Federal contract award
W58RGZ19C0003
REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 336412 — Aircraft Engine and Engine Parts Manufacturing |
| PSC | AC14 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; R&D ADMINISTRATIVE EXPENSES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $963.8M |
| Current contract value | $964.1M |
| Potential contract value / ceiling | $1.2B |
| Start date | Feb 1, 2019 |
| Current end date | Dec 31, 2029 |
| Potential end date | Dec 31, 2029 |
| Latest award activity | May 21, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 104 of 104 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | P00107 | $9.8M | THE IMPROVED TURBINE ENGINE PROGRAM WILL DEVELOP AND QUALIFY A RELIABLE TURBOSHAFT ENGINE THAT IS CAPABLE OF PROVIDING SUFFICIENT POWER FOR THE APACHE AND BLACK HAWK TO MEET MISSION REQUIREMENTS. THE ADDITIONAL FUNDING IS NEEDED TO CONTINUE SUPPORT OF THE IMPROVED TURBINE ENGINE PROGRAM FOR THE ENGINEERING AND MANUFACTURING DEVELOPMENT EFFORTS. |
| May 21, 2026 | P00106 | $0 | SUPPORT OF THE IMPROVED TURBINE ENGINE PROGRAM |
| Apr 22, 2026 | P00105 | $0 | CONTRACT SUPPORTING THE IMPROVED TURBINE ENGINE PROGRAM |
| Apr 16, 2026 | P00104 | $16.8M | INCREMENTAL FUNDING ACTION |
| Mar 24, 2026 | P00103 | $0 | THE PURPOSE OF THIS ACTION IS TO INCORPORATE A CONTRACT LINE ITEM FOR SHIPMENT OF THE ENGINEERING AND MANUFACTURING DEVELOPMENT HARDWARE DELIVERABLE IN SUPPORT OF THE IMPROVED TURBINE ENGINE PROGRAM. |
| Mar 12, 2026 | P00102 | $0 | THE PURPOSE OF THIS ACTION IS TO UPDATE THE SHIPPING INSTRUCTIONS FOR T901 ENGINES IMPROVED TURBINE ENGINE PROGRAM IN SUPPORT OF THE WARFIGHTER. |
| Feb 13, 2026 | P00101 | $0 | THE PURPOSE OF THIS ACTION IS TO INCORPORATE THE REQUEST FOR VARIANCE ATTACHMENTS INTO THE IMPROVED TURBINE ENGINE PROGRAM CONTRACT. |
| Dec 23, 2025 | P00100 | $26.9M | THE IMPROVED TURBINE ENGINE PROGRAM INCREMENTAL FUNDING FOR THE CONTINUATION OF ENGINES IN SUPPORT OF THE WARFIGHTER. |
| Sep 24, 2025 | P00098 | $0 | IMPROVED TURBINE ENGINE PROGRAM REVISED FUNDING INCORRECTLY MOVED FROM THE LINE OF ACCOUNTING INADVERTENTLY. |
| Sep 23, 2025 | P00097 | $1.9M | COST PLUS INCENTIVE FEE CONTRACT SUPPORTING THE IMPROVED TURBINE ENGINE PROGRAM. |
| Sep 17, 2025 | P00096 | $7.1M | THE PURPOSE OF THIS ACTION IS IN SUPPORT OF THE COST PLUS INCENTIVE FEE CONTRACT FOR THE IMPROVED TURBINE ENGINE PROGRAM BY INCREASING THE FUNDING FOR MULTIPLE CONTRACT LINE ITEMS. |
| Sep 12, 2025 | P00095 | $-500.0K | THE PURPOSE OF THIS ACTION IS TO SUPPORT THE FIRM FIXED PRICE INTEGRATED ENGINE FOR THE IMPROVED TURBINE ENGINE PROGRAM. |
| Sep 9, 2025 | P00094 | $36.9M | THE PURPOSE OF THIS ACTION IS IN SUPPORT OF THE COST PLUS INCENTIVE FEE CONTRACT FOR THE IMPROVED TURBINE ENGINE PROGRAM BY INCREASING THE FUNDING FOR MULTIPLE CONTRACT LINE ITEMS. |
| Sep 2, 2025 | P00093 | $-10.8M | THE PURPOSE OF THIS MODIFICATION IS TO SUPPORT THE COST PLUS INCENTIVE FEE CONTRACT FOR THE IMPROVED TURBINE ENGINE PROGRAM BY DECREASING THE INCENTIVE FEE ON MULTIPLE CONTRACT LINE ITEMS REIMBURSED TO THE GOVERNMENT. |
| Jul 28, 2025 | P00092 | $8.1M | THE PURPOSE OF THIS MODIFICATION IS TO SUPPORT THE COST PLUS INCENTIVE FEE TYPE CONTRACT FOR THE IMPROVED TURBINE ENGINE PROGRAM. |
