Federal contract award

W58RGZ17C0059

IGF::OT::IGF CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336411 — Aircraft Manufacturing
PSCR425 — Engineering and Technical Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$323.8M
Current contract value$323.8M
Potential contract value / ceiling$365.7M
Start dateJul 27, 2017
Current end dateSep 30, 2024
Potential end dateSep 30, 2024
Latest award activityMay 28, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 103 of 103 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 28, 2026P00076$0GFE LOSING TRANSFER
Sep 18, 2025A00070$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 18, 2025A00070$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Feb 4, 2025A00060$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Feb 4, 2025A00060$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 12, 2024P00075$850.0KENGINEERING AND MANUFACTURING DEVELOPMENT FOR THE CH-47 PROGRAM GFP TRANSFER
Aug 26, 2024P00074$0ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) FOR THE CH-47 PROGRAM
Jul 17, 2024A00067$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jul 17, 2024A00068$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jul 17, 2024A00069$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 12, 2024P00073$0GFE MOD
Mar 18, 2024A00065$0A
Mar 18, 2024A00066$0A
Jan 29, 2024P00072$0ENGINEERING, MANUFACTURING, AND DEVELOPMENT - POP EXTENSION FOR CDRL COMPLETION
Sep 13, 2023P00071$0REALINGNMENT MODIFICATION
Nov 7, 2022P00070$0ENGINEERING AND MANUFACTURING DEVELOPMENT PERIOD OF PERFORMANCE EXTENSION FOR ALL ACTIVE CLINS UNTIL JAN 2024.
Jul 25, 2022P00069$0REVISE POP
Apr 28, 2022P00067$7.5MINCREMENTALLY FUND FY2021 RDT&E EAC/OVERRUN TO SUPPORT BLOCK II EMD.
Mar 31, 2022P00065$0EXTEND THE POP, REVISE FUNDING DATE IN SECTION H, AND REVISE ATTACHMENTS 000 AND 0009
Mar 31, 2022P00066$4.9MINCREMENTAL FUNDING
Jan 13, 2022P00063$0ACCEPTANCE OF PROPERTY CAP/GFM FROM 14-D-0075/0309 MOD 13
Sep 23, 2021P00062$017-C-0059 GAINING MOD FROM LOSING MOD 14-D-0075/023/MOD06
Sep 8, 2021P00061$22.6MEAC/OVERRUN (BLOCK II)
Aug 30, 2021P00060$0THE PURPOSE OF MOD P00060 IS TO ISSUES A REALIGNMENT OF FUNDS.
Aug 9, 2021P00059$250.0KTHE PURPOSE OF MOD P00059 IS TO ACCEPT GFE.
Aug 5, 2021P00057$0THE PURPOSE OF MOD P00057 IS TO REALLOCATE FUNDS TO CLINS 0004 AND 0005, TO SUPPORT BLOCK II EMD.
Aug 3, 2021P00058$0ACCEPTANCE OF GFE/GFP FROM CONTRACTOR ACQUIRED PROPERTY FROM T.O. 0267 AND T.O. 0309
Apr 26, 2021P00056$0THE PURPOSE OF P00056 IS TO REVISE THE DELIVERY SCHEDULE DATES FOR AIRCRAFT M1001 AND M1002 AS LISTED IN SECTION B, CLIN 0013AA, BASED ON INCOMPLETION OF FLIGHT TEST FOR CH-47F BLOCK II EMD AIRCRAFT, AT NO ADDITIONAL COST TO THE GOVERNMENT.
Mar 25, 2021P00055$0THE PURPOSE OF P00055 IS TO ISSUE AN ADMINISTRATIVE MODIFICATION TO REVISE THE PERIOD OF PERFORMANCE UNDER THIS CONTRACT DUE TO CLARIFICATION ERROR, AT NO ADDITIONAL COST TO THE GOVERNMENT.
Mar 3, 2021P00054$0THE PURPOSE OF MODIFICATION P00054 IS TO ACCEPT ACCOUNTABILITY AS (GFM/GFP), TO SUPPORT THE BLOCK II EMD FLIGHT TEST "SPARES" AT NO ADDITIONAL COST TO THE GOVERNMENT.
