Federal contract award

W58RGZ23F0302

THIS IS A RAPID MANUFACTURING CAPABILITY TO SUPPORT DESIGN VERIFICATION ACTIVITIES AND TO SUPPORT SHORT SUSPENSE FABRICATION EFFORTS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC1520 — Aircraft, Rotary Wing
Parent award / vehicleW58RGZ18D0001
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$1.6M
Current contract value$1.6M
Potential contract value / ceiling$1.6M
Start dateMay 22, 2023
Current end dateMay 18, 2026
Potential end dateMay 18, 2026
Latest award activityNov 22, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 22, 2025P00009$0ON-POST RAPID MANUFACTURING.
Nov 22, 2025P00009$0ON-POST RAPID MANUFACTURING.
Jul 24, 2025P00008$0ON POST RAPID MANUFACTURING
Jul 24, 2025P00008$0ON POST RAPID MANUFACTURING
Apr 30, 2025P00006$-1.5KON-POST RAPID MANUFACTURING
Apr 30, 2025P00006$-1.5KON-POST RAPID MANUFACTURING
Dec 2, 2024P00005$1000.0KON-POST RAPID MANUFACTURING: REQUIREMENT TO ESTABLISH AN ON-POST (REDSTONE ARSENAL, AL) RAPID MANUFACTURING CAPABILITY TO SUPPORT DESIGN VERIFICATION ACTIVITIES AND TO SUPPORT SHORT SUSPENSE FABRICATION EFFORTS.
Dec 2, 2024P00005$1000.0KON-POST RAPID MANUFACTURING: REQUIREMENT TO ESTABLISH AN ON-POST (REDSTONE ARSENAL, AL) RAPID MANUFACTURING CAPABILITY TO SUPPORT DESIGN VERIFICATION ACTIVITIES AND TO SUPPORT SHORT SUSPENSE FABRICATION EFFORTS.
Oct 7, 2024P00004$0ON POST RAPID MANUFACTURING.
Oct 7, 2024P00004$0ON POST RAPID MANUFACTURING.
May 21, 2024P00003$440.0KON-POST RAPID MANUFACTURING.
Apr 22, 2024P00002$0ON POST RAPID MANUFACTURING SUPPORT.
Jul 24, 2023P00007$-2.2KON-POST RAPID MANUFACTURING
Jul 17, 2023P00001$0ON-POST RAPID MANUFACTURING SUPPORT.
May 22, 20230$212.4KTHIS IS A RAPID MANUFACTURING CAPABILITY TO SUPPORT DESIGN VERIFICATION ACTIVITIES AND TO SUPPORT SHORT SUSPENSE FABRICATION EFFORTS.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.