| Jun 10, 2025 | P00091 | $0 | CONTRACT SUPPORTING THE IMPROVED TURBINE ENGINE PROGRAM. |
| Jun 4, 2025 | P00090 | $133.2K | THIS COST PLUS FIXED FEE CONTRACT IS FOR THE ENGINEERING AND MANUFACTURING DEVELOPMENT PHASE OF THE IMPROVED TURBINE ENGINE PROGRAM. |
| May 16, 2025 | P00088 | $0 | IMPROVED TURBINE ENGINE PROGRAM (ITEP) |
| Mar 31, 2025 | P00089 | $0 | THIS COST PLUS FIXED FEE CONTRACT IS FOR THE ENGINEERING AND MANUFACTURING DEVELOPMENT PHASE OF THE IMPROVED TURBINE ENGINE PROGRAM. |
| Jan 22, 2025 | P00087 | $9.7M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE INCREMENTAL FUNDING. |
| Nov 26, 2024 | P00086 | $5.0M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBER 0001. |
| Nov 24, 2024 | P00085 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN APACHE STOP WORK ORDER AND CHANGING DELIVERY INFORMATION FOR 2 ECS UNITS. |
| Oct 22, 2024 | P00083 | $0 | MODIFICATION TO RECLASSIFY THE UNBILLED PORTION OF THE TARGET FEE ON THE CONTRACT LINE-ITEM NUMBER 0001 TO THE TARGET COST. |
| Aug 22, 2024 | P00078 | $0 | THE PURPOSE OF THIS ACTION IS TO ADD FUNDING AND ESTABLISH A CONTRACT LINE ITEM NUMBER FOR THE PURCHASE OF FOUR (4) ENGINES. |
| Aug 20, 2024 | P00080 | $250.0K | THE PURPOSE OF THIS MODIFICATION IS THE ADD INCREMENTAL FUNDING IN SUPPORT OF IMPROVED TURBINE ENGINE PROGRAM. |
| Jul 9, 2024 | P00079 | $38.1M | INCREMENTAL FUNDING FOR CLIN 0001 IN THE AMOUNT OF $38.1M |
| Jun 10, 2024 | P00082 | $0 | CHANGING TAC TO TAC A9CP |
| Jun 6, 2024 | P00081 | $0 | ADD RFV ATTACHMENTS FOR ESN-111223-REV 1 AND ESN-111224 REV 1 |
| May 21, 2024 | P00077 | $0 | CHANGED SHIPPING INFORMATION. |
| Apr 12, 2024 | P00076 | $0 | IN SUPPORT OF THE IMPROVED TURBINE ENGINE PROGRAM FOR THE EMD PHASE |
| Apr 4, 2024 | P00075 | $366.0K | IN SUPPORT OF THE IMPROVED TURBINE ENGINE PROGRAM FOR THE EMD PHASE |
| Mar 27, 2024 | P00074 | $10.0M | IN SUPPORT OF THE IMPROVED TURBINE ENGINE PROGRAM FOR THE EMD PHASE |
| Mar 14, 2024 | P00073 | $987.8K | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Jan 10, 2024 | P00072 | $73.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Dec 12, 2023 | P00071 | $3.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Dec 11, 2023 | P00070 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Oct 10, 2023 | P00069 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Sep 27, 2023 | P00068 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Sep 25, 2023 | P00067 | $3.7M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Sep 5, 2023 | P00065 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Sep 5, 2023 | P00066 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Aug 29, 2023 | P00064 | $3.6M | CONTRACT FOR THE ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) PHASE OF THE IMPROVED TURBINE ENGINE PROGRAM (ITEP) TO BE PERFORMED IN ACCORDANCE WITH (IAW) THE ITE EMD STATEMENT OF WORK (SOW), SYSTEM REQUIREMENTS DOCUMENT (SRD), AND GOVERNMENT APPROVED ENGINE MODEL SPECIFICATION (EMS). |