Dec 21, 2020P00052$0THE PURPOSE OF MODIFICATION P00052 IS TO ACCEPT ACCOUNTABILITY OF GOVERNMENT FURNISHED MATERIAL/GOVERNMENT FURNISHED EQUIPMENT PROPERTY FROM CONTRACT W58RGZ-14-D-0075 TASK ORDER 0010 "IMPROVED ADJUSTABLE PITCH CHANGE LINK AND PROTECTIVE BOOT" MODIFICATION 04 TO CONTRACT W58RGZ-17-C-0059 BLOCK II EMD
Dec 21, 2020P00053$5.7MTHE PURPOSE OF THIS MOD IS TO INCORPORATED THE 16TH INCREMENTAL FUNDING AGAINST CONTRACT W58RGZ-17-C-0059
Dec 16, 2020A00064$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 11, 2020P00051$235.3KTHE PURPOSE OF MODIFICATION P00051 IS TO INCORPORATE THE 15TH INCREMENTAL FUNDING IN ACCORDANCE IN FAR CLAUSE 52.232-22 "LIMITATION OF FUNDS", UTILIZING FISCAL YEAR (FY) 2019 RESEARCH, DEVELOPMENT, TEST AND EVALUATION (RDT&E) FUNDS TO SUPPORT THE CH-47F BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) PROGRAM.
Sep 2, 2020P00050$0THE PURPOSE OF MOD P00050 TO REVISE TO DD250 CLIN 0013AA, ESTABLISHED IN P00046 AND REVISED IN P00049, TO REFERENCE DODAAC W81YTA FOR DD250 ACCEPTANCE OF CH-47 BLOCK II AIRCRAFT S/N 1701001, S/N 1701002, AND S/N 1701003.
Aug 13, 2020P00049$1THE PURPOSE OF MODIFICATION P00029 IS TO REVISE CLIN 0013AA FROM A NSP CLIN TO A PRICED CLIN TO SUPPORT BLOCK II EMD
Aug 3, 2020A00063$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jul 17, 2020P00046$0THE PURPOSE OF MOD P00046 IS TO ESTABLISH A NSP CLIN FOR ACCEPTANCE OF THREE (3) EMD AIRCRAFT AND EXTEND THE POP FROM 27 JULY 2021 TO 31 JULY 2021.
Jul 17, 2020P00047$0THE PURPOSE OF MODIFICATION P00047 IS TO ISSUE AN ADMINISTRATIVE CHANGE TO ATTACHMENT(S) 0002 DSL 0010 GFT AND 0029 DATA RIGHTS AT NO ADDITIONAL COST TO THE GOVERNMENT IN SUPPORT OF CH-47F BLOCK II EMD PROGRAM
Jul 17, 2020P00048$0THE PURPOSE OF MODIFICATION P00048 IS TO ISSUE AN ADMINISTRATIVE CORRECTIVE CHANGE TO SECTION B CLIN 0001AG ENTITLED EMD INCREMENT VI (FY19), DUE TO MATHEMATICAL ERROR IN THE FEE, AT NO CHANGE IN CONTRACT COST, IN SUPPORT OF THE BLOCK II EMD PROGRAM.
Jun 23, 2020A00062$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 1, 2020P00045$1.1MTHE PURPOSE OF MOD P00045 IS TO INCORPORATE THE 14TH INCREMENTAL FUNDING UTILIZING FY2019 FUNDS IN SUPPORT OF BLOCK II EMD
May 28, 2020P00043$3.3MTHE PURPOSE OF MOD P00043 IS TO INCREMENTALLY FUND SLIN 0001AP AND UPDATE H-4 FUNDING SCHEDULE AND INCORPORATE GUNNISON, CO AGAINST H-7 TO SUPPORT BLOCK II EMD PROGRAM
May 28, 2020P00044$0THE PURPOSE OF THIS MODIFICATION P00044 IS TO ACCEPT ACCOUNTABILITY OF GOVERNMENT FURNISHED MATERIAL/GOVERNMENT FURNISHED EQUIPMENT PROPERTY FROM VARIOUS TASK ORDER(S) AND DELIVERY ORDER TO THE BLOCK II EMD CONTRACT.
