Federal contract award
W58RGZ21C0015
APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-RSA |
| NAICS | 336411 — Aircraft Manufacturing |
| PSC | 5342 — Hardware, Weapon System |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.5B |
| Current contract value | $1.5B |
| Potential contract value / ceiling | $1.6B |
| Start date | Jun 18, 2021 |
| Current end date | Dec 31, 2028 |
| Potential end date | Dec 31, 2028 |
| Latest award activity | Jun 1, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 91 of 91 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 1, 2026 | P00050 | $3.4M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15. |
| May 20, 2026 | P00049 | $172.5K | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| May 18, 2026 | P00048 | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Apr 30, 2026 | P00047 | $88.6K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Apr 13, 2026 | P00009 | $5.4M | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOT 12-16. |
| Mar 26, 2026 | P00046 | $0 | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Mar 25, 2026 | P00045 | $0 | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Mar 24, 2026 | P00044 | $174.6K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Feb 27, 2026 | P00042 | $441.0K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Feb 23, 2026 | P00043 | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Feb 4, 2026 | A00036 | $0 | MOD MESSAGE MY7109 |
| Feb 4, 2026 | A00037 | $0 | MOD MESSAGE MY7110 |
| Jan 20, 2026 | A00035 | $0 | MOD MESSAGE MY7108 (REPLACES A00034) |
| Jan 15, 2026 | P00041 | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Jan 15, 2026 | P00041 | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Jan 11, 2026 | P00040 | $750.0K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Jan 5, 2026 | A00034 | $0 | MOD MESSAGE MY7108 |
| Dec 22, 2025 | P00039 | $501.7K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Oct 7, 2025 | P00036 | $0 | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 12-16. |
| Oct 7, 2025 | P00036 | $-56.5K | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 12-16. |
| Oct 6, 2025 | P00038 | $106.3K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Oct 1, 2025 | P00037 | $723.5K | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Sep 22, 2025 | P00035 | $0 | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOT 12-16 |
| Sep 15, 2025 | P00035 | $14.8M | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOT 12-16 |
| Sep 5, 2025 | P00033 | $344.0M | EXERCISE LOT 15 |
| Sep 5, 2025 | P00033 | $1.3M | EXERCISE LOT 15. |
| Sep 4, 2025 | P00030 | $0 | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOT 12-16 |
| Sep 4, 2025 | P00030 | $24.3M | APACHE AH-64E FULL RATE PRODUCTION LOTS 12-16 |
| Sep 3, 2025 | A00033 | $0 | MOD MESSAGE MY7107 |
| Aug 14, 2025 | P00029 | $0 | TO AWARD AN UNPRICED CHANGE ORDER FOR THE LCT 31 CARE AND FEEDING WITH NOT TO EXCEED PRICE OF $517,402.00 |
| Aug 7, 2025 | P00034 | $0 | AH-64E APACHE FULL RATE PRODUCTION (FRP) LOTS 12-16. |
| Jul 31, 2025 | A00031 | $0 | MOD MESSAGE MY7106 |
| Jul 28, 2025 | P00032 | $253.5K | TO AWARD AN UNPRICED CHANGE ORDER FOR THE LCT 31 CARE AND FEEDING WITH NOT TO EXCEED PRICE $517,402.00 |
| Jul 17, 2025 | A00030 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP |
| Jul 15, 2025 | P00031 | $0 | APACHE AH-64E FULL RATE PRODUCTION (FRP) LOTS 12-16 |
| Jul 14, 2025 | A00028 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP |
| Jul 2, 2025 | P00028 | $585.0K | APACHE ADVANCED PROCUREMENT AWARD FOR LOTS 12-16 FULL RATE PRODUCTION. |
| Jun 18, 2025 | A00027 | $0 | MODIFICATION TO DOCUMENT MOD MESSAGE MY7105 |
| May 21, 2025 | A00026 | $0 | MODIFICATION TO DOCUMENT MOD MESSAGE MY7104 |
| May 20, 2025 | A00025 | $0 | MODIFICATION TO DOCUMENT TRANSFER (ACCEPTANCE) OF GFP |
| May 20, 2025 | P00026 | $0 | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| May 16, 2025 | P00027 | $3.6M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Apr 30, 2025 | A00024 | $0 | MODIFICATION TO DOCUMENT MOD MESSAGE MY7103 |
| Apr 22, 2025 | A00022 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF PROPERTY |
| Apr 22, 2025 | A00023 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF PROPERTY |
| Mar 28, 2025 | P00025 | $0 | TO UPDATE SHIPPING ADDRESS. |
| Mar 10, 2025 | A00020 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP |
| Mar 3, 2025 | A00021 | $0 | MODIFICATION TO DOCUMENT MOD MESSAGE MY7102 |
| Jan 29, 2025 | P00023 | $-10.0M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Jan 27, 2025 | A00018 | $0 | MODIFICATION TO DOCUMENT MOD MESSAGE MY7101 |