| Aug 21, 2023 | P00063 | $28.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| May 25, 2023 | P00061 | $23.1M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE ANIMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| May 22, 2023 | P00062 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| May 10, 2023 | P00060 | $6.1M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Feb 28, 2023 | P00059 | $55.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE ANIMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Feb 21, 2023 | P00058 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Dec 15, 2022 | P00057 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Dec 14, 2022 | P00056 | $3.2M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Nov 29, 2022 | P00055 | $14.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Oct 27, 2022 | P00054 | $10.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Aug 16, 2022 | P00047 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Aug 15, 2022 | P00053 | $8.8M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Jul 28, 2022 | P00052 | $7.9M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Jul 26, 2022 | P00051 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Jun 30, 2022 | P00049 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Jun 30, 2022 | P00050 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Jun 2, 2022 | P00046 | $20.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Apr 15, 2022 | P00048 | $40.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Mar 30, 2022 | P00045 | $0 | EFFORT FOR PLANNING, DESIGN, DEVELOPMENT, TEST, QUALIFICATION, MANUFACTURING READINESS, PRODUCTION READINESS AND INTEGRATION OF AN IMPROVED TURBINE ENGINE (ITE) DURING THE ENGINEERING & MANUFACTURING PHASE |
| Jan 10, 2022 | P00044 | $45.0M | EFFORT FOR PLANNING, DESIGN, DEVELOPMENT, TEST, QUALIFICATION, MANUFACTURING READINESS, PRODUCTION READINESS AND INTEGRATION OF AN IMPROVED TURBINE ENGINE (ITE) DURING THE ENGINEERING & MANUFACTURING AND DEVELOPMENT PHASE. |
| Dec 7, 2021 | P00040 | $0 | EFFORT FOR PLANNING, DESIGN, DEVELOPMENT, TEST, QUALIFICATION, MANUFACTURING READINESS, PRODUCTION READINESS AND INTEGRATION OF AN IMPROVED TURBINE ENGINE (ITE) DURING THE ENGINEERING & MANUFACTURING DEVELOPMENT (EMD) PHASE. |
| Nov 17, 2021 | P00043 | $7.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Oct 25, 2021 | P00042 | $8.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Oct 13, 2021 | P00041 | $0 | ADDITION OF FUEL PURCHASE AGREEMENT AS ATTACHMENT 0023 TO CONTRACT. |
| Jul 26, 2021 | P00039 | $1.3M | INCREMENTAL FUNDING IN THE AMOUNT OF $1,285,000 AND INCORPORATE FAR CLAUSE 252.251-7000. |
| Jul 7, 2021 | P00035 | $0 | ITEP ENGINE REQUIREMENT REVISING H-1 SPECIAL PROVISION |
| Jul 2, 2021 | P00031 | $0 | INCORPORATION OF REVISED DATA RIGHTS ASSERTION TABLE DATED 14 APRIL 2021. |
| Jun 11, 2021 | PZ0038 | $11.1K | ITEP REQUIREMENT DEFINITIZATION OF CLIN 0011 |
| Jun 3, 2021 | P00037 | $0 | ITE REQUIREMENT REVISING CLIN 0011 FROM A COST NO FEE TO CPFF SO IT CAN BE DEFINITIZED. |
| May 19, 2021 | P00036 | $18.9M | INCREMENTAL FUNDING FOR CLIN 0001AD IN THE AMOUNT OF $18,906,000.00 |
| May 11, 2021 | P00034 | $26.0K | ADDITIONAL FUNDING REV G |
| Apr 28, 2021 | P00033 | $15.9M | OPTION EXERCISE FOR REMAINING 5 OPTIONS ENGINE. INCREMENTAL FUNDING FOR CLIN 0010 FARA PHASE II. |
| Mar 22, 2021 | P00032 | $52.0K | ENGINE CONTROL SYSTEM MATLAB/SIMULINK MODEL |