May 27, 2020A00061$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Apr 15, 2020P00042$0THE PURPOSE OF MOD P00042 IS TO AMEND THE SUBMISSION DATES IN ACCORDANCE WITH ATTACHMENT 0008 COST AND SOFTWARE DATA SUMMARY REPORT (CSDR)
Feb 20, 2020A00057$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Feb 20, 2020A00058$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Feb 20, 2020A00059$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Feb 18, 2020P00041$18.2MTHE PURPOSE OF MOD P00041 IS TO INCORPORATE THE 12TH INCREMENTAL FUNDING IN SUPPORT OF THE BLOCK II EMD PROGRAM
Feb 5, 2020P00040$500.0KTHE PURPOSE OF MOD P00040 IS TO FUND SLIN 0008AB INCENTIVE SCHEDULE FOR POOL 7
Jan 14, 2020P00039$26.9MTHE PURPOSE OF MOD P00039 IS TO INCORPORATED THE 11TH INCREMENTAL FUNDING TO SUPPORT CH-47F BLOCK II EMD
Jan 13, 2020P00038$0THE PURPOSE OF MOD P00038 IS TO INCREMENTALLY FUND THE EMD CONTRACT.
Dec 23, 2019P00037$0THE PURPOSE OF MODIFICATION P00037 IS TO REMOVE AND REPLACE ATTACHMENT 0001 AND ATTACHMENT 0015 AS A RESULT OF THE DELAYED DELIVERY OF CH-47F BLOCK II EMD AIRCRAFT EMD3/M1003 TO PATUXENT RIVER, MD AND DIVERSION TO HUNTSVILLE/REDSTONE ARSENAL, AL AT NO ADDITIONAL COST TO THE GOVERNMENT.
Dec 5, 2019P00036$0TRANSFER GFE STRESS RELIEF OVEN FROM W58RGZ-04-G-0023/D.O.0266 TO W58RGZ-17-C-0059 BLOCK II EMD
Nov 22, 2019P00035$2.2MTHE PURPOSE OF THIS MODIFICATION P00035 IS FUND CLIN 0008AA AFTER SUCCESSFUL COMPLETION OF INCENTIVE POOL(S) 1, 2, AND 5 IN ACCORDANCE WITH CONTRACT CLAUSE H-15 "COST AND PERFORMANCE INCENTIVE FEE PLAN, IN SUPPORT OF BLOCK II EMD
Nov 15, 2019P00034$25.4MTHE PURPOSE OF MOD P00034 IS TO INCORPORATE THE 10TH INCREMENT TO SUPPORT OF BLOCK II EMD
Oct 11, 2019P00033$0THE PURPOSE OF MOD P00033 IS TO REVISE CONTRACT CLAUSE H-7; ATTACHMENT 0009; AND ATTACHMENT 0027 TO SUPPORT BLOCK II EMD PROGRAM AT NO ADDITIONAL COST TO THE GOVERNMENT
Sep 12, 2019A00052$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 12, 2019A00055$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 12, 2019A00056$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 12, 2019P00032$5.8MTHE PURPOSE OF MOD P00032 IS TO INCORPORATE THE 9TH INCREMENTAL FUNDING AGAINST EMD LABOR TO SUPPORT BLOCK II EMD PROGRAM
Sep 10, 2019P00031$1.3MTHE PURPOSE OF MOD P00031 IS TO INCORPORATE THE EIGHTH INCREMENTAL FUNDING FOR EMD LABOR AND FINAL INCREMENTAL FUNDING AGAINST LIGHTWEIGHT FUEL SYSTEM PHASE II
Sep 9, 2019A00051$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Sep 6, 2019P00030$2.9MTHE PURPOSE OF MOD P00030 IS TO INCREMENTALLY FUND LIGHTWEIGHT FUEL SYSTEM PHASE II UTILIZING FY 19 RDT&E FUNDING.
