Federal contract award

W58RGZ19F0187

THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC1520 — Aircraft, Rotary Wing
Parent award / vehicleW58RGZ18D0001
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$17.8M
Current contract value$17.8M
Potential contract value / ceiling$17.8M
Start dateMay 30, 2019
Current end dateJun 30, 2022
Potential end dateJun 30, 2022
Latest award activitySep 5, 2023
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 5, 2023P00010$-16.3KTHE PURPOSE OF THE STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.
Jun 2, 2022P00009$99.7KUNSCHEDULED MAINTENANCE DISCOVERED WHILE RETURNING AIRCRAFT TO A FLYABLE STATUS PLUS DESIGN CHANGES MADE TO THE (GFI) TECHNICAL DATA PACKAGE. MANUFACTURING, INSTALLING AND TESTING THE GLARESHIELD AND CLOSEOUT THE PROJECT,(30)DAYS ADDED TO THE (POP)
Apr 19, 2022P00008$0THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.
Feb 15, 2022P00007$329.1KORIGINAL TDP HAVING MORE THAN ANTICIPATED WHICH RESULTED IN ADDITIONAL LABOR HOURS FOR MANUFACTURING, PROPERTY, QUALITY, CONFIGURATION AND DATA MANAGEMENT AND INTEGRATION. OEP 21237 FOR THIS ORDER ASSUMED A TOTAL OF 250 REVISION TO THE TDP.
Sep 22, 2021P00006$0MODIFICATION P00006 TO ORDER W58RGZ-19-F-0187 UNDER CONTRACT W58RGZ-18-D-0001 (RBA 22699), PERIOD OF PERFORMANCE (POP) EXTENSION TO SLINS 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF.
Apr 12, 2021P00005$52.3KCUSTOMS & BORDER PROTECTION HH-60L AIRCRAFT 4 & 5 MODIFICAITONS
Mar 8, 2021P00004$0CUSTOMS & BORDER PROTECTION HH-60L AIRCRAFT 4&5 MODIFICATIONS
Jan 19, 2021P00003$596.1KCBP CONVERSION
Jul 11, 2019P00001$0THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.
Jun 28, 2019P00002$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A REVISED GOVERNMENT PROPERTY LIST (GFP).
May 30, 20190$16.7MTHE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.