Federal contract award

W58RGZ24F0451

THIS REQUIREMENT IS FOR THE PROCUREMENT OF THE GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI), FOR PRODUCTION, SUSTAINMENT HARDWARE, TECHNICAL, LOGISTICAL, TEST, AND ENGINEERING SUPPORT FOR THE APACHE ATTACK HELICOPTER.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RSA
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSCJ016 — Maintenance, Repair and Rebuilding of Equipment: Aircraft Components and Accessories
Parent award / vehicleW58RGZ24D0078
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$59.7M
Current contract value$59.7M
Potential contract value / ceiling$97.7M
Start dateAug 29, 2024
Current end dateAug 30, 2027
Potential end dateAug 30, 2027
Latest award activityJul 15, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 15, 2025P00004$3.2MINCREASE FUNDING FOR CLIN 0001AB OF GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI) CONTRACT: W58RGZ-24-D-0078 TASK ORDER: W58RGZ-24-F-0451.
Jul 15, 2025P00004$3.2MINCREASE FUNDING FOR CLIN 0001AB OF GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI) CONTRACT: W58RGZ-24-D-0078 TASK ORDER: W58RGZ-24-F-0451.
Jul 8, 2025P00003$0POP EXTENSION FOR CLIN 0001AA OF GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI) CONTRACT: W58RGZ-24-D-0078 TASK ORDER: W58RGZ-24-F-0451.
Jul 8, 2025P00003$0POP EXTENSION FOR CLIN 0001AA OF GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI) CONTRACT: W58RGZ-24-D-0078 TASK ORDER: W58RGZ-24-F-0451.
Apr 30, 2025A00001$0MODIFICATION ISSUED TO CORRECT PAYMENT OFFICE.
Apr 30, 2025A00001$0MODIFICATION ISSUED TO CORRECT PAYMENT OFFICE.
Apr 30, 2025A00002$0MODIFICATION ISSUED TO CORRECT PAYMENT OFFICE.
Apr 30, 2025A00002$0MODIFICATION ISSUED TO CORRECT PAYMENT OFFICE.
Apr 30, 2025P00002$18.8MTHIS REQUIREMENT IS FOR THE PROCUREMENT OF THE GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI), FOR PRODUCTION, SUSTAINMENT HARDWARE, TECHNICAL, LOGISTICAL, TEST, AND ENGINEERING SUPPORT FOR THE APACHE ATTACK HELICOPTER.
Apr 30, 2025P00002$18.8MTHIS REQUIREMENT IS FOR THE PROCUREMENT OF THE GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI), FOR PRODUCTION, SUSTAINMENT HARDWARE, TECHNICAL, LOGISTICAL, TEST, AND ENGINEERING SUPPORT FOR THE APACHE ATTACK HELICOPTER.
Nov 7, 2024P00001$0CHANGE THE QUANTITY ON SUBCLIN FROM 2 TO 1.
Nov 7, 2024P00001$0CHANGE THE QUANTITY ON SUBCLIN FROM 2 TO 1.
Aug 29, 20240$18.9MTHIS REQUIREMENT IS FOR THE PROCUREMENT OF THE GEN 2/3 RADAR FREQUENCY INTERFEROMETER (RFI), FOR PRODUCTION, SUSTAINMENT HARDWARE, TECHNICAL, LOGISTICAL, TEST, AND ENGINEERING SUPPORT FOR THE APACHE ATTACK HELICOPTER.

Estimated positioning window

Oct 25, 2026 – Feb 28, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2027-08-30 (309 days from calculation)
+35 points
124 historical awards in this buyer and category group
+15 points
13 recorded award transactions
+10 points
Latest award action: 2025-07-15
+0 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.