| Feb 25, 2021 | P00030 | $70.0M | INCREMENTAL FUNDING IN THE AMOUNT OF $70,000,000.00 AND LANGUAGE REGARDING SLINGS THAT HAVE BEEN DD 250'D, SLINS A003 AND A004. |
| Jan 28, 2021 | P00029 | $25.0M | INCREMENTAL FUNDING - $25,000,000.00 AND ADDING REVISED DD254 |
| Jan 15, 2021 | P00028 | $0 | ADMIN MOD TO ADJUST TARGET COST AND FEE. |
| Jan 11, 2021 | P00027 | $653.7K | INCREMENTAL FUNDING FOR CLIN 0001 ($10M) AND DE-OBLIGATION OF FY 20 FUNDS IN THE AMOUNT OF $9,346,337.13. |
| Nov 30, 2020 | P00026 | $2.0M | EXERCISE OPTION OF 4 ENGINES |
| Nov 6, 2020 | P00025 | $20.0M | INCREMENTAL FUNDING OF CLIN 0001 FOR $20 MILLION |
| Oct 29, 2020 | P00024 | $0 | INCORPORATING REVISED SPECIAL PROVISION H-8 AND ADDING AN A NARRATIVE FOR CONSIDERATION, |
| Sep 29, 2020 | P00023 | $1.4M | ITE OPTION EXERCISE CLIN 0006AD FOR ONE ENGINE AND ADD INCREMENTAL FUNDING TO CLIN 0001 VIA SLIN 0001AA AND 0001AC. |
| Sep 24, 2020 | P00022 | $-364.0K | DE-OBLIGATION ON CLIN 0009AA IN THE AMOUNT OF $364,000.00 |
| Aug 27, 2020 | P00021 | $0 | INCORPORATE SOW REV E AND F INTO THE ITEP REQUIREMENT. |
| Jun 26, 2020 | P00020 | $17.1M | ITEP FARA REQUIREMENT |
| Jun 18, 2020 | P00019 | $0 | DATA RIGHTS ASSERTIONS - BAE |
| May 6, 2020 | P00018 | $0 | REA |
| Apr 23, 2020 | P00017 | $0 | MODIFICATION TO UPDATE DRA TABLE PARKER ASSERTIONS |
| Apr 1, 2020 | P00016 | $3.5M | ENGINE INTEGRATION |
| Feb 25, 2020 | P00015 | $30.0M | ENGINEERING AND MANUFACTURING DEVELOPMENT OF THE ITEP PROGRAM |
| Feb 5, 2020 | P00014 | $-45.0M | DEOBLIGATE FUNDS IN THE AMOUNT OF $45,000,000 VIA SLIN 0001AA. |
| Jan 27, 2020 | P00011 | $0 | CHANGE THE INSPECTION AND ACCEPTANCE POINTS ON CLIN 0002, SLIN A003 FROM ORIGIN TO DESTINATION. |
| Jan 8, 2020 | P00010 | $33.2M | ENGINEERING AND MANUFACTURING DEVELOPMENT OF THE ITEP PROGRAM |
| Dec 19, 2019 | P00009 | $22.0M | INCORPORATE NO-COST SOW CHANGES UNDER REVISION D. |
| Nov 6, 2019 | P00008 | $14.8M | NO COST CHANGES TO SOW |
| Sep 26, 2019 | P00007 | $2.0M | ENGINEERING AND MANUFACTURING DEVELOPMENT OF THE ITEP PROGRAM |
| Sep 25, 2019 | P00006 | $-2.0M | ENGINEERING AND MANUFACTURING DEVELOPMENT OF THE ITEP PROGRAM |
| Sep 5, 2019 | P00005 | $1.8M | ENGINEERING AND MANUFACTURING DEVELOPMENT OF THE ITEP PROGRAM |
| Jun 14, 2019 | P00004 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALITY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) |
| May 30, 2019 | P00003 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY, AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) |
| Feb 19, 2019 | P00001 | $7.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
| Feb 19, 2019 | P00002 | $0 | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) |
| Feb 1, 2019 | 0 | $130.0M | REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
Estimated positioning window
Dec 31, 2028 – Jun 30, 2029
35/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 35/100. Available recorded signals: 30 points.
- Contract end 2029-12-31 (1156 days from calculation)
- +5 points
- 1 historical awards in this buyer and category group
- +0 points
- 104 recorded award transactions
- +10 points
- Latest award action: 2026-05-21
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.