Sep 5, 2019P00028$0THE PURPOSE OF THIS MODIFICATION P00028 IS TO DECREASE AND DELETE IN ITS ENTIRETY CLINS 0010AA AND 0010AB AND REALIGN FUNDING TO CLIN 0001AH AT NO CHANGE IN CONTRACT PRICE
Aug 22, 2019P00029$0TRANSFER OF GOVERNMENT FURNISHED PROPERTY (GFP) FROM CONTRACT W58RGZ-13-C-0002 (MYII) TO EMD CONTRACT W58RGZ-17-C-0059.
Jul 23, 2019A00048$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jul 9, 2019A00047$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 28, 2019A00046$0CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 27, 2019P00027$4.3MTHE PURPOSE OF MODIFICATION P00027 IS TO INCORPORATED ADDITIONAL LIGHTWEIGHT FUEL SYSTEM PHASE II AND FUND INCREMENT VII (7) TO SUPPORT EMD BLOCK II
Jun 26, 2019A00045$0IGF::OT::IGF CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 24, 2019A00043$0IGF::OT::IGF CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 24, 2019A00044$0IGF::OT::IGF CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Jun 7, 2019P00026$0THE PURPOSE OF MOD P00026 IS TO REVISE THE EMD INCENTIVE POOL AND INCORPORATE THE REQUIRED DOCUMENTS FOR EACH INCENTIVE
Jun 5, 2019A00042$0THE PURPOSE OF THIS MODIFICATION IS TO TRANSFER ACCOUNTABILITY OF THE GOVERNMENT PROPERTY ITEMS LISTED ON ATTACHMENT 0002 TO CONTRACT W58RGZ-17-C-0059 FROM CONTRACT W58RGZ-13-C-0002.
May 2, 2019A00041$0IGF::OT::IGF CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
Apr 19, 2019P00024$15.1MTHE PURPOSE OF MODIFICATION P00024 IS TO FUND INCREMENT VI IN ACCORDANCE WITH FAR 52.232-22 "LIMITATION OF FUNDS" UTILIZING FY19 RDTE FUNDS, TO SUPPORT BLOCK II EMD.
Feb 26, 2019P00023$0REVISE ATTACHMENT 0001; ESTABLISH ATTACHMENT 0033; AND INCORPORATE THE NSN AND P/N FOR THE MRL ATTACHMENT
Jan 31, 2019P00022$0THE PURPOSE OF MODIFICATION P00022 IS TO REALIGN FY17 AND FY19 FUNDING
Dec 21, 2018P00020$0THE PURPOSE OF MOD P00020 IS TO DECREASE FUNDING FROM SUBCONTRACT LINE ITEM NUMBERS (SLINS) 0003AB, 0006AB AND 0006AC IN THE AMOUNT OF $7,541,882 AND REALLOCATE THE FUNDING TO SLINS 0001AB AND 0001AC, AT NO CHANGE IN CONTRACT COST, TO SUPPORT THE CH-47F BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT PROGRAM
Dec 21, 2018P00021$70.3MINCREMENTAL FUNDING V IN ACCORDANCE 52.232-22 "LIMITATION OF FUNDS" UTILIZING FY19 TO SUPPORT THE CH-47 BLOCK EMD.
Dec 18, 2018P00019$0THE PURPOSE OF MODIFICATION P00019 IS TO ISSUE AN ADMINISTRATIVE CORRECTIVE CHANGE AGAINST SECTION B, CLIN 0008AA, SCHEDULE INCENTIVE EMD BLOCK II SECTION H-4, INCREMENTAL FUNDING AND LIMITATION OF GOVERNMENT OBLIGATION AND H-15,COST AND PERFORMANCE INCENTIVE FEE PLAN
Dec 14, 2018P00018$0THE PURPOSE OF MODIFICATION P00018 IS TO ISSUE AN ADMINISTRATIVE CHANGE THAT INCORPORATE LANGUAGE THAT WAS OMITTED FROM P00017.
Nov 20, 2018P00017$0INCORPORATE ADMINISTRATION CHANGES TO ATTACHMENT 15, DD610-GFE AND EMD CDRL 032 "ILSP".
