIFICATION TO UPDATE THREE ATTACHMENTS IN SECTION J. |
| Aug 28, 2020 | P00064 | $0 | APACHE FULL RATE PRODUCTION LOTS 7-11 |
| Aug 20, 2020 | A00108 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
| Aug 20, 2020 | A00109 | $0 | MODIFICATION TO DOCUMENT THE TRANSFER OF PROPERTY TO THIS CONTRACT. |
Estimated positioning window
Oct 25, 2026 – Feb 28, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-08-31 (310 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 355 recorded award transactions
- +10 points
- Latest award action: 2026-06-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.