Federal contract award

W58RGZ19C0054

DESIGN PHASE OF THE APACHE IMPROVED TURBINE ENGINE INTEGRATION EFFORT - ITE PHASE 1

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336411 — Aircraft Manufacturing
PSC1680 — Miscellaneous Aircraft Accessories and Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$42.1M
Current contract value$42.1M
Potential contract value / ceiling$42.1M
Start dateAug 28, 2019
Current end dateSep 30, 2025
Potential end dateSep 30, 2025
Latest award activityMar 13, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 21 of 21 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 13, 2025P00016$2.7MDEFINITIZE REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR ITEP PHASE I LATE GFI
Mar 13, 2025P00016$2.7MDEFINITIZE REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR ITEP PHASE I LATE GFI
Sep 25, 2023PZ0015$0DEFINITIZATION OF CHANGE ORDER FOR THE IMPROVED TURBINE ENGINE (ITE) PHASE I ENGINE CLAMSHELL REDESIGN AND INTEGRATION OF ITE EXHAUST SYSTEM AND ENGINE CHOP. CHANGE ORDER WAS ESTABLISHED VIA DIRECTED CHANGE ON W58RGZ-19-C-0054 MODIFICATION P00005.
Sep 11, 2023PZ0014$446.6KDEFINITIZATION OF CHANGE ORDER FOR THE IMPROVED TURBINE ENGINE (ITE) PHASE I ENGINE COMPONENT TEMPERATURE COOLING DESIGN SOLUTION. THE DIRECTED CHANGE WAS ESTABLISHED VIA DIRECTED CHANGE ON W58RGZ-19-C-0054 P00008.
Jun 5, 2023P00013$606.5KCOMPONENT TEMPERATURE COOLING DESIGN SOLUTION, SLIN INCREASE AND POP EXTENSION.
Jan 31, 2023P00012$451.0KCREATE NEW CLIN FOR OVERRUN, AND EXTEND PERIOD OF PERFORMANCE.
Sep 23, 2022A00003$0MODIFICATION TO DOCUMENT THE TRANSFER OF GFP TO ANOTHER CONTRACT.
Sep 21, 2022P00011$-1.3MCONTRACT - ITE PHASE I APACHE INTEGRATION MOD - DEOBLIGATION OF EXCESS FUNDS
Jul 7, 2022P00010$-147.0KINCREASE OF EXPIRED PERIOD OF PERFORMANCE AND DE-OBLIGATION OF EXCESS FUNDS.
May 27, 2022P00009$0CONTRACT: APACHE IMPROVED TURBINE ENGINE INTEGRATION PHASE 1 MODIFICATION: CLINS 2001 AND 2002 EXTENSION
Apr 14, 2022P00008$1.5MIMPROVED TURBINE ENGINE (ITE), ROM NTE FUNDING FOR COMPONENT TEMPERATURE COOLING
Nov 16, 2021P00007$550.0KCONTRACT - APACHE ITE PHASE 1 MOD - EVM OVERRUN AND ATTACHMENT UPDATE.
Oct 13, 2021P00006$-550.0KCONTRACT: APACHE ITE INTEGRATION PHASE 1 MODIFICATION: NTE REDUCTION ON UNIQUE EXHAUST.
Sep 2, 2021P00005$4.2MCONTRACT: IMPROVED TURBINE ENGINE PHASE 1 INTEGRATION - APACHE MODIFICATION: DIRECTED CHANGE - RH CLAMSHELL, ENGINE CHOP, UNIQUE EXHAUST.
Jul 21, 2021A00002$0CONTRACT: IMPROVED TURBINE ENGINE INTEGRATION FOR AH-64E PHASE I MODIFICATION: DOCUMENTS GFP TRANSFER TO THIS CONTRACT.
Jul 1, 2021P00004$5.1MUPDATE OF ATTACHMENTS 01, 03, AND EXHIBIT A, INCREASE IN INCREMENTAL FUNDING
Aug 26, 2020P00003$465.0KCONTRACT: APACHE IMPROVED TURBINE ENGINE INTEGRATION MODIFICATION: ADDITIONAL FY20 INCREMENTAL FUNDING
Jul 16, 2020P00002$0CONTRACT: IMPROVED TURBINE ENGINE INTEGRATION FOR AH-64E PHASE I MODIFICATION: ADMINISTRATIVE CLEAN UP
Apr 30, 2020A00001$0CONTRACT: IMPROVED TURBINE ENGINE INTEGRATION FOR AH-64E PHASE I MODIFICATION: DOCUMENTS GFP TRANSFER TO THIS CONTRACT.
Dec 23, 2019P00001$18.0MCONTRACT: PHASE 1 OF IMPROVED TURBINE ENGINE INTEGRATION FOR APACHE MODIFICATION: INCREMENTAL FUNDING
Aug 28, 20190$10.0MDESIGN PHASE OF THE APACHE IMPROVED TURBINE ENGINE INTEGRATION EFFORT - ITE PHASE 1

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.