Sep 25, 2018P00016$0ADMINISTRATIVE MODIFICATION
Aug 17, 2018P00013$0INCREASE CEILING PRICE FOR ADDITIONAL SPARES IN ACCORDANCE WITH FAR 52.232-22
Jun 5, 2018P00012$0DELETE AND REPLACE H-15 COST AND PERFORMANCE INCENTIVE FEE PLAN, BLOCK II EMD.
May 23, 2018P00007$0REVISE SECTION H AND SECTION J AND INCORPORATE PAINT CHANGE
May 23, 2018P00011$48.0MTHE PURPOSE OF THIS MODIFICATION IS TO FUND INCREMENT IV.
May 17, 2018P00009$0REPLACE IN ITS ENTIRETY ATTACHMENT 028 TO SUPPORT EMD BLOCK II PROGRAM
May 17, 2018P00010$0REVISE ATTACHMENT 0018, ENTITLED "CH-47F BLOCK II EMD DISPOSITION DOCUMENTS", TO SUPPORT EMD BLOCK II PROGRAM
Apr 16, 2018P00008$0HE PURPOSE OF MODIFICATION P00008 IS TO INCORPORATE AND REVISE THE FOLLOWING: THE GOVERNMENT HEREBY INCORPORATES GOVERNMENT FURNISHED MATERIAL (GFM) PART NUMBERS TO SUPPORT GROUND TEST VEHICLE (GTV); AND REVISE SECTION J "ATTACHMENT AND EXHIBITS", ATTACHMENT 0018, "CH-47 BLOCK II EMD AIRCRAFT PARTS DISPOSITION", DATED 14 MARCH 2018
Apr 10, 2018A00003$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE NATIONAL STOCK NUMBERS (NSNS) ON THE ATTACHED MATERIAL REQUIREMENTS LIST (MRL).
Mar 21, 2018P00006$2.1MTHE PURPOSE OF MODIFICATION P00006 INCORPORATE INCREMENTAL FUNDING III AGAINST THE EMD BLOCK II PROGRAM
Mar 9, 2018P00005$0IDENTIFY THE CONTRACTOR CONFIGURATION ITEM AND GOVERNMENT TAIL NUMBER TO SUPPORT OF EMD BLOCK II PROGRAM.
Mar 1, 2018A00002$0INCORPORATE MATERIAL LIST
Feb 6, 2018A00001$0THE PURPOSE OF MODIFICATION A00001 IS TO TRANSFER ACCOUNTABILITY OF GOVERNMENT PROPERTY FROM W58RGZ-04-G-0023/0275 TO W58RGZ-17-C-0059.
Jan 25, 2018P00003$0THE PURPOSE OF MODIFICATION P00003 IS TO INCORPORATED AND OR REVISE AN ADMINISTRATIVE CHANGE (SECTION(S) B, H, I, AND E) TO SUPPORT CH-47F ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) BLOCK II PROGRAM.
Jan 17, 2018P00004$0THE PURPOSE OF MODIFICATION P00004 IS TO ISSUE AN ADMINISTRATIVE CHANGE TO SUPPORT CH-47F ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) BLOCK II PROGRAM AT NO ADDITIONAL COST TO THE GOVERNMENT.
Dec 6, 2017P00002$27.0MTHE PURPOSE OF MODIFICATION P00002 IS TO FUND INCREMENT II IN ACCORDANCE WITH FAR CLAUSE 52.232-22 "LIMITATION OF FUNDING" UTILIZING FISCAL YEAR (FY) 2018, RESEARCH, DEVELOPMENT, TEST, AND EVALUATION (RDT&E) FUNDS, TO SUPPORT CH-47F ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) BLOCK II PROGRAM.
Aug 22, 2017P00001$0IGF::OT::IGF THE PURPOSE OF MODIFICATION P00001 IS TO DEFUND SLIN 0001AB AND REALLOCATE THE FUNDING TO CLINS 0005AA AND 0006AA IN SUPPORT OF EMD BLOCK II
Jul 27, 20170$27.3MIGF::OT::IGF CH-47 BLOCK II ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)

Research next steps