| Jan 23, 2025 | A00017 | $0 | MODIFICATION TO DOCUMENT MOD MESSAGE MY7100 |
| Dec 19, 2024 | P00021 | $2.6M | UNPRICED CHANGE ORDER FOR EARLY CARVE OUT OF THE EGYPT UNIQUES EFFORT ON THE AH-64E APACHE |
| Dec 5, 2024 | P00020 | $0 | ADMINISTRATIVE MOD TO UPDATE THE MISSION EQUIPMENT PACKAGE FOR THE FOREIGN MILITARY SALES CUSTOMER KUWAIT. CHANGE UNIT OF MEASUREMENT AND UPDATE DODAAC'S. |
| Nov 12, 2024 | P00022 | $0 | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Oct 10, 2024 | P00018 | $0 | ADMIN MOD TO GENERATOR EFFORT FOR THE FUNCTIONAL VERIFICATION OF THE -15 HYBRID GENERATOR, PROVIDING 18 LEAD THE FLEET GENERATORS UPON QUALIFICATION OF THE -15 HYBRID GENERATOR, AND REMANUFACTURING THE -11 GENERATORS INTO THE -7 GENERATOR CONFIG. |
| Sep 23, 2024 | P00019 | $0 | CHANGE TO INDUCTION SCHEDULE FOR THE APACHE AH-64E AIRCRAFT |
| Sep 12, 2024 | A00016 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER |
| Aug 9, 2024 | P00016 | $1.0M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Aug 9, 2024 | P00016 | $1.7M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Aug 2, 2024 | A00013 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER |
| Aug 2, 2024 | A00014 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER |
| Aug 2, 2024 | A00015 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER |
| Jul 30, 2024 | P00017 | $-20.1M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Jul 22, 2024 | P00015 | $17.4M | MOD TO INCLUDE THE FUNCTIONAL VERIFICATION OF THE -15 HYBRID GENERATOR, PROVIDING 18 LEAD THE FLEET GENERATORS UPON QUALIFICATION OF THE -15 HYBRID GENERATOR, AND REMANUFACTURING THE -11 GENERATORS INTO THE -7 GENERATOR CONFIGURATION. |
| Jul 16, 2024 | A00009 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER TO CONTRACT |
| Jul 15, 2024 | A00008 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER TO CONTRACT |
| Jul 15, 2024 | A00010 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER TO CONTRACT |
| Jul 15, 2024 | A00011 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER TO CONTRACT |
| Jul 10, 2024 | A00007 | $0 | MODIFICATION TO DOCUMENT PROPERTY TRANSFER TO CONTRACT |
| Jul 10, 2024 | A00012 | $0 | MODIFICATION TO DOCUMENT MULTIPLE RFAM'S/PROPERTY BORROW/PAYBACK |
| May 29, 2024 | P00014 | $485.9M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Apr 25, 2024 | A00006 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP. |
| Feb 28, 2024 | P00012 | $7.9M | APACHE AIRCRAFT FULL RATE PRODUCTION LOTS 12-15, DEFINITIZATION OF MULTI-CORE PROCESSORS, FROM A QUANTITY OF 84 TO A QUANTITY OF 127. |
| Jan 22, 2024 | P00010 | $49.1M | AUSTRALIA DIRECTED CHANGE |
| Jan 19, 2024 | P00011 | $7.3M | APACHE AIRCRAFT FULL RATE PRODUCTION LOTS 12-15, UPDATE TO UCO FOR THE PURCHASE OF MULTI-CORE MISSION PROCESSORS, FROM A QUANTITY OF 84 TO A QUANTITY OF 127. |
| Jan 12, 2024 | A00004 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP. |
| Oct 25, 2023 | A00003 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP TO THIS CONTRACT. |
| Sep 29, 2023 | P00008 | $16.3M | APACHE AIRCRAFT FULL RATE PRODUCTION LOTS 12 - 15 |
| Sep 22, 2023 | A00002 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP TO THIS CONTRACT. |
| Sep 8, 2023 | A00001 | $0 | MODIFICATION TO DOCUMENT TRANSFER OF GFP TO THIS CONTRACT. |
| Aug 8, 2023 | P00006 | $4.1M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Jul 21, 2023 | P00005 | $74.8M | APACHE AIRCRAFT FULL RATE PRODUCTIO FOR LOTS 12 THROUGH 15 |
| Jul 21, 2023 | P00005 | $318.3M | APACHE AIRCRAFT FULL RATE PRODUCTIO FOR LOTS 12 THROUGH 15 |
| May 24, 2023 | P00004 | $-48 | APACHE AIRCRAFT FULL RATE PRODUCTIO FOR LOTS 12 THROUGH 15 |
| May 24, 2023 | P00004 | $8.8M | APACHE AIRCRAFT FULL RATE PRODUCTIO FOR LOTS 12 THROUGH 15 |
| Apr 6, 2023 | P00003 | $6.4M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Mar 17, 2023 | PZ0002 | $890.7M | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Mar 17, 2023 | PZ0002 | $1.1B | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
| Mar 25, 2022 | P00001 | $-5.0M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Jun 18, 2021 | 0 | $169.5M | APACHE ADVANCED PROCUREMENT AWARD FOR LOT 12 FULL RATE PRODUCTION. |
| Jun 18, 2021 | 0 | $0 | APACHE AIRCRAFT FULL RATE PRODUCTION FOR LOTS 12 THROUGH 15 |
Estimated positioning window
Dec 31, 2027 – Jun 30, 2028
50/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 50/100. Available recorded signals: 45 points.
- Contract end 2028-12-31 (798 days from calculation)
- +15 points
- 5 historical awards in this buyer and category group
- +15 points
- 91 recorded award transactions
- +10 points
- Latest award action: 2026-06-01
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.