THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| PSC | 1520 — Aircraft, Rotary Wing |
| Parent award / vehicle | W58RGZ18D0001 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $17.8M |
| Current contract value | $17.8M |
| Potential contract value / ceiling | $17.8M |
| Start date | May 30, 2019 |
| Current end date | Jun 30, 2022 |
| Potential end date | Jun 30, 2022 |
| Latest award activity | Sep 5, 2023 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 5, 2023 | P00010 | $-16.3K | THE PURPOSE OF THE STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. |
| Jun 2, 2022 | P00009 | $99.7K | UNSCHEDULED MAINTENANCE DISCOVERED WHILE RETURNING AIRCRAFT TO A FLYABLE STATUS PLUS DESIGN CHANGES MADE TO THE (GFI) TECHNICAL DATA PACKAGE. MANUFACTURING, INSTALLING AND TESTING THE GLARESHIELD AND CLOSEOUT THE PROJECT,(30)DAYS ADDED TO THE (POP) |
| Apr 19, 2022 | P00008 | $0 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. |
| Feb 15, 2022 | P00007 | $329.1K | ORIGINAL TDP HAVING MORE THAN ANTICIPATED WHICH RESULTED IN ADDITIONAL LABOR HOURS FOR MANUFACTURING, PROPERTY, QUALITY, CONFIGURATION AND DATA MANAGEMENT AND INTEGRATION. OEP 21237 FOR THIS ORDER ASSUMED A TOTAL OF 250 REVISION TO THE TDP. |
| Sep 22, 2021 | P00006 | $0 | MODIFICATION P00006 TO ORDER W58RGZ-19-F-0187 UNDER CONTRACT W58RGZ-18-D-0001 (RBA 22699), PERIOD OF PERFORMANCE (POP) EXTENSION TO SLINS 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF. |
| Apr 12, 2021 | P00005 | $52.3K | CUSTOMS & BORDER PROTECTION HH-60L AIRCRAFT 4 & 5 MODIFICAITONS |
| Mar 8, 2021 | P00004 | $0 | CUSTOMS & BORDER PROTECTION HH-60L AIRCRAFT 4&5 MODIFICATIONS |
| Jan 19, 2021 | P00003 | $596.1K | CBP CONVERSION |
| Jul 11, 2019 | P00001 | $0 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. |
| Jun 28, 2019 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A REVISED GOVERNMENT PROPERTY LIST (GFP). |
| May 30, 2019 | 0 | $16.7